Insurer declined claim for sewer pipe replacement, landscaping and building cracking damage after a leaking sewer pipe
Text of the determination
Determination
|
Case number
|
12-25-284733
|
Financial firm
|
XL Insurance Company Se
Case number: 12-25-284733 15 June 2026
1 Determination overview
1.1 Complaint
The complainant was authorised to make a complaint on behalf of a strata body corporate which held a residential strata insurance policy with the financial firm (insurer) from 1 June 2024 to 1 June 2025. The policy insured a building in Victoria for $1,890,000. The policy excess was $2,000.00.
The complainant, the owner of unit 2 at the property, made a claim for damage regarding a sewer pipe which occurred on 25 February 2025. In this determination, the complainant’s three items of claimed damage are referred to respectively as:
· the sewer pipe replacement damage
· the landscaping repair damage
· the building cracking repair damage.
The insurer denied the claim because it said the complainant had not established a valid claim or, alternatively, relied upon exclusions. The complainant disputed the insurer’s denial.
1.2 Issues and key findings
Was the insurer entitled to decline the claim?
No. The insurer was not entitled to deny the claim for the sewer pipe replacement damage or the landscaping repair damage. The insurer should pay interest on the amounts for those items. The insurer was entitled to decline the claim for the building cracking repair damage.
Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for there to be an award of non-financial loss compensation.
1.3 Determination
The determination is in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall:
· pay the complainant for NM’s invoice in the amount of $9,500 (being $11,500 minus the $2,000 excess) in relation the sewer pipe replacement damage
· pay the complainant for JM’s quote in the amount of $11,000 in relation the landscaping repair damage
· pay the complainant interest under section 57 of the Insurance Contracts Act 1984 (the Act) on $20,500 (being $9,500 plus $11,000) from 1 September 2025 until that amount is paid by the insurer
· pay the complainant $1,000 for non-financial loss.
2 Reasons for determination
2.1 Was the insurer entitled to decline the claim?
No. The insurer was not entitled to deny the claim for the sewer pipe replacement damage or the landscaping repair damage. The insurer should pay interest on the amounts for those items. The insurer was entitled to decline the claim for the building cracking repair damage.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Policy Schedule (Schedule) (together referred to as the policy).
I am satisfied that the policy has been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Proximate cause
When establishing the cause of the damage to the complainant’s property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause.
The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Policy provided cover subject to exclusions
Section 1 of the policy provided cover against accidental Loss or Damage to the Insured Property which occurred during the Period of Insurance (page 21).
‘Loss or Damage’ was defined (page 14):
means direct physical loss of, destruction of, or damage to Insured Property from any sudden and accidental cause not otherwise excluded by this Policy, with Lost or Damaged having a corresponding meaning.
‘Insured Property’ was defined (pages 13-14):
a) Building
Building means: Building or buildings as defined by the Owners Corporation Act 2006 (Victoria) .., including:
ii) fixtures and structural improvements other than Floating Floors and carpets;
..
vi) underground and overhead services;
Building and Common Area Contents do not include:
Plants, hedges, trees, shrubs, gravel, shale, stones, clay or soil on paths or driveways or tennis courts, soil or bark or mulch in gardens other than as covered under Special Benefit 22 of Section 1;
‘Wear, Tear’ was defined (page 16):
means damage or a reduction in value through age, ordinary use or lack of maintenance.
The policy provided exclusions (page 27):
What is not covered
1) We will not pay for Loss or Damage:
c) caused by moths, termites or other insects, vermin, mice, rats, rust or oxidisation, mildew mould, contamination or pollution, wet or dry rot, corrosion, gradual corrosion or deterioration, change in colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in texture or finish or pecking, biting, chewing or scratching by birds or animals
d) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws
However We will pay if any of the causes (listed in subsections c) to e) above) directly results in Loss or Damage from any other Event claimable under Section 1 such as fire or glass breakage
...
i) caused by vibration or from the removal or weakening of or interference with the support of land or Buildings or any other property, Erosion or Earth Movement.
However We will pay if the Loss or Damage is due to:
ii) bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus;
n) due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in Buildings, foundations / footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements.
2) We will not pay for:
b) the cost of rectifying faulty or defective materials or faulty or defective workmanship
d) the cost of clearing blocked pipes or drains unless the blockage causes or is the result of physical damage to the pipe or drain.
However We will pay for water or liquid damage to Your Insured Property resulting from the overflow of such blocked pipes or drains.
