Text of the determination
Determination
|
Case number
|
12-25-282104
|
Financial firm
|
The Hollard Insurance Company Pty Ltd
Case number: 12-25-282104 16 June 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 29 May 2025, a claim was lodged for storm damage to the insured property said to have occurred on or about 23 May 2025.
The insurer has partially accepted the claim for damage it says is covered by the policy. The complainant is dissatisfied with the insurer assessment of its liability. Also, she says the complainant’s appointed trades caused additional damage during and/or as a result of their make safe works. The complainant says the insurer has failed to provide her with the policy.
1.2 Issues and key findings
Has the insurer met its obligations to clearly inform the complainant?
No. The insurer failed to clearly inform the complainant of the relevant terms and conditions of the policy. This is because it has not established that the relevant policy documents were sent to the complainant. As such, the prescribed contract under the Insurance Contracts Regulations 2017 (Regulations) applies.
Is the insurer entitled to limit its liability for the claimed damage?
Yes. The exchanged information shows the insurer is entitled to decline cover for the main building internal damage and external roof damage.
Is the complainant entitled to compensation?
Yes. The insurer is to pay the complainant $3,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as it acknowledges the insurer’s failures and requires the insurer to compensate the complainant for her poor experience. It would be unfair to require the insurer to cover loss or damage which it is otherwise entitled to decline in line with the prescribed exclusions. Make safe repairs by their very nature are not expected to act as a long term or robust solution. These are temporary repairs designed to allow some extra time to arrange more permanent measures and assist with mitigating further loss or damage.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to partially decline the claim. Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to pay her $3,000 in NFL.
2 Reasons for determination
I note the complainant had also raised concerns regarding the Premium Commitment benefit and the insurer’s failure to correct the address for the home building in its records. Having considered the exchanged information, I am satisfied the insurer has provided compelling information to support its position that these issues have since been resolved.
Therefore, consideration of this complaint is limited to the issues regarding the damage to the home building and the complainant’s entitlement to compensation.
2.1 Has the insurer met its obligation to clearly inform?
No. The insurer failed to clearly inform the complainant of the relevant terms and conditions of the policy. This is because it has not established that the relevant policy documents were sent to the complainant. As such, the prescribed contract under the Regulations applies.
Insurer is obliged to clearly inform the complainant of the policy provisions
The complainant says the insurer has failed to provide her with the policy. She says this is despite requesting the insurer to provide her with a copy of the product disclosure statement (PDS).
Under section 35 of the Insurance Contracts Act 1984 (Act), an insurer cannot refuse payment of a claim made under a prescribed contract for damage caused by a prescribed event. This is unless it can show it clearly informed the complainant in writing of the relevant terms when the contract was entered into and that its liability for the claim would be less than that offered under the prescribed contract.
The obligation to clearly inform will normally be met by providing the complainant with the policy documentation, including the PDS.
Information from the insurer is not persuasive
The insurer disputes the complainant’s assertion and says it did provide her with the policy documentation including the certificate of insurance and PDS. The insurer has provided screenshots of information it says shows it clearly informed the complainant of the policy provisions.
The insurer says the information in these screenshots show the policy documents were sent to the complainant’s nominated email address on 24 November 2016 (when the policy was incepted).
I have carefully reviewed this information and accept it shows:
· the complainant incepted the policy on 24 November 2016
· the insurer emailed the complainant a document named ‘Certificate of Insurance Property’
· the email address is same email address the complainant has provided to AFCA as her current email address
· the delivery status for this email is recorded as ‘delivered’.
I accept the information establishes, on the balance of probabilities, that the insurer provided the complainant with the relevant certificate of insurance at policy inception in 2016. However, it does not show the PDS was also sent to her at this time.
The information from the insurer does not show any other insurance documentation was sent to the complainant at policy inception or any updated policy documents since inception in 2016. This includes the correct/updated PDS for the relevant policy period (24 November 2024 – 24 November 2025). Even if I were to accept (which I do not) that the insurer has shown it is most likely the PDS was sent to the complainant in 2016, I am not satisfied this is the relevant version of the PDS applicable to the 2024-2025 policy period.
Given the above, I am not satisfied the insurer has established that it clearly informed the complainant of the relevant terms and conditions of the policy as required under section 35 of the Act. In these circumstances, Part 3, Division 1 of the Regulations applies, and the complainant’s claim must be assessed under the prescribed events for loss or damage to the Home Building.
2.2 Is the insurer entitled to limit its liability for the damage?
Yes. The exchanged information shows the insurer is entitled to decline cover for the main building internal damage and external roof damage.
Complainant needs to show claim falls within the terms of standard cover
The standard cover in Part 3, Division 1 under subdivision C, sets out the minimum level of cover provided for home buildings, subject to certain conditions and exclusions. Under section 19 the home building is covered for destruction or damage that is caused by or results from one or more of the prescribed events including storm, earthquake and flood.
