Partial denial of remaining storm-related building damage, defective repairs, temporary accommodation cut-off and claim delays
Text of the determination
Determination
|
Case number
|
12-25-277011
|
Financial firm
|
AAI Limited
Case number: 12-25-277011 28 May 2026
1 Determination overview
1.1 Complaint
The complainant holds an insured events home building policy with the financial firm (the insurer) for her home in New South Wales (the property). The policy was issued on 14 July 2021. The relevant period of insurance is 16 August 2021 to 16 August 2022.
The complainant lodged a claim for damage to the property on 16 March 2022. She says the damage was caused by a storm that occurred on about 3 March 2022.
The insurer investigated the circumstances of the loss and damage. It then accepted the claim and elected to manage and complete repairs to the property.
Most of the repairs have now been completed. However, the complainant remains dissatisfied with aspect of the claim and the claim process. She says:
· repairs to the property were delayed and not properly completed
· this prevented her from safely returning home in a timely manner
· claim delays and defective repairs caused additional damage to some of her contents
· the insurer incorrectly denied cover for some of the storm-related damage
· the insurer should cover the costs associated with further temporary accommodation
· the insurer should properly complete the outstanding repairs and remedial works
· the insurer has mismanaged the claim, and this has caused her unnecessary stress, anxiety and upset
· the insurer should therefore pay her compensation for non-financial loss.
The insurer says, amongst other things, most of the damage that remains in dispute was not caused by the insured event, the property met minimum habitability standards when it stopped paying for temporary accommodation, and it has met its obligations under the terms and conditions of the policy.
1.2 Issues and key findings
Should the insurer provide cover for all of the remaining claimed building damage?
No. The exchanged material shows some of the claimed damage that remains in dispute was not caused by the storm or during the repairs. It follows the insurer is entitled to deny the claim insofar as it relates to this damage.
Should the insurer cover further temporary accommodation costs?
Yes. The property was not deemed safe for the complainant to return. The insurer should therefore provide cover for the costs associated with further temporary accommodation in accordance with the terms of this determination.
Should the insurer provide cover for additional damaged contents?
No. There is no persuasive evidence that the claimed additional contents were damaged by the insured event or by reason of the remediation works and repairs. Moreover, the complainant has not established that the ‘loss of utilisation’ of contents equates to damage which should be covered by the insurer.
Is the complainant entitled to non-financial loss?
Yes. The exchanged material shows the insurer should pay the complainant $1,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the insurer must complete the rectification works it has accepted
· the insurer is not required to cover building damage that was not caused by the insured event (the storm) or by the insurer’s repair works
· the complainant required additional temporary accommodation because her home was not safe or secure
· there is no persuasive evidence the claimed additional contents were damaged by the insured event or during the repairs
· an award of non-financial loss compensation is appropriate and reasonable in this instance.
1.3 Determination
This determination is substantially in favour of the complainant.
The complaint should be resolved in accordance with Section 2.5, below, the terms and conditions of the policy, and the matters set out in this determination.
2 Reasons for determination
2.1 Should the insurer provide cover for all of the remaining building damage?
No. The exchanged material shows some of the claimed damage that remains in dispute was not caused by the storm or during the repairs. It follows the insurer is entitled to deny the claim insofar as it relates to this damage.
Complainant says some repairs were not completed properly and some storm-related damage has not been accepted
The property includes a single story, three-bedroom, double brick dwelling built in about 1936. It has a pitched tiled roof. The exchanged material shows the dwelling was generally maintained in ‘good condition’.
After the storm occurred in March 2022, the insurer accepted the claim and commenced repairs to the property.
Disputes then arose about the cause, quality and completion of some of the repairs and remedial works. The claim also developed over a prolonged period and eventually involved multiple repair stages, changes in builders and the engagement of several specialists, including assessors, engineers, hygienists and quality assurance consultants. Some of the works required re-attendance or further review after concerns were raised about workmanship and completeness.
Specific disputes involved issues about:
· whether particular damage was caused by the insured event
· whether additional damage occurred during the repair process, especially damage to some of the complainant’s contents
· whether repairs and remedial works arranged by the insurer were completed to an acceptable standard.
Concerns about several building items persisted, including the functionality of the bi‑fold door locks, damage to internal wall linings, paint defects, flooring issues, bathroom deterioration, and possible damage to the garage caused when it was accessed by trades during the repair process.
The complainant also says that some issues were not resolved when first raised and this led to repeated attendances and ongoing uncertainty about the condition of the property.
