Determination 12-25-287381

Storm damage claim partly declined; cash settlement of accepted repairs with 20% uplift

FirmAllianz Australia
Decided2026-06-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$521
Non-financial loss—
Amount claimed$52,500
SourceAFCA PDF

Summary

The complainant claimed storm damage to his home after a January 2025 storm and sought full cash settlement of builders' quotes. AFCA found the insurer correctly accepted only part of the storm damage and ordered a cash settlement of $521.38 after the excess, applying a 20% uplift to the insurer's repair quote.

The complainant must establish a storm-caused loss; the evidence did not show sunroom, electrical, roof or mould damage was caused by the storm, so only accepted repairs are payable.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-287381 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-287381 30 April 2026 1 Determination overview 1.1 Complaint The complainant holds a building insurance policy issued by the financial firm (insurer). On 16 June 2025, the complainant lodged a claim in respect to damage to the property following a storm on or about 20 January 2025. The complainant reported leaks from his roof and damage to a side gate of an external fence. The insurer accepted resultant damage to ceilings in particular rooms and damage to the fence panel. The insurer says the minor water staining to the ceilings can be sealed and painted. It obtained a scope of works for these repairs and a cost estimate in the amount of $4,601.15. The insurer said the scoped works is less than the excess amount payable by the complainant under the policy of $5,000. Therefore, the insurer said it was not required to pay the claim. Further, the insurer declined cover for damage to the sunroom (including the ceiling), the roof and electrical works. It says any damage to these areas was not caused by the claimed storm and exclusions apply. The complainant says the ceilings, including the sunroom ceiling, require complete replacement due to water damage caused by the storm. He has obtained quotes from builders ranging between $42,580 and $52,500 (exclusive GST). The complainant wants the insurer to accept the claim in full and cash settle the claim based on his builder’s quote. The insurer made an ex-gratia offer of $1,000 in order to resolve the complaint which was not accepted. 1.2 Issues and key findings Has the insurer correctly assessed the claim? Yes. I am satisfied that the insurer has offered to cash settle the repair of damage more likely related to the claimed storm event. The insurer’s repair method is appropriate. Why is the outcome fair? The outcome is fair because the complainant has not established a valid claim in respect to the damage to the sunroom and electricals. It would not be fair to require the insurer to settle the claim based on any of the complainant’s builders’ quotes where the expert information does not show that extent of work is reasonable and necessary to repair storm related damage. 1.3 Determination This determination is in favour of the insurer. If the complainant accepts the determination, within 14 days of being notified of that acceptance, the insurer is required to make a cash settlement payment to the complainant of $521.38 in accordance with section 2.1 below. 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim? Yes. I am satisfied that the insurer has offered to cash settle the repair of damage more likely related to the claimed storm event. The insurer’s repair method is appropriate. Complainant must establish a valid claim The complainant has the initial onus of establishing he suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). If the complainant can establish he suffered a claimable loss, the onus shifts to the insurer to show, on balance: · it is entitled to rely on an exclusion under the policy, or · it is otherwise entitled to decline the claim. Policy covers damage caused by storm subject to exclusions The terms and condition of the policy are set out in the product disclosure statement (PDS) and certificate of insurance (COI). The COI shows that during the relevant policy period 21 May 2024 to 21 May 2025, a $5,000 excess applied for buildings cover. It also shows optional ‘accidental damage’ cover was not in place. At page 17 of the PDS, the policy provides cover for loss or damage caused by storm. There are specific exclusions which apply to this cover including loss or damage caused by: rainwater, run-off, hail, wind or water that enters your buildings through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone, or, if you’ve selected the optional cover Accidental Damage and it is shown on your policy schedule). From page 53, the PDS sets out a number of general exclusions which apply to all sections of the policy. This includes loss or damage which is the result of, caused by or arises from: · wear and tear including depreciation, gradual deterioration, or lack of maintenance, · inherent defects including faulty design or materials, structural defects or poor workmanship, · anything not directly related to one of the insured events, · rust damp or chemical damage which includes loss or damage caused directly or indirectly by mould. However, there is cover for loss or damage when it is a direct result of an insured event, and · consequential loss which means there