1 Determination overview
1.1 Complaint
The complainant holds a home buildings insurance policy with the financial firm (the insurer). He lodged a claim after his home was damaged by Cyclone Alfred in March 2025.
The insurer’s builder said some of the damage at the home (the accepted damage) was consistent with the cyclone. The insurer’s builder quoted $12,825.65 to repair the accepted damage. The insurer has offered to pay this amount to settle the claim.
The complainant says the cyclone caused additional damage (the disputed damage). He says the cost of repairing all cyclone damage is more than $260,000. The insurer says the disputed damage does not appear to have been caused by the cyclone, and some of it existed before the complainant bought the home.
The insurer has offered to appoint an engineer to inspect the home. The complainant says there is already enough evidence (including a report from his own engineer) to show the disputed damage was caused by the cyclone. He says the insurer should pay:
· the cost of repairing all claimed damage
· the cost of mould remediation
· for alternative accommodation while his home is unliveable
· the costs of his expert reports
· compensation for non-financial loss (stress, inconvenience, and delay).
This complaint was referred to a panel for determination.
1.2 Issues and key findings
Is the insurer required to cover the disputed damage?
No. The expert reports provided so far do not show the disputed damage was caused by the cyclone. At this stage, the insurer is not required to cover the disputed damage.
If the complainant agrees, the insurer must appoint an engineer to inspect the home. The insurer must then reconsider its position after reviewing the engineer’s report.
Should the insurer pay more for the accepted damage?
Yes. The insurer is entitled to settle the claim based on its builder’s quote. However, the insurer must pay a 10% allowance for the transfer of risk due to cash settlement.
Is the insurer liable for mould damage?
Yes. Mould damage to 6 August 2025 occurred because of the cyclone, and because the insurer took no action to treat or contain the mould. Any mould that developed after 6 August 2025 occurred because the complainant did not remediate the mould, and did not allow the insurer to access the property.
The insurer must pay the cost of mould remediation as at 6 August 2025, and the cost of post-remediation verification.
Is the complainant entitled to other compensation?
Yes. The insurer must pay:
· the cost of two months’ accommodation
· $5,000 towards the cost of the complainant’s expert reports
· $5,000 compensation for non-financial loss.
Why is the outcome fair?
It is fair for the insurer to pay for the damage caused by the cyclone, and for losses caused by its errors. If would not be fair to require the insurer to pay for damage that existed before the complainant bought the home. The panel is satisfied that this determination provides the fairest possible outcome, based on the information provided by the parties.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer must pay the complainant:
· $12,825.65 for cyclone damage (excluding mould damage)
· $1,282.57, plus interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 26 May 2025, for the transfer of risk due to cash settlement
· $54,243.75, plus interest at the rate determined under section 57 of the Act from 12 December 2025, for mould remediation
· the reasonable cost of post-remediation verification
· the reasonable cost of two months’ accommodation
· $5,000 towards the cost of the complainant’s expert reports
· $5,000 compensation for non-financial loss.
The insurer may deduct any amounts already paid for these expenses from these amounts.
If the complainant agrees, the insurer must appoint an engineer to inspect the home and assess whether the cyclone caused any of the following damage:
· movement damage (in addition to the cracking present before the complainant bought the home)
· sagging of a section of roof tiles
· displacement of the jetty pier.
The insurer is not required to take any other action in relation to this complaint.
2 Reasons for determination
2.1 Is the insurer required to cover the disputed damage?
No. The expert reports provided so far do not show the disputed damage was caused by the cyclone. At this stage, the insurer is not required to cover the disputed damage.
If the complainant agrees, the insurer must appoint an engineer to inspect the home. The insurer must then reconsider its position after reviewing the engineer’s report.
Insured property damaged by cyclone
The insured property is on the waterfront, and features a jetty and a revetment wall (a waterside retaining wall).
The complainant bought the home in January 2022. A different insurer insured the home between 2022 and 2025. The insurer insured the home from 27 January 2025.
