Home / Allianz Australia / Determination 12-25-279119

Determination 12-25-279119

Non-financial loss compensation for inadequate claim investigation and handling after a leaking pipe caused damage to bathroom and subfloor

FirmAllianz Australia
Decided2026-05-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,500
Amount claimed$3,000
SourceAFCA PDF

Summary

A home insurance claim for a leaking pipe was initially only partly accepted, with bathroom and subfloor damage refused, though the insurer later accepted liability under a second claim. AFCA found the insurer's investigation inadequate and ordered $2,500 non-financial loss compensation.

Under AFCA Rule D.3, the insurer's inadequate investigation and refusal caused unusual stress and inconvenience over eight months, so a conservative $2,500 non-financial loss payment was fair.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-279119 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-279119 12 May 2026 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under a home insurance policy. A pinhole leak in a polybutylene pipe located inside the wall cavity between the bedroom and shower recess tiled wall had damaged the property on or around 4 June 2025. The insurer accepted the claim partially. It initially denied liability for the subfloor and bathroom tile damage because these were not caused by the subject leaking pipe. It has since accepted liability for the disputed damage under another leaking pipe claim in a different area of the same bathroom. The complainant seeks the insurer to pay $3,000 non-financial loss compensation for its claim handling. 1.2 Issue and key findings Is the insurer required to pay compensation? Yes. The insurer’s initial investigations into the extent of the damage to the area surrounding the leaking pipe was inadequate and incomplete. The insured damage remained unrepaired for over eight months. The insurer’s claim refusal and its failure to address the complainant’s concerns about the additional damage to the property by the leak caused stress, inconvenience and frustration to the complainant. Why is the outcome fair? It is fair the insurer pays non-financial loss compensation for its poor claim handling. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to pay $2,500 non-financial loss compensation. 2 Reasons for determination 2.1 Is the insurer required to pay compensation? Yes. The insurer’s initial investigations into the extent of the damage to the area surrounding the leaking pipe was inadequate and incomplete. The insured damage remained unrepaired for over eight months. The insurer’s claim refusal and its failure to address the complainant’s concerns about the additional damage to the property by the leak caused stress, inconvenience and frustration to the complainant. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Leaking pipe caused cracked tile and extensive damage to the subfloor area The exchanged information shows the insurer’s builder MK attended the property on 20 June 2025 to assess the damage claimed. The leaking pipe was situated between the bedroom wall and the bathroom shower wall. MK’s initial report shows that it did not check the moisture levels within the wall cavity or notice the crack on the shower wall adjacent to the leaking pipe. It however states drying equipment was installed as makesafe. The makesafe report shows the drying of the area was completed near/within the subject wall cavity. To fix the leaking pipe, invasive works were required through the shower wall. This leak could not be fixed through the bedroom wall. The complainant and her plumber were of the view the assessor had confirmed the invasive works would be covered. However, upon reviewing the claim notes and exchanged information, I am satisfied the assessor did not authorise the damage caused to the shower wall as part of the leaking pipe repair. After the complainant raised concerns about the cracked tile, additional damage caused by the leaking pipe and her dissatisfaction with the insurer’s decision to not allow the shower wall repair, the insurer arranged a leak detection test with NL. MK’s subsequent report dated 14 July 2025 states: Further to our previous report, following receipt of the specialist leak detection report dated 10 July 2025, we confirm that the shower recess is performing as intended and is watertight. All relevant pressure and spray tests passed, including testing directly over the cracked wall tile, indicating the waterproofing membrane remains effective and intact. We note that a cracked tile is present near the area of invasive repair where the Insured’s plumber accessed a burst polybutylene pipe. However, the tile underlay is in good condition. It is therefore our professional opinion that the cracked tile is not the result of the burst pipe and does not constitute resultant damage. Accordingly, no changes are required to our original Scope of Works, which includes rectification to the wall lining in the adjacent bedroom only. We confirm that the bathroom area and invasive plumbing works are not included, as the escape of liquid did not cause resultant damage within the bathroom. While plumber NL’s leak detection report indicated the spray testing of the shower wall and base passed, no thermal imaging of this area was presented. I am not satisfied this test by itself was adequate to rule out any additional damage to the shower wall and subfloor area from the leaking pipe. NL