Partial decline of cyclone damage claim for pergola and adequacy of ensuite scope of works
Text of the determination
Determination
|
Case number
|
12-25-279827
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-25-279827 27 May 2026
1 Determination overview
1.1 Complaint
The complainant jointly holds a home building and contents insurance policy issued by the financial firm (insurer). On 14 March 2025, the complainant lodged a claim for damage to his home following a cyclone on 6 March 2025.
The insurer partially accepted the claim agreeing to cover internal damage and damage to fencing. The complainant has accepted the insurer’s cash settlement offer in respect to these aspects and payment has been made.
However, the complainant disputes the insurer’s decline of the damage to the pergola. The insurer says the movement of the pergola and the deflection of the insulated panels were not caused by the storm but by excluded causes including structural defects.
The complainant also says the insurer’s scope of works for the ensuite repairs is inadequate. The insurer disagrees.
The complainant wants the insurer to accept the damage to the pergola and accept additional works are required to repair the ensuite. The complainant seeks non-financial loss compensation. He says the insurer’s handling of the claim has caused delay, stress and inconvenience.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
No. Taking a balanced view of the exchanged information, I am satisfied the insurer should cover the damage to the pergola. Its scope of works and cash settlement offer was otherwise fair and reasonable.
Is the complainant entitled to compensation?
No. Based on the exchanged information, an award of non-financial loss compensation is not warranted.
Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer has not established the pergola was more likely damaged by an excluded cause.
1.3 Determination
This determination is substantially in favour of the complainant. If the complainant accepts the determination, within 21 days of being notified of that acceptance, the insurer is required to accept the damage to the pergola and settle the claim in accordance with the terms and conditions of the policy as set out in section 2.1 below.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
No. Taking a balanced view of the exchanged information, I am satisfied the insurer should cover the damage to the pergola. Its scope of works and cash settlement offer was otherwise fair and reasonable.
Complainant must establish a valid claim
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
If the complainant can do this, the onus shifts to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
Policy covers storm damage subject to exclusions
The terms and conditions of the policy are set out in the product disclosure statement (PDS) and policy schedule.
The policy schedule for the relevant period 26 May 2024 to 26 May 2025 shows the complainant held optional accidental damage cover in addition to cover for the standard insured events.
In summary, at page 17 of the PDS, the policy says there is cover for loss or damage to buildings/contents caused by cyclone. There are a number of specific exclusions which apply to cover for cyclones.
In addition, there are a number of general exclusions which apply to all sections of the policy. Relevantly, the policy excludes loss or damage caused by or arising from:
‘Inherent defects Including faulty design, structural defects or poor workmanship’…
‘Anything not directly related to one of the insured events,…
‘consequential loss of any kind. This means we don’t cover you for anything not expressly described in the cover sections of this policy. For example, we will not pay for loss of income.
Complainant says insurer’s scope of works and quote is inadequate
The complainant has raised the following issues with the insurer’s scope of works.
Complainant says pergola was damaged by cyclone and should be included
The claim lodgement form shows at the time of claim lodgement, the complainant reported the following in respect to the patio and ensuite:
· the flyover roof has become unstable, the cyclone caused flex depressions and foam cracking,
· cracking and water damage to the en-suite. The complainant says this was due to water ingress through the ensuite bathroom window,
The complainant has provided the following information in support of his position the cyclone damaged the pergola:
· the pergola was constructed in September 2022 and was two years old at the time of the cyclone. The solar panels were installed in October 2023,
· prior to the cyclone, the patio was in a safe stable condition
· the cyclone caused the patio to become unstable and unsafe. There are stress marks throughout the panels and major lateral movement,
· the insurer’s report states the construction of the patio had met all requirements as per design and engineering specifications and that it now has stability issues and bracing would be required,
· the pergola and solar panels have been installed in accordance with manufacturer’s guidelines and requirements, and
· all solar panels were installed by a professional and the load is under the maximum load design for the pergola.
The complainant has submitted the handling and installation manual for the panelled pergola roof system. This includes information about the installation of services/accessories including maximum dead loads and spans.
The complainant also says the insurer’s loss assessor, C, and its appointed engineer, CD, are not independent of the insurer. The complainant has requested the insurer arrange an assessment of the pergola by another builder/engineer. The insurer says CD is an independent expert and appropriately qualified to comment of the cause of damage. The insurer also says it would consider any information provided by the complainant’s tradespeople in respect to the cause of the damage to the pergola.
Complainant says the insurer’s scope of repairs to the ensuite is insufficient
The insurer’s accepted scope of work includes the filling, patching and painting of the ensuite wall. The insurer says this is sufficient to repair the reported damage. More invasive repairs are not necessary because CD did not identify any structural issues.
