Home / IAG / Determination 12-25-291940

Determination 12-25-291940

Insurer denied cover for ongoing water ingress after repairs under the original storm claim; AFCA required further repairs to the slab and slab-wall junctions

FirmIAG
Decided2026-07-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a storm water damage claim and paid for wall waterproofing repairs, but water kept entering through the slab and slab-wall junctions and it denied further cover as wear and tear. AFCA found in favour of the complainant and required the insurer to complete further repairs under the original claim, or cash settle with a 20% contingency.

The insurer accepted the original claim and was on notice of the slab as a cause, so it was fair and reasonable to require it to repair all remaining causes of the water ingress under that claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claimrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-291940 | Financial firm | CGU Australia Pty Ltd Case number: 12-25-291940 29 June 2026 1 Determination overview 1.1 Complaint The complainant is represented by BR, solicitor. Unless otherwise specified, both the complainant and BR will be referred to as ‘the complainant’. The complainant holds an accidental damage building and contents policy with the financial firm (the insurer) for his home in New South Wales (the property). He lodged a claim for damage to the property in December 2020. The complainant told the insurer water entered the ground floor of his two-storey home during a storm that occurred several days prior. The insurer investigated the circumstances of the loss and damage and accepted the claim. It concluded water had entered the property primarily through outer walls where waterproofing was deficient. The insurer then covered the costs associated with extensive remedial works designed to repair and improve waterproofing on several outer walls of the dwelling. Drainage was also installed. The works were completed in about February 2024. However, shortly thereafter, the complainant reported that water continued to enter areas of the ground floor, especially during heavy rainfall. The complainant says the repairs, therefore, did not fix the underlying cause of the damage. The insurer arranged for further inspections of the property. It then denied the claim for the damage caused by the ongoing water ingress. In summary, the insurer says: · the continuing water ingress is not related to the original defects in the walls and is not a result of faulty repairs undertaken during the three years or so following acceptance of the original claim · the persistent water problem is caused by defects and waterproofing deficits in the concrete foundation slab and slab-wall junctions which allow ground water to rise up into the ground floor of the dwelling · it is entitled to deny the claim for the damage caused by the continuing water ingress because it is a result of wear, tear and deterioration over time. Damage caused in this manner is excluded from cover under the terms of the policy · in any event, any policy entitlement the complainant may have regarding the persistent (post-repairs) water damage should be made via the lodgement of a new claim. The complainant disagrees. He says the insurer misdiagnosed the cause of the original water ingress in early 2021 and, consequently, whilst the repairs undertaken by the insurer may have been satisfactorily completed, they did not fix one of the underlying problems – that is, the water ingress through the concrete foundation slab and slab-wall junctions. The complainant says, therefore, the insurer should complete the necessary repairs to address all underlying causes of the water ingress problem. 1.2 Issues and key findings Should additional repairs be covered under the original claim? Yes. The insurer accepted the original claim after the storm in December 2020. It then completed repairs. Its repairs did not fix all causes of the water ingress, even though the insurer was put on notice about deficits associated with the concrete slab foundation and the slab-wall junctions. Although the repairs may have been satisfactorily completed (in that they remedied one cause of the damage), they did not rectify the deficits in the concrete slab. It is fair and reasonable that the insurer be compelled to complete further repairs to rectify the remaining cause of the ongoing, persistent water ingress. These further works should be completed pursuant to the original claim. Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer accepted the claim, but did not successfully repair all damage and rectify all causes of the damage · it is reasonable and appropriate that the insurer complete additional repairs to rectify all causes of the damage. 1.3 Determination This determination is in favour of the complainant. The complaint should be resolved in accordance with section 2.2, below, and the matters set out in this determination. 2 Reasons for determination 2.1 Should additional repairs be covered under the original claim? Yes. The insurer accepted the original claim after the storm in December 2020. It then completed repairs. Its repairs did not remedy all causes of the water ingress, even though the insurer was put on notice about deficits associated with the concrete slab foundation and the slab-wall junctions. Although the repairs may have been satisfactorily completed (in that they remedied one cause of the damage), they did not rectify the deficits in the concrete slab. It is fair and reasonable that the insurer be compelled to complete further repairs to rectify the remaining cause of the ongoing, persistent water ingress. These further works should be completed pursuant to the original claim. Complainant says the property was damaged accidentally The property includes a free-standing, two-storey, double brick dwelling constructed in about 1980. The dwelling has a pitched tiled roof and includes a double garage and a ‘granny flat’ area on the ground floor. The exchanged material indicates the complainant purchased the property in about June 2020. The policy documents show the property has been maintained in a reasonable condition. The