Determination 12-25-281296
Dispute over cash settlement amount for hail damage roof repairs, including patio roof, and compensation for delay
Summary
The insurer accepted a hail damage claim and offered a cash settlement of $38,647 based on its builder's scope of works; the complainant wanted her own builder's $59,849.68 quote. AFCA required payment of the insurer's quote plus a 25% uplift ($48,309.84), interest, and $1,500 non-financial loss.
The policy only covers damaged roof sheets, but because the extent of patio damage was unclear and the insurer did not investigate further, a 25% contingency uplift and interest under section 57 of the Insurance Contracts Act were fair, with compensation for delays.
Issues
- Claim amount dispute primary · upheld
“does not include any contingency or allowance for variations. It is fair for the insurer to cash settle by paying the amount quoted by RP plus a 25% uplift”
- Inadequate claim investigation secondary · upheld
“The insurer could have arranged a further inspection of the patio roof to confirm the extent of the hail damage, or obtained another builder's quote”
- Delay secondary · upheld
“there were delays by the insurer finalising the SOW which caused the complainant stress and inconvenience”
- Poor communication secondary · upheld
“followed up several times for updates, and I am satisfied that the lack of communication caused her additional stress”
- Product terms interpretation secondary · not upheld
“insurer is only required to cover the patio roof sheets damaged by the hailstorm and it is not required to ensure product consistency”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
|
Case number
|
12-25-281296
|
Financial firm
|
AAI Limited
Case number: 12-25-281296 16 June 2026
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer) and made a claim for hail damage to the property in November 2024. The insurer accepted the claim and offered a cash settlement based on a scope of works (SOW) and repair quote by its builder, RP. This included replacement of the main roof and one roof panel on the flyover patio.
The complainant says the scope of works does not cover all items required for replacement of the roof. She wants the insurer to cover replacement of the entire flyover patio and scaffolding in addition to the main roof and seeks a settlement based on her own builder’s quote.
The complainant also seeks compensation for the insurer’s handling of the claim.
1.2 Issues and key findings
Is the insurer’s settlement offer fair and reasonable?
No. The extent of damage to the patio roof is unclear and the insurer’s offer does not include any contingency or allowance for variations. It is fair for the insurer to cash settle the claim by paying the amount quoted by RP plus a 25% uplift and statutory interest.
Is the insurer required to pay compensation for non-financial loss?
Yes. The claim was not handled as well as it could have been and there were delays by the insurer finalising the SOW which caused the complainant stress and inconvenience. It is fair for the insurer to pay $1,500 compensation for non-financial loss.
Why is the outcome fair?
The insurer’s liability has been determined based on the policy terms and general principles of insurance law. It is fair for the insurer to apply a 25% uplift to its offer to ensure settlement sum reflects the reasonable cost of repairs including contingencies and potential variations. The payment of statutory interest and compensation accounts for delays by the insurer.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of notification of acceptance of this determination, the insurer is required to pay the complainant:
· $48,309.84 for building repairs to the property
· interest under section 57 of the Insurance Contracts Act 1984 (the Act) from 24 July 2025 (date of insurer’s response letter) to the date of payment
· $1,500 compensation for non-financial loss.
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair and reasonable?
No. The extent of damage to the patio roof is unclear and the insurer’s offer does not include any contingency or allowance for variations. It is fair for the insurer to cash settle the claim by paying the amount quoted by RP plus a 25% uplift and statutory interest.
Policy coverage and issues in dispute
There is no dispute the complainant was provided with the policy documents including the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
The policy covers loss or damage caused by listed events including ‘Storm’ (page 41 of the PDS). There is no dispute that a storm occurred during the policy period, and the insurer has accepted that hail damage occurred to the property. However, there is a dispute regarding the amount the insurer is required to pay under the policy.
Page 74 of the PDS sets out ‘How we settle building claims’ and states:
We will aim to use a member of our supplier network to repair or rebuild the damage to the building. Sometimes this is not always possible e.g. if there is pre-existing damage. This will determine how the building claim will be settled.