‘Earth Movement’ was defined (page 13):
means heavage, landslide, land-slippage, mudslide, settling, shrinkage, subsidence (settlement of newly made up ground or settlement caused by the bedding down of new structures), or collapse.
The policy provided a benefit for exploratory costs (page 24):
17) Exploratory costs
We will pay for the reasonable exploratory costs You necessarily incur in locating the source of bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or carry liquid of any kind.
We will also pay for reasonable costs incurred in:
a) repairing the area of Your Insured Property damaged by such exploratory work;
b) Repairing or replacing the defective part or parts of such tanks, apparatus or pipes, to a limit of $1,000;
c) rectifying contamination damage or pollution damage to land at Your Situation caused by the escape of liquid, to a limit of $1,000.
We will not pay for any of these costs if the bursting, leaking, discharging or overflowing is caused by a Building defect, Building movement, faulty workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual deterioration, Earth Movement or by trees, plants or their roots.
We will not pay for any of these costs referred to below if the bursting, leaking, discharging or overflowing is caused by a Building defect, Building movement, faulty workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual deterioration, Earth Movement or by trees, plants or their roots.
We will pay for the reasonable exploratory costs You necessarily incur in locating the source of bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or carry liquid of any kind. We will also pay for reasonable costs incurred in:
a) repairing the area of Your Insured Property damaged by such exploratory work;
b) Repairing or replacing the defective part or parts of such tanks, apparatus or pipes, to a limit of $1,000;
c) rectifying contamination damage or pollution damage to land at Your Situation caused by the escape of liquid, to a limit of $1,000.
The wording of the above benefit for exploratory costs contained provisions which were repetitive. In practical terms, the benefit provided cover but was subject to what the parties referred to as a ‘write-back’, which commenced with the phrase ‘We will not pay for any of these costs if’.
The policy also provided a benefit for landscaping costs (page 25):
22) Landscaping
We will pay up to $30,000 for the reasonable costs You or a Lot Owner necessarily incur in replacing or repairing damaged trees, shrubs, plants, lawns or rockwork at Your Situation lost or damaged by an Event claimable under Section 1.
Complainant made a claim for damage caused by leaking sewer pipe
The complainant said that damage occurred on 25 February 2025 due to a leaking pipe which expelled sewage in the rear yard of the property.
The complainant sought:
· the cost of plumbing repairs he had incurred to repair and replace the damaged sewer pipe (in the amount of $11,500)
· an estimated amount for repairs to landscape the rear yard which had been damaged during the plumbing repairs (in the amount of $10,000)
· the cost of repairs to cracking damage to the building (for which he did not provide any cost estimate).
Complainant engaged a plumber to do repairs prior to notifying the insurer
The complainant’s broker, WH, lodged a ‘New Claim’ on behalf of the complainant with the insurer dated 17 March 2025:
Date of loss: 25/02/2025
Unit Number: 2
Address: [not included]
Cause of damage: broken sewer pipe
Areas of damage: The Broken Pipe has resulted in significant damage to the property. [Complainant] has advised that [he has] lost [his] deck, paving and garden. In addition the water damage has caused [his] property to sink!
Repairer to attend? Yes
Please find supporting documentation attached.
The [complainant] has advised that they have images and a plumbers report to provide us.
Once we have obtained these we will forward them to [the insurer].
Can [the insurer] please appoint a repairer to attend to inspect the damages.
The complainant’s Declaration of Loss and Damage recorded that the date and time of the loss was 25 February 2025 at 14:52, the particulars of the event causing damage were ‘Burst sewer pipe’ and the description of the items lost/ damaged was ‘Deck, Slabs, Lawn, foundation drama’. The Declaration stated ‘Yes’ to the question ‘Do you require the insurer to arrange an insurer preferred repairer to attend’.
The complainant said on 24 November 2025 to the Australian Financial Complaints Authority (AFCA) that:
· the exact timeline from the time of first symptoms to repair completion was:
Detailed sequence:
1. 24 Feb 2025 evening: Gurgling sounds from drains noticed
2. 25 Feb 2025 morning: Toilet paper visible in garden drain, sewage smell evident
3. 25 Feb 2025 afternoon: Raw sewage overflowing, emergency plumber contacted
4. 26 Feb 2025: NM (plumber) attended, commenced excavation
5. 26 - 28 Feb 2025: Located break, excavated damaged section
6. Early March 2025: Pipe replacement completed, system restored
7. 23 Mar 2025: Compliance certificate issued.