complainant lodged a claim with the insurer in December 2020. He told the insurer a storm occurred on 16 December 2020 and caused water damage to the downstairs area of the dwelling. The insurer investigated the circumstances of the loss and damage and accepted the claim pursuant to the terms and conditions related to accidental cover. It arranged for MB, builders, to provide an assessment and a report in February 2021. MB identified the following longstanding waterproofing and drainage deficiencies at the property: · the external walls of the dwelling were in contact with ground fill · physical and waterproofing barriers had broken down and were failing, including those in the external walls and the concrete foundation slab · stormwater issues contributed to ongoing moisture problems. MB said these problems and defects allowed water to enter the dwelling laterally through external walls and, possibly, up through the concrete foundation slab. MB reported: From my discussions and observations with the insured water has entered from along the western wall and flooded the entire lower level by breaching the outer walls and it may have also penetrated from beneath the concrete floor, evident by small cracks in the floor and along tooled joints in the floor slab. MB said these conditions developed over time and were consistent with progressive deterioration. Nevertheless, MB recommended the claim be accepted and the insurer should cover the costs of repairing the damage. Complainant established a valid claim that was accepted by the insurer It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event or matter covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim. The policy provides cover for damaged caused by. Page 13 of the PDS says: Section 1 – Your Buildings and Contents What is covered Accidental Damage Cover Your Buildings and/or your Contents as set out on your Policy Schedule are covered if they are accidentally destroyed, accidentally lost or accidentally damaged. They are covered only if you own them, or are liable for their destruction, loss or damage. The terms ‘accident’ and ‘accidental’ are not defined in the policy documents. However, the Macquarie Dictionary provides the following acceptable definitions: ‘Accident’ means anything that happens unexpectedly, without design, or by chance. ‘Accidental’ means happening by chance or accident, or unexpectedly. In this matter, the insurer accepts the complainant did establish a valid claim for the damage caused accidentally in December 2020. Insurer paid for extensive repairs and remedial works PD, one of the insurer’s authorised builders, completed rectification works over the next three years. The repairs were extensive and cost more than $350,000. They involved works to reseal and waterproof an outer wall and the side of the house opposed to the garage, as well as the outer wall of the rear downstairs bedroom. Drainage was also installed. It appears no substantial remedial work was undertaken in regard to the concrete slab foundation. The exchanged material indicates the waterproofing and drainage works had been completed, certified, and were performing ‘as intended’ in February 2024. Water ingress continued after the works were completed Between about November 2023 and about April 2024 the complainant reported further water damage. He told the insurer water continued to intermittently enter the downstairs granny flat when storms occurred. The complainant says, therefore, PD’s works did not rectify the problems originally reported in December 2020. The insurer then arranged for a reinspection and further assessment of the property by SW, engineers and building consultants, in August 2024. PD was also present at the inspection. The insurer asked SW to determine, amongst other things, whether faulty repairs by PD were responsible for the persistent water ingress. SW found PD’s repairs were adequate. It reported: At the time of our inspection, we noted no evidence of water permeation through the external walls, where the aforementioned repair works have been completed. As such, in our opinion, the waterproofing and drainage works completed to the subject dwelling have been completed adequately and is performing its intended purpose. However, SW identified another cause; that is, water rising from beneath the slab due to a failed or missing vapour barrier, entering at the slab-wall junction. SW reported: We were of the opinion that the infill slab was not waterproof and was allowing subterranean water to ingress the rooms downstairs and the ingress was not caused by any defect with the repair works [by PD]. Significantly, upon inspection SW noted: Evidence of efflorescence within the internal brickwork wall separating the [downstairs] BIR and bathroom areas. Efflorescence within the brickwork is caused by moisture ingress, where the moisture enters and moves through the porous brick units and dissolves the soluble salts present. This mineral salt solution eventually finds its way to the surface by evaporation or hydraulic pressure, where the water evaporates, which in turn leaves behind a white deposit of mineral salts on the surface. From our observations, it is evident the experienced water ingress is emanating from the junction between the infill concrete slab and brickwork walls. SW also found poor sealing around the hot water system and recommended repairs. The insurer accepted this aspect of the claim and, on 24 January 2024, offered a cash settlement in the sum of $6,399. The exchanged material does not reveal whether the complainant accepted this cash settlement offer. In any event, issues regarding this particular damage do not form part of this complaint. Insurer denied the claim for additional water damage In summary, SW concluded the current water ingress and consequential damage is caused by long‑term deterioration beneath the slab, specifically, the vapour barrier beneath the concrete slab has been omitted or failed. SW says: In saying this, should a vapour barrier be present, the mechanism of failure indicates it is significantly deteriorated as a result of general wear and tear over an extended period of time (years). SW concluded this was