Dispute over the scope and cost of repairs for storm damage and cracking caused by the absence of guttering
Text of the determination
Determination
|
Case number
|
12-25-292592
|
Financial firm
|
AAI Limited
Case number: 12-25-292592 10 April 2026
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy underwritten by the financial firm (insurer). They lodged a claim for hail damage at the home from 20 January 2020. The insurer accepted the claim.
Before the insurer undertook repairs, further storms caused more damage. The home was left without any guttering or effective stormwater management for about 10 months. Consistent rain saturated the surrounding soil, causing movement and cracking inside the home.
The insurer acknowledges that some damage was caused through the absence of the gutters. It considered the damage was mostly cosmetic and offered to pay $48,524 for repairs plus $5,000 as compensation for non-financial loss.
The complainants rejected the offer. They seek up to $483,600 based on a quote from builder SH to resolve the matter, as well as compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer’s settlement offer fair?
No. I am not satisfied the insurer’s offer is sufficient to resolve the matter.
How should the matter be settled?
The insurer is required to appoint new experts as directed in section 2 of this determination. These experts must quote to repair all cracking and movement damage in the home and to address the foundations, as necessary.
Is an award of compensation warranted?
Yes. The insurer is required to pay compensation for non-financial loss of $5,000 in total.
Why is the outcome fair?
The parties agree that leaving the home without guttering for an extended period caused significant damage. The insurer agrees it is liable for this. It is fair that it quotes and attends to the necessary repair work, unless the complainants prefer a cash settlement. Further, the significant delays warrant payment of compensation.
1.3 Determination
The determination is substantially in favour of the complainants.
Within 14 days of acceptance of this determination, the insurer is required to take steps to begin the repair process. This includes nominating local experts for the complainants to choose from and resolving the claim as set out in section 2 of this determination.
The insurer is also required to pay compensation of $5,000 for non-financial loss.
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair?
No. I am not satisfied the insurer’s offer is sufficient to resolve the matter.
No dispute there was damage caused to the home after the original claim
The insured home is a single storey brick veneer building constructed in or about 1968. More than one of the attending experts described it as being in ‘good condition’ prior to the loss.
The complainants purchased the home in or about 2013. It is not in dispute that:
· the complainants lodged a claim for storm damage which occurred on 20 January 2020
· this storm damaged and detached gutters from around the home’s perimeter
· the insurer agreed to cover the damage and set about arranging the necessary repairs
· before the work was done, further damage occurred at the home.
The complainants say rainwater was unable to discharge into the stormwater system due to the absence of gutters. Water then flowed under the home and into the reactive clay soils. This caused significant damage and the home now requires underpinning to restore structural integrity. The complainants seek cover for $450,000 to address this damage.
Whilst acknowledging weather events after the claimed loss caused damage that was avoidable, the insurer considers the extent of this damage was limited. It offered to pay $48,524.42 based on a scope of work (SOW) from repairer RC from 23 March 2024 for $40,437.01 and a contingency uplift of 20% ($8,087.41).
Complainants’ expert initially said damage was cosmetic
The displaced guttering from the January 2020 event was replaced in or about October 2020, meaning the home was left without effective or adequate guttering for about 9-10 months.
The complainants arranged for structural engineer SC to attend the home. It provided a report dated 4 December 2020. SC found:
· there were some internal cracks and separation of internal walls, particularly at the interface with the ceiling cornices
· recent ‘above normal seasonal rainfall’ over the last 6-8 months had affected the area
· cracking was due to abnormal moisture conditions caused by the delays encountered in re-fitting the displaced drainage gutters
· rainwater had discharged directly to the external perimeter of the home, instead of into the stormwater system, due to the absence of the gutters
· this meant the external foundations had experienced ‘differential lifting when compared to the internal foundations’
· repairs should be ‘cosmetic in nature’
· they should be delayed 12-18 months to enable the soil to return to equilibrium.