is no cover for anything not expressly described in the cover sections of the policy. Relevant to the issues in dispute, page 60 the PDS says the following in respect to repair methods when a claim is accepted: If we agree to cover your claim for loss of or damage to your buildings, we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. At our discretion (acting reasonably), we may: • enter into a contract with a builder to repair or rebuild your home, or • pay you the reasonable cost of repairing or rebuilding your home in cash or cash equivalent. When it is not possible to use original materials during the repair or rebuilding process, we will make best efforts to use the nearest available equivalent to the original materials… In respect to the excess, at page 14 of the PDS, the policy says: Unless we state otherwise in the PDS, you will need to pay the applicable excess(es) as a contribution to your claim… We will only pay the claim if the claim amount is more than the excess(es) that apply… Insurer’s builder says certain damage was not caused by storm The primary issues in dispute are · the insurer’s decision to decline cover for the sunroom and electricals, and, · the adequacy of the insurer’s repair method and quote to rectify accepted damage. To assist with the assessment of the claim, the insurer engaged builder, KA, to assess and report on the cause of the damage. KA attended the site on 9 July 2025 and provided a make safe report dated 14 July 2025. This says: · no storm related damage to light fittings in the bedroom. The water ingress to the house is approximately 2m away from the subject light. · the owner advised of an issue with the power to areas of the house. Tripping after usage of the rear external outdoor area wall heater and tv. He says this began before the storm event. At the time of inspection, the power was operating normally, · photographs are provided titled ‘maintenance damage photos’. These show staining to the ceiling of a covered patio area, the use of a tarp over a sliding door, and a light fitting. KA inspected the roof on 11 July 2025. KA’s roof report dated 18 July 2025 says: · the home is approximately 50 years old, · it has a concrete tiled main roof with a metal roof at the extension, · the roof is of average condition, · the following possible water entry issues were found: Roof sheets on back flat roof are not full length with joined sheets and patch repairs on the roof. No weep-holes installed in top ridge caps on main roof. · the damage to the roof was not caused by a single storm event and there were no storm created openings, · the damage is due to workmanship, · an inspection inside the ceiling cavity was not conducted, and · the presence of roof sarking to the main roof was confirmed. The roof report contains a number of photographs. KA’s building assessment report dated 18 July 2025 says: · the customer reported leaks and damaged fencing observed in January 2025, · there appears to be both long term and single event related damages, · KA says a contributing factor to the damage has been ‘Poor workmanship to the metal roof installation. No weep holes in the ridge tiles’, · A maintenance issue was identified being ‘General crazing and peeling of ceiling paint of internal rooms indicating adhesion failure and end of life of original paint. Long term damage noted’ · With respect to event related damage, KA identified: > minor water ingress to several internal rooms, > buckled sheet of an external fence. · KA’s report contains photographs of: > ceiling stains/peeling paint in the open plan area, bedroom 2, bedroom 3, games room, > unrelated cracking in bedroom 3, > a point of leak above the doorway of the rumpus at the back of the house. No damage was noted to the rumpus room itself. > a tarp in the adjoining sunroom over the leak area above the doorway. KA says the roof is leaking above the doorway near an electric shutter, > marks/staining on the ceiling and swollen timber trims/fascia in the sunroom, > a dislodged panel of a side fence that had been propped up. KA provided a scope of works dated 22 July 2025 in the amount of $5,857.79 (inclusive GST) (KA quote). The scope includes: · sealing and painting of ceilings in bedrooms 2 and 3, games room, open plan area, and sunroom, · the replacement of swollen timber in the sunroom only with a note ‘no rotted/long term damage included’. · replacing the side fencing, and · furniture removal. The exchanged information includes an email from KA to the insurer dated 23 October 2025 in which KA says: [KA] has made a judgment based on visual observations: the newly stained areas are noticeably darker, while sections of peeling paint and other unrelated areas appear dry, flaky, and show no signs of dampness. No formal moisture readings have been taken. On 22 July 2025, the insurer wrote to the complainant declining the claim on the basis that KA found the damages inspected were not from a one-off insurable event. The water ingress and claimed damages would not have occurred if not for the poorly installed metal roof and lack of weep holes to the main roof. On the same day, the complainant raised a complaint. Following an internal dispute resolution (IDR) review, on 18 August 2025, the insurer partially accepted the claim. It agreed to cover storm related damage to the fence panel and ceilings in bedrooms 2, 