Between 6 March 2025 and 13 March 2025, the home was damaged by Cyclone Alfred. The complainant stayed with a nearby relative but checked his home daily. The complainant moved back into his home on 14 March 2025.
On 12 March 2025, the complainant lodged a claim for damage caused by the cyclone. According to the insurer’s records, the complainant said the cyclone had caused extensive damage, including:
· water damage to ceilings in the lounge room, kitchen, and bedroom
· cracking in multiple rooms
· damage to the garage roller door
· damage to the granny flat
· damage to the pool pump
· cracking in the revetment wall
· damage to the jetty caused by a neighbour’s pontoon hitting the jetty.
Insurer appointed experts to inspect property
On 14 March 2025, the insurer’s loss adjuster inspected the home and said:
· the complainant said the storm had caused water damage, cracking, and subsidence
· the cause of water entry was unclear
· the cracking looked like movement and settlement cracking, not storm damage
· it was not clear that any subsidence was caused by a storm.
The loss adjuster said it had asked the insurer’s builder to assess the cause of damage, and a further assessment by an engineer may be warranted.
On 27 March 2025, the insurer’s builder inspected the home and said:
· the following damage was consistent with the cyclone:
> visible mould on the garage ceiling
> water damage to the front office main ceiling and lower wall
> water damage to the lounge room main ceiling and lower wall
> water staining around an LED light in the dining room
> water staining around an LED light in the bedroom
> water damage to the rear wall of the rear patio
> blistering on two soffit sheets on the eastern elevation
> water entry to an exterior light fixture at the front entry
· the following damage was consistent with long-term moisture exposure:
> water damage and sagging of the garage ceiling. This was caused by wind-driven rain entering the ceiling void over an extended period. There was overpaint and paint build-up at tile lap intersections, causing water ponding beneath the tile lap
> water staining and timber rot around a northern soffit vent pipe
> deteriorated timber trims of the soffit and fascia of the granny flat
· the building had movement cracks, but there was no evidence that the movement was caused by a storm.
The insurer’s builder recommended appointing an engineer to determine the cause of the movement damage. However, the loss adjuster found online photographs showing cracks in external walls before the complainant bought the property. The insurer decided there was already enough evidence to show the movement damage was not caused by the storm, so there was no need to appoint an engineer.
On 7 April 2025, the insurer’s electrician inspected the home. The electrician recorded damage to the solar system, pool pump, and garage roller door, but said none of this damage was caused by the cyclone.
On 20 May 2025, the insurer’s builder quoted $12,825.65 to repair the damage consistent with the cyclone.
On 26 May 2025, the insurer wrote to the complainant saying it would pay $12,825.65 for the damage in its builder’s quote, but would not pay for any other damage.
Complainant appointed experts to inspect property
On 1 June 2025, the complainant’s electrician inspected the solar system and said it had been damaged by a power surge.
On 2 June 2025, the complainant’s engineer inspected the home and said the following damage was consistent with the cyclone:
· movement damage in the garage, kitchen, and study
· sagging of a section of roof tiles
· a near-vertical crack in the revetment wall (and associated damage to the pool surround slab and fence at the top of the wall)
· displacement of a concrete pier under the jetty.
On 20 June 2025, the complainant obtained a quote for $262,000 for repairs. The quote referred to ‘rotten roofing timbers from storm’, but did not say anything else about the cause of damage.
On 28 July 2025, the complainant lodged this AFCA complaint about the insurer’s handling of the claim.
On 6 August 2025, the complainant’s biologist inspected the home. The biologist reported visible mould growth in several rooms. The biologist said the property required ‘immediate remediation efforts’.
On 8 September 2025, the complainant obtained a quote for $43,395 for mould remediation.
On 12 September 2025, the complainant obtained a quote for $266,750 for repairs. The quote said it was based on the complainant’s engineer’s report.
No further reports provided
The insurer appointed a building consultant to inspect the home and provide a report. The building consultant inspected the home on 4 August 2025, but never provided a report. The building consultant recommended appointing an engineer and a hygienist to inspect the home.