Insurer’s experts provided differing views about the damage
The insurer asked consulting engineer JH to attend the home. JH wrote on 9 April 2021 that:
· a floor level survey showed differential settlement of up to 39mm across the home, with the worst affected area being the bathroom
· based on Australian Standard AS 2870, cracking damage observed at the home is at category 2 (slight – cracks between 1-5mm)
· this is considered ‘a normal part of household maintenance’ and there is ‘no structural concern’ for the home
· stabilising the moisture conditions of the clay should resolve the issue.
Some of the photos showed significant cracking and movement gaps in the home. Despite its view that the cracks were not serious, JH suggested that jacking or re-levelling the floors may return these areas to their original position.
A building report from KB on 8 June 2021 confirmed the lack of stormwater drainage caused damage to the home. It reported there was ‘no internal cracking or movement damage evident prior to that event’. KB also suggested the bathroom no longer had ‘the correct fall for the drainage due to the movement of the floor levels’.
KB informed the insurer it could not warrant any work ‘due [to] the high subsoil moisture content, the instability of the soils and the property state in general’.
Building consultant and engineer, CR attended the home on 22 December 2021. It found:
· the condition of the soil was normal and consistent with it being exposed to ‘normal climatic conditions’
· a floor level survey found there was ‘significant movement’, with differences of up to 39mm across the internal floor area
· there is no reason any repair work cannot be conducted now.
Geotechnical engineer AC prepared a report for CR, dated 16 December 2021. AC found:
· cracks evident in the home are ‘indicative of foundation movement’
· surface movement indicates the site is ‘highly reactive’
· with rain being unable to go through the absent gutters for 10 months, water would have created ‘abnormal moisture conditions’ adjacent to the home
· this caused ‘wetting and swelling of the foundation soils’, although it is ‘impossible to prove or disprove the extent of abnormal moisture conditions during that time’
· underpinning or soil stabilisation is ‘often not effective’ in fixing house cracks
· some of the floor joists have separated from the internal stumps and posts.
Experts disagree on whether the home should be underpinned
Geotechnical engineer DN attended the home on behalf of the complainants. DN broadly agreed with the findings of AC. It provided a report dated 15 June 2022, in which it found:
· lifting and packing the floor frame is appropriate if underpins are provided for the entire structure and other precautions taken
· this should ensure any future soil movement due to moisture changes would be ‘isolated from the foundation system and therefore the house structure’.
AC later provided a second report dated 5 September 2022. It noted cracking due to shrinking and swelling of moderate to highly reactive soils are ‘notoriously difficult to remediate’.
On 18 December 2023, CR provided a written response to the findings of DN. It acknowledged the proposed underpinning method of repair would ‘likely assist in reducing the future overall seasonal movements’ at the home. However, it considered the damage caused by the absence of gutters did not require this to be done.
CR considered there were ‘other viable methods’ which were ‘more appropriate’ and cost effective to address the damage. It also says DN did not consider the likely impact of surrounding trees. CR considered the ‘underpinning solution’ was not required to address the problems at the home. It says it will be sufficient to repair the wall cracks and re-level and repack the floor structure.
Consulting engineer GD for the insurer provided a report dated 19 December 2023. GD also reviewed the opinion of DN and found:
· the degree of variation (39mm) discovered in the floor level survey fell below the threshold for ‘normal expected movements’ of 45mm
· most of the damage internally is less than category 2, which is normal, meaning ‘it is reasonable to hold that no damage has occurred’
· underpinning is not required
· the bathroom was reportedly installed in 2012 and ‘is consistent with a non-compliant construction’ based on Australian Standard AS 3740 clause 4.9.1 and is ‘unrelated to any footing movement’.