not a problem which involved the external walls, as thought by MB. SW also says the damage reported in April 2024 is not related to the storm of December 2020. The complainant arranged emergency repairs through ST, professional cleaners and restorers. However, the insurer declined to cover these costs or the costs associated with any further repairs. The insurer says the cause of the ongoing water damage is long-term wear, tear and deterioration of the concrete foundation slab waterproofing system and not the storm of December 2020. In doing so, it relies upon the following policy exclusion set out on pages 13 to 14 of the PDS: What we will not pay for We will not pay for your Buildings or Contents which are destroyed, lost or damaged by: […] Rust, corrosion, gradual deterioration, depreciation, wear or tear […] The insurer also says it is entitled to deny the claim for the additional water damage because: · the repairs and remedial works undertaken by PD were completed satisfactorily · the persistent water ingress problem is not related to defective or incomplete repairs undertaken by PD · the damage related to the persistent water ingress was not caused accidentally · therefore, any policy entitlement the complainant may have regarding the continuing water damage should be made via the lodgement of a new claim. The complainant says the insurer should accept his claim in full, both in relation to the original damage reported in December 2020 and the further damage reported in early 2024, and either repair his home properly or cash settle him the cost of the necessary repairs. He says, as a result of the insurer’s claim denial, his home has still not yet been properly repaired, and he has not yet been properly indemnified for the original (and continuing) loss and damage. Complainant says MB misdiagnosed cause of damage The complainant says the insurer reached the wrong conclusion because MB initially misdiagnosed the cause of the water ingress in its report dated 2 February 2021 or, at the very least, failed to properly canvass all potential causes of the water ingress. He says this led to an incorrect and inadequate scope of works (SOW) being drawn up and, consequently, repairs that did not resolve all causes of the water ingress. The complainant says the insurer should be responsible for these failings and should, therefore, complete further repairs to rectify all causes of the damage, or cash settle him an appropriate sum so that he can make arrangements for the necessary repairs to be completed. He says further denials by the insurer will only exacerbate the stress, inconvenience and upset he and his young family have endured since the original claim was lodged. Insurer should cover the costs of additional repairs In all the circumstances, I am satisfied the exchanged material demonstrates it is fair and reasonable that the insurer should provide cover for the costs associated with further repairs to the concrete slab foundation and the slab-wall junctions. I am also satisfied these costs should be covered under the original claim and there is no need for the complainant to lodge a new claim. This is because of the following considerations. First, in its report dated 2 February 2021, MB clearly puts the insurer on notice that there are at least two potential causes of the water ingress. At pages 4 and 5 of its report MB says: [The complainant] described that water had entered the garage area and the self-contained unit, ‘granny flat’ area in the most recent rainfall events over December 2020 and January 2021…. From my discussions and observations with the insured water has entered from along the western wall and flooded the entire lower level by breaching the outer walls and it may have also penetrated from beneath the concrete floor, evident by small cracks in the floor and along tooled joints in the floor slab [emphasis added]. On page 7 of its report MB says: I was advised by the insured that water was pumping up into the floors from below the slab as well as the wall floor junction. Cracks do occur along tooled joints that are deliberately placed in the concrete surface to allow the slab to crack at these locations, particularly garage floors, this is a common construction practice. There are construction joints and tooled joints in the garage floor of this building. Due to poor or failed drainage these cracks most likely have provided an entry point for the moisture under the exceptional circumstances that have occurred. It is hard to determine the exact cause of the flooding to the lower levels…. MB summarised its conclusions on page 8 of its report as follows: To summarise, I believe that due to the exterior walls of the house being in direct contact with the fill material surrounding the house there has been a gradual breakdown of the physical waterproofing barriers such as a bituminous paint membrane applied to the walls and the silting up of the core drain, these factors therefore being the most likely cause of the water ingress into the lower floors. Whilst the problems regarding the concrete slab foundation are not mentioned in this summary, the excerpts from MB’s report set out above clearly show MB also considered the concrete slab issues to be a potential cause of the claimed damage. Indeed, some remedial works on the concrete foundation slab are mentioned under the ‘Schedule of Works’ commencing on page 35 of MB’s report: Allow to grind the slab surface and remove any rough surfaces or peeling surface paint and seal the surface with a proprietary floor sealer, fill any cracks and caulk all joints to the entire floor area according to the manufacturer’s directions and AS 3740. Second, the insurer accepted the original claim after the storm in December 2020, apparently without restrictions or conditions regarding the nature of the required repairs. There is nothing in the exchanged material which indicates the insurer’s claim acceptance was restricted to only covering the costs of repairs to the walls of the dwelling. Moreover, there is nothing in the exchanged material which indicates the insurer would have denied the original claim had it adequately focussed its attention upon the