On 4 September 2025 (verbally) and 12 September 2025 (in writing), the insurer offered to appoint an engineer and a hygienist to inspect the home. The complainant did not agree to allow any further inspections.
On 15 January 2026, the complainant said he would not allow any further inspections until AFCA issued its determination. The complainant said he believed the inspections already completed provided sufficient evidence.
Insurer’s builder correctly assessed water damage
The complainant obtained a pre-purchase inspection report dated 12 January 2022.
The pre-purchase inspection report said some roof tiles were cracked and would need to be replaced to prevent leaks into the roof cavity. It also noted water damage and sagging to some ceilings, including in the garage and the granny flat. This supports the insurer’s builder’s finding that damage in these areas was consistent with long-term moisture exposure, not the cyclone.
The insurer’s builder said the roof had leaked because of overpaint and paint build-up at tile lap intersections. The complainant’s engineer said the insurer’s builder’s photos only showed overpaint between two tiles, which was ‘negligible’ and not enough to cause roof leaks. However, the engineer also said sagging plasterboard ceilings are common in older homes (the house was built in 1989), as they are often fixed with glue that deteriorates. The engineer did not give any other explanation for the sagging.
The insurer’s builder’s report distinguished between new water damage consistent with the cyclone and long-term water damage that pre-dated the cyclone. This assessment is supported by the pre-purchase inspection report, and not refuted by any persuasive evidence. Having considered the information provided by both parties, the panel believes the insurer’s builder’s assessment was correct.
Evidence does not show cyclone caused movement damage
The complainant’s engineer recorded the following movement damage:
· a diagonal crack above a window in the kitchen
· a crack in the corner of ceiling in the garage
· movement of skirting boards in the corner of the study.
The engineer said this damage was not recorded in the pre-purchase inspection report. However, the damage may have been present without being recorded. Photographs show there was cracking in external walls before the complainant bought the home, but this cracking was not recorded in the pre-purchase inspection report.
The engineer said the corner of the garage ceiling had been cracked by ‘roof truss uplift, which occurred as a result of storm-driven rain entering the roof cavity’. The engineer did not explain how they reached this conclusion. The pre-purchase inspection report showed there was pre-existing damage to the garage ceiling, but the engineer did not appear to consider this in their assessment.
The engineer said storm-driven rain entering the roof cavity had caused foundation movement. There is evidence that water entered the roof cavity and damaged ceilings, but there is no evidence that a significant amount of water travelled all the way from the roof cavity to the foundations. The engineer did not explain how water entering the roof cavity could have caused foundation movement.
The panel is not persuaded that the cyclone caused any movement damage.
Evidence does not show cyclone caused sagging roof tiles
The complainant’s engineer said a section of the tiled roof had subsided. They said this damage was ‘consistent with the direction of the cyclone winds’.
The insurer’s building consultant said the home underwent extensive renovations between January 2021 and January 2022 (immediately before the complainant bought the home). During the renovations, an internal wall was removed, causing the roof over it to sag.
The building consultant said they told the complainant the insurer would ask his permission to obtain a copy of the building approvals for the renovations, but the complainant was ‘quite adamant that he would not comply with this request’.
The building consultant emailed the engineer saying the roof sagged because an internal wall had been removed. The engineer replied saying there was no evidence the roof had been modified, but did not comment on the building consultant’s claim that the internal wall supporting the roof had been removed.
The panel is not persuaded that the cyclone damaged the roof.
Cyclone did not cause crack in revetment wall
The complainant’s engineer said:
· there was a near-vertical crack in the revetment wall (and associated damage to the pool surround slab and fence at the top of the wall)
· there was a clear washout gap beneath the base of the wall. It was believed the cyclone caused soil washout, which caused the cracking
· the cracking was unlikely to have been caused by settlement because settlement cracks usually occur within five years of construction, and the crack was not referenced in the pre-purchase inspection report from 2022.