3, games room and the open plan area. It says based on the KA quote, the repairs of the accepted damage amounts to $4,601.15. The insurer continues to decline cover for damage to the roof and sunroom because it says this is the result of wear and tear, lack of maintenance, faulty design and poor workmanship which are excluded causes. Complainant’s expert information The complainant says: · there were no roof leaks at the property before the storm event, · his family continue to live at the property where mould has developed and paint is peeling, · the ceilings in three bedrooms, the lounge room, outdoor patio/sunroom, kitchen and dining room require replacement, · KA did not inspect the roof space, and · electrical works are required. In support of his position, the complainant has provided: · a number of photographs of the property. Among other things, these show staining and peeling paint on certain ceilings, · a quote from SG construction company dated 20 April 2025 for the repair of storm related damages. The total quoted is $45,000 and includes: > supply and installation of new light fixtures to ‘replace water damaged lights from water leaking through the ceiling’, > supply and installation of plasterboard for the ceiling of three bedrooms, lounge room, outdoor patio, kitchen and dining ceiling. The quote says ‘mould pattern Gyproc and cornice included in the price’. > replacement of the side fence, > ‘Painting of new plaster board ceiling after repairs and removal of mould on some internal walls and new paint to walls in all bedrooms’, > repairs to some parts of the wardrobe ‘from swelling and some architraves around doors’. > a note ‘This quote is based on documentation provided by the client which did not included engineer documents or complete scope of works’ · a document titled ‘scope of works and tender specification’ from builder SBG dated 6 June 2025 which includes various photographs. The total quoted is $42,580 plus GST and includes repairs to storm related damages as follows: > ‘remove and repair gyprock works to 3 bedrooms, lounge room, kitchen and dining room and outdoor patio’, > repairing fence, > all works to be carried out like for like which include all custom patterns and moulded gyprock and cornices, and. > electrical works to facilitate the repair · a second document titled ‘Scope of works and tender specification’ from builder SBG dated 6 June 2025. This includes commentary under the heading ‘Cause of damage’: Upon inspection, it was noted that the water ingress which caused this damage was related to a heavy storm downfall. This was determined onsite after visual inspection of the roof and water tests that we conducted. The extent of the damage and locations mostly effected also point to the cause being storm related · a quote from builder, AS, dated 27 November 2025 in the amount of $52,500 plus GST. The quote includes: > the supply and installation of gyprock, cornice, ceiling insulation, pant, labour. There is no detail provided about the particular rooms to which this work relates and no measurements have been supplied, > accommodation costs for 6 weeks in the amount of $3,500. · a report from AS dated 22 November 2025 which says: > upon inspection, every room has water damage to the ceiling and cornice, > he has no doubt the ceilings need to be removed and replaced, > mould is already starting to appear in some rooms on the ceiling and in the roof space, > the roof insulation is still damp at the date of inspection, > there is moisture in the ceilings based on readings he obtained, and > it is generally recommended that gyprock plasterboard is replaced after being substantially wet. Insurer has correctly assessed the claim Taking a balanced view of the exchanged information, I am satisfied the insurer has correctly assessed the claim based on the KA reports. This is since: · KA confirms the minor ceiling staining which is attributable to the storm can be appropriately rectified by stain sealing and repainting. There is no convincing information indicating this would not be sufficient, · the exchanged information does not show that it is necessary to replace the ceilings in order to address the storm related damage. In particular, > I am not satisfied a replacement of the ceilings is necessary based on the extent of the damage shown in the photographs provided by KA and the complainant, > the complainant’s builders have not provided a well-reasoned explanation as to why the ceilings require replacement, > I acknowledge the complainant says the damaged ceilings have patterned gyprock and any works to repair the ceiling should restore this pattern. Even if I were to accept the storm related water staining has impacted patterned areas, it is not clear the sealing and painting works scoped by KBA would disturb the pattern or not properly restore these areas if they are stained. · KA’s roof report did not find any storm related damage to the roof including any storm created openings. There is no information which would contradict this finding, · further, the quotes/scope of works provided by the complainant appear to include repairs unrelated to storm damage. In particular: > the quotes include replacement of the ceiling in the outdoor patio/ sunroom. However, I accept the ceiling damage in the sunroom appears aged and it is unlikely to have occurred due to a one-off storm