The insurer arranged for its trades and experts to inspect the property and report (including its assessors, engineers, hygienists and other specialists) in response to these concerns. Copies of these reports have been provided to the complainant.
Based on the evidence of these trades and experts, the insurer accepted liability for some rectification works and denied cover for other items it considered were not damaged by the storm or during the repairs.
The primary areas of concern and the building items which are still in dispute include the following:
· the bi-fold door locks
· internal living room wall linings
· the bathroom
· the stone thresholds
· the ceilings
· the garage
· whether a hygienist should be engaged by the insurer to inspect the property again after all repairs are completed
· completion of minor rectification works identified during inspections of the property.
Each of these issues is addressed below.
The bi-fold door locks
The complainant says the bi‑fold door locks did not work and the key did not turn. She says she consistently raised this as a functional issue with the insurer because it directly affects the security of her home. The complainant provided videos showing the locks did not function.
The insurer says the locks were replaced. At different points during the claim, the insurer also said the complainant had been cash settled for the locks, before later clarifying the bi‑fold door locks were not cash settled.
There is also dispute about whether the insurer did, in fact, cash settle the complainant for the replacement locks on 25 November 2025. Indeed, as of March 2026, the complainant says the locks were still not functioning properly.
Considering the exchanged material, I am satisfied the bi‑fold door locks were not satisfactorily repaired and they did not function properly.
Moreover, the complainant maintains she will be compelled to arrange for the locks to be replaced herself.
Therefore, after she has replaced the locks, if the insurer has not already done so, it must reimburse to the complainant the reasonable costs of the replacement bi-fold door locks. If necessary, the complainant must provide the insurer with a copy of the relevant invoice(s) for reimbursement.
The internal living room wall linings
The complainant raised concerns about delamination and deterioration of the wall linings in the living room. The complainant says this damage was caused by the storm or, alternatively, developed because of the repair process. She says the condition of the wall linings also worsened over time and was not adequately addressed by the insurer.
The insurer says the wall lining damage was not caused by the insured event. In this regard, it relies on a causation report prepared by SC, engineers, dated 28 March 2025.
Relevantly, SC reported:
· the dwelling was constructed in the 1930s, with plasterboard wall linings installed using the ‘direct stick’ method over rendered and painted masonry walls
· the internal wall linings had not been replaced during the insurer’s repair works
· the observed damage involved delamination of the plasterboard wall linings, with failure occurring between the painted masonry wall and the adhesive used to fix the plasterboard
· the spacing of the adhesive daubs was observed to be approximately 150 to 400 millimetres
· there was no water staining on the wall or ceiling linings near the delaminated areas
· the damage pattern was consistent with failure of the adhesive bond, rather than direct water contact.
ST, engineer, then inspected the property on 4 November 2025. ST concluded:
Although structural or workmanship defects from the original construction, as well as the building’s age and accumulated dust, may have contributed to the loss of bond between the lining and the brick wall, the primary and more recent cause is considered to be secondary to moisture ingress and prolonged damp conditions
After examining all the exchanged material in detail, I am of the opinion the proximate and dominant cause of the wall lining delamination is defective workmanship, namely inadequate surface preparation prior to installation of the plasterboard wall linings. Indeed, the evidence shows that, although moisture presence from storm-water ingress during the insured event may have contributed to the damage, the insured event was not the primary cause.
It follows the insurer is not required to accept the claim insofar as it relates to the damage to the living room wall linings.
The bathroom
The complainant raised concerns about damage and deterioration in the bathroom, including floor tile deterioration and marks. The complainant also says certain bathroom items were missing or removed during the repair process, including a toilet cistern cover, a hinge, and a strip on a bathroom cabinet door.
The insurer says the bathroom tile damage and marks were present before cleaning or are consistent with a moisture-related issue unrelated to the insured event. The insurer also says its contractors used pH-neutral cleaning products and did not cause the bathroom damage.
The insurer also says the toilet cistern cover, the bathroom hinge and the cabinet door strip did not form part of the accepted scope of works. The insurer says it was not necessary to remove these items to complete the insured repairs and there is no available information showing the insurer removed them or caused them to be removed.
The insurer relies on reporting and claim documentation which it says records marks and deterioration in the bathroom as present before cleaning commenced and notes the condition worsened over time. The insurer also relies on hygienist’s reports identifying damp issues under the building and advising sub-floor damp should be addressed to reduce moisture in the home. The insurer says this damp issue is not related to the insured event and is the likely cause of moisture-related deterioration, including to the bathroom floor tiles.
Copies of these reports have been provided to the complainant.