The pre-purchase inspection report did not mention the revetment wall. However, the revetment wall is visible in the background of some photographs in the report. One of the photos shows a crack near the top of the wall. This is the top of the crack identified and photographed by the complainant’s engineer. The shape of the crack and the pattern of water staining on the bricks is the same in both photos. The complainant’s engineer said this crack was likely caused by the cyclone in 2025, but the photo in the pre-purchase inspection report shows the crack was present in 2022.
The panel is not persuaded that the cyclone damaged the revetment wall, pool surround slab, or fence.
Evidence does not show cyclone damaged jetty pier
The complainant’s engineer said a concrete pier supporting the jetty had been displaced. The insurer’s building consultant emailed the engineer saying there was ‘minimal movement’ to the jetty. The complainant’s engineer replied that they disagreed, and believed the structural integrity of the jetty had been compromised.
The pre-purchase inspection report noted damage to the deck and stairs leading down to the jetty, but did not include any photos or comments about the jetty or the piers supporting it.
The complainant’s engineer said the pier was displaced by ‘strong waves and rising water levels’. They did not provide any further detail. They did not say:
· when the pier was displaced
· whether the displacement occurred during a single event or over several years
· how they determined the cause of the displacement.
The panel is not persuaded that the cyclone damaged the jetty or the jetty piers.
Cyclone did not cause electrical damage
On 7 April 2025, the insurer’s electrician inspected the home and said:
· over 90% of the solar panels had visible ‘micro-cracks’ caused by impacts. Thermal imaging showed the impacts had caused internal damage and reduced the panels’ performance. The impacts were likely caused by one or more hailstorms. Cyclone Alfred was unlikely to have caused any of this damage because it did not include hail
· the pool pump had a damaged electrical cord with visible wear and tear. The complainant had tried to repair it using electrical tape. The cord was likely damaged by old age, not the cyclone
· the garage roller door was slow and did not fully close. The electrical circuits were functioning normally. The performance issues were likely due to mechanical parts needing servicing.
The complainant has not provided information refuting the insurer’s electrician’s findings about the pool pump and the garage roller door. However, the complainant provided an electrician’s report about the solar system.
On 1 June 2025, the complainant’s electrician inspected the solar system and said:
· the inverter would not start up and displayed error codes 002 and 003. It contained burnt wiring and an exploded component
· the inverter was likely damaged by a power surge caused by ‘storm/lighting damage to the local transformer’. This power surge had also damaged the solar panels
· the damage aligned with severe weather events such as Cyclone Alfred.
The complainant’s electrician took photographs of the inverter, but did not take photographs of the solar panels or comment on their condition. They do not appear to have inspected the panels. They did not comment on the insurer’s electrician’s report, which provided photographs of the panels and said they showed impact damage.
The complainant provided a copy of an electricity bill dated 5 August 2025. The bill shows his solar exports gradually decreased to nil between October 2024 and May 2025, and remained at nil from May 2025 to August 2025. There was no sudden decrease in March 2025.
The panel is not persuaded that the cyclone damaged the solar system, pool pump, or garage roller door.
Insurer must appoint engineer if complainant agrees
The expert reports provided so far do not show the disputed damage was caused by the cyclone. However, the expert reports lack detail in some areas.
The insurer has offered to appoint an engineer to inspect the property. If this is allowed, the insurer’s engineer’s report may provide evidence that the cyclone caused or contributed to some the disputed damage.
If the complainant allows it, the insurer must appoint an engineer to inspect the property. The insurer must then review the engineer’s report and consider whether the cyclone caused any damage it has not already agreed to cover.
Any engineer appointed by the insurer is only required to investigate whether the cyclone contributed to the following damage:
· movement damage (in addition to the cracking present before the complainant bought the property)
· sagging of a section of roof tiles
· displacement of the jetty pier.
The insurer has enough evidence to justify denying cover for the other disputed damage without obtaining any further reports. The insurer is not required to arrange any further expert reports on the other disputed damage, including:
· sagging of the garage ceiling (present when the complainant bought the home)
· the crack in the revetment wall (present when the complainant bought the home)
· electrical damage (addressed in the electricians’ reports).