Civil engineer and building consultant SW then visited the complainants’ home at the request of the insurer. SW’s subsequent report of 6 February 2024 found:
· if the soil was as reactive as DN suggests, there should be ‘significant cracking’ in the external brickwork, not only the internal areas
· this would mean any repair work to be done could not be warranted, because of the ‘highly reactive nature of the soil’
· the damage present is limited to ‘cosmetic and minor cracking’ and was not caused by the claimed event. It was only exacerbated by the absence of the gutters
· the resultant damage is limited to 1mm cracking of the external brick veneer walls and minor cracking to the plasterboard wall linings in the residence (except in the kitchen and bathroom)
· the home was not ‘adequately constructed in accordance with the relevant standards at the time of original construction’ and would not comply with current codes or standards.
Concerns with some of the opinions offered about the damage
SW cited concerns with alleged breaches of building codes which were not applicable at the time of construction. I acknowledge the 2010 codes may have been applicable at the time of renovation. However, it is not clear how any alleged breaches are relevant to the claimed damage or why it should limit the complainants’ claim.
Based on SW’s opinion, the insurer says there are ‘preexisting non-compliant structural issues’ at the home. This is why it is unable to warrant any repairs. SW considered:
the proximate cause of damage to the southern end of the kitchen, as well as the bathroom floors, is consistent with non-compliant building work, specifically the insufficient fixing and support of the structural floor frame during the 2014 renovations of the property.
Except for GD, this is not an opinion shared by any of the other experts. GD merely said the bathroom damage is not related to footing movement. A detailed analysis of the bathroom damage was not done. Further, SW believes the renovations were undertaken in 2014, whereas elsewhere it is said these were done in 2012.
Significantly, only DN seems to consider that underpinning is necessary to repair the home. Most of the other experts consider other options are available. This is not to say underpinning could not be a viable option, only that it is not the prevailing view.
Existing repair quotes are not helpful and cannot be relied upon
RC’s quote to address the damage totalled $40,437.01. It formed the basis for the insurer’s offer for settlement. I note RC’s business address is more than 300km from the insured address. The insurer says RC is not prepared to warrant the repairs and I therefore consider it is not an actionable quote.
An actionable quote is a retail quote which the customer can match in the marketplace. That is, an individual can rely on the quote to get the work done for the price cited in the document.
Clearly, that is not the case with the RC quote. Therefore, I am not satisfied it should be used as a basis for settlement.
The complainants obtained an undated quote from builder SH for $483,600. Whilst SH was a local builder, there was only a limited breakdown of the costs. The insurer says this quote includes ‘upgrades and repairs that are not required to repair the cracking caused by the lack of guttering’.
Without suitable analysis to support the view widespread repairs are required, I am not satisfied the SH quote should be preferred either.
This means a new quote to repair the damage is required.
2.2 How should the matter be settled?
The insurer is required to appoint new experts as set out below. These experts must quote to repair all cracking and movement damage in the home and to address the foundations, as necessary.
Satisfied any cracking damage in the home must be repaired by the insurer
The exchanged information shows that the insured home sustained damage and some measure of structural instability due to being left without gutters for an extended period.
This damage caused movement within the home, which is apparent in the provided reports and particularly the attached photographs. Importantly, despite the home’s age, there is no documented significant movement or damage present prior to the issues which arose after the initial claim.
I acknowledge that some of the insurer’s experts suggested that the documented movement of the flooring was within tolerance levels. This does not mean the insurer is not liable. There is no persuasive evidence any such damage was present in January 2020.
Further, the complainants say the cracking has not resolved since the event despite time for the underlying soil to dry. I accept there needs to be work conducted to repair this damage.
A pre-purchase inspection report from HB on 10 July 2012 found:
· the walls inside the home were in a ‘good structural condition’
· the floor frame appeared to have been ‘constructed in a proper manner’
· overall, the home was in a ‘sound condition’ for its age
· whilst there was sagging in some ceiling areas, no significant cracks were identified
· the footings were thought to be ‘adequate and stable’
· the subfloor was ‘adequately ventilated’ and ‘free of excessive moisture'.
The above indicates the home was in good condition before the complainants purchased it. It was already more than 40 years old at this time and is now more than 50 years old.
