Partial decline of cyclone damage claim; additional damage not shown to be caused by the cyclone
Text of the determination
Determination
|
Case number
|
12-25-295799
|
Financial firm
|
Allianz Australia General Insurance Limited
Case number: 12-25-295799 21 May 2026
1 Determination overview
1.1 Complaint
The complainant (jointly) held a home building and contents insurance policy underwritten by the financial firm (insurer) covering loss or damage caused by insured events, including cyclones.
In April 2025, the complainant lodged a claim under the policy for damage to the property following Cyclone Alfred (which occurred in March 2025), including structural movement, cracking to walls and tile surfaces, and water damage.
The insurer partly accepted the claim. It agreed that the cyclone caused some water damage to the lounge room because of water ingress through the roof. However, it declined the remainder of the claim, saying that the additional damage was not caused by the cyclone. Instead, it said the damage resulted from pre-existing conditions including maintenance issues, poor workmanship, gradual deterioration, soil movement and atmospheric conditions.
The complainant disagrees and says the cyclone caused all the damage. He says the insurer should pay all the claim for damage, along with associated costs for temporary accommodation and storage expenses.
1.2 Issues and key findings
Is the insurer required to pay more of the claim?
No. The complainant has not shown, on the balance of probabilities, that the additional damage was caused by the cyclone. As the complainant has not established a valid claim for the additional damage, the insurer is not required to pay more of the claim for the damage, or any of the other associated costs, including temporary accommodation and storage expenses.
Is the insurer required to pay compensation for non-financial loss?
No. I am not satisfied that the insurer has mismanaged or unduly delayed the claim. The insurer is therefore not required to pay non-financial loss compensation to the complainant.
Why is the outcome fair?
I am not satisfied the complainant has established a valid claim for the additional damage and additional claimed costs. It would not be fair in the circumstances to require the insurer to cover these additional parts of the claim.
1.3 Determination
The determination is in favour of the insurer. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to pay the part of the claim it has already accepted less the applicable excess (if it has not already done so). It is entitled to deny the remainder of the claim.
2 Reasons for determination
2.1 Is the insurer required to pay more of the claim?
No. The complainant has not shown, on the balance of probabilities, that the additional damage was caused by the cyclone. As the complainant has not established a valid claim for the additional damage, the insurer is not required to pay more of the claim for the damage, nor any of the other associated costs, including temporary accommodation and storage expenses.
There is damage to the property
The insured property is a residential house owned and occupied by the complainant and insured under a home building insurance policy underwritten by the insurer. The house is two storeys with timber-framed walls and plasterboard internal linings, and was constructed in the 1970s. It is supported on a combination of masonry piers, timber bearers and joists.
In March 2025, Cyclone Alfred impacted the property, bringing severe winds and heavy rain. About a month later (in April 2025), the complainant contacted the insurer to lodge a claim. He reported damage from the cyclone (mainly on the right side of the house) including water ingress to the lounge room ceiling and cornice, as well as damage to the gutters, structural movement, cracking to walls and tiles, and other internal issues (including mould growth, floor sponginess and movement).
The insurer accepted that the cyclone caused some water ingress through the roof, which resulted in some water damage to the lounge room ceiling and cornice. However, it did not accept that the cyclone caused the remaining damage.
Policy cover is subject to terms, conditions and exclusions
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule.
The policy covers loss or damage to the insured property caused by an insured event. The PDS states at page 17 that the policy covers:
Loss or damage caused by:
• storm
• cyclone*
• rainwater
• run-off (provided run-off is not combined with flood waters)
Loss or damage caused by or arising from:
• soil movement, including erosion
• landslide
• mudslide
• subsidence
if it is caused directly by and occurs within 72 hours of a storm.
The policy excludes loss or damage caused by or arising from wear and tear, gradual deterioration or lack of maintenance, inherent defects and poor workmanship, soil movement; and atmospheric or climatic conditions.
Complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
Whilst there is no dispute that the insured event (the cyclone) occurred, the onus is on the complainant to show that the proximate cause of the additional claimed damage was the insured event. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
If the complainant is able to establish that the proximate cause of the additional damage was the cyclone, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Complainant says additional damage was caused by the cyclone
The complainant says the cyclone caused more extensive damage to the property than the limited damage to the lounge room accepted by the insurer. He says the intensity of the cyclone, including severe winds and prolonged heavy rainfall, caused water ingress and soil saturation, which in turn led to movement of the building and resulting damage. He also says that a falling tree caused damage to the guttering system and downpipe.
The complainant says the damage appeared during or shortly after the cyclone and was not present before. He has provided a pre-purchase building inspection report (dated 30 August 2023, when he purchased the house) which he says showed no significant structural defects or movement.
The complainant also says the extent of the damage is significant and requires major rectification works. He engaged a builder, BM, to inspect the damage and provide a repair estimate. BM estimated substantial repair costs of at least $325,000, including structural repairs, internal reinstatement, and associated works.