In all the circumstances, I am of the opinion the exchanged material shows the bathroom floor tile deterioration and marks were not caused by the insured event or by cleaning or repair works arranged by the insurer. Moreover, the insurer is not responsible, under this claim, for the toilet cistern cover, the bathroom hinge, or the missing cabinet door strip.
The stone thresholds
The complainant raised concerns about damage to the stone thresholds. She says the thresholds were cracked or damaged and should be replaced rather than repaired. She says repair would not adequately restore the appearance or integrity of the thresholds.
The insurer says the stone thresholds are repairable and do not require replacement. It relies on specialist advice obtained during the claim which says the thresholds are not structurally compromised and can be satisfactorily repaired. The insurer says repair is an appropriate and reasonable method of reinstatement under the policy.
In light of the exchanged material, I am of the opinion the stone thresholds are not structurally unsound or beyond repair. Moreover, there is no persuasive evidence that repair would fail to restore the thresholds to a reasonable pre‑loss condition.
Under the terms and conditions of the policy, the insurer is required to repair or reinstate damaged property. The policy does not require the insurer to replace items where repair is a reasonable and effective method of reinstatement.
On balance, I am satisfied the available information shows repair of the stone thresholds is a reasonable method of reinstatement. The insurer is not required to replace the stone thresholds.
The ceilings
The complainant raised concerns about the condition of the ceilings and paintwork. She says some ceilings were not repainted and anti‑mould paint was not applied throughout the property. She says this resulted in an inconsistent finish. She also raised concerns about air quality.
The insurer says it completed painting repairs to areas affected by the insured event. It says unaffected ceilings and painted surfaces met the relevant standard and did not require repainting or application of anti‑mould paint. The insurer relies on paint audit and quality assurance material obtained during the claim and upon completion of repair works. The material assessed the condition of painted surfaces and identified whether further rectification was required. The reporting concluded the ceilings and painted areas not affected by the insured event met the applicable standard set out in the policy and did not require further rectification.
The exchanged material also shows the insurer applied anti‑mould paint to areas where it considered it necessary as part of the insured repairs. Moreover, there is no persuasive evidence showing anti‑mould paint was required to be applied to unaffected ceilings or that failure to do so resulted in a breach of the insurer’s obligations under the policy.
Under the policy, the insurer is required to repair or reinstate damage caused by the insured event. The policy does not require the insurer to upgrade the property or to repaint or treat areas that were not damaged by the insured event to achieve consistency of appearance.
On balance, I am of the opinion the insurer is not required to repaint unaffected ceilings, apply anti‑mould paint to those areas, or otherwise upgrade the paint finish beyond the scope of repairs already undertaken.
The garage
The complainant raised concerns the insurer’s trades accessed the garage during the repair process and mould and other damage within the garage were caused during this access. The complainant says, and the exchanged material shows, there were multiple contractor attendances at the property over an extended period. There is no clear or consistent record confirming the garage was not accessed during those attendances.
The insurer says the garage was not part of the accepted scope of works and it had previously declined liability for garage mould and associated damage. The insurer relies on the reporting of BT, building technical advisor, in support of its position.
BT inspected the property on 9 February 2026. It also reviewed assessor, builder, hygienist and restoration reports, as well as photographs and on-site conditions. BT reported:
· there were no images of the internal garage condition before the complainant raised concerns
· the garage was in a poor overall condition, including rusted and hanging gutters, stormwater discharging around the foundations, rising damp, timber rot, and a cracked and deteriorated roof
· elevated moisture and mould conditions in the garage were consistent with long‑term issues and not attributable to a single insured event
· similar garage issues had previously been declined under an earlier claim.
BT recommended the insurer’s earlier decision to decline liability for garage mould and the general condition of the garage be upheld, as these issues were not caused by the insured event.
On balance, I am satisfied the insurer is not liable for the overall condition of the garage (or for mould within it). I am also of the opinion the exchanged material shows it is unnecessary for the insurer to arrange a further inspection of the garage to address the complainant’s concerns about possible access‑related damage. This is because the complainant has not provided persuasive evidence of possible further access-related damage, in addition to that which was originally observed by BT.
The insurer is not required to take any further action in relation to the garage.
Hygienist to re-attend after the completion of outstanding works
The complainant raised concerns about air quality and potential residual moisture or mould following the prolonged repair process. She says a further hygienist inspection is required before she returns to the property.
The insurer relies on earlier hygienist material and says remediation, structural drying and restoration were completed. The insurer also says ceiling linings and insulation were removed and replaced, and the property met minimum habitability standards.
