Claim declined for building movement damage following a burst pipe and water tank leak; insurer relied on earth movement exclusion and pre-existing damage
Text of the determination
Determination
|
Case number
|
12-25-286715
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-286715 6 February 2026
1 Determination overview
1.1 Complaint
The complainant holds a farm insurance policy (policy) with the financial firm (insurer). The policy includes cover for the complainant’s home building and contents. The complainant was on holidays from 11 December 2024 and returned on 28 December 2024 to find there was no water pressure.
Investigations found a burst pipe (leak event) under the building. Further, that the three water tanks (35,000-40,000 litres each) the pipe was connected to were empty and had been full before she went on holiday. Shortly after, the complainant has noticed signs of considerable building movement and associated damage to the building. A claim was lodged seeking cover for this damage.
The insurer has declined the claim. The insurer says its assessments have found evidence of long term movement damage from before the claimed event. Also, the insurer says the policy excludes loss or damage due to earth movement, unless it is from subsidence or landslide which occurs within 72 hours of one or more of four specific insured events. The complainant disputes the insurer’s assessment of its liability and decision to decline the claim.
1.2 Issues and key findings
Has the complainant established a claim under the policy?
Yes. The complainant has established a claim within the terms of the policy. This is both under the insured event “bursting, leaking, discharging or overflow’ and the accidental damage benefit.
Is the insurer entitled to refuse payment of the claim?
No. The insurer is not entitled to refuse payment of the claim. However, it is fair that the insurer be allowed to limit its liability. This is because some of the damage occurred before the claimed event. It is fair the insurer be entitled to limit its liability to 70% of the cost of repairs.
Why is the outcome fair?
The outcome is fair because it is based on the exchanged information and the policy. The exchanged information shows it is most likely the building has suffered new and extensive damage due to the leak event. Evidence of previous damage and/or repairs is limited. It would not be fair to permit the insurer to decline the claim in its entirety, or to require the insurer to cover damage that has been shown to have occurred prior to the event.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to settle the claim in line with section 2.2 of this determination.
2 Reasons for determination
This determination is based on information submitted by the parties. Each party has had an opportunity to review and respond to the other party’s submissions.
I have considered all the parties’ submissions, but in this determination, I have only commented on submissions directly relevant to the outcome.
2.1 Has the complainant established a claim under the policy?
Yes. The complainant has established a claim within the terms of the policy. This is both under the insured event “bursting, leaking, discharging or overflow’ and the accidental damage benefit.
The policy covers the insured property against accidental loss or damage
The insurer provided the complainant with the relevant policy documentation, including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
This means that not all loss and damage is automatically covered. Rather, only accidental damage and/or loss or damage caused by one or more of the insured events occurring during the period of insurance and not subject to the exclusions, is covered.
Circumstances of damage claimed trigger cover under the policy
The complainant says she has been living at the insured property for over 20 years. The complainant accepts there was some minor seasonal movement damage/repairs to the property prior to the event. However, the complainant says shortly after the leak event the building presented with new and widespread movement damage. This, she says, is due to the significant amount of water that has leaked into the foundation soils of the building.
There is no dispute that the leak event occurred or that this event would fairly be considered an unexpected and/or unintended event. It is also not disputed that water from all three tanks, around 35,000-40,000 litres each, has leaked into the foundation soils of the building with evidence of fresh movement damage.
Given this, I am satisfied it is reasonable to accept the complainant has shown loss or damage due to circumstances that trigger cover under the policy. The onus rests with the insurer to show it is more likely than not that the damage is due to circumstances excluded from cover under the policy.
2.2 Is the insurer entitled to refuse payment of the claim?
No. The insurer is not entitled to refuse payment of the claim. However, it is fair that the insurer be allowed to limit its liability because some of the damage occurred before the claimed event. It is fair the insurer be entitled to limit its liability to 70% of the cost of repairs.