BM stated as follows:
· it observed structural movement and deformation, cracks, floor issues, and water-related damage
· the house was in ‘OK condition’ before the cyclone
· that it is ‘quite likely that the severe weather event [Cyclone Alfred] has created these structural deformities’.
Insurer’s experts say additional damage was not caused by the cyclone
The insurer says Cyclone Alfred caused only limited damage to the property, being water ingress through the roof which resulted in minor internal damage to the lounge room ceiling and cornice. However, it says the cyclone did not cause the broader structural damage, cracking, floor tile cracks, guttering and roofing issues claimed by the complainant. Rather, it says the remaining claimed damage resulted from pre-existing conditions, including maintenance issues, poor workmanship, gradual deterioration, soil movement and atmospheric conditions.
The insurer engaged external experts to investigate the cause of the damage, including a builder, ES, and an engineer, SP.
ES conducted a building and roof inspection in May 2025 and observed that the roof and wall cladding were in poor condition, with incomplete flashings, rusted and loose fixings, non-compliant installation of the roof and cladding, blocked gutters, and gaps around windows and cladding. It concluded that the cyclone did not cause, but rather, exposed these ongoing maintenance issues, as follows:
Recent weather events have simply exposed ongoing maintenance issues present at the property
ES also found that cracking to tiles and other internal areas (apart from the main bedroom) was not consistent with damage that would be caused by the cyclone, and that some damage was due to poor workmanship or pre-existing conditions. ES’s report contains photos and comments about these areas, for example:
· ‘window outside lower bedroom has large gaps and not weatherproof’
· ‘some cracks to tiles however grout unaffected indicates this is not recent movement’
· ‘floor tiles don’t present in new condition but also no evidence of damage related to recent storm’
· ‘roof and gutters in poor condition, with incomplete flashings, rusted and loose fixings, and defects that would allow water entry, indicating ongoing maintenance issues rather than storm-created damage’
· ‘guttering found to have missing connection to downpipe also presents in poor condition where it [is] difficult to determine if this was in a serviceable state prior to event’.
However, I note that in relation to the main bedroom, ES provided some photos of cracking to the ceiling along the cornice and said that this was ‘most likely due to movement during storm’.
The insurer also obtained an engineering report from SP, which involved an inspection of the property and review of relevant material. SP concluded that:
· the internal cracking (including to walls and ceilings) was consistent with long-term movement. It says that:
> some areas showed there had been previous patch repairs
> this cracking and separation occurred along junctions, corners and openings, which shows that this has arisen due to the expansion and contraction of building materials over time
> there was ‘no evidence of movement or distress to the building fabrics to indicate the footings experienced sudden or abrupt movement as a result of the storm event’
> SP also did not agree with ES’s finding that the lounge room cornice cracking was caused by the cyclone. SP said that as with the other cracking and separation observed in other areas, this cracking was around the junction only and had also had prior patch repairs. SP also concluded that ‘we did not note signs of water ingress or damage to the ceiling lining plasterboard in this room’.
· cracking to floor tiles was localised and ‘appears to be aged with rounded and dulled edges’ rather than recently caused
· the other wider structural and building damage was not caused by the cyclone, and was caused by a combination of long-term movement, poor workmanship, and pre-existing conditions. SP found that:
> the observed damage pattern was localised (for example, cracking to isolated walls and ceilings throughout different areas of the house) and irregular. SP said that there was no uniform damage nor clear signs of building rotation or subsidence that would ordinarily result from a structural movement or foundation failure caused by a cyclone
> the water ingress came through the roof above the lounge room. There was no water ingress anywhere else, nor did SP make any finding of subsoil or water saturation underneath the house, or water impacting on the subfloor area.
> the roof damage observed showed there were pre-existing defects and deterioration such as incomplete flashings and rusted and loose fixings, rather than storm damage.
Complainant has not established a valid claim for the additional damage
Based on the exchanged material, I am not satisfied the complainant has established, on the balance of probabilities, that the cyclone caused the additional damage to the house.
I have carefully considered the complainant’s submissions and supporting material. I accept that the cyclone was intense, and involved heavy and prolonged rainfall and very strong winds. However, the material does not show that the cyclone was the proximate cause of the damage observed. In particular:
· I acknowledge the complainant’s submission that the pre‑purchase inspection report reported overall that the property was in sound condition about a year prior to the cyclone. However, its overall finding of a ‘sound’ condition was also limited to only some sections of the property. More critically, it identifies numerous issues, including:
> gutter corrosion and an area where it was about to fall off
> problems with the downpipes
> the piers, stumps and concrete supporting the house being in ‘poor condition’ with movement in the stumps supporting the rear deck
> pre-existing internal movement cracking in ceilings, walls and tiles (rating the condition of the wall framing and sheeting as ‘poor’)
> uneven floors in various rooms.