The PDS then sets out the settlement process and options depending on whether a member of the insurer’s supplier network can complete the repairs.
Page 74 states that the insurer will engage a builder to prepare a scope of works (SOW) and quote and then assess the quote to make sure it is appropriate and reasonable. If the assessed amount is less than the building sum insured, the insurer will offer the insured the choice to have the building repaired or rebuilt (based on the recommendation of its builder).
Page 75 states:
If you choose not to accept the offer
You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note: this amount to repair or rebuild may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network.
The insurer says its builder, RP, can complete the repairs, and the claim is being cash settled at the request of the complainant. The insurer has offered the pay the complainant $38,647 based on an amended SOW and quote by RP dated 22 April 2025. The complainant says the insurer’s SOW is inadequate and has provided a SOW and quote by CO for $59,849.68.
The issue for determination is whether the insurer’s settlement offer is fair and reasonable.
Insurer’s experts estimate roof repairs at $38,647.87
The insurer relies on the following expert reports and documents:
· roof report by PC dated 4 December 2024
· building assessment report by RP dated 4 December 2024
· SOW by RP dated 16 December 2024 ($23,343.38)
· desktop assessment report by IA dated 30 December 2024
· amended SOW by RP dated 13 February 2025 ($30,659.33)
· amended SOW by RP dated 10 March 2025 ($30,161.42)
· amended SOW by RP dated 22 April 2025 ($38,647.87)
· financial review report by IA dated 13 May 2025.
PC inspected the roof and reported that various roof sheets and flashings have minor hail damage. RP reported that over 50% of the roof sheeting to the main dwelling was impacted.
The PC report states, ‘Hail damaged roof sheet to rear flyover roof’ and includes a photo of one dent. However, the RP report states, ‘No hail damage was found to the flyover roof’.
PC and RP both recommended carrying out a full re-roof including all associated flashings. RP provided a SOW and quote to complete repairs to the main dwelling roof for $23,343.38.
IA reviewed the SOW and found the costings fair and reasonable but requested confirmation that certain items were included in the SOW and whether a building certifier was required. RP confirmed the flashings and cappings were included and certification was not required.
The complainant raised multiple concerns about items missing from the SOW including the patio roof. In response, RP submitted several amended SOWs with the final version dated 22 April 2025 for $38,647.87. This covers replacement of the entire main roof and one insulated panel on the patio roof. IA reported this is fair and reasonable.
Complainant’s expert estimated cost of repairs at $59,849.68
The complainant relies on a roof report by CO dated 18 November 2025, together with a SOW and quote dated 14 January 2025.
CO reported that the property was damaged by a storm on 30 October 2024 and identified hail dents to the corrugated roof sheets on the main roof and additional damage to the insulated patio roof. The CO report includes photos of the dents and estimates 50% of the roof is damaged.
The CO quote dated 14 January 2025 estimates the roof repairs at $59,849.68. This includes replacement of the entire patio roof with Cooldeck insulated panels.
Parties have made submissions regarding the necessary repairs
The complainant submitted the following items were omitted from the insurer’s SOW:
· Preliminaries – certifier and engineer to ensure compliance with current standards
· Main roof – replacement of insulation, antenna, crane hire and wall flashing to lower roof
· Fly over patio – quote is for partial replacement only which is inappropriate and does not ensure product consistency.
The insurer says that certification is not required, the disputed items on the main roof have been allowed for in the RP SOW and hail damage was only found to part of the flyover.
The complainant’s representative later advised AFCA she was happy for the certification not to be included (23 September 2025) and acknowledged the insurer’s revised SOW includes insulation, crane hire and wall flashings (27 October 2025).
The complainant maintains that the hail damage to the patio exceeded 20% and it therefore requires full replacement under accepted building practice. She also says the insurer’s SOW does not allow for full perimeter scaffolding, which is a compliance requirement to ensure safe access and fall protection. She says a licenced builder cannot undertake the works in the absence of these items.