The specified prescribed exclusions include amongst others loss or damage caused by wear, tear, rust or corrosion.
Insurer has partially accepted the complainant’s claim for damage to the granny flat section of the home building, and which therefore is not in dispute between the parties. This complaint relates to the main section of the home building.
The complainant is seeking cover for internal stormwater ingress damage and damage to the external tile roof. She says the internal stormwater ingress damage (internal damage) is due to the claimed storm event and additional damage to the tile roof was caused by the insurer’s make safe works.
I acknowledge the complainant’s reference to earthquake and flood damage. However, if she seeks cover for loss or damage from these events, she will need to lodge separate claims for consideration. The exchanged information before me relates to a claim for storm damage to the home building.
Parties rely on reports from their preferred consultants
The insurer initially appointed restoration and building experts ‘BB’. BB attended on 2 June 2025 and noted the home building as being 50-60 years old and in poor condition. BB confirmed internal damage to three rooms (Master, Bed 2 and Bar Area) and signs of mould consistent with the storm event. BB completed moisture mapping, moisture readings, installed AFD, applied anti-microbial, Hepa vac and recommended roof repairs be completed as soon as possible.
The insurer appointed building consultants ‘RC’ to investigate the cause and extent of the damage as well as complete necessary make safe works. RC attended on 4 June 2025 and notes the condition of the home building as ‘average’. RC found the minor mould and flaking paint to the ceilings in the bedrooms and bar area were unrelated to a recent storm. Rather, this was consistent with gradual wear and tear, poorly prepared plasterboard (prior to painting) with some minor water entry. RC conducted temporary repairs to affected areas of the roof to prevent potential water entry due to the poor condition of the roof. It noted the following maintenance related deterioration:
· cracked ridge hip and gable end pointing
· rusted valley gutters
· rusted roof sheets over granny flat
· rusted screw fixings to granny flat metal roof
· foot traffic dents to granny flat metal roof
· lack of downpipes and falling gutter over granny flat rear bedroom.
RC has provided a specialist roof report dated 25 June 2026 based on an inspection completed to confirm the cause for the internal damage. The report notes the concrete roof as being in decent condition with no evidence of a storm damage. It says the damage noted is due to maintenance related issues, age, wear and tear and defective installation. It notes this as being pre-existing damage and not due to the claimed storm event.
RC noted:
· the gutters were rusted
· a ridge tile had been broken in the past and patched with concrete and lead flashing
· broken ridge capping
· cracking to ridge pointing
· the chimney flashing had wear and tear.
RC says any water ingress is most likely due to wind driven rain and may have been entering through the broken ridge tile. However, that there was no internal damage noted around the broken ridge tile.
RC has provided a make safe report dated 25 June 2025. This report notes the roof needed repairs unrelated to the claimed storm event. These include:
· a broken ridge tile needing replacement
· rusted sheets needing replacement
· replacement of incorrect material to suitable material for the roof degree
· a broken barge board and fallen out bedding along the barge.
The complainant relies on information from roofing consultants ‘ME’ and says the insurer’s make safe works have resulted in damage to 50 concrete roof tiles. She says what was a small claim has now developed into a big claim. She has provided a quote from ME dated 18 September 2025 in the amount of $20,137.70 for a complete roof replacement (concrete tile to colourbond). This is claimed to be due to the said 50 damaged roof tiles caused by the insurer’s make safe works.
However, ME has not provided any supporting information in the form of photos or evidence of 50 damaged tiles (whether from the storm event or make safe works). There is no explanation as to how ME has come to this conclusion or why the replacement of 50 damaged tiles can reasonably translate to a full roof replacement.
I find the information from ‘CD’, provided by the complainant, to be more persuasive than the information from ME. This is because the exchanged information shows CD had been involved with inspecting and repairing the home building from at least 29 September 2024.
In a letter CD confirms he was first contacted by the complainant’s husband on 29 September 2024. This was a request that CD provide an opinion regarding the presence of black mould on the ceilings in the two front bedrooms. Also, that he had some concerns regarding the bar area towards the rear of the building.
CD completed an inspection of the roof above these areas and found one damaged tile, which he replaced. During the week commencing 19 May 2025, CD says the weather was quite wet and so he checked in with the complainant’s husband on the mould issue. On inspection CD found some sections of paint were beginning to crack and blister.
I note CD does not provide an explanation or opinion for the cause of the noted cracking and blistering of the paint. However, it is fair to accept that the home building presented with black mould in the front two bedrooms as well as concerns in the bar area before the claimed storm event. However, it is unclear whether paint cracking/blistering was due to the claimed storm event in May 2025 or not, given no explanation or opinion from CD.
The complainant has provided a roof report from CD having attended the home building on or about 2 February 2026. This was following a call from the complainant advising the make safe tarps on the roof had torn and let go. CD attended and noted the tarps were too damaged to be reinstated, so they were removed. CD completed an inspection of the roof and found four additional damaged roof tiles (in addition to the few damaged roof tiles and affected ridge capping previously temporarily repaired during make safe works).