The exchanged material shows at least one hygienist assessment did not include inspection of the roof cavity. It also shows repair and rectification works continued after earlier hygienist attendances. In addition, as set out herein, further works must be completed in accordance with the terms of this determination.
Given the length of time the claim has been on foot, the number of site attendances, and the need for further rectification works to be completed (including works affecting security and access), I am satisfied it is reasonable and appropriate to require the insurer to arrange or a hygienist to re‑attend the property after all works are completed.
The purpose of the further hygienist attendance is not to re‑open matters already addressed, but to provide confirmation, following completion of all outstanding repairs and remediation works, that the property (including its roof cavity) is safe and not a risk to health, and the dwelling is suitable for occupation from a health and safety perspective.
Insurer has agreed to further rectification works
The exchanged material shows the insurer has accepted responsibility for some further rectifications works. These items are not in dispute between the parties.
For instance, the insurer has agreed to cover the dent in the loungeroom floor. Although the exchanged material does not conclusively establish when the dent occurred, the insurer has accepted responsibility to progress rectification of this item as part of finalising the claim.
The insurer has also agreed to complete minor rectifications identified during inspections, including minor paint touch‑ups and replacement of a missing power point cover.
I am satisfied the insurer is responsible for completing the accepted rectifications in a proper and workmanlike manner, and for restoring the affected items to a reasonable condition. To the extent these works have not yet been completed, it is appropriate to include them in the orders below to ensure completion and bring finality to the complaint.
Insurer’s liability is limited to the matters set out in this determination
In summary, in regard to the claimed building damage which is still in dispute, I am satisfied the insurer is liable for, and should cover the costs of, remediation and repairs of the matters and items set out above in Section 2.1 of this determination.
Moreover, I am of the opinion the insurer is not liable for the balance of the disputed building damage claimed by the complainant. This is because the exchanged material shows such damage was not caused by the insured event (that is, the storm) or by the insurer’s repair works.
2.2 Should the insurer cover further temporary accommodation costs?
Yes. The property was not deemed safe for the complainant to return. The insurer should therefore provide cover for the costs associated with further temporary accommodation in accordance with the terms of this determination.
It was not safe for the complainant to return to the property
The complainant lived in temporary accommodation arranged by the insurer while repairs to the property were carried out.
The insurer says it stopped paying for temporary accommodation after receiving hygienist’s and assessor’s reports indicating the property met minimum habitability standards. The insurer says it was reasonable for the complainant to return to the property at that juncture.
The complainant says it was unreasonable to expect her to return to the property while accepted rectification works remained incomplete. In particular, she says the bi‑fold door locks did not function, which affected the security of the home. She also says the prolonged claim and repeated attendances contributed to her reluctance to return without confirmation the property was suitable for occupation.
Both habitability and safety must be considered when assessing whether it was reasonable for the complainant to return to the property.
The insurer’s evidence supports, from a health and safety perspective, the habitable areas of the home were suitable for occupation once remediation, drying and reinstatement works were completed.
However, meeting minimum habitability standards does not necessarily mean it is reasonable to require the complainant to return to the property. As indicated, unresolved safety‑related issues arising from accepted but incomplete repairs must also be considered.
As set out above, the insurer agreed to rectify the bi‑fold door locks. The bi‑fold door forms part of the external security of the home. While the locks did not function properly, the complainant could not secure the property in the usual way.
In all the circumstances, I am satisfied the property’s security was compromised, even though the property met minimum habitability standards. The ability to secure external doors is a fundamental safety consideration when determining whether a person can reasonably return to their home.
This claim has been on foot for an extended period, and it has involved repeated attendances by contractors. Given the duration of the claim and the outstanding accepted rectification works affecting security, I am satisfied it is reasonable for the complainant to seek completion of those works and confirmation of security before returning home.
Complainant is entitled to further temporary accommodation costs
Based on the exchanged material, I am satisfied the complainant is entitled to temporary accommodation costs for the period during which it was not reasonable or safe for her to return to the property.
Although the available information shows the property met minimum habitability standards, the insurer had accepted responsibility for rectification works which directly affected the safety and security of the dwelling. In particular, the bi‑fold door locks did not function properly and prevented the complainant from securing the property.
While accepted rectification remained incomplete, it was not reasonable to expect the complainant to return to the property. In such circumstances, I am satisfied the insurer should have been required to continue paying temporary accommodation costs until the accepted rectification works were completed and a further hygienist attendance confirmed the property was suitable for occupation.