Insurer’s plumber unable to decipher between existing and new damage
The insurer appointed plumbing consultants ‘SP’ to investigate the cause and extent of the damage. In its report dated 8 April 2025, SP confirms attending the insured property to complete its assessment. SP says it did not go under the building due to concern relating to recent snake activity i.e. SP did not inspect the sub-floor or foundation soils.
SP concluded that in its professional opinion there was a loss of water event under the building that caused the footings and stumps to move. There was evidence of movement to the building that pre-dates the leak event as well as further damage consistent with the recent leaking event. However, that it could not decipher between the previous and more recent damage.
Geotechnical engineers’ findings are not persuasive
The insurer appointed geotechnical engineering consultants’ ‘IN’ to attend the insured property. IN attended on 14 April 2024 and have provided a report dated 13 May 2025. IN determined the site was classified as Class P due to prevailing abnormal moisture conditions resulting from trees and existing building and pavement. The site is underlain by moderately reactive clays with seasonal shrink/swell movements of between 20mm to 40mm.
IN says it is possible that seasonal shrink swell movements are exacerbated when exposed to abnormal moisture conditions. I note IN’s report does not comment on the fact close to 100,000 litres of water leaked into the foundation soils, and whether this would qualify as ‘abnormal moisture conditions’.
IN found that moisture content testing indicated generally similar results across the site within similar materials at equivalent depths. There was however a slight decrease in moisture content from borehole2 (at rear of site), likely due to its proximity to the row of trees located at the western boundary of the property.
IN says, therefore, abnormal moisture conditions caused by the trees may have partially contributed to the damage observed around the dwelling. IN does not persuasively explain how it came to this conclusion and/or what the dominant cause for the claimed damage. Referring only to trees as a partial contributing factor does not identify the dominant cause.
Engineers’ inspection and findings are inconclusive
The insurer also relies on a report from engineering consultants ‘AA’ dated 14 May 2025, after having visited the insured property on 14 April 2025. AA notes renovation works were completed to the building approximately 10-15 years prior, including restumping works.
AA says the property possesses several inherent landscape and site drainage issues, which need to be addressed to mitigate further damage. However, there is an absence of persuasive explanation as to how AA came to this conclusion other than use of general information and assertions.
AA confirmed the sub-floor appeared damp. However, similar to SP, AA did not enter the sub-floor area to complete a thorough assessment of the sub-floor foundation soils or structure. A floor level survey confirmed significant floor level deviations with the low point coinciding with the location of the trees and shrubs.
AA found the differential footing movement is consistent with changes that have occurred with respect to the moisture condition of the reactive foundation clays across the site. It says the primary external factors that have contributed to changes in moisture conditions of the foundation clays have existed over an extended period of time. These being drying effects of trees and shrubs as well as inadequate site drainage conditions.
AA does not persuasively explain how it came to this conclusion and/or how the trees or drainage conditions could be considered significant contributing factors for the claimed damage. I note on the one hand AA says at the time of inspection there was no evidence to indicate that the building had been subjected to a significant ground movement event due to the leak event.
However, AA then says adequate drying of the foundation soils will take a considerable amount of time, estimated between 12-24 months before they will stabilise. It is not unreasonable to conclude from this that AA accepts the foundation soils were subjected to a significant amount of water (moisture) and were not stable and further damage was to be expected.
AA has provided many photos in support of its report. I have carefully reviewed these photos and accept they confirm that the building presented with previous repairs to movement related damage as well as evidence of reopening of cracks in some areas. The complainant does not dispute this and accepts there was minor historical movement damage.
However, from the significant number of photos, I note only four or five photos identify the above. The remaining photos, in my opinion, support the presence of new and fresh cracking damage to walls, cornices, floor tiles etc. I acknowledge AA refers to the type of cracking to floor tiles, and that this is not consistent with differential movement damage. However, there is no comment or response to the floors (tiles) being bouncy since the leak event and may have been damaged due to foot traffic in these areas since the event.