concluded the source of water ingress/damage is consistent with a burst polybutylene pipe in the wall behind shower. This has caused damages to the wall. It is unclear if NL meant the shower wall or the bedroom wall. No further clarification was sought from NL by the insurer or MK. On 19 January 2026, the complainant lodged another claim for damage due to a burst pipe in the far behind corner of the ensuite cabinetry, in the same bathroom. This damage was assessed by builder RC. RC’s report dated 22 January 2026 states: Hairline cracking to shower wall and floor tiles at the lower corner of the shower, consistent with substrate movement caused by moisture exposure. Swelling and deterioration of the Villaboard substrate behind shower wall tiles due to prolonged moisture. Localised settlement of the structural flooring beneath the shower, contributing to tile separation at wall-to-floor junctions. RC’s leak detection also observed the shower passed the spray test. However, it also found the cracking to the tile was caused by the leaking pipe behind the shower wall. The photographs presented by the complainant of the subject area after the walls were removed shows extensive damage to the subfloor in this area caused by the subject water leak. I acknowledge the insurer on receipt of RC’s report has accepted liability for the new claim. The scope of works included the repair of the bathroom and the shower. Insurer should pay non-financial loss compensation to the complainant The complainant however remains disappointed with the claim delays for almost 12 months and all the inconvenience/time this has caused to her way of life. They had no shower for this prolonged time. She felt unheard and mistreated and totally let down by the insurer and says this has been a very stressful part of her life. The insurer refused to pay non-financial loss compensation and says: · non-financial loss should not be awarded just because a complainant is disappointed that their claimed loss falls outside of the policy terms and conditions · it could find no instance in which the complainant attributed the cracked tile in the bathroom to drying works completed under any of the claims · the claim was lodged on 14 June 2025, and it advised the complainant it could not cover the costs involved with accessing and repairing the leak on 27 June 2025 · MK responded on 27 June 2025 confirming there was no sign of moisture and this tile could not have been damaged by the leak · it clarified its position after the complainant lodged a complaint 1 July 2025 about its scope of damage covered under the claim · MK’s further response was shared with the complainant via email on 28 July 2025, and a final decision letter was issued on 29 July 2025 · the complainant then raised a complaint to AFCA on 6 August 2025. I acknowledge the insurer’s submission that it made a claim decision within 4 months of receiving the claim and within 10 business days of receiving all relevant information. The complainant raised concerns about the effect of drying equipment on the damaged area on 26 September 2025 as below: G. On 14 Jul, Allianz requested a secondary builder’s report about the cracked tile. The first report made no mention of a cracked tile. The second report noted it, but confirmed the cracked tile was on a different wall to plumbing works. No under-house inspection has ever been done to rule out structural swelling as cause. (Attachment 7) H. We called Allianz again on 25 Jul and spoke to Shea O’Brien, who said they were still following up with builder despite report being completed on 14 Jul. Unreasonable delay. I. On 28 Jul, Allianz dispute resolution emailed us, stating cracked tile was not caused by leak, with “no signs of moisture ingress.” We dispute this, as moisture was evident before drying equipment was installed for six days. (Attachment 8: Specialist leak detection report with photos.) Given the above, I am satisfied the insurer’s initial investigations into the extent of the damage to the area surrounding the leaking pipe was inadequate and incomplete. This is because had the insurer conducted further investigations to the subfloor area as requested by the complainant, it would have discovered the extensive damage caused to the area by the leaking pipe. Further, RC confirmed the cracked tile was caused by the leaking pipe as suggested by the complainant throughout the claim and complaint process. It is plausible the drying of the subject area by MK may have concealed the actual damage to the shower wall and subfloor area given the location of the drying equipment exhibited in MK’s report. The insurer failed to consider this submission from the complainant. The insured damage remained unrepaired for over eight months. The insurer’s initial claim refusal and failure to address the complainant’s concerns about the additional damage to the property by the leak caused stress, inconvenience, and frustration to the complainant. The complainant being unable to use the shower over this period further inconvenienced her. Therefore, given the above and also having regard to AFCA’s conservative approach to awarding non-financial loss compensation, I am satisfied it is fair in all the circumstances the insurer pays $2,500 non-financial loss compensation to the complainant. 2.2 Why is the outcome fair? It is fair the insurer pays non-financial loss compensation for its poor claim handling. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.