· the full scope of the plumber’s work and documentation was:
Work undertaken: - Emergency excavation to locate damaged pipe section - Removal of 3 metres of broken sewer pipe – Installation of new pipe section - Restoration of sewer connection - Backfilling and temporary surface restoration
Documentation limitations: - No pre-work CCTV as this was an emergency health hazard requiring immediate action. - Photos taken but focused on completed repair, not damaged pipe (health/safety reasons). - Invoice and compliance certificate provide written scope. - Plumber’s cancer diagnosis prevents additional documentation.
Why no CCTV: - Emergency health hazard took priority. - Raw sewage was actively overflowing. - Victorian health regulations require immediate remediation. - Cost and delay of CCTV are inappropriate for an emergency.
The complainant engaged a plumber, NM, on 25 February 2025 to perform repairs to the damaged pipe. NM provided an invoice dated 20 March 2025 in the amount of $11,500. NM’s invoice recorded:
[NM attended] the property due to ongoing issues with the sewer pipe and the overflow pipe becoming clogged with toilet paper, further investigation revealed that the pipe had become dislodged. Water was leaking from the pipe into the surrounding soil. To address and repair the issue, [NM] had to remove the decking, pavers, garden, and grass area in the affected zone. Additionally, [NM] excavated the area around the sewer line to locate the damaged section. The necessary repairs involved relining the entire sewer line to restore proper function. The [complainant] ha[d] paid in full after job was successfully completed.
The complainant also provided a Victorian Building Authority Compliance Certificate from a certifier dated 23 March 2025 (and lodged on 1 April 2025) which recorded:
· installation information – drainage
· installation details – emergency sewer repair replaced 3 metres of broken below ground sewer
The complainant says he noticed gurgling sounds from the drains on 24 February 2025, toilet paper was visible in the garden drain with a sewage smell on 25 February 2025, and raw sewage was overflowing on 25 February 2025. He contacted the plumber on 25 February 2025. The plumber attended on 26 February 2025 and commenced excavation, the plumber excavated the area to locate the damage section of pipe from 26 to 28 February 2025, and the pipe replacement was completed and the system restored in early March 2025.
As referred to above, the complainant’s broker made a claim on the complainant’s behalf with the insurer on 17 March 2025.
On 24 March 2025 the insurer’s representative, CC, prepared a report on 21 March 2025. CC recorded some internal cracking to the building (together with photographs) in:
· the living room – cracking below the cornice
· WC – separation to the WC tiles at ground level
· bedroom 3 – cracking to the entrance to the bedroom which was located at the front of the property on the ground floor
· stair well – minor cracking to the square set of the staircase void
· master bedroom – cracking to the master bedroom cornice which was located at the front of the property on the first floor.
CC recorded (together with a photograph) that in the rear yard area:
The [complainant’s] plumber ha[d] removed a section of the decking, all grass and placed crushed rock following the pipe replacement.
CC recorded also that the complainant confirmed that no contaminated water entered the unit during the event which was contained to the rear yard.
Insurer engaged an engineer regarding the building cracking repair damage
The insurer also engaged SW, engineers, to prepare a report dated 26 March 2025. SW’s report was detailed and concluded in relation to the building cracking repair damage:
[SW] acknowledge[d] the appearance of cracks/gaps in the subject building; however, in [SW’s] opinion, the underlying cause of the observed cracking is consistent with the normal foundation reactivity and expected general building movement.
These are typical of buildings of this age and construction and would have occurred over the life of the building regardless of the pipe leak.
In saying that, there is no evidence of localized subsidence that would compromise the structural integrity of the building. Such movement would typically result in significant cracks and damage to both the walls and floors.
[SW’s] observations indicate[d] that the subfloor ground [was] not graded to prevent water ponding beneath the building and is lower than the external finished levels.
Had adequate subfloor drainage been provided to prevent water ponding under the building, it would have mitigated the general foundation reactivity, and any water ingress or discharged liquid from a leaking drain would have been directed away from the foundation.
[SW] acknowledge[d] the building is approximately 15 years in age, with the construction date estimated in the late 2000s.
On the basis of the above, [SW] consider[ed] that the subfloor drainage measures had not been adequately provided in accordance with the relevant standards at the time of original construction, nor would it comply with current codes and standards.
As such, [SW] confirm[ed] the defect identified within the body of this report would have been deemed as defective construction at the time of original build.
