Partial claim acceptance for storm and tree impact damage; structural damage declined; claim mishandled
Text of the determination
Determination
|
Case number
|
12-25-280353
|
Financial firm
|
AAI Limited
Case number: 12-25-280353 13 January 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy covering insured events (policy) with the financial firm (insurer). On 13 February 2024, she lodged a claim for property damage caused by tree branches falling onto the roof during a severe storm the same day.
The insurer partially accepted the claim for the damage it says was caused by the fallen branches. It offers settlement of $23,891 based on its quote for the approved scope of works (SOW).
The complainant disputes the insurer’s assessment and rejects its offer, asserting structural roof damage. Relying on two engineering reports, she seeks a cash settlement of $101,676, based on the average of three builder quotes that include structural repairs.
She also says the insurer mishandled the claim causing financial burden, emotional stress, worsening damage and disruption.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
Yes. I am satisfied, on the balance of probabilities (that is more likely than not), the proximate cause of the structural damage to the property is a result of causes outside of the policy terms. However, the insurer is required to increase its settlement offer by 20% for the effluxion of time and the transfer of repair risk.
Did the insurer mishandle the claim?
Yes. This is because the exchanged information shows the insurer and its appointed assessors were largely responsible for delays with some contribution from the complainant. I am satisfied $3,000 compensation for non-financial loss (NFL) adequately compensates the complainant for her claims experience.
Why is the outcome fair?
The outcome is fair because the insurer has correctly assessed the claim in accordance with policy terms. It would be unfair to require it to accept damage that falls outside of cover. A 20% uplift on the cash settlement offer fairly compensates for the passage of time and the transfer of repair risk. The insurer mishandled the claim. NFL of $3,000 addresses the complainant’s poor claims experience.
1.3 Determination
This determination is in favour of the insurer. Within 14 days of receiving notification the complainant accepts this determination, the insurer is required to pay the complainant in accordance with sections 2.1 and 2.2 below.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
Yes. I am satisfied, on balance, the proximate cause of the structural damage to the property is a result of causes outside of the policy terms. However, the insurer is required to increase its settlement offer by 20% for the effluxion of time and the transfer of repair risk.
Complainant must show the damage claimed triggers cover under the policy
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Only if the complainant can do this, will the onus shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
Policy cover is subject to terms, conditions, and exclusions
The policy covers the period from 26 June 2023 to 26 June 2024. Coverage is defined in the product disclosure statement (PDS) and certificate of insurance (COI), which must be read together. Relevant terms are outlined in section 3.2.
There is no dispute the complainant received a copy of the policy documents. The insurer is entitled to rely on the policy terms in assessing the claim.
Policy covers insured events
The policy covers defined insured events. This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events occurring during the period of insurance, and not subject to the exclusions, is covered.
Loss or damage caused by ‘storm’ and ‘impact’ by a falling tree and its parts are insured events under the policy. Cover is subject to the general policy exclusions for wear and tear, gradual deterioration, inherent defects, faulty design, structural faults, or poor workmanship. The complainant did not purchase optional accidental damage cover.
The onus is on the complainant to establish the structural damage to the building is the result of an impact or other insured event during the period of insurance.
The parties agree the property has been damaged by fallen tree branches. This dispute is about whether the impact (or any other insured event) was the proximate cause of the structural damage to the property.
AFCA’s approach to proximate cause
The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause.
The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss.
If one event causes loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Insurer partially accepts claim
On 13 February 2024, the complainant reported tree impact damage. The insurer appointed PA for make-safe and assessment, accepted the claim, and issued a SOW. After concerns about the roof space, a dual assessment was completed and an amended scope provided.
The complainant, believing structural damage existed, obtained engineering reports and design plans. The insurer referred these to its internal assessor and a panel engineer (MO).
MO’s inspection report (21 November 2024) concluded the tree impact did not damage the roof or wall framing. Structural defects were long-standing, caused by poor timber seasoning and construction practices rather than the storm.
Specifically, MO reports:
· approximately 30 broken roof tiles and damaged gutters
· minor ceiling plaster damage in Bedrooms 2–4 from water ingress
· no structural damage to roof framing or walls
· aged splits in rafters, underpurlins, and struts from poor timber seasoning
· long-term roof sagging visible since 2018; hip rafter cracks and lintel deflection due to poor design
· walls within tolerance; no impact-related cracking
· timber splits pre-date event and occur where impact is unlikely
· branch impact energy insufficient to damage hardwood framing
· roof sagging confirmed as long-standing via Google Street View
After reviewing MOs assessment, the insurer confirmed it would cover only cosmetic repairs, stating the structural works proposed by the complainant’s engineers were unrelated to the storm.
It offered a cash settlement of $23,890 for the accepted SOW and paid $1,000 goodwill. The insurer says structural faults and deterioration not caused by an insured event are excluded under the policy.
Complainant says tree branch impact caused structural damage
The complainant says the structural damage to the property was directly caused by the tree impact during the February 2024 storm event. To support her position, she cites two independent engineering reports from AE (July 2024 and August 2024) and ME (March 2025).