concrete slab foundation issues as well as the external wall issues. Third, SW’s evidence confirmed conclusively that a primary cause of the water ingress, both in 2020 and currently, is the deficits regarding the concrete slab and the slab-wall junctions. SW concluded: · water rose from beneath the slab due to a failed or missing vapour barrier · water entered the property at the slab-wall junctions · the observed patterns of water ingress are not consistent with moisture permeation through the external walls, but rather, seepage through the joint between the wall and infill concrete slab. This is evident in the locations of water ingress being mainly along the internal walls. SW did not say that the failed or missing slab vapour barrier (or the issues with the slab-wall junctions) only became problematic after 2021. Indeed, the reasonable and rational conclusion is that this cause, clearly identified and explained in detail by SW, was present when MB inspected the property in 2021. Fourth, despite the observations by MB, the SOW relied upon by the insurer and PD during completion of the repairs in the years following the storm of December 2020 contained only minimal works on the concrete slab and the slab-wall junctions. Whilst PD’s works likely remedied the problems with the external walls, the reasonable conclusion to draw is that the repairs did not remedy the concurrent slab issues. In essence, PD’s repairs did not remedy one cause of the water ingress, even though the insurer was put on notice of deficits regarding the concrete slab foundation. Although PD’s repairs may have been satisfactorily completed (in that they remedied one cause of the damage), they did not rectify the deficits in the concrete slab foundation and the slab-wall junctions. Fifth, the complainant has also raised concerns about PD’s rectification works, specifically, that they were not completed to scope. Significantly, the complainant says there is no evidence showing the waterproofing installed by PD was extended at least 500 millimetres below the footing level. The complainant says there are no photographs showing waterproofing below the footing or any aggregate lines at the base of the excavated trench. Instead, he says the photographs show waterproofing applied over damp footings. Whilst the complainant has not provided any expert evidence to show the waterproofing is non‑compliant, he relies on SW’s email dated 29 October 2024, which notes that the waterproofing membrane did not extend down to the footing and that a fillet was required at the wall and footing junction. The email also records that SW requested ‘as‑built’ photographs and waterproofing certification from PD, but these were not provided. The additional works undertaken by the insurer will provide a further opportunity to investigate whether PD’s repairs were completed to scope and in accordance with applicable standards. If not, the insurer must remedy any defective or deficient repairs. In conclusion, and in light of these considerations, I am satisfied it is fair and reasonable that the insurer be compelled to complete further repairs to rectify the remaining cause of the ongoing water ingress, being the deficits regarding the concrete foundation slab and the persistent problems with the slab-wall junctions identified by SW. These further works should be completed pursuant to the original claim. 2.2 Claim should be resolved in this way Time is of the essence Within 14 days’ notice that the complainant accepts this determination, the insurer must confirm claim coverage insofar as it relates to the ongoing water ingress (pursuant to the original claim lodged by the complainant in December 2020) and begin to process it in accordance with the terms and conditions of the policy and the matters set out in this determination Within 28 days’ notice that the complainant accepts this determination, the insurer must engage a qualified builder, engineer and/or other suitably qualified expert (who has not previously inspected the property) to attend and inspect the property. This expert(s) must draw up a detailed SOW regarding the necessary repairs and associated works required to repair the claimed damage regarding the concrete slab foundation and the slab wall junctions identified by SW. Any deficiencies in PD’s repairs that are discovered during this process must also be accounted for in the SOW. After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and New South Wales building-related, safety-related and health-related laws, regulations and codes. Within seven days of receipt of the associated quotation(s), the insurer must elect to either: · agree to commence the necessary repairs and associated works as soon as possible, or · offer a cash settlement to the complainant based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required. As set out above, the additional works undertaken will provide a further opportunity to investigate whether PD’s repairs were completed to scope and in accordance with applicable standards. If it is discovered they were not, the insurer must also cover the costs associated with works to remedy any defective or deficient repairs. The insurer must also assess whether the complainant and his family will require temporary accommodation and storage of contents while the repairs and remedial works are being undertaken and, if so, assess these benefits in accordance with the terms and conditions of the policy. If such benefits exceed the policy limit the insurer should cover them in any event. Finally, I have not made a finding regarding legal or professional costs incurred by the complainant during the course of this complaint. However, I consider BR’s submissions were detailed, rational and helpful during the analysis of the issues involved in this matter. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer accepted the claim, but did not successfully repair all damage and rectify all causes of the damage · it is reasonable and appropriate that the insurer complete additional repairs to rectify all causes of the damage. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. Whilst the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.