2.2 Should the insurer pay more for the accepted damage?
Yes. The insurer is entitled to settle the claim based on its builder’s quote. However, the insurer must pay a 10% allowance for the transfer of risk due to cash settlement.
Insurer entitled to settle claim based on insurer’s builder’s quote
The insurer’s builder’s report distinguished between new water damage consistent with the cyclone and long-term water damage that pre-dated the cyclone. As stated above, the panel believes the insurer’s builder’s assessment was correct.
The complainant has not provided information showing the cyclone caused damage to the property, other than the accepted damage. At this stage, the insurer is not required to cover any other damage to the property.
If the complainant allows the insurer to appoint an engineer to inspect the property, and the engineer’s report indicates the cyclone caused additional damage, the insurer must consider whether this damage is covered under the policy. In the meantime, the insurer is entitled to settle the claim for the accepted damage.
On 20 May 2025, the insurer’s builder quoted $12,825.65 to repair the damage consistent with the cyclone. The complainant has not provided information showing this would be insufficient to repair the accepted damage. The panel considers it fair for the insurer to settle the claim for the accepted damage based on this quote.
Insurer must pay 10% allowance for transfer of risk
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should consider paying an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
The repairs quoted by the insurer’s builder were superficial and non-structural. The risk of additional damage was low. The panel considers a fair allowance for the transfer of risk would be 10% of the estimated cost of repairs ($1,282.57).
Insurer required to pay interest on allowance
Section 57 of the Act says an insurer must pay interest on a claim settlement payment from the time it was unreasonable to have withheld payment.
The insurer offered to pay $12,825.65 for the accepted damage. The insurer said the complainant could accept this payment while the case remained under review. The insurer did not withhold this amount. Therefore, the insurer is not required to pay interest on the amount.
The insurer must pay interest on the 10% allowance for the transfer of risk from 26 May 2025, the date the insurer offered to settle the claim by paying the amount of the insurer’s builder’s quote.
The insurer must settle the claim for the accepted damage by paying:
· $12,825.65, with no interest
· $1,282.57, plus interest at the rate determined under section 57 of the Act from 26 May 2025.
2.3 Is the insurer liable for mould damage?
Yes. Mould damage to 6 August 2025 occurred because of the cyclone, and because the insurer took no action to treat or contain the mould. Any mould that developed after 6 August 2025 occurred because the complainant did not remediate the mould, and did not allow the insurer to access the property.
The insurer must pay the cost of mould remediation as at 6 August 2025, and the cost of post-remediation verification.
Cyclone caused mould damage in March 2025
On 27 March 2025, the insurer’s builder said the garage ceiling had ‘evidence of recent water ingress consistent with [Cyclone Alfred] causing visible mould’.
The insurer’s builder said the garage ceiling showed evidence of pre-existing water damage caused by long-term roof leaks. The pre-purchase inspection report supported this finding. However, the insurer’s builder did not say the pre-existing leaks had caused any mould damage. None of the expert reports say the home had pre-existing mould damage.
The evidence indicates the home had pre-existing roof leaks which had caused water damage, but had not caused mould damage. The evidence indicates the mould damage in the garage ceiling was caused by the cyclone. This mould damage is covered under the policy.
Insurer liable for additional mould growth to August 2025
On 27 March 2025, the insurer’s builder reported visible mould in the garage. The insurer took no action to treat or contain the mould.
On 20 May 2025, the complainant emailed the insurer saying the mould was ‘getting worse’ despite his attempts at cleaning and drying. He asked: ‘Should I source someone to come out to test the [mould] levels in the kids bedrooms or do you do that?’ The insurer did not respond to this question.
On 22 July 2025, the complainant emailed the insurer saying the mould was ‘now growing and spreading’.
On 6 August 2025, the complainant’s biologist reported visible mould growth in multiple rooms. The biologist said a water-damaged mat had been left in the garage, providing ‘a perfect environment for mould’.