She says these independent structural assessments confirm the February 2024 tree impact caused severe structural damage beyond design tolerances. Both reports identify:
· roof structure - permanent sagging and deformation; flexural, compression, and connection failures in rafters, underpurlins, ridge beams, and battens; fractured bracing and misaligned gutters
· load transfer damage - external brick veneer and internal stud walls bowed and misaligned; lintel above a large window in plastic failure stage; floor framing stressed
· cause - impact load far exceeded AS1170.1 design capacity
· safety risk - roof and walls no longer meet structural integrity requirements; risk of collapse under adverse conditions
· recommendation: - complete replacement of damaged roof structure, deflected walls, and lintel; reinforcement of floor framing; works to comply with AS/NZS codes and NCC standards.
Both reports conclude localised repairs are inadequate and full reconstruction is required to restore safety and compliance.
Complainant’s expert reports are not persuasive
I have carefully considered the complainant’s engineers’ reports. However, I do not find these reports persuasive.
AE’s report includes detailed technical analysis of failure modes, clear safety emphasis, and logical causation linking tree impact to overload using design standards (AS1170, AS3700, AS4349, AS1170.4). It provides visual evidence with photos and diagrams and explains structural implications clearly.
However, it omits quantitative impact force calculations, limited historical evidence to rule out pre-existing defects, and no consideration of alternative causes such as deterioration or poor construction. It also assumes brick tie condition without verification.
ME’s report provides a detailed damage assessment, SOW aligned with Australian Standards, and a clear causation link to tree impact. However, it assumes a perfect pre-event condition and attributes all structural damage solely to overload.
This assumption is problematic because MO notes the tree limbs were too small and light to cause the claimed structural damage. In addition, some structural damage occurred outside the impact zone.
Historical evidence, including 2018 Google Street View images, show roof sagging. Whilst expert observations indicate the impact may have exceeded AS1170 limits locally and caused minor cosmetic issues, the structural defects are consistent with long-term deterioration and pre-existing weaknesses.
On balance, structural damage falls outside the policy terms
I have carefully considered the exchanged information. I am not satisfied, on balance, the complainant has established the proximate cause of the structural damage is impact or any other insured event.
This is because MO persuasively refutes AE’s classification of roof framing defects as ‘major’ and storm-related, presenting technical analysis backed by physical evidence and historical data.
MO found cracks identified as flexural and compression failures do not match expected stress patterns:
· flexural cracks occur along rafter sides under bending, not on the top face
· the alleged compression failure was in a non-compressive zone.
MO attributes these defects to poor timber seasoning at construction, explaining that ‘green’ timber dries unevenly, causing splits over time. The aged, dull cracks contrast with fresh fractures typical of impact damage.
Google Street View images from 2018 show roof sagging long before the storm, confirming long-term deformation.
On wall plumbness, MO notes deviations of 0.4–0.5° are within tolerance for an older dwelling, with no cracking or separation indicative of impact. It also says the energy imparted by small to medium tree branches, was insufficient to damage hardwood framing. Further, impact-related damage would present as fresh splits or crushing, which were absent.
Overall, MOs’ evidence is compelling because it combines technical reasoning, physical evidence, and historical verification to demonstrate the defects are pre-existing and unrelated to the storm event. This systematic approach undermines AE’s conclusions and strengthens the argument that claim-related damage is limited to cosmetic issues such as broken tiles, guttering, and minor plaster repairs.
On balance, I am satisfied MO’s evidence, including several annotated images to support its findings, demonstrates defects are pre-existing, limiting claim-related damage to cosmetic issues.
The insurer is entitled to deny the claim for the structural damage.
Insurer offers to cash settle for accepted impact damage
The insurer obtained a SOW for accepted damage from MO dated 20 November 2024. Following an internal assessment, two quotes were obtained based on MO’s scope:
· CR ($22,377)
· PA ($22,798)
PA’s quote was revised to $23,891 following internal assessment to ensure alignment with the SOW. Due to the pre-existing damages found at the property, the insurer offered settlement based on PA’s quote for the approved repairs.
Based on the internal assessment report dated 24 December 2024, I am satisfied PA’s quote is in accordance with the SOW. However, the insurer is required to uplift this amount by 20% for:
· the transfer of repair risk, and
· the effluxion of time since the date of the revised quote (11 December 2024).
Within 14 days of receiving notification the complainant accepts this determination, the insurer is required to pay the complainant $28,669 (i.e. PA’s repair quote: $23,891 plus 20%: $4,778).
2.2 Did the insurer mishandle the claim?
Yes. This is because the exchanged information shows the insurer and its appointed assessors were largely responsible for delays with some contribution from the complainant. I am satisfied $3,000 compensation for NFL adequately compensates the complainant for her claims experience.
AFCA’s approach to NFL
Under the AFCA Rules, AFCA can award up to $6,300 compensation per claim for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the complainant’s actions or by factors outside the insurer’s control.
