Insurer declined cover for ongoing movement and cracking damage and offered only a sewer relining cash settlement following defective repairs on a 2012 escape of liquid claim
Text of the determination
Determination
|
Case number
|
12-25-277757
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-277757 11 August 2026
1 Determination overview
1.1 Complaint
The complainants held a home and contents insurance policy with the financial firm (insurer). In 2012, they lodged a claim for damage to their home due to a leaking pipe. The insurer accepted the claim and approved repairs, which included relining the leaking sewer pipes underneath the house.
Over subsequent years, the complainants discovered further damage to the home. The insurer accepts the repairs to the sewer pipes were defective and it did not allow enough time for the soil moisture levels to return to normal before repairing the resultant damage.
This complaint concerns further movement and cracking damage, as well as sewer pipe defects. The insurer declined cover for the cracking and movement damage. It says the ongoing ground movement is due to site conditions, not the escape of liquid or faulty workmanship. However, it offered $6,311.90 plus a 15% uplift to reline the sewer pipes again. The insurer has since agreed the sewer pipes cannot be relined, and it wants to conduct another investigation of the pipes to determine an appropriate repair method.
The complainants rejected a further assessment and want a cash settlement for the repairs based on their quote for $487,173.50. They also want $39,000 for temporary accommodation for the six months estimated to complete the repairs.
The complainants also want compensation for the way the insurer has handled the claim over the last 14 years.
1.2 Issues and key findings
Does the insurer’s settlement offer satisfy its obligations under the claim?
No. The panel is satisfied the ongoing foundation movement is related to the escape of liquid and poor workmanship by the insurer’s trades.
Are the complainants entitled to non-financial loss compensation?
Yes. The circumstances of the complaint warrant an award of compensation of $5,000.
Why is the outcome fair?
The exchanged information shows the claimed damage is due to an escape of liquid event, as well as faulty workmanship from the insurer’s trades. The panel is satisfied it would be unfair to allow the insurer to undertake further inspections on the cause of damage for a claim that has been ongoing for 14 years. The panel is satisfied it is fair in the circumstances for the insurer to pay them temporary accommodation and accept the claim for the building movement damage and sewer pipe repairs.
1.3 Determination
This determination is in favour of the complainants. Within 14 days of receipt of the complainants’ acceptance of this determination, the insurer is required to pay the complainants:
· $39,000 for temporary accommodation; and
· $5,000 in non-financial loss.
For the building damage, the panel considers it fair for the complaint to be resolved as follows:
· within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to provide a list of three experts, who are independent and who have not previously been involved with the complaint, to the complainants;
· within 7 days of receiving the list of experts, the complainants are required to communicate their choice to the insurer;
· within 14 days of being notified of the complainants’ chosen expert, the insurer is required to engage them to provide a scope of works;
· within 14 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote; and
· within 14 days of receiving the quote, the insurer is required to cash settle the complainants with a 15% uplift for contingencies and the loss of a lifetime guarantee on repairs.
2 Reasons for determination
2.1 Does the insurer’s settlement offer satisfy its obligations under the claim?
No. The panel is satisfied the ongoing foundation movement is related to the escape of liquid and poor workmanship by the insurer’s trades.
Complaint concerns ongoing movement damage to the property
When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability.
The policy is an ‘accidental damage’ policy. Accidental is something unintended and unexpected from the insured’s view. This means the policy covers unintended and unexpected damage during the period of insurance, unless it is specifically excluded.
The PDS also states some loss or damage is only covered under specific conditions, including:
Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours after a direct result of one of the following:
…
· Liquid that escapes from a fixed pipe or something attached to a pipe, fixed gutter, fixed tank apparatus or a drain.
The insurer relies on specific exclusions for:
We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:
· Landslide or subsidence except as described on page 14.
· Settling, shrinkage or any movement of earth.
…
· Rust, corrosion, gradual deterioration, depreciation, wear or tear.
The insurer also relies on the following general exclusions:
We will not pay claims for loss, damage or liability arising from:
…
· Landslide or subsidence except as detailed on page 14.
There is no dispute the property was accidentally damaged when the complainants lodged the claim in 2012. However, this complaint concerns whether the current claimed cracking and movement damage and ongoing sewer pipe issues are due to the original claim in 2012, the insurer’s defective repairs, or whether it is due to a cause not covered under the policy.