event. Further, I am persuaded by the findings and photographs in the KA building report which indicate this area has been impacted by longer term water ingress most likely due to issues with the roof. > the exchanged information does not support a finding that the claimed storm caused any damage to the electrical fittings. · there is no dispute between the parties that the fence panel requires replacement and the insurer has correctly included this in the scope of works, The comments of the complainant’s builder, SBG, on the cause of the damage does not assist the complainant because: > it does not specify how rainwater during the claimed storm entered through the roof, > it does not provide reasoning for why it attributes the damage to a single “heavy storm downfall”, > it does not provide details of any “water tests” conducted, and > it does not explain why the extent and location of the damage links the damage to the claimed storm event. Similarly, the report by the complainant’s other builder, AS, does not assist the complainant because: > the report does not outline the results of any moisture testing, > the report does not provide a detailed explanation of why all staining and any mould is attributable to a one-off storm event in about January 2025, > it does not provide reasoning which would support a finding the ceilings have been compromised due to the claimed storm event and therefore require replacement. If the ceilings have been significantly compromised, this is more likely due to long term water ingress. Complainant has not established a valid claim for sunroom and electrics In light of the above, I accept the insurer’s submission that the complainant has not established a valid claim for damage to the sunroom or electrics. For completeness, a valid claim has also not been established in respect to the roof although repairs to the roof are not included in the complainant’s quotes. The complainant has not established that any damage to these aspects of the property has occurred as a result of the claimed storm event. Any damage to the sunroom is more likely the result of long term water ingress due to issues with the roof as identified by KA. As I have determined the complainant has not established a valid claim in respect to these aspects, it is not necessary that I consider whether the insurer is entitled to apply any exclusion clauses. Mould growth is not attributable to the claimed storm event I acknowledge the complainant says the storm has caused mould growth at the property. Experts for both parties refer to the presence of mould: · In respect to the sunroom, KA’s building report says ‘sheet joins visible of ceiling, atmospheric mould noted’, and · SG’s quote includes the removal of mould on some internal walls. I am not satisfied there is sufficient information to attribute mould growth to the claimed storm event. On a balanced view of the exchanged information, it is more likely the property has experienced water ingress over time. In particular: · KA points to ‘peeling paint and other unrelated areas appear dry, flaky, and show no signs of dampness’ as indicating water ingress which pre-dated the claimed storm event, · KA noted potential water entry points on the roof and a non-compliant roof pitch. I accept these are capable of allowing water ingress into the property. I am not satisfied the mould at the property can be attributed solely or mainly to the claimed storm event which KA says caused only minor staining to the ceiling. Therefore, the insurer is not liable under the policy for any mould related damage as, on balance, it is not likely the mould has been a direct result of the claimed storm event. Insurer is required to cash settle claim applying a 20% uplift to KA quote The insurer has confirmed KA is unable to complete repair works at the property due to ongoing roof maintenance issues and the pre-existing damage due to water entry. The insurer says KA could not warrant any repairs due to these issues. In the circumstances. I accept it is appropriate for the insurer to cash settle the claim. In the course of the AFCA process, the insurer made an offer to settle the claim applying a 20% uplift to the KA quote for accepted repairs of $4.601.15. Applying the uplift, this totals $5,521. Under the terms and conditions of the policy, the insurer is entitled to deduct the excess of $5,000 from a claim amount. The complainant would then receive a payment of $521.38. I am satisfied it is fair in all the circumstances for the insurer to apply a 20% uplift to the KA repair quote in recognition of the transfer of risk to the complainant. If the complainant accepts this determination, the insurer is required to cash settle the claim as set out above resulting in a payment to the complainant of $521.38. 2.2 Why is the outcome fair? The outcome is fair because the exchanged information does not show the internal ceilings require replacement due to storm related damage. Further, it is more likely than not the damage to the sunroom is due to long term water ingress and not the claimed storm event. Therefore, it would not be fair in all the circumstances to compel the insurer to settle the claim based on any quote obtained by the complainant as the quotes do not relate to reasonably required repairs to rectify storm related damage. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.