Complainant says insurer mishandled claim
The complainant says, the prolonged process has caused significant financial burden through out-of-pocket costs for independent assessments, emotional stress from ongoing uncertainty, and increased property risk due to worsening water ingress. Additionally, she has faced major disruption, wasting time managing communications and coordinating assessments.
Complainant entitled to NFL
The exchanged information shows the insurer has reimbursed the complainant for her independent assessments and paid $1,000 on a good will basis following internal review. However, I am not satisfied this adequately compensates the complainant for her claim experience.
This is because the claim experienced significant delays and multiple escalations. Initial assessment and make safe were delayed due to logistical challenges.
Subsequent progress stalled as the complainant disputed the initial SOW, prompting engagement of independent engineers and submission of multiple reports between August 2024 and October 2024.
The insurer appointed MO in November 2024. However, the report turnaround and internal review extended into December 2024, culminating in a partial acceptance limited to cosmetic repairs.
Dissatisfaction with this outcome led to formal complaints and ultimately an AFCA referral in August 2025. The claim notes show delays were primarily attributable to the insurer’s slow coordination of assessments, repeated rescheduling of dual inspections, and prolonged internal reviews, compounded by the complainant’s pursuit of independent reports.
I am satisfied responsibility for delays rests with the insurer and its appointed assessors, with some contribution from the complainant’s extended time in providing documentation.
Within 14 days of receiving notification the complainant accepts this determination, the insurer is required to pay the complainant $3,000 NFL. This is in addition to the $1,000 paid on a good will basis.
2.3 Why is the outcome fair?
The outcome is fair because the insurer has correctly assessed the claim in accordance with policy terms. It would be unfair to require it to accept damage that falls outside of cover. A 20% uplift on the cash settlement offer fairly compensates for the passage of time and the transfer of repair risk. The insurer mishandled the claim. NFL of $3,000 addresses the complainant’s poor claims experience.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy terms
|
Page
|
Description
|
24, 30
|
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from:
Defects, faults, workmanship
· loss or damage caused by, connected with or arising from, or liability caused by, connected with or arising from inherent defects, faulty design, structural defects, structural fault or faulty/poor workmanship (e.g. structural posts, beams or load bearing walls have been removed without taking into account structural engineering requirements), if you knew or should have reasonably known about it (e.g. because the defect or fault was able to be observed by you or because it was identified in a pre-purchase building inspection report);
· any loss or damage to the part of the building with an inherent defect, faulty design, structural defect or faulty/poor workmanship, whether or not you knew or should reasonably have known about it.
…
|
38, 41, 49
|
What you are covered for- Insured Events
Loss or damage to the building
We cover
We cover loss or damage to your building at the insured address caused by an insured event in the period of insurance.
The insured events we cover are set out on pages 39 to 52.
We don’t cover
We don’t cover anything in section 3 ‘Things we don’t cover’ on pages 23 to 36.
There are also things that we don’t cover set out in sections 4 to 6 on pages 37 to 70.
If you have the Complete Replacement Cover® option, there are also certain things we do not cover under that optional cover see page 66 for more details.
…
Storm
We cover
Loss or damage caused by a storm.
We don’t cover
· loss or damage caused by flood;
· loss or damage to the building caused by actions or movements of the sea or storm surge;
· loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion, structural fault or design fault;
· loss or damage to retaining walls, sea walls, revetments, garden borders and free-standing outdoor walls;
· resultant cracking to sealed paths, sealed roads and sealed driveways, but we will cover them if they are washed away by the storm;
· loss or damage to a sporting surface or court including a tennis court, squash court or multi-court surface;
· loss or damage to boat jetties, pontoons, mooring poles and their attachments and accessories, including if they are washed away by the storm;
· damage to external paintwork of the building, if that is the only building damage caused by the storm;
· loss or damage to gates, fences or wall fences that would be considered by a reasonable person to be in an obvious state of disrepair before the loss or damage occurred.
…
Impact
We cover
Loss or damage caused by impact (or by power surge caused by impact) at the insured address from:
· a falling tree or part of a falling tree including the roots;
· power poles;
· TV antennas or satellite dishes, communication aerials or masts;
· drones;
· watercraft, aircraft, motor vehicles or trailers;
· an object falling from a motor vehicle or aircraft;
· space debris or meteorites.
We don’t cover
· loss or damage caused by flood or storm surge;
· loss or damage to driveways, paths, paving or underground services caused by a road vehicle, crane or earthmoving equipment;
· loss or damage to any portion of a fence or wall that is not owned by you;
· the cost of removing or lopping trees or branches that have not damaged the building;
· loss or damage caused by trees being lopped, felled or transplanted by you or someone authorised by you;
· the removal of tree stumps or roots still in the ground
|
103, 104, 106
|
Words with special meanings
Some words in this policy have a special meaning. It is important to read this section because it can impact how your policy is interpreted.
If a word does not have a special meaning then it just has its ordinary meaning
…
Incident
means a single event, accident or occurrence which you did not intend or expect to happen. A series of incidents attributable to one source of originating cause is deemed to be the one incident.
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.