I am not satisfied the engineers’ report and findings are persuasive. There is an absence of compelling explanation or supporting information. The findings appear to be inconsistent with accepted facts in relation to the leak event as well as the physical and documented damage to the insured building.
There is an absence of a compelling explanation regarding the clearly present new movement damage that occurred within a short period of time after the substantive leak event. This is in contrast to the limited extent of damage that has occurred or been repaired over the many years the complaint has lived at the property.
Policy excludes cover for earth movement
The insurer says it is entitled to apply the following exclusion:
Other loss or damage
There is no cover under this section of your Policy for any claim, loss, damage, cost, injury, death or legal liability that is caused by or arises from:
…• earth movement except for landslide or subsidence where it occurs within 72 hours of, and as a direct result of, the following Insured Events:
o ‘2. explosion’;
o ‘3. storm, rainwater or wind’;
o ‘5. earthquake or tsunami’;
o ‘9. bursting, leaking, discharging or overflow’;
The complainant says this exclusion should not apply, because the earth movement was caused by the leak event.
The insurer says the exclusion applies to all earth movement and therefore the circumstances of the complainant’s claim.
Earth movement was not the proximate cause of loss
AFCA usually considers that, to apply an exclusion to deny a claim, an insurer must establish that the excluded factor was the ‘proximate cause’ of the loss.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances.
If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause.
With respect to this complaint, I am not satisfied the evidence shows the earth movement itself was the proximate cause of the new damage to the building. That is because without the significant leak event it is more likely than not the new and widespread damage would not have happened.
Therefore, the proximate cause of the new damage is the leak event, not earth movement.
It is fair to require the insurer to partially accept the claim
On receiving notice of the complainant’s acceptance of this determination:
· within 14 days the insurer is to arrange for an adequately qualified consultant to address any necessary make safe works, including asbestos related, to the building
· within 21 days the insurer is to arrange for a suitably qualified consultant to attend the property and confirm whether or not the site has adequately dried and is stable enough to commence repairs
· within 7 days of receiving the report from the above noted consultants and the building site is ready for repairs, the insurer is to appoint two adequately qualified consultants to provide a scope of works and repair quotes. This does not extend to the external damage to the eaves etc noted in the reports and is limited to the internal movement damage
· within 14 days of receiving these scopes of works and repair quotes, the insurer is to cash settle the complainant an amount equal to 70% of the lower of the two repair quotes. In the absence of persuasive evidence to the contrary from either party, I am satisfied 70% represents a fair apportionment and/or representation of the extent of the new and fresh damage arising from the leak event
· the final cash settlement is to be increased by a further 10% uplift to allow for contingencies and the transfer of risk in arranging the repairs
· finally, if found that it is necessary for the complainant to vacate the building to allow repairs to be completed, the insurer is to cover up to 70% of the reasonable cost of temporary accommodation whilst repairs are completed in line with this determination and its obligations under the policy.
With respect to the determined 70% apportionment, I conclude this based on the exchanged information, what is considered fair in all the circumstances, an absence of persuasive expert evidence differentiating between the two sets of damage and in an effort to bring finality to this complaint.
Having carefully considered the exchanged information (including very helpful photos from both parties), I am satisfied the evidence:
· shows limited evidence of pre-existing movement damage and/or repairs to the insured building
· shows limited locations where existing and/or previously repaired cracks had re-opened
· the significant portion of damage documented appears new and consistent with being due to the leak event
· the external damage to the building does not appear to be new or consistent with movement damage from the leak event.
2.3 Why is the outcome fair?
The outcome is fair because it is based on the exchanged information and the policy. The exchanged information shows it is most likely the building has suffered new and extensive damage due to the claimed event. Evidence of previous damage and/or repairs is limited. It would not be fair to permit the insurer to decline the claim in its entirety, or to require the insurer to cover damage that has shown to have occurred prior to the event.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.