On 20 August 2025, according to the insurer’s notes, the insurer’s building consultant said the mould in the home was ‘minimal’. However, the building consultant is not a mould specialist and did not provide a report. The panel gives this comment much less weight than the biologist’s report.
On 3 September 2025, the insurer’s building consultant emailed the insurer saying the home had wet carpet which ‘should have been removed immediately’.
The mould damage at the property became worse between 27 March 2025 (when the insurer’s builder reported mould) and 6 August 2025 (when the complainant’s biologist inspected the home). This occurred because the insurer did not do anything to treat or contain the mould, and did not tell the complainant he should do anything to treat or contain the mould.
The insurer is responsible for the mould damage reported on 27 March 2025 because it was caused by the cyclone. The insurer is responsible for the additional mould damage that occurred between 27 March 2025 and 6 August 2025 because it was caused by the insurer mishandling the claim.
Insurer not liable for additional mould growth after August 2025
On 26 May 2025, the insurer said its builder could not warrant repairs due to ‘pre-existing cracking to the ceilings and maintenance issues to the roof’, so it would settle the claim by paying a cash settlement.
On 6 August 2025, the complainant’s biologist said the home had ‘critical issues that necessitate immediate remediation efforts’.
From 4 September 2025, the insurer offered to appoint a hygienist to inspect the home, but the complainant did not allow such an inspection.
After receiving his biologist’s report, the complainant knew his home needed urgent mould remediation work. He also knew the insurer was not arranging any such work. Therefore, it was his responsibility to arrange the work.
The mould damage at the home may have become worse since the biologist’s inspection of 6 August 2025. If so, this has occurred because the complainant has not remediated the mould, and has not allowed the insurer to access the property. The insurer is not responsible for any additional mould damage that occurred after 6 August 2025.
Best estimate of mould remediation cost is $43,395
On 8 September 2025, the complainant obtained a quote for $43,395 for mould remediation. The insurer has not provided information showing this was excessive.
On 26 August 2025, the complainant obtained a quote for $20,432.50 for the replacement of the air conditioning system. However, the mould remediation quote included full remediation of the air conditioning system, including the replacement of all flexible ductwork. The insurer is not required to pay for a new air conditioning system in addition to paying for the remediation of the existing air conditioning system.
From 4 September 2025, the insurer has offered to appoint a hygienist to inspect the home, but the complainant has not allowed such an inspection. Since that time, the insurer has not had an opportunity to obtain its own reports on the extent of mould damage in the home or the cost of remediating the mould. The insurer said it was unwilling to pay the $43,395 quoted for mould remediation without an inspection by its hygienist.
The panel has considered whether the insurer should be given another opportunity to inspect the property before being required to pay for mould remediation. However, the insurer is only liable for the cost of repairing the mould damage that existed on 6 August 2025. The best available estimate of this cost is the quote dated 8 September 2025 for $43,395. Any assessment conducted now would be unlikely to produce a more accurate estimate.
Insurer must pay 25% allowance for transfer of risk
In addition to the quoted cost of mould remediation, the insurer should consider paying an allowance for the transfer of risk.
The mould remediation quote is based on estimates of how much building material will need to be removed and how long drying equipment will need to be operated. These estimates necessarily involve a degree of uncertainty. There is a high risk that the cost of mould remediation will be higher than estimated. There is also a risk that the mould remediation work, if not done correctly, could cause the mould to spread.
For the above reasons, the panel considers a fair allowance for the transfer of risk would be 25% of the estimated cost of mould remediation.
The estimated cost of mould remediation is $43,395. 25% of this amount is $10,848.75. These amounts total $54,243.75.
Insurer must pay interest
Section 57 of the Act says an insurer must pay interest on a claim settlement payment from the time it was unreasonable to have withheld payment. The panel considers this to be 12 December 2025, two weeks after the insurer was provided a copy of the quote for mould remediation.
The insurer must settle the claim for mould remediation costs by paying $54,243.75, plus interest at the rate determined under section 57 of the Act from 12 December 2025.
Insurer must pay for post-remediation verification
The mould remediation quote does not include post-remediation verification. Post-remediation verification is necessary to confirm the remediation was successful.