· even if these issues had not been identified, a pre-purchase report is not analogous to a causation report. It does not address how or why later damage may have occurred, even if I was to accept (which I have not) that this damage was not present at the time of the property purchase. The complainant has not shown he addressed or fixed the issues identified in the report
· BM’s opinion that it is ‘quite likely’ the cyclone caused the damage is expressed in general and tentative terms. It does not provide an explanation of how it was caused (for example, how soil saturation from the cyclone resulted in the observed pattern of cracking and movement in some areas and not others). BM also attended the property in late 2025, about 9 months after the cyclone.
· the complainant’s position relies in part on the conclusion that prolonged rainfall caused soil saturation leading to structural movement. However, I note that the complainant has not shown (such as through photographs) that there was any contemporaneous or prolonged subsoil or ground saturation beneath the house. From the photographs observed, the property is on a slope and it is likely that water drained away from the house after the storm event.
· the complainant has also not shown that the soil movement observed occurred within 72 hours of the cyclone. Even if I was to accept (which I have not) that the soil movement was caused by the cyclone, it also has to occur within 72 hours to be covered by the policy. The complainant has not shown this
· the complainant has not shown that the severe winds that came with the cyclone were also the cause of any of the additional damage. For example, the material he has provided does not show or explain how the wind could have led to the type of cracking and movement seen in the property. The material does not show other damage such as uplift of the building frame or storm-created openings other than the roof opening already accepted by the insurer.
· the complainant has also not shown how the other damage identified (such as gaps and holes in the cladding and the gutter and downpipe damage) was caused by the cyclone. For example, there is no report or photographs from the time showing the tree that impacted the gutter, or any other material (such as maintenance or repair records) showing that this damage did not exist prior to the cyclone.
By contrast, the material provided by the insurer, particularly the engineering report from SP, provides a detailed, technical and reasoned explanation of what caused the damage. SP identified features such as cracking along junctions, corners and openings, and prior patch repairs, and explained why this showed that the damage was caused over time rather than by the cyclone. SP further identified that the water ingress was limited to the roof above the lounge room, with no signs of water ingress elsewhere (including underneath the house).
I have also placed weight on ES’s findings about the condition of the house, including the photographs and associated comments. ES provided photos showing incomplete flashings, explanations of non-compliant installation and gaps in cladding. ES also explained why the cracking to tiles and other internal areas was pre-existing and not caused by the cyclone.
The information (including photographs) in the complainant’s pre-purchase report also supports SP’s and ES’s findings on the condition of the house, and shows their pre-existing nature.
The complainant has also raised concerns that the insurer did not properly investigate the cause of the damage, including by not undertaking floor level measurements, subfloor inspection, moisture readings, soil or footing analysis, or cyclone load modelling. However, I am not satisfied that this was necessary for the insurer to do in the circumstances. While further testing may have provided additional detail, the available information already provides a reasoned explanation of the damage. In any event, the complainant bears the onus of establishing that the damage was caused by the cyclone, and I am not satisfied that this has been met.
Lastly, I have considered the complainant’s claim for temporary accommodation and storage costs. However, these costs arise from the broader repair works the complainant says are required for the additional damage. The insurer has already accepted limited internal water damage to the lounge room ceiling and cornice, and there is nothing in the exchanged material that shows this accepted damage, on its own, has or will rendered the property uninhabitable or require the removal and storage of contents. Temporary accommodation and emergency contents storage is only payable under the policy when the insured event has caused damage to such an extent that the property cannot be lived in. As I am not satisfied that the additional damage was caused by the cyclone, I am also not satisfied that the claimed temporary accommodation or storage costs are covered.
Accordingly, the insurer is not required to pay any further amounts in relation to the claim.
2.2 Is the insurer required to pay compensation for non-financial loss?
No. I am not satisfied that the insurer has mismanaged or unduly delayed the claim. The insurer is therefore not required to pay non-financial loss compensation to the complainant.
AFCA can award compensation for non-financial loss
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
Compensation for non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Compensation is not warranted in the circumstances
The complainant says the insurer’s actions throughout the claim have caused him stress and inconvenience. In particular, he has raised concerns about the length of time he has remained at the property as the damage has progressively worsened, as well as the stress and inconvenience this has caused him. He has also raised concerns, which I have outlined above at 2.1, that he considers the insurer did not properly investigate the cause of the damage which meant it then made the incorrect claim decision.
Whilst I accept there has been some dissatisfaction, inconvenience and stress for the complainant, this is not unusual in the circumstances of a disputed insurance claim. While the complainant disagrees with the outcome of the claim, the exchanged information shows the insurer arranged inspections, obtained expert reports and considered the available material before making its decision. There is no indication of unreasonable delay, misconduct, or poor claims handling conduct by the insurer that would warrant an award of compensation for non-financial loss in these particular circumstances.
2.3 Why is the outcome fair?
I am not satisfied the complainant has established a valid claim for the additional damage and additional claimed costs. It would not be fair in the circumstances to require the insurer to cover these additional parts of the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.