Extent of building and contents settlement after escape of liquid damage, plus alleged claims mismanagement
Text of the determination
Determination
|
Case number
|
12-25-273008
|
Financial firm
|
AAI Limited
Case number: 12-25-273008 16 June 2026
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (insurer). He lodged a claim for damage caused by a tap left running in an upstairs ensuite. This dispute is about the extent of the insurer’s liability for building works, the cash settlement offered for contents, and alleged claims mismanagement.
1.2 Issues and key findings
Is the insurer’s building settlement offer fair?
Yes, mostly. The insurer is to pay its current offer plus 15% uplift, and the reasonable cost of the minor subfloor repair explained at section 2.1.
Is the insurer’s contents settlement offer fair?
Yes, mostly. The insurer is to pay its current offer plus 20% uplift.
Is the complainant entitled to additional compensation?
No. While the insurer’s claims handling was not perfect, it has already waived the $2,000 excess. No further compensation is justified.
Why is the outcome fair?
The complainant bears the onus to establish, on the balance of probabilities, the extent of the damage. Persuasive evidence is needed to show the insurer’s scope of works and repair costs are incorrect or unfair. The available information is not enough to do so. The insurer has fairly assessed its liability, subject to the adjustments explained.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer must pay more than its current offers, as set out below. If the complainant accepts the determination, then to the extent it has not already done so, the insurer must:
· cash settle the building claim for $26,993.98 plus a 15% uplift, and interest in line with section 57 of the Insurance Contracts Act 1984 (Cth) from 1 August 2025 until the date of payment
· include in the building settlement the reasonable cost of the minor subfloor repair needed to address the event-related squeak in the bedroom adjacent to the ensuite (see section 2.1), to the extent its scope does not already allow for this
· cash settle the contents restoration claim based on AD’s quote for $50,056.45, plus a 20% uplift, and interest in line with section 57 of the Insurance Contracts Act 1984 (Cth) from 16 July 2025 until the date of payment
· maintain its $2,000 excess waiver
· in due course, consider any reasonable specialist report and invoices the complainant provides for the ducted HVAC system, and any invoices for non-salvageable contents and the failed electrical items described at section 2.2.
2 Reasons for determination
2.1 Is the insurer’s building settlement offer fair?
Yes, mostly. The insurer is to pay its current offer plus 15% uplift, and the reasonable cost of the minor subfloor repair explained below.
Parties disagree about scope and cost of repairs
The policy covers insured events and accidental damage. Relevant policy wording is set out at section 3.
There is no dispute that an escape of liquid event occurred and caused property damage. The parties disagree about the extent of the damage and the reasonable cost of repairs.
The insurer’s builder BB said it could not warrant repairs, mainly because of defects. The insurer therefore offered a cash settlement based on BB’s scope of works, with some additions. The complainant provided a quote from his builder DD for $336,275. The insurer assessed that quote in line with the policy. Considering its assessment and BB’s scope, it offered $26,993.98. It says this reflects the scope of works for claim-related damage, and that the other repairs DD proposes are unrelated to the claim or excluded.
The insurer arranged for BB and its engineer MM to attend and scope the repairs. It also arranged for a hygienist EH, a flooring expert AA and an electrical expert LE. Its internal assessor attended several times. The insurer also arranged for a building restorer LR and a contents restorer AD to assess and remediate. These experts provided reports.
Each party has an onus of proof
The complainant disputes the insurer's settlement position and expert evidence. An insured has the onus to establish the extent of their loss under a policy. At law a party alleging a matter generally has the onus to prove the allegation. Consistent with fairness and legal principle, the complainant bears the onus of proof to establish his position.
The standard of proof is the balance of probabilities, that is, more likely than not.
This means he must provide evidence that his builder DD's proposed scope of works and costings are, more likely than not, more reasonable and accurate than the insurer's material. In other words, he must show the insurer’s material does not fairly represent what is required to restore the property to its pre-loss condition.
To the extent the information does not prove this, the complainant's claim will not succeed.
The insurer bears the onus to prove any limiting provisions apply. For example, the insurer partly relies on exclusions relating to defects. The insurer must provide information to establish it is more likely than not that the limiting provision applies.
Bearing these onuses of proof in mind, I reviewed the available information from both parties.
Insurer’s reports are more persuasive overall
The reports from BB, AA and MM are more persuasive than DD’s quote and the complainant’s submissions. This is because:
· the experts are appropriately qualified and experienced, their views are based on physical inspections, and they provide detailed analysis and photographs in support
· MM, in particular, is the most qualified, being a structural engineer, and his views are largely consistent with the insurer’s other experts
· while DD is a registered builder, the extent of his previous experience and current professional operation is not entirely clear
· DD asserts, in essence, that the water damage was more widespread than the insurer has accepted. But he does not provide detailed supporting analysis (such as photographs, test results or moisture maps)
· for the most part, DD’s evidence amounts to assertions that his scope is justified based on the damage he says he observed
· DD’s scope is contradicted by the insurer’s internal assessor, who first physically inspected the site on 3 January 2025, and by the restorer LR, who attended on 9 January 2025. Both took photographs and noted that some areas did not appear damaged at all. LR’s report recorded the water intrusion as Class 1 (the least damage) and found moisture readings within acceptable parameters
· DD’s scope also includes areas that were likely not damaged by the event, which I address below (such as the entry). This reduces the weight I give his quote
· the complainant’s submissions are well-considered, and I deal with them below. But the complainant is not a qualified expert, and his submissions and photographs are not sufficiently persuasive to establish his position on most items in dispute.