Accordingly, the complainant is entitled to temporary accommodation costs from 9 September 2025 (being the date the insurer ceased paying these costs) up to and including the date the locks are (or were) replaced by the complainant. If she has not already done so, the complainant must act reasonably and in a timely fashion (that is, without delay), to replace the locks.
2.3 Should the insurer provide cover for additional damaged contents?
No. There is no persuasive evidence that the claimed additional contents were damaged by the insured event or by reason of the remediation works and repairs. Moreover, the complainant has not established that the ‘loss of utilisation’ of contents equates to damage which should be covered by the insurer.
Complainant says delays caused damage to contents
The complainant’s claim regarding her contents damaged by the insured event was determined in a separate AFCA complaint. The complainant was cash settled the sum insured for the contents.
The complainant now seeks payment for contents damaged or lost by reason of the prolonged duration of the claim. She says the long claim process prevented her from accessing and using some her belongings that have been in storage and resulted in their deterioration and loss of utility (including the expiration of warranties). The complainant also says she purchased contents prematurely after relying on the insurer’s assurances she could return to the property. However, those contents, including several mattresses, remained in their packaging and, as a result, are now damaged.
After having examined in detail all the exchanged material, I am of the opinion the insurer should not be compelled to cover the costs of additional contents. This is because:
· apart from evidence from a mattress manufacturer (which states, because a mattress has not been unrolled and used, it will not provide optimal comfort), the complainant has not provided persuasive evidence to show the claimed additional contents were damaged by the insured event or during the course of the repairs
· there is no persuasive evidence which shows that a ‘loss of utility’ equates to ‘damage’ in this instance
· there is no persuasive evidence which shows the claimed additional contents have deteriorated purely by reason of being in storage, or remaining in their packaging and remaining unused during the claim process.
2.4 Is the complainant entitled to non-financial loss?
Yes. The exchanged material shows the insurer should pay the complainant $1,000 in non-financial loss compensation.
AFCA can award non-financial loss compensation in certain circumstances
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
However, complainants should note that non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Non-financial loss compensation is warranted in the circumstances
The complainant says the way the insurer handled the claim caused her stress, inconvenience and disruption beyond what would ordinarily be expected during the course of an insurance claim.
As indicated, this claim has been ongoing for more than four years and has involved multiple stages of repair, changes in builders, repeated inspections and the involvement of several specialists. During this time, several issues were revisited and not resolved when first raised.
The exchanged material also shows some accepted rectification works, including rectification of the bi‑fold door locks, remained outstanding for an extended period. This contributed to uncertainty about when the complainant could reasonably return to her home and whether it was safe to do so.
While some delay is inherent in large and complex building claims, I am satisfied the duration and management of this claim went beyond what would ordinarily be expected. The need for repeated follow‑ups, the ongoing uncertainty about completion of accepted works, and the prolonged period the complainant remained out of her home, support this conclusion.
It follows the insurer should pay the complainant $1,000 in non-financial loss compensation.
2.5 Complaint should be resolved this way
Time is of the essence
Within 28 days’ notice that the complainant accepts this determination, the insurer must:
· pay the complainant $1,000 in non-financial loss compensation
· if the insurer has not already cash settled the complainant for the costs associated with the replacement of the bi-fold door locks, upon production by the complainant of the relevant invoice(s) demonstrating such costs, reimburse to the complainant these costs
· complete rectification of the dent in the loungeroom floor, as well as other minor rectifications identified during inspections, including minor paint touch‑ups and replacement of a missing power point cover.
In addition, the insurer must pay the reasonable costs of temporary accommodation from 9 September 2025 up to and including the date the bi-fold door locks are (or were) replaced by the complainant. The complainant must act reasonably and in a timely fashion, without delay, to replace the locks, if she has not already done so.
Otherwise, within 14 days’ notice that all rectification works and repairs have been completed, if it has not already done so, the insurer must arrange for a hygienist to re‑attend and inspect the property. The purpose of the further hygienist attendance is not to re‑open matters already addressed, but to provide confirmation, following completion of all outstanding repairs and remediation works, that the property is suitable for occupation from a health and safety perspective.
2.6 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the insurer must complete the rectification works it has accepted
· the insurer is not required to cover building damage that was not caused by the insured event (the storm) or by the insurer’s repair works
· the complainant required additional temporary accommodation because her home was not safe or secure
· there is no persuasive evidence the claimed additional contents were damaged by the insured event or during the repairs
· an award of non-financial loss compensation is appropriate and reasonable in this instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
Whilst the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.