SW did not provide any opinion regarding the sewer pipe replacement damage or the landscaping repair damage. Further, the insurer acknowledged on 8 December 2025 that, regarding the ‘pipe damage specifically, the insurer ‘relied on the [NM]'s own verbal advice (as the only available expert evidence on the pipes) rather than extrapolating from [SW’s] engineering report’.
CC had a telephone conversation with NM on 30 April 2025
On 13 June 2025 at 2:34pm the insurer sought from CC a recording of a telephone call by CC with the complainant’s plumber, NM, or a post call written recording of what was discussed.
On 13 June 2025 at 3:11pm CC provided an email to the insurer which recorded an outgoing telephone contact on 30 April 2025 at 1:48pm by CC which stated ‘called and spoke to the plumber (engaged direct by the [complainant]) [the plumber] mentioned that a number of pipes were not connected to the mains and as [sentence incomplete in email]. [CC had] requested that [NM] provide this information to present to the [insurer]’.
As referred to below, in its denial of the claim on 20 June 2025 (and, again, in its responses to AFCA on 8 December 2025 and 15 December 2025) the insurer said that the additional words were ‘as such were being released into the ground’. According to the insurer, the complete note was ‘called and spoke to the plumber (engaged direct by the [complainant]) [the plumber] mentioned that a number of pipes were not connected to the mains and as such were being released into the ground. [CC had] requested that [NM] provide this information to present to the [insurer]’.
It is not disputed by the complainant or the insurer that NM was diagnosed with cancer and that NM did not provide the information which the insurer’s representative requested on 30 April 2025 and has not provided any further information regarding the plumbing repairs performed by him between 26 February 2025 and early March 2025.
On 8 December 2025 the insurer advised AFCA that there is no call recording of the conversation between CC and the complainant’s plumber, NM.
Insurer declined the claim on 20 June 2025
On 20 June 2025 the insurer declined the claim.
The insurer referred specifically to the section of the report dated 26 March 2025 from its engineer, SW, (as set out above) in relation to its denial of the complainant’s claim for the building cracking repair damage.
In its denial dated 20 June 2025 the insurer recorded also:
Email from [CC, insurer’s representative] dated 12 June 2025
During [NM’s] conversation with [CC] they advised that there were pipes in the rear yard that were not connected to the mains, as such the pipes were filling with soil.
[The insurer] believe[d] this contributed to the blockage.
Phone note from call [by CC] with Plumber received 13 June 2025
Called and spoke to the plumber (engaged direct by the [complainant]).
[NM] mentioned that a number of the pipes were not connected to the mains and as such were being released into the ground.
[CC] requested that [NM] provide this information in writing to present to [the insurer].
Unfortunately, [NM] has recently become quite ill, and was unable to provide this in writing to [the insurer].
In its denial dated 20 June 2025 the insurer said that:
· SW concluded that the gaps and cracks which the property had experienced was expected for general building movement and would be happening over the life of the building
· the information the insurer had indicated that the pipes in the rear yard were not connected to the mains and as such soil entered into them. The policy did not respond to damage which was caused by earth movement or the vibration of land and the costs associated with the soil entering the pipes was denied
· SW concluded that the cracks in the property were consistent with the expected and general building movement that a property undergoes and this indicated that the damage was due to the normal settling, heaving, shrinkage and expansion that a building experiences. The policy did not respond to damage which was result of these causes
· Specially:
As stated by [CC], the pipes in the rear yard were not connected to the main lines, which has allowed soil to enter into them and cause the blockage. The policy does not respond to faulty and defective workmanship and materials. The lack of connection between these pipes and the mains indicate[d] defective materials and workmanship. As such, the policy cannot respond to the costs associated.
· the policy also has a Special Benefit for exploratory costs for pipes. This benefit did not apply if the cause for the burst pipe was either a building defect, building movement, faulty workmanship or Earth Movement. The information provided indicated that the cause of the damage is a combination of these, which means that the Special Benefit cannot apply.
The insurer maintained its denial of the claim for sewer pipe replacement damage on 12 August 2025 and also on 28 October 2025. On 28 October 2025 the insurer said:
Regarding the sewage pipe, the limited available evidence indicates that the pipes were not connected to the mains and had been allowing ongoing egress of water into the ground, which does not constitute a sudden and accidental event. The [insurer] has made every reasonable effort to obtain evidence about the cause of the pipe damage, but has been precluded from conducting its own investigation because the complainant's plumber had already completed all rectification works before site inspection could occur.