I note that MM’s supplementary report was prepared after the insurer asked him to review BB’s later report and address discrepancies with his own findings. The complainant says, in effect, that the insurer’s experts shaped their reports to match the assessor. I have kept that in mind.
But MM is an independent engineer who inspected the property, and his revised views are reasoned by reference to the physical evidence and photographs (for example, the heat damage to the cabinetry over the cooktop). On that basis I give his revised opinion weight, while recognising the change in his position.
Insurer’s assessed scope is mostly fair
BB provided a scope of works, which MM endorsed. The insurer then assessed DD’s scope and agreed on a portion of the works.
BB’s and the insurer’s assessment of the scope are supported by more persuasive evidence overall. By contrast, DD’s scope stands largely alone and is not supported by persuasive expert evidence. I have carefully reviewed the photographs and videos the complainant provided. I refer to some of this material below. It does not strongly support the complainant’s position, and is largely insufficient to discharge his onus. On balance, the insurer’s assessed scope is a more accurate representation of the necessary repairs.
I set out my comments on each area of disputed damage below.
Garage
DD quotes to repair the garage ceiling.
MM found that water likely ran down the western (rear) garage wall, causing staining but no damage. He found the stain can be cleaned and did not cause structural damage.
BB found no damage to the garage, but a possible slurry drip mark from the slab above.
The internal assessor says it is unlikely that water tracked significantly into the garage, given the volume and the flow path (which included insulation in the middle level that would have absorbed much of the water). He says there is no damage to the ceiling, and the wall markings appear to be slurry stains from mortar or paint overspray.
This explanation is plausible and consistent with the weight of expert opinion. The complainant has not provided persuasive information to rebut it. I do not accept that DD’s claimed garage damage is established.
Kitchen and butler’s pantry
In the pantry, BB’s scope is for ceiling damage only. DD’s scope is for a full strip-out and replacement of cabinetry, benches, splashback and flooring. I deal with appliances in the contents section below.
The evidence from MM and BB is that the cabinetry over the cooktop is heat-damaged, not water-damaged. That is not covered. MM’s first report suggested the edge of the cabinetry may be water-damaged, but he changed his view in his second report to align with BB. That is not ideal. But there is still insufficient evidence from the complainant establishing water damage to this area.
The complainant relies on DD’s assertions, and also parts of the insurer’s material. In particular, the complainant refers to the internal assessor’s note of water near the pantry cabinetry and LED lights on 3 January, the MM report, AD’s report, the failure of the LED strip and rangehood, and the water flow path. I have reviewed all of this. It shows water reached the pantry area. But it does not establish concealed water damage to the cabinetry, or the extent of damage claimed. The presence of water in an area is not, by itself, proof that the cabinetry needs replacing.
The issue was specifically checked. At the dual assessment, the hygienist said insulation prevented identification of any further pantry and kitchen ceiling damage, and asked BB to cut exploratory holes in both ceilings. The later scope and the post-remediation material support only the limited ceiling works the insurer has accepted. There is no persuasive evidence of any additional concealed claim-related damage beyond that. There are also no moisture readings or other objective evidence to support DD’s scope.
I prefer BB’s and MM’s inspection evidence, which establishes only minimal damage to the kitchen and pantry.
Entry, study, second lounge, laundry
DD scopes various areas that the insurer says were not water-damaged, including the entry, study, second lounge and laundry.
There is no persuasive information linking the event to these areas. This accounts for a large part of the gap between the parties.
The complainant says the photographs show swollen, bubbled, delaminated cabinetry and ceiling and wall staining.
The available photographs do not establish the extent of water damage claimed. DD’s and the complainant’s assertions are not enough to support DD’s scope.
The complainant says AD’s report supports his position. I do not accept this. AD’s references to MDF (a type of material) are not relevant to these areas.
The complainant also refers to the restorers’ make-safe and assessment reports. These do not support his position. The contractors noted likely affected areas, but the reports do not establish damage of the type claimed by the complainant and DD.
Laundry benchtop chip
The complainant says the benchtop was chipped by the removalists when they removed the contents during the insurer’s custody, and that DD’s quote records this.
There is a photograph of what appears to be a chip. But there is no persuasive information that AD or any of the insurer’s other contractors caused it. Nothing in any report or claim file note determines the matter conclusively. The only evidence is DD’s quote, which is an assertion of damage.
I accept the benchtop is accidentally damaged and the complainant can lodge a claim for it. But the evidence does not establish that the insurer’s contractors were the cause.