The insurer must obtain a quote for the fair and reasonable cost of post-remediation verification at the insured property, and pay this amount to the complainant.
2.4 Is the complainant entitled to other compensation?
Yes. The insurer must pay:
· the cost of two months’ accommodation
· $5,000 towards the cost of the complainant’s expert reports
· $5,000 compensation for non-financial loss.
Insurer must pay for two months’ accommodation
The policy covers the reasonable costs of temporary accommodation if the insurer agrees to cover damage to the home and the damage makes the home unfit to live in.
The biologist’s report of 6 August 2025 said the home had mould which could pose health risks. The insurer should have offered to cover temporary accommodation from 6 August 2025.
The mould remediation quote of 8 September 2025 estimated mould remediation would take 8-10 days, not including post-remediation verification. The insurer should have offered to cover temporary accommodation for two weeks from the date of the mould remediation quote, plus an additional two weeks to allow time for post-remediation verification (i.e. to 6 October 2025).
The insurer must pay the reasonable cost of temporary accommodation from 6 August 2025 to 6 October 2025.
Insurer must pay $5,000 for complainant’s professional costs
Under the AFCA Rules, we can require an insurer to contribute to professional costs a complainant incurred in making a complaint. We cannot award more than $5,000 for professional costs unless there are special circumstances. The panel does not consider there are special circumstances in this case that would justify awarding more than $5,000.
In considering whether an insurer should contribute to a complainant’s costs, we consider whether they were reasonably incurred, and whether they helped resolve the complaint.
The complainant has provided invoices showing he was charged:
· $2,590 for his engineer’s inspection and report
· $3,400 for his biologist’s inspection, samples, lab tests, and report.
The insurer’s builder recommended appointing an engineer, but the insurer decided not to appoint an engineer. In the circumstances, it was reasonable for the complainant to appoint an engineer.
The cyclone caused mould damage, and the insurer took no action to treat or contain the mould. In the circumstances, it was reasonable for the complainant to appoint a biologist.
The insurer must contribute $5,000 to the complainant’s professional costs.
Insurer must pay $5,000 compensation for non-financial loss
Under the AFCA Rules, we can award up to $6,300 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim.
We will only award this type of compensation if there has been an unusual degree of stress, inconvenience, or delay. We will not award compensation for the usual amount of inconvenience involved in making a claim. We will not award compensation for delays caused by a complainant, or other factors outside the insurer’s control.
When the insurer’s building consultant inspected the home on 4 August 2025, they left their dog in their car. The complainant says the dog was in the car for over three hours until a neighbour discovered it and got it out. The panel believes it was wrong for the building consultant to leave the dog in the car. However, the complainant did not know about the dog until after it was out of the car, so it did not cause him an unusual degree of stress or inconvenience.
The insurer initially provided only one page of its electrician’s report of 7 April 2025. The insurer provided a full copy of the report on 23 September 2025. The initial failure to provide a full copy of the report caused a minor degree of inconvenience.
The cyclone caused mould damage which was initially confined to the garage. However, because the insurer took no action to treat or contain the mould, it spread to other parts of the building. The complainant says this made the home unsafe for his family, especially as his wife was pregnant. He says they had to move in with a family member.
The biologist’s report of 6 August 2025 said the property had mould which could pose health risks. The panel accepts it was unsafe for the complainant and his family to live in the home. The complainant was forced to move out of the home because of the insurer’s failure to treat or contain the mould. This caused severe stress and inconvenience.
The panel considers the stress and inconvenience caused by the insurer’s errors warrants compensation for non-financial loss in the sum of $5,000.
2.5 Why is the outcome fair?
It is fair for the insurer to pay for the damage caused by the cyclone, and for losses caused by its errors. If would not be fair to require the insurer to pay for damage that existed before the complainant bought the home. The panel is satisfied that this determination provides the fairest possible outcome, based on the information provided by the parties.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
Complainant represented by family member or friend
The complainant was represented by a family member or friend. In this determination, submissions made by the complainant’s representative are treated as if they were made by the complainant.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with extensive experience in consumer and small business advocacy
· a member with extensive experience in insurance.