The insurer said on 28 October 2025 that:
· the complainant failed to establish that the loss arose from a sudden and accidental cause as required by the policy. The reference in NM’s invoice to ongoing issues with the sewer pipe directly contradicted any suggestion of a sudden event. The invoice provided no technical explanation or professional assessment of what caused the pipe to become dislodged or when this occurred. The description was consistent with gradual deterioration or pre-existing defective installation, neither of which would constitute a sudden and accidental event covered by the policy
· the insurer appreciated the unfortunate circumstances of the plumber's serious illness. However, the plumber's inability to provide a written report did not alter the complainant's burden of proof to establish a valid claim. To assist the complainant to establish this claim, the insurer had relied upon contemporaneous notes taken following a phone call with the plumber, which would otherwise not be considered sufficient evidence. In the absence of evidence from the plumber establishing that the loss arose from a sudden and accidental cause covered by the policy, the complainant has not established a valid claim
· the available evidence indicated that the problem was caused by defective plumbing installation (pipes not connected to mains) and gradual soil intrusion, neither of which constitute sudden and accidental causes
· the damage falls within the policy exclusion for faulty workmanship (2(b))
· the special benefit for exploratory costs (Special Benefit 17) did not apply because the issue was caused by faulty workmanship, which was specifically excluded.
Complainant has made a valid claim for sewer replacement damage
NM’s invoice, dated 20 March 2025, recorded it attended:
the property due to ongoing issues with the sewer pipe and the overflow pipe becoming clogged with toilet paper, further investigation revealed that the pipe had become dislodged. Water was leaking from the pipe into the surrounding soil. To address and repair the issue, [NM] had to remove the decking, pavers, garden, and grass area in the affected zone. Additionally, [NM] excavated the area around the sewer line to locate the damaged section. The necessary repairs involved relining the entire sewer line to restore proper function. The [complainant] has paid in full after job was successfully completed.
The complainant also provided a Victorian Building Authority Compliance Certificate from a certifier dated 23 March 2025 which recorded:
· installation information – drainage
· installation details – emergency sewer repair replaced 3 metres of broken below ground sewer.
In its denial of the claim the insurer relied upon a file note of a conversation between CC and the complainant’s plumber, NM, on 30 April 2025 which the insurer said, ‘mentioned that a number of the pipes were not connected to the mains and as such were being released into the ground’. However, the insurer also said further in its denial dated 20 June 2025 that this information indicated ‘that the pipes in the rear yard were not connected to the mains and as such soil entered into them’.
Based on the exchanged information, the complainant’s plumber’s invoice from NM dated 20 March 2025 and the Victorian Building Authority Compliance Certificate from a certifier dated 23 March 2025 is to be preferred to the brief note from CC of its phone conversation with NM on 30 April 2025.
As referred to in Section 3.1 of this determination, AFCA gives more weight to documents created at the time the events occurred. The invoice from NM was dated 20 March 2025 and the Compliance Certificate dated 23 March 2025 were prepared shortly after the sewer pipe replacement damage was completed by NM in early March 2025.
The invoice from NM provided a description of the works performed by NM which were:
· NM attended the property due to ongoing issues with the sewer pipe and the overflow pipe becoming clogged with toilet paper
· further investigation revealed that the pipe had become dislodged
· water was leaking from the pipe into the surrounding soil
· to address and repair the issue, NM had to remove the decking, pavers, garden, and grass area in the affected zone
· additionally, NM excavated the area around the sewer line to locate the damaged section
· the necessary repairs involved relining the entire sewer line to restore proper function.
The Compliance Certificate from a certifier dated 23 March 2025:
· installation information – drainage
· installation details – emergency sewer repair replaced 3 metres of broken below ground sewer.
The description by NM was supported by the description by the certifier. Neither NM’s invoice nor the Compliance Certificate referred to ‘a number of the pipes were not connected to the mains and as such were being released into the ground’.
By contrast, the phone note from CC was of a conversation on 30 April 2025 which was nearly two months after the completion of the repairs by NM in early March 2025. Further, the phone note related to a matter which the plumber had ‘mentioned’ but the phone note did not include any of the other matters which were recorded in NM’s invoice or in the Compliance Certificate.
Further, the insurer said that CC requested that NM provide confirmation in writing but that NM had become ill and was unable to do so. Accordingly, the information in the file note was not confirmed by NM.