The complainant says patch repairs quoted by the insurer are not adequate or suitable. He says:
· patching the joint in the bathroom ensuite (a wet area) does not meet the national standard,
· all walls and window sills sustained water damage. In the time between the cyclone and the builder’s inspection of the damage, the moisture decreased and swelling has occurred at horizontal joints,
· he says the full sheet requires replacement as well as the installation of waterproofing.
Insurer’s expert says damage to pergola is unrelated to cyclone and repairs to ensuite are sufficient
Pergola
The insurer says its experts found the damage to the pergola (deflection and weakening of the structure) was mainly because:
· the additional load of 15 solar panels was unsuitable and called for additional, site-specific measures, which were not completed, and
· it has inadequate bracing.
The insurer accepts however that:
· the insulated panel roofing was installed within the required manufacturer’s guidelines, and
· the weakening of the pergola was likely exacerbated by the claimed cyclone.
The insurer engaged builder/engineer CD to assess the damage, including to the pergola and solar panel installation. Most relevantly, CD’s causation report dated 27 May 2025 says:
The insulated sandwich panel was observed to be 100mm in depth and spanning 5100mm between steel beams, which meets most manufacturers' specifications…
The insulated sandwich panelled roof had 15 roof mounted solar panels installed, which covers 30m2 out of the total roof area of 36.5m2…
Solar panels typically add an extra dead load of 15–20 kg/m²on top of the self-weight of the panel…
On review of manufacturers specifications, I can confirm that insulated roof panels have allowances for deflection limits and additional dead loads of max 25kg per m2….
Although I cannot confirm who manufactured the insulated roof panels, I have reviewed multiple manufacturers and it appears that the current span and dead load is close to exceeding the maximum allowances, which has caused the observed deflection
CD then reviewed information provided by the complainant including the handling and installation manual issued by the manufacturer of the pergola roof panels. On 5 August 2025, CD provided a response to that information which says in part:
I have reviewed the …”Handling and Installation manual which advises the solar panels can be installed if the design and installation meets the Dead load table. On review, I can confirm there is a dead load allowance of 0.25kPa for light fittings etc and a live dead load allowance of 0.25kPa. The Patio roof has 15 solar panels which are commonly 21kg each plus brackets and accessories, which would be considered acceptable as per the dead load allowance however, states “ensure the roof, as installed, is design for the additional imposed loads”…
Additional bracing and other requirements may be required depending on the site conditions…
Ensuite
The CD causation report found:
· water ingress may have occurred through the ensuite window during the claimed event but the water has not caused significant damage,
· minor repairs and painting of the fibre cement wall lining joint is required,
· the paper tape and setting compound of the fibre cement wall lining has delaminated on the wall adjacent to the aluminium window (photographs are provided),
· no water staining was observed to the sheet joint or surrounds of the painted fibre cement sheeting, or to the plasterboard ceiling lining or cornices.
· moisture testing to the fibre cement wall lining and timber window showed ‘a nominal moisture reading’.
Insurer has not established damage to pergola is excluded
Having carefully considered CD’s comments in respect to the cause of the deflection of the pergola insulated panels, I am not convinced the insurer has established the solar panels have caused this damage. This is since:
· CD confirm that the solar panels (brackets and accessories) are within the acceptable dead load allowance, and
· CD says that in its causation report, it was highlighting potential damages to the panels if the tolerances had been exceeded. CD accepts the tolerances have not been exceeded.
Given the above, I am not convinced the insurer has shown the installation of the solar panels has caused or contributed to the minor deflection of the pergola insulated panels.
Further, generally speaking, deflection in insulated panels can be caused by inadequate bracing and/or exposure to external forces like wind.
I acknowledge that CD points to particular issues with the construction method of the pergola that it says is causing the pergola to ‘move freely’. Specifically:
· the pergola has no fixed point of attachment,
· the roof extender brackets which penetrate the concrete roof tiles do not provide bracing, and
· the timber post installed on above ground stirrups does not provide any bracing.
Importantly, CD assumes there are bracing requirements which have not been met. In saying this, it acknowledges that bracing requirements are not mentioned in the information provided by the complainant regarding handling and installation of the panels. CD says:
‘The attached documentation does not mention any bracing requirements to support the freestanding Patio however, I would assume the constructing builder and or certifier would provide recommendations if required’.
I am not convinced on the basis of CD’s reasoning (or the other exchanged information), it is fair and reasonable for the insurer to apply the exclusion clause for ‘Inherent defects Including faulty design, structural defects or poor workmanship’. I am not persuaded by CD’s comments that the pergola has any design flaws or structural defects. CDs comments are speculative. I am also not convinced the insurer has established it is more likely than not the damage has been caused by factors other than the claimed cyclone event.