Bedroom flooring and subfloor
The parties dispute whether the event damaged the flooring and subfloor, and whether the fair scope is a full second-storey replacement or a localised uplift and refit.
The insurer’s evidence on the bedroom subfloor is mixed. AA, the flooring specialist, found the bedroom subfloor movement and noise more severe than the laminate noise and in need of attention, and considered a contributing cause of the squeak likely aligns with the event in the adjacent ensuite. The internal assessor’s March review and MM also treated the bedroom squeak as event-related. BB’s later report, by contrast, treats the chipboard as unaffected by the event and instead “not nailed down” (i.e. a defect or workmanship issue).
I am satisfied the bedroom subfloor squeak is event-related. AA is the flooring expert, and its view is supported by the earlier assessor and engineering reviews. I therefore find the insurer is liable for the reasonable cost of the minor repair needed to address that squeak.
The insurer’s accepted scope re-lays the flooring that restoration had already removed in the bedroom, walk-in robe and landing. But it does not appear to include any repair of the event-related subfloor squeak itself, because BB treated the squeak as a defect. So the insurer is to include in its settlement the reasonable cost of that minor repair, to the extent its scope does not already allow for it. Consistent with the policy (discussed below), that cost is to be calculated as if the defective subfloor installation were not present. In practical terms, this covers the localised repair of the event-related squeak, not the re-laying or rectification of the whole subfloor to the relevant standard.
Beyond that discrete item, the complainant has not established that the wider flooring and subfloor works DD quotes are payable. The insurer says the broader subfloor movement is due to defective installation and hygroscopic timber. That is supported by the evidence: BB and the maintenance material establish that the yellow-tongue subfloor was not correctly nailed to the bracing or joists (creating a “bounce”), and that the floor was out of level by 20-25 mm in places. The gap between the bottom plate and the studs in bedroom 2 is consistent with that defective install and the natural movement of hygroscopic timber, not with the event.
On method of repair, MM says the laminate can be removed and refitted to allow minor repairs to the subfloor, and that there is no reason the existing flooring cannot be reused. I accept this. The complainant has not shown that the existing second-storey flooring needs full replacement, or that the insurer’s repair method is inadequate.
The insurer’s position is also supported by the policy:
· where the insurer’s builder cannot warrant repairs because of an existing defect, the insurer pays for the covered damage as if the defect were not there. It does not pay to fix the defective part itself. This is how the cash settlement on the subfloor squeak is to be approached
· the policy does not cover the defective parts themselves (e.g., the incorrectly installed subfloor). That exclusion applies whether or not the complainant knew of the defect. The separate exclusion for resultant damage caused by a defect applies only where the insured knew or should reasonably have known of the defect. The insurer does not rely on that resultant-damage exclusion here, and there is no suggestion the complainant knew of these construction defects. The items I have declined are because they are the defective parts themselves, or because the event did not cause them
· the policy also contains a limited matching benefit, capped at $1,000. The insurer can limit its liability for undamaged sections of flooring in line with that benefit.
The complainant says the insurer’s delays led to further damage, including subfloor movement. As explained at section 2.3, the evidence does not support that. The early reports showed the property was within dry standards with only minimal moisture, so there was no large volume of standing water that earlier drying would have removed.
For these reasons, apart from the minor subfloor repair, the complainant has not discharged his onus to prove the insurer’s position on the flooring and subfloor is unfair.
Staircase and landing gaps
The parties dispute whether the event caused gaps to open up in the stairs and landing.
The balance of the evidence – from MM, BB and AA – supports the insurer. The AA report found the gaps were unlikely to be due to water damage. This is because the flooring has shrunk rather than expanded, putty in the joints shows the gaps existed and were filled before the steps were sanded, and the moisture readings are consistent throughout the area. The engineering material attributes slight gaps to the cantilevered design of the staircase, which makes the joints susceptible to movement under load.
This matters to the quantum. A full staircase replacement is one of the single largest items in DD’s quote. It is not justified, because the gaps are shrinkage, not event-related swelling.
Floor tiles
The parties dispute whether the event caused the floor tile to crack at the stairs.
The insurer initially said the damage was due to poor cutting and installation, and that the tiles have no expansion joints (i.e. it was defect). That is supported by BB and MM’s supplementary report. MM’s original report had suggested the event caused the cracked tile at the top of the stairs, and the accepted scope ultimately includes replacing that single tile.
There is no basis to replace the wider tiling. The insurer’s present position already allows for replacement of the single cracked tile at the top of the stairs. Beyond that, the complainant has not established that the event caused wider tile failure or that broader replacement is required.
Ceiling and wall staining
The insurer accepts the ceilings and walls are stained but disputes the area and extent of repair.
The complainant seeks full ceiling reinstatement across the affected levels, including the garage ceiling.
Both MM and BB note extensive ceiling staining (in the kitchen, dining and living areas) and wall staining by the staircase. The accepted scope includes preparing and painting those ceilings and walls, and replacing the small sections of ceiling cut open for the mould investigation.
I am satisfied BB’s scope fairly accounts for the claim-related damage. The complainant has not provided enough evidence to justify DD’s larger scope to