Parties disagree on whether the patio roof needs replacement
The complainant says the insurer is required to pay the cost of replacing all panels on the patio roof. She bears the onus of establishing the roof sheets on the flyover suffered hail damage from the storm necessitating replacement.
The CO report states that the patio roof was affected but does not explain the extent of the damage to the patio roof. The CO report includes seven photos of dents to what appear to be Trimdek roof sheets (the material used on the patio), but these are under the heading ‘Main roof damage’ and no obvious damage is shown in the photos under the heading ‘Patio’.
The insurer says the RP report and PC establish that one roof sheet was damaged requiring a replacement of 6m2. I accept that PC identified one damaged roof sheet on the patio. RP initially found no hail damage to the flyover roof, but later included one roof sheet in its SOW.
The CO quote includes $18,436 for repairs to the patio roof, while the RP quote only includes $8,098.22 for repairs to this area (excluding builder’s margin).
The main difference between the two is the type and quantity of insulated roof panels. RP has allowed for replacement of 6m2 of 100mm Spanline insulated roofing, whereas CO has allowed for 57m2 of 100mm Thick Cooldeck panels. There is also a difference in the amount for scaffolding, but the revised quote by RP includes the erection of perimeter scaffolding.
The complainant says the insurer has not considered product matching to ensure continuity and uniformity. She also says partial replacement of the patio will negatively affect the lifespan of the product, but she has not provided any information to support this.
Insurer is not required to cover undamaged roof sheets or match materials
Page 78 of the PDS relevantly states:
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged where the damage is covered by your policy. Apart from the limited circumstances where we will repair or rebuild undamaged parts (see ‘When we will pay extra in relation to undamaged parts’ page 79) this policy does not cover you to replace undamaged parts, such as when:
…
· roof sheeting is damaged
we will only replace the damaged roof sheeting, not the undamaged roof sheeting, even if the closest match available to us is in a different shade, colour, finish, material or profile to the undamaged roof sheeting.
Page 79 of the PDS provides further guidance on what the insurer will do when it cannot match materials to undamaged parts.
The insurer says RP quote includes pricing for the correct patio roof sheets, with Spanline being the brand of the patio sheets and Trimdek the design. The insurer says the complainant appears to be seeking to upgrade to thicker Cooldeck panels, which are a different and more expensive product.
I am satisfied the insurer’s quote is based on the product the complainant currently has. The complainant has not provided any persuasive information to refute this or show there will be a mismatch in materials if only one roof sheet is replaced.
The policy clearly states that the insurer is only required to cover the patio roof sheets damaged by the hailstorm and it is not required to ensure product consistency. It would be unreasonable to expect the insurer to cover the cost of installing a better product.
Fair for insurer to apply a 25% uplift to its settlement offer
I have carefully reviewed the expert reports, quotes and submissions from both parties.
Based on the exchanged material, I am satisfied that the insurer’s quote for repairs to the main roof is fair and reasonable. However, the precise extent of damage to the patio roof and the cost to repair the patio roof is unclear.
The complainant has not provided persuasive evidence that the entire patio roof needs to be replaced. However, the CO report and photos indicate that more than one roof sheet is likely to be damaged, and the insurer has not adequately responded to this.
The insurer relies on the reports by PC and RP which are at odds with the CO report and quote. The insurer’s builder incorrectly reported the patio roof had no damage and later revised its SOW multiple times which casts some doubt on its findings. The insurer could have arranged a further inspection of the patio roof to confirm the extent of the hail damage, or obtained another builder’s quote for comparison, but it did not do so.
I acknowledge that RP is willing to complete the repairs. Based on the terms of the policy, I consider it would be unfair to require the insurer to pay more than it would cost to have the works completed by RP. However, I do not consider it fair and reasonable for the insurer to limit its cash settlement to amount quoted by RP when the extent of damage to the patio is unclear. If the insurer authorised repairs, it would be liable for the amount quoted plus any variations arising during the repair process. If any further hail damage was identified to the patio roof or additional scaffolding was required, this would be covered by the insurer.