Fair for the panel to make a determination on the information exchanged
The complainants lodged the original claim in June 2012 for damage due to a leaking pipe. The insurer accepted the claim and engaged its plumber (TG) to repair the leak and its builder to repair the resultant damage. Over the subsequent years, the complainants identified further damage to the property. The insurer accepted further repairs over this time. In 2018, the insurer accepted liability for rectification repairs due to TG’s previous repairs to the leaking pipe. The insurer completed further repairs to the property after TG completed rectification works.
In 2019, the complainants raised further concerns regarding ongoing damage at the property. The insurer appointed an engineer (MB), who confirmed in its report dated 20 October 2019 that the insurer had not allowed an appropriate drying out period between the plumbing rectification works and resultant repairs. The insurer accepts there was an error made in failing to wait an appropriate drying out period before undertaking repairs.
The insurer also acknowledges there was another error at this point because it failed to conduct further investigations about resultant damage that may be due to this failure. In 2023, the insurer subsequently agreed to cover further damage at the property and made a settlement offer for these works. Further issues were identified regarding TG’s repairs to the pipe and the insurer agreed to cover this cost.
The insurer appointed another engineer (CR). CR’s report dated 6 March 2024 states ongoing settlement movement within the footing system and subsequent cosmetic damage is due to two distinct damage mechanisms, being long-term drying settlements and underperformance within the footing system.
The insurer says while it accepts responsibility for the plumbing works undertaken by TG, it is unable to force any of its panel providers to complete and warrant repairs at the property. It says this is due to unrelated issues with the underperformance within the footing system, long-term drying settlement and resulting ground movement. It says its quote is for the rectification of the sewage relining.
The insurer offered a cash settlement of $6,311.90, plus 15% contingency, which it says covers all damage associated with the original claim after a full assessment of the damage. The quote relied on by its builder (AC) covers the following repairs: ‘Hone sewage lines to remove internal lining – Re-line sewage lines upon removal of the existing’.
However, it says its own engineer (CR) says further relining is unlikely to provide a suitable or durable repair, and the reports indicate the existing liner has collapsed, making it nearly impossible to reline.
The complainants also raise several concerns with the insurer’s method of repair. The complainants provided a quote dated 18 December 2025 for the repairs. In support of the scope of repairs included in the quote, the complainants provided an email from the builder that says:
Based on your CCTV imagery, diameter of pipe at present time, previous blistered and failed sleeving attempts, it is my opinion that a new sleeve will not be sufficient to rectify the issue and the full replacement will be the most logical, viable and correct way to solve this issue. The replacement of the pipe will also ensure that all appropriate certification and warranties can be issued for the works carried out
The panel accepts the cash settlement offer is not fair in light of the above concerns because the method of repair in AC’s quote will not adequately repair the pipe.
During the AFCA complaint, the insurer reconsidered its position regarding the relining and agrees it is no longer appropriate due to concerns regarding the integrity of the pipe and liner, and the risk of further compromising the system.
The insurer proposed conducting a further CCTV inspection to determine whether the sewer system is leaking, and if so, obtain expert assessment to determine the zone of influence and whether any resultant damage is attributable to that leak. The insurer also proposed to further assess the current condition of the pipe to determine a remedial pathway.
The panel does not accept the insurer’s proposal to appoint more experts to assess the damage is fair in the circumstances. The original claim was lodged in 2012, and numerous experts have been appointed in that time to assess the damage. The panel is satisfied the insurer has had ample opportunity to assess its liability on the claim. Given the length of time the claim has been ongoing as well as the extent of damage now present, the panel considers it fair to make a determination based on the information exchanged.
Fair for the insurer to accept all damage claimed
Having considered all exchanged information, the panel accepts it is more likely than not that the original sewer problems have not been resolved and are causing the continuing movement-related damage at the property. Whilst the panel accepts the insurer has completed repairs and paid some cash settlements for various areas of damage over the years, the panel accepts the initial repairs to the leaking pipe were defective and have led to continuing issues at the property. The panel also accepts the failure of the insurer to wait for the appropriate drying period prior to undertaking some repairs likely also contributed to these ongoing issues.
This is supported by MB’s report dated 20 October 2019, which stated the cracking damage identified at that time was due to the pipe leaks and insufficient time allowed for normalisation of the underlying soil moisture. The panel accepts this shows there were ongoing issues with the insurer’s repairs throughout the history of the claim. MB’s report dated 15 October 2020 found some of the further reported damage falls within the original claim and also notes poor quality repairs by the insurer’s trades.
Regarding CR’s report dated 6 March 2024, the panel does not accept its findings. The reasoning does not take into account the extensive history of the claim, the original pipe leak, and the subsequent inadequate and defective repairs by the insurer over the years. The panel does not find CR’s report persuasive.