Finally, even noting that NM’s invoice and the Compliance Certificate are to be preferred to the content of CC’s phone note, in its denial on 20 June 2025 the insurer did not accurately summarise the content of the note. The wording of the content of the note of the conversation between CC and NM which the insurer included in its denial letter dated 20 June 2025 (and, again, in its response to AFCA on 8 December 2025) referred to the sewage ‘being released into the ground’. However, the insurer said twice on 20 June 2025 that ‘The information [the insurer had] indicate[d] that the pipes in the rear yard were not connected to the mains and as such soil entered into them’ and ‘As stated by [CC], the pipes in the rear yard were not connected to the main lines, which has allowed soil to enter into them and cause the blockage’. As referred to above, the note from CC dated 30 April 2025 of its conversation with the NM did not record that the ‘soil entered into’ the pipes.
Accordingly, based on the exchanged information, I accept the complainant has established a valid claim for sudden and accidental damage to the sewer pipe which had become dislodged and leaked sewage into the surrounding soil.
In those circumstances, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Insurer not entitled to decline the claim based on faulty workmanship exclusion
The insurer denied the claim on 20 June 2025 (which denial it maintained on 28 October 2025) on the basis that the policy did not cover faulty and defective workmanship and materials and that the lack of connection between the pipes and the mains indicated defective materials and workmanship.
Exclusion 2(b) provided the insurer did not cover the cost of rectifying faulty or defective materials or faulty or defective workmanship.
The insurer said on 28 October 2025 that the damage fell within the policy exclusion for faulty workmanship (Exclusion 2(b) of the policy) and the ‘problem was caused by defective plumbing installation (pipes not connected to mains) and gradual soil intrusion’.
However, the insurer did not provide any expert opinion regarding alleged faulty or defective workmanship in relation to the installation of the pipe. As referred to above, the report from its engineer, SW, related only to the building repair damage. SW said that the building was approximately 15 years in age, with the construction date estimated in the late 2000s, but did not provide any opinion regarding alleged faulty or defective workmanship in relation to the installation of the pipe.
Further, as referred to above, the insurer’s basis of alleging that the pipes were not connected to the mains and that there had been soil intrusion was premised on the file note of CC of its conversation with the complainant’s plumber, NM, on 30 April 2025. As referred to above, the invoice from NM and the Compliance Certificate are to be preferred and neither of those documents made any reference to faulty or defective workmanship in relation to the installation of the pipe or to the pipes not being connected to the mains or to gradual soil intrusion.
Accordingly, based on the exchanged information, the insurer has not established that it was entitled to decline the claim based on the faulty workmanship exclusion.
Insurer not entitled to decline special benefit for exploratory costs
The insurer said on 20 June 2025 that the exploratory costs policy Special Benefit did not apply if the cause for the burst pipe was either:
· a building defect
· building movement
· faulty workmanship, or
· earth movement.
It considered the cause of the damage was a combination of the above factors.
In its letter of 28 October 2025, the insurer said the special benefit for exploratory costs (Special Benefit 17) did not apply because the issue was caused by faulty workmanship, which was specifically excluded from that benefit.
The onus was on the insurer pursuant to the ‘write-back’ in the exploratory costs Special Benefit to establish that ‘the bursting, leaking, discharging or overflowing [was] caused by a Building defect, Building movement, faulty workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual deterioration, Earth Movement or by trees, plants or their roots’.
For the same reasons as the insurer was not entitled to rely on the exclusion for faulty workmanship, the insurer has not established that it was entitled to rely upon the ‘write-back’ regarding either ‘building defect’ or ‘faulty workmanship’. Further, the insurer has not established that bursting, leaking, discharging or overflowing was caused by building movement or by earth movement which, pursuant to the policy, meant heavage, landslide, land-slippage, mudslide, settling, shrinkage, subsidence (settlement of newly made up ground or settlement caused by the bedding down of new structures), or collapse.
Further, the insurer said on 28 October 2025 that the complainant’s plumber’s invoice statement that the pipe was dislodged was ‘consistent with gradual deterioration’ and on 8 December 2025 said that the leaking pipe had caused the dirt surrounding it to shift and dislodge the pipe itself and that this was gradual deterioration as the pipe had deteriorated (through shifting and dislodging) over a period of time.
The insurer said that the exploratory costs benefit did not respond where the cause of the leak was gradual deterioration. In doing so, the insurer adopted a position which was inconsistent with earlier denials that the cause of the damage was the lack of connection of the pipe at the time of its installation.
Further, the damaged pipe was PVC and the insurer did not provide any support for its view that the pipe had deteriorated. Accordingly, the insurer has not established that the bursting, leaking, discharging or overflowing was caused by gradual deterioration.