Further to this, the insurer would have inspected the home in the aftermath of the January 2020 event. It reported no concerns with movement cracks or pre-existing damage.
These factors confirm the home was in good condition for its age.
Based on this, I am satisfied the photos of cracking damage and the movement of the floors are evidence of the damage caused after the initial claim occurred. This is damage I am satisfied the insurer is liable for.
Evidence does not persuasively show the home requires underpinning
The parties disagree over whether underpinning is required. The complainants believe it is necessary and the insurer considers it is not. However, the insurer agrees that re-leveling of the stumps is necessary. It relies on the opinion of JH and says underpinning should only be used as a ‘last resort’.
The insurer’s view is that underpinning may not even be helpful.
DN suggested that any commitment to underpinning would have to extend to the whole building. JH considers this would not be recommended given the home is situated on reactive clay-based soil.
Earlier opinions about the damage attest to a waiting period being necessary to evaluate the extent to which underpinning or the re-leveling of stumps is required. I accept sufficient time has now elapsed, noting it is more than five years since the damage occurred (and more than six years since the original loss).
Any correction in the soil should have occurred by now. To the extent that cracking damage remains inside the home, I am satisfied the insurer is liable for this. However, the exchanged material is not persuasive in showing that underpinning is necessary. As any movement caused by the absence of gutters has now likely settled, I am satisfied an accurate evaluation of the damage can be done.
New experts required to evaluate loss and prepare SOW
A new builder and structural engineer must be appointed by the insurer.
These experts are to ascertain, quote and (at the discretion of the complainants) repair the claimed damage. The insurer must nominate at least two and up to three suitable builders and structural engineers for the complainants to chose from. The relevant experts must be from the complainants’ local area.
The chosen builder and engineer can then attend the property and ascertain a fair cost to repair the damage. This will include an assessment of whether underpinning is necessary. The builder must be prepared to undertake the work, and the insurer must be prepared to warrant it.
To be clear: I am satisfied the insurer is required to address all cracking and movement-related damage to the home. The inspection by the builder and the engineer is not to reassess to what extent the insurer is liable for the claimed damage. It is purely to ascertain what the damage will cost to repair and the best repair method.
Once the reports are obtained, the insurer must attend to the necessary repairs, unless the complainants choose to receive a cash settlement. If the complainants prefer the second option, the insurer must include a contingency uplift of 20%. This will compensate the complainants for the transfer of risk and the possibility of additional unseen damage.
Should the complainants not be satisfied with the final quote and repair options, they retain the option to return to AFCA for a further determination on these issues.
If it has not already done so, the insurer is also required to indemnify the complainants for any reasonable professional costs incurred for its engineers and builders. These reports were helpful in considering the loss.
Whilst AFCA usually imposes a $5,000 total limit on these costs, I am satisfied they arose from the insurer’s error in failing to secure the site after the initial claim. Therefore, it is fair the insurer pays any reasonably incurred expert costs in full. Any such payment must include interest pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from the date of any invoice provided, calculated until the date the amount is paid.
2.3 Is an award of compensation warranted?
Yes. The insurer is required to pay compensation for non-financial loss of $5,000 in total.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer offer for $5,000 for non-financial loss is fair
Acknowledging the complainants’ frustration with the claim and the delays, the insurer agreed to pay non-financial loss compensation of $5,000.
I am satisfied this is a fair amount. The claim was protracted and I accept the principal issue was avoidable if the insurer had either addressed the repairs quicker or undertaken make safe work at the time. I further acknowledge the wealth of expert opinion provided likely overwhelmed and frustrated the complainants.
The impact on them is obvious: there have been significant delays and damage caused to their home.
On balance, I accept the amount proposed to compensate the complainants is fair.
2.4 Why is the outcome fair?
The parties agree that leaving the home without guttering for an extended period caused significant damage. The insurer agrees it is liable for this. It is fair that it quotes and attends to the necessary repair work, unless the complainants prefer a cash settlement. Further, the significant delays warrant payment of compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.