In the circumstances, the panel is satisfied the damage is due to the original leak, which is accepted accidental damage under the policy, as well as defective repairs from the insurer, which the insurer is liable to cover outside the terms of the policy.
The panel is not satisfied the insurer has shown any of the exclusions relied on are applicable in the circumstances. The insurer is liable for all current movement and cracking damage at the property and is liable for the rectification of the sewer pipe. The insurer’s cash settlement offer does not reflect its liability on the claim.
The complainants want settlement based on their quote, which they say is the full cost to repair the damage due to the original claim and subsequent repairs.
The complainants’ figure is based on SR’s quote, which includes:
· site establishment and preliminaries: $19,898
· demolition and strip-out: $16,598
· complete sewer removal, replacement, slab cutting and reinstatement: $255,000
· ground floor bathroom reconstruction: $37,254
· flooring reinstatement: $25,748
· kitchen reconstruction: $72,587
· pantry reconstruction: $15,800
· total building rectification cost (incl. GST): $487,173.50.
The panel notes the insurer had the opportunity to assess the complainants’ quote but did not do so. However, given the significant costs involved, the panel considers it fair for the insurer to arrange for a further scope of works and quote for the damage. This should cover all movement and cracking damage to the property and rectification of the sewer pipe and should be resolved as follows:
· within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to provide a list of three experts, who are independent and who have not previously been involved with the complaint, to the complainants;
· within 7 days of receiving the list of experts, the complainants are required to communicate their choice to the insurer;
· within 14 days of being notified of the complainants’ chosen expert, the insurer is required to engage them to provide a scope of works;
· within 14 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote; and
· within 14 days of receiving the quote, the insurer is required to cash settle the complainants with a 15% uplift for contingencies and the loss of a lifetime guarantee on repairs.
Fair for the insurer to pay temporary accommodation costs
The complainants want temporary accommodation costs for the duration of repairs as they say the house will be unliveable and unsafe. The complainants provided an email from a real estate agent stating a similar home will be $1,500 per week.
The policy covers extra costs if they relate to loss or damage caused by or arising from accidental loss or damage covered by the policy. This includes where the insured is unable to live in the building after the damage has occurred. This is limited to an amount equal to the amount that the buildings could have been rented out for each week if the loss or damage had not occurred. The most the insurer will pay is 20 per cent of the building sum insured.
Considering the extent of repairs required, the possibility of additional unidentified damage requiring repairs, the time needed to dry the ground, along with the absence of compelling information from the insurer to show the claimed amount is otherwise unreasonable, the panel accepts the complainants’ claim for temporary accommodation is fair. The insurer is to settle the complainants $39,000 for temporary accommodation.
2.2 Are the complainants entitled to non-financial loss compensation?
Yes. The circumstances of the complaint warrant an award of compensation of $5,000.
AFCA can award compensation for non-financial loss
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
Complainants should be aware that non‑financial loss is not awarded where a person experiences the normal degree of inconvenience when a problem occurs. Non‑financial loss compensation is also not intended to be a punishment for any wrongdoing by the insurer.
Compensation warranted in the circumstances
The insurer acknowledged there were issues in the handling of the claim, which led to delays on the claim.
The complainants made detailed submissions addressing errors they say occurred on the claim and the impact this has had on them.
The insurer appears to accept it made errors when it did not wait an appropriate drying out period before undertaking repairs and failed to conduct further investigations about resultant damage that may be due to this failure. The panel accepts these errors led to extensive delays and undue inconvenience for the complainants.
The exchanged information shows the original claim was submitted on or around 5 June 2012. It has been reopened several times to rectify faulty workmanship and address continued and reoccurring damage.
Despite acknowledging the faulty workmanship, the insurer:
· decided it was appropriate to cash settle the cost to reline the sewer pipes for a third time, even though it had failed twice,
· did not act on engineer MB’s findings and recommendations,
· had very long gaps where no action was taken, and
· changed its position on the claim 14 years after it was lodged.
The panel considers it fair in the circumstances for the insurer to pay the complainants $5,000 in non-financial loss compensation to account for these errors and the impact they had on the complainants.
2.3 Why is the outcome fair?
The exchanged information shows the claimed damage is due to an escape of liquid event, as well as faulty workmanship from the insurer’s trades. The panel is satisfied it would be unfair to allow the insurer to undertake further inspections on the cause of damage for a claim that has been ongoing for 14 years. The panel is satisfied it is fair in the circumstances for the insurer to pay them temporary accommodation and accept the claim for the building movement damage and sewer pipe repairs.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.