In the circumstances, I consider it fair for the insurer to cash settle the claim by paying the amount quoted by RP plus an uplift of 25% to allow for contingencies. The uplift amounts to $9,661.97 which I consider sufficient to cover the potential need to replace additional roof sheets on the patio (with the same material).
The insurer it therefore required to pay the complainant $48,309.84. I consider this a fair outcome as the settlement sum falls between the quotes relied on by each party.
Fair for insurer to pay interest on settlement sum
The insurer initially assessed the cost of repairs at $23,343.38 in January 2025.
Following concerns raised by the complainant about missing items, the insurer’s builder increased its SOW and quote several times until it reached $38,647.87 in late April 2025 (approximately six months after claim lodgement).
The insurer offered to cash settle the claim for this amount, but the SOW remained in dispute, and the insurer did not make any partial payments or unconditional offers. This resulted in a situation where the insurer had the benefit of funds that were payable to the complainant.
I consider it was unreasonable for the insurer to delay payment of the claim after 24 July 2025 when it issued its formal response after receiving the final SOW. It is therefore fair for the insurer to pay interest on the settlement sum under section 57 of the Act from 24 July 2025 until the date of payment.
2.2 Is the insurer required to pay compensation?
Yes. The claim was not handled as well as it could have been and there were delays by the insurer finalising the SOW which caused the complainant stress and inconvenience. It is fair for the insurer to pay $1,500 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. In assessing whether to award compensation, AFCA expects complainants to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. AFCA considers the severity and impact of the financial firm’s conduct on the particular complainant.
The complainant says the insurer delayed handling the claim. She says she had to make several attempts to obtain a revised quote because the original quote did not include all required items. She also says the insurer’s SOW did not accurately reflect the repairs needed to the property. She wants the insurer to waive the $3,000 excess.
Insurer caused unreasonable delays on the claim
The complainant lodged the claim on 18 November 2024. The insurer arranged an inspection on 4 December 2024. On 11 December 2024, the complainant appointed a representative. On 14 January 2025, the insurer accepted the claim and provided its SOW.
The complainant asked the insurer to review the SOW on 31 January 2025 and 20 May 2025 because it appeared items were missing. The insurer responded on 19 March 2025 and 13 June 2025. The complainant made a further request on 14 June 2025 and made an internal complaint on 25 June 2025. The insurer issued a formal response on 24 July 2025.
Based on the timeline, I am satisfied the SOW required multiple revisions due to missing and incomplete items, and there were delays by the insurer finalising the SOW. I consider this was unsatisfactory and unreasonably delayed settlement of the claim.
The insurer’s cash settlement offer was made approximately six months after claim lodgement.
The complainant provided her expert reports early in the claim process and I do not consider she contributed to the delays. She also followed up several times for updates, and I am satisfied that the lack of communication caused her additional stress.
Fair for insurer to pay $1,500 compensation for non-financial loss
The insurer has acknowledged delays in finalising the SOW and offered the complainant $1,000 in non-financial loss compensation, which she declined. I consider the insurer’s offer was made in good faith, but it does not adequately account for the complainant’s claims experience.
I am satisfied the complainant suffered stress and inconvenience due to avoidable delays and errors made by the insurer and its builder. I consider it fair for the insurer to pay the complainant $1,500 compensation for non-financial loss.
There is no basis for AFCA to find the insurer is required to waive the $3,000 excess. The complainant is required to pay the excess in accordance with the policy terms.
2.3 Why is the outcome fair?
The insurer’s liability has been determined based on the policy terms and general principles of insurance law. It is fair for the insurer to apply a 25% uplift to its offer to ensure settlement sum reflects the reasonable cost of repairs including contingencies and potential variations. The payment of statutory interest and compensation accounts for delays by the insurer.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.