Accordingly, under the policy the insurer was not entitled to decline the complainant’s claim for the reasonable exploratory costs the complainant ‘necessarily incur[red] in locating the source of bursting, leaking, discharging or overflowing of... pipes used to hold or carry liquid of any kind’. The complainant’s invoice from NM recorded that the repairs performed and that the ‘necessary repairs involved relining the entire sewer line to restore proper function’.
Based on the exchanged information, the complainant has established that the repairs were necessary.
Accordingly, the insurer should pay the complainant the cost of NM’s repairs in the amount of $9,500 (being NM’s invoice in the amount of $11,500 less the policy excess of $2,000).
Insurer obliged to pay for landscaping claim
The policy provided in the Exploratory Costs benefit that:
We will pay for the reasonable exploratory costs You necessarily incur in locating the source of bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or carry liquid of any kind.
We will also pay for reasonable costs incurred in:
a) repairing the area of Your Insured Property damaged by such exploratory work;
The complainant provided a quote dated 5 August 2025 from JM for landscaping the backyard totalling $11,000 (including GST):
· concreting area 2.4 x 5.4 metres
· Sir Walter buffalo grass installation and ground preparation. Area (3.1 x 2.8 m) + (4.7 x 2.6 metres)
· free re-timbering of deck 3.1 x 1.35 metres
· ground preparation for garden bed area along fence line with steel edging.
Based on the information, the complainant has established that those costs were reasonable costs to repair the area (the rear yard) damaged by the exploratory work. As recorded in NM’s invoice dated 30 March 2025 – ‘To address and repair the issue, [NM] had to remove the decking, pavers, garden, and grass area in the affected zone’. As referred to above, NM’s invoice is persuasive. Accordingly, the insurer should pay the complainant the cost of JM’s estimate in the amount of $11,000.
Interest is payable under section 57 of the Insurance Contracts Act
Section 57 of the Act says that an insurer must pay interest on a benefit:
commencing on the day as from which it was unreasonable for the insurer to have withheld payment
AFCA has a published an Approach to Awarding Interest in Insurance, which says:
Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be:
• the date the claim was denied
• if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or
• the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy).
AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm.
In the circumstances, the insurer should have paid the cost of NM’s invoice dated 20 March 2025 (less the policy excess of $2,000) and JM’s estimate quote dated 5 August 2025. It was unreasonable for the insurer to have not made payment for those amounts by 31 August 2025.
Accordingly, the insurer should pay the complainant interest under section 57 of the Act on the NM’s invoice in the amount of $9,500 (being $11,500.00 minus the $2,000 excess) and JM’s quote in the amount of $11,000 from 1 September 2025 until those amounts are paid by the insurer.
Insurer entitled to decline claim for building cracking repair damage
The insurer’s report from SW, engineers, dated 26 March 2025 concluded in relation to the building cracking repair damage:
· the underlying cause of the observed cracking was consistent with the normal foundation reactivity and expected general building movement
· was typical of buildings of this age and construction and would have occurred over the life of the building regardless of the pipe leak
· there was no evidence of localized subsidence that would compromise the structural integrity of the building. Such movement would typically result in significant cracks and damage to both the walls and floors.
· the subfloor ground was not graded to prevent water ponding beneath the building and is lower than the external finished levels
· had adequate subfloor drainage been provided to prevent water ponding under the building, it would have mitigated the general foundation reactivity, and any water ingress or discharged liquid from a leaking drain would have been directed away from the foundation.
· the building was approximately 15 years in age, with the construction date estimated in the late 2000s
· the subfloor drainage measures had not been adequately provided in accordance with the relevant standards at the time of original construction, nor would it comply with current codes and standards and would have been deemed as defective construction at the time of original build.
The complainant requested on 29 July 2025 that the insurer review its denial of the building cracking repair damage. The complainant acknowledged that the SW report had confirmed that the cracking was consistent with normal settling and foundation reactivity and that this could cause building cracking. However, the complainant contended that the damage could also be caused due to a sudden ingress of extensive water and that a burst sewage pipe with a large flow of water coursing through the pipeworks had allowed for the soil to react and move thus causing the sinking and cracking to the building. The complainant acknowledged the insurer’s engineer’s opinion and the complainant did not provide a report or opinion from an engineer regarding the building cracking repair damage in support of his contention that it was caused by the damage to the sewer pipework.