3.2 Relevant policy terms
Product Disclosure Statement
|
PART 1 LOSS OR DAMAGE TO YOUR HOME (pages 15 – 23)
|
The events we insure you for
We only insure you if the loss or damage to the home:
· is caused by one or more of the 13 events we list below,
· happens in the period of insurance, and
· is not excluded either by the specific exclusions we list in this section under ‘What we do not insure you for’, any of the General Exclusions we list on page 32, or any exclusions listed on your certificate.
|
6 Storm, snow or hail
What we insure you for
We insure you for loss or damage to the home caused by storm (including cyclone), snow or hail.
By ‘storm’ we mean a violent wind that may occur with thunder or heavy rain.
What we do not insure you for
We do not insure you for loss or damage caused by wind, rain, snow or hail entering the home unless it enters because of structural damage to the home that is directly caused by the storm, snow or hail.
|
7 Rain
What we insure you for
We insure you for loss or damage to the home caused by rain. Rain includes that part of the rainfall that is not absorbed by the soil but runs off as surface water.
What we do not insure you for
We do not insure you for loss or damage caused by rain seeping into or entering the home because of:
· defects in the structure or design of the home
· defects in building work done on the home
· an opening made in the home so that it could be added to, renovated, repaired or modified
· failing to properly maintain the home.
We do not insure you for loss or damage to the external paint work or other external coatings on the home.
|
What we pay
A. Repairing or rebuilding your home
If we agree to pay a claim for loss or damage to the home, we may choose to:
· pay you a cash amount for what we think are the reasonable costs of repairing or rebuilding the home, or
· pay the reasonable costs you actually incur in repairing the home if it is damaged (but if it costs less to rebuild the damaged part of the home than to repair it, we will pay the reasonable costs of rebuilding it instead), or
· pay the reasonable costs you actually incur in rebuilding the home if it is destroyed.
…
We will pay the reasonable costs of repairing or rebuilding the home on a ‘new for old’ basis to a condition substantially the same as but not better than when new.
…
Please also note, we will only pay your costs in getting quotes or inspection reports if we agree to do so before you get them.
B. Additional expenses we pay for
As part of your sum insured, we insure you for these additional expenses:
· temporary accommodation
…
Please note, the most we will pay for each claim for all of these additional expenses is 20% of the sum insured.
C. Temporary accommodation
We will pay you the reasonable costs of temporary accommodation (including temporary accommodation for your household pets) if:
· we agree to pay your claim for loss or damage to the home, and
· the loss or damage makes the home unfit to live in.
We will only pay you the reasonable costs of temporary accommodation that you are actually responsible for paying.
We will pay these costs:
· for the reasonable time it takes to repair or rebuild the home, or
· for up to 12 months from the date of the loss or damage,
whichever is less.
…
|
PART 2 ACCIDENTAL LOSS OR DAMAGE (pages 24 – 25)
|
In addition to insuring you for loss or damage to the home that is caused by an event (see Part 1), we also insure you for other accidental loss or damage to the home. We automatically provide you with this insurance when you buy this policy. It is part of your sum insured for Part 1: Home Building.
|
What we insure you for
We only insure you if the loss or damage to the home:
· happens during the period of insurance, and
· is accidentally and directly caused by a sudden and unexpected event (other than by an event we insure in Part 1), and
· your claim is not excluded by the specific exclusions listed below in the ‘What we do not insure you for’ section, any of the General exclusions on page 32, or any exclusions listed on your certificate.
|
Limits on what we pay
The most we will pay for each claim for accidental loss or damage is $5,000.
…
|
PART 7 GENERAL EXCLUSIONS (page 32)
|
…
We do not insure you for loss or damage or legal liability caused by:
· failing to keep the home or site in good repair and condition
…
· defects in structure, design, work done, or materials used on the home or at the site
· wear and tear
· rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or process