One of the four additional damaged tiles was on the valley gutter over the front porch area and could be due to the sandbags placed on the roof as part of the make safe works. Another issue noted by CD was foot traffic up and down as well placement of sandbags on the valley gutters flattening the upright edges. This can allow moisture to be drawn over the edge and into the roof space (depending on the volume of rainwater).
CD confirms all damaged tiles had been replaced.
Damage is most likely due to wear, tear and gradual deterioration
I empathise with the complainant’s position and accept this situation will have been stressful and inconvenient. I acknowledge her view that the insurer was aware it was insuring an old home, and so for it to now decline the claim based on the age of the roof is not fair or reasonable.
However, as noted above, for the insurer to be required to cover the cost to repair loss or damage to the home building, it be shown, on balance:
that the loss or damage is due to one or more of the listed insured events and not excluded under the policy (where the claim is being considered under the policy); or
that the loss or damage is due to one or more of the prescribed events and not excluded by one or more of the prescribed exclusions specified in the Regulations (relevant to this complaint).
This means, regardless of the age of the risk, it must first be shown, on balance, that the damage claimed is due to circumstances that trigger cover and are not excluded. I am not satisfied the exchanged information shows, on balance, that the claimed storm has been shown to be the cause for the disputed damage.
Rather, on balance, it is reasonable to conclude the home building was presenting with pre-existing internal moisture and wear and tear damage. This includes the two front rooms and the bar area which were presenting with moisture damage from at least September 2024. It has not been shown, on balance, that this damage is due to one or more of the prescribed events.
Accordingly, I accept the insurer is entitled to limit its liability to the granny flat damage and exclude cover for the damage to the main building.
Insurer not liable for additional damage claimed to be due to make safe works
To accept the insurer is, on balance, most likely liable for the claimed additional damage, I must be persuaded that it acted in a reckless, careless or negligent manner. Further, that this conduct is most likely to have resulted in additional damage and associated financial loss.
Having considered the exchanged information, I am not satisfied the complainant has shown, on balance, that the insurer or RC can reasonably be held liable for the claimed additional damage. I am not satisfied the complainant has provided persuasive information in support of the claim that RC’s make safe works damaged 50 roof tiles or that the roof requires complete replacement due to such damage.
Rather, I am more persuaded by the information from CD that limits any potential additional roof damage to about four roof tiles and possibly the valley gutters. In saying that, I am satisfied it is fair to accept that make safe works by their very nature are considered temporary measures in an attempt to mitigate further damage from occurring. These steps are by no means a guaranteed solution or expected to meet the level of effectiveness or efficiency of comprehensive and long lasting repairs.
The effectiveness of roofing make safe works can be impacted by a variety of factors including but not limited to continued deterioration of the roof and subsequent weather events. These are factors outside the control of the party undertaking make safe works and must be considered on a case by case basis.
The exchanged information shows RC was responsive to contact and information from the complainant as well as the developing circumstances. It responded to concerns regarding make safe works and re-attended the site to complete further make safe measures. With hindsight, it may well be that installing heavier tarping rather than using sandbags may have been the better option.
However, I am not satisfied this establishes recklessness or negligence on RC’s part. The steps taken by RC may not meet the complainant’s expectations. However, this does not mean RC was reckless, negligent or did not act in accordance with accepted industry practices. Therefore, I am not satisfied it has been established, on balance, that the insurer is responsible for the additional loss and damage claimed.
2.3 Is the complainant entitled to compensation?
Yes. The insurer is to pay the complainant $3,000 in non-financial loss compensation (NFL).
AFCA Rules allow for an award of NFL in certain circumstances
AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer.
Insurer to pay the complainant NFL
I am satisfied the exchanged information supports the view that the insurer’s overall management of the complainant’s claim and policy had caused her to experience undue levels of stress, anxiety and inconvenience. This includes but is not limited to:
· the failure to provide the complainant with the PDS despite requests from the complainant
· the failure and delay in correcting the complainant’s address in its records despite repeated requests by the complainant
· the failure to apply the premium commitment benefit in the first instance
· poor communication with respect to the opportunity to lodge separate claims
· poor communication regarding the difference between a causation report and a repair quote. This confused the complainant regarding the information she had provided versus what the insurer was expecting her to provide.
I am satisfied that it is fair the insurer pays the complainant $3,000 in NFL. This is to be paid withing 14 days of receiving notice of the complainant’s acceptance of this determination.
2.4 Why is the outcome fair?
The outcome is fair as it acknowledges the failures on the insurer’s part and requires the insurer to compensate the complainant for her poor experience. It would be unfair to require the insurer to cover loss or damage which it is otherwise entitled to decline. Make safe repairs by their very nature are not expected to act as a long term or robust solution. These are temporary repairs designed to allow some extra time to arrange more permanent measures and assist with mitigating further loss or damage.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.