Insurer is required to accept damage to pergola
I am satisfied the complainant has established a valid claim in respect to the damage to the pergola. This is since it is not in dispute the cyclone event occurred and based on the exchanged information, I accept the cyclone more likely caused the claimed damage to the pergola. The insurer has failed to establish an exclusion clause applies.
Therefore, it is fair in all the circumstances that the insurer accept the damage to the pergola. The insurer is to arrange an assessment of the required repairs and settle this aspect of the claim in accordance with the terms and conditions of the policy.
If the insurer is to cash settle this aspect of the claim, the insurer is to apply a 20% uplift for contingencies and to reflect the transfer of risk to the complainant if repairs are to be arranged by the complainant.
Insurer’s scope of works for the ensuite is adequate
Taking a balanced view of the exchanged information, I am satisfied the scope of repairs and repair method for the ensuite is adequate to address the cyclone related damage.
The expert information does not support a finding that walls linings have been water damaged and require replacement. CD says there was no swelling or delamination to the window reveal where the water ingress was reported to have occurred. The moisture metre testing did not show significantly elevated moisture levels. The complainant has not provided any information which would contradict these findings. There is insufficient information to link any reported cracking to water ingress as a result of the cyclone.
Further, I am satisfied CD is appropriately qualified to determine an acceptable repair method meeting relevant building standards.
I acknowledge the complainant indicated a preference for a cash settlement in respect to accepted damage. The insurer agreed and a cash settlement payment has been made which included accepted repairs to the ensuite. The insurer appropriately applied an uplift of 20% to the accepted quote in recognition of the transfer of risk to the complainant in arranging the repairs.
2.2 Is the complainant entitled to non-financial loss?
AFCA can award non-financial loss compensation
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
In assessing whether to award compensation, AFCA expects complainants to:
· be moderately robust,
· bear the normal degree of inconvenience experienced when a problem occurs, and
· take reasonable steps to minimise the inconvenience suffered.
Complainant’s concerns
The complainant has raised a number of concerns regarding the insurer’s handling of the claim. His main concerns are:
· the insurer delayed reaching a decision,
· the insurer has based its decisions on multiple inaccurate investigations and reports,
· the insurer’s communication has been poor. He has had to prompt updates,
· he was made to liaise with multiple different people during the assessment process, and
· scope and quotations have changed a number of times.
Financial loss compensation is not warranted
I acknowledge there has been numerous communications between the complainant and the insurer or its appointed assessor/expert over the course of the claim assessment. However, I am satisfied that overall, the insurer has been reasonably timely in its handling of the claim. In particular:
· the claim was lodged on 14 March 2025 and the insurer promptly appointed a loss assessor and relevant experts to assess the damage,
· builder, AS, assessed the property on 29 March 2025. Engineer, CD, attended the property on 16 May 2021.
· the complainant raised a complaint on 19 June 2025 regarding the handling of the claim,
· the insurer issued a claim decision letter on 25 June 2025 partially declining the claim,
· on 21 July 2025, the complainant raised a new complaint about the exclusion of the patio and adequacy of the repair quote for the ensuite.
· on 13 August 2025, the insurer issued an updated cash settlement offer less the applicable excess,
· on 22 August 2025, the insurer issued a letter responding to the complaint raised on 19 June 2025,
· on 1 September, a final cash settlement fact sheet was provided to the complainant.
However, I acknowledge there have been some minor delays:
· the insurer has conceded that it did not meet required timeframes under the General Insurance Code of Practice (GICOP) for addressing complaints,
· the insurer has conceded that it did not clearly inform the complainant when it had received all reports necessary to finalise the claim decision,
· the claims notes and other exchanged information shows the complainant followed up the insurer for updates on a few occasions including on 9 July, 21 July and 31 July 2025,
Given all of this, I am satisfied the insurer’s offer to waive the complainant’s excess of $800 as a gesture of goodwill is fair and reasonable. This was factored into the cash settlement payment already made. An award of non-financial loss compensation is not warranted and would be not be fair in all the circumstances because:
· any delays have been relatively minor and some delays were out of the insurer’s control,
· the insurer was entitled to investigate the cause of the damage and appoint appropriate experts,
· while the complainant regularly sought updates, I am not satisfied the insurer breached any timeframes under GICOP such that it caused unusual stress and inconvenience, and
· the insurer provided a claim decision within four months of the claim lodgement in keeping with the requirements of GICOP.
2.3 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer has not established the pergola was more likely damaged by an excluded cause.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.