On 12 August 2025 the insurer said that the damage to the building was not from a sudden and accidental event, as required by the policy, but as a result of normal settling and would have been occurring over the life of the building and, as such, the building damage was declined.
Based on the exchanged information, the insurer’s engineer’s report was persuasive and provided conclusions (which the complainant acknowledged and did not provide any expert opinion to the contrary) that the cause of the cracking to the building was consistent with the normal foundation reactivity and expected general building movement typical of buildings of its age and construction and would have occurred over the life of the building regardless of the pipe leak.
The complainant has not established a valid claim for the building cracking repair damage and the insurer was entitled to decline that claim.
Section 54 of the Insurance Contacts Act does not assist the complainant
The complainant and the insurer referred in submissions to Section 54 of Act. This provides, broadly speaking, that an insurer cannot refuse a claim in whole or in part by reason of some ‘act’ (which includes an omission) that occurs after the contract of insurance was entered into unless it can establish:
· the level of prejudice sustained, in which case it can reduce its liability by the extent of the prejudice (section 54(1)); or
· the act could reasonably be regarded as being capable of causing or contributing to the loss (section 54(2)).
As referred to above, the plumber’s repairs were completed prior to the notification of the claim to the insurer by the complainant’s broker. The insurer said on 8 December 2025 that it was prejudiced in its investigation in the following ways:
· there was no opportunity to inspect the original condition of the pipes to determine the nature, extent, and location of any damage
· there was no ability to engage an independent plumbing expert to provide a professional assessment of causation
· the physical evidence that would have determined whether the pipe failure was sudden and accidental (as required for coverage) or the result of gradual deterioration, defective installation, or faulty workmanship (which are excluded) had been removed and destroyed
· the insurer was forced to rely solely on information provided by the complainant's plumber, who subsequently became seriously ill and was unable to provide written documentation
· the insurer did not have the opportunity to propose non-invasive investigation techniques because the excavation and replacement works had already been completed before the first site attendance by CC. When CC attended on 21 March 2025, the rear yard had already been excavated, the pipes removed and replaced, and the area backfilled with crushed rock
· had the complainant notified the insurer before commencing permanent rectification works, appropriate investigation techniques could have been considered. These might have included CCTV inspection of the sewer line to identify the location and nature of any blockage or damage, pressure testing to assess pipe integrity, or targeted excavation. Such techniques are routinely used in sewer leak claims to establish causation without destroying evidence
· the insurer acknowledged that the complainant may have needed to undertake urgent works to address the sewage overflow. However, the extent of works undertaken, which included complete excavation of the rear yard, removal and replacement of the entire sewer line and subsequent reinstatement of earth, went significantly beyond emergency mitigation and into permanent rectification
· reasonable mitigation steps, such as clearing the blockage or temporary repairs, could have been undertaken while still preserving the opportunity for proper investigation of the underlying cause.
However, on 8 December 2025 (and, again, both on 23 March 2026 and 29 May 2026) the insurer made clear that the complainant’s claim was not denied ‘because of the pre-remediation works, but rather that the available evidence does not establish that the loss arose from a covered cause’.
In those circumstances, the insurer has emphasised that it does not rely on an act of the complainant (in performing the repairs prior to notifying the insurer) after the policy was entered into in denying the claim. Based on the conclusions in this determination, the complainant has established a claim for the both the sewer pipe replacement damage and the landscaping repair damage but has not established a claim for the building cracking repair damage. Accordingly, it is not necessary to consider further the potential operation of section 54 of the Act.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Non-financial loss compensation is payable by the insurer
In the circumstances of this complex and protracted complaint, it is not productive, and not fair to the parties, to traverse each aspect of the protracted claims history and the extensive number of communications. It is fair and appropriate to seek to progress the resolution of the complaint and the claim, including a fair assessment of non-financial loss compensation.
As referred to in Section 3.1 below, all the information the parties have provided has been reviewed and considered.
The complainant has been inconvenienced by the need to follow up the insurer regarding the status of the claim and the delays in the resolution of the claim. The insurer was not entitled to decline two aspects of the claim but was entitled to decline the building cracking repair damage claim. The parties exchanged extensive submissions regarding the claim and the complainant was frustrated by the insurer’s denials and the insurer’s reliance upon the file note. The complainant has had to experience a rear yard covered with crushed rock rather than landscaping and will continue to do so until those repairs are performed.
I consider it is fair for there to be an award of non-financial loss compensation of $1,000.
2.3 Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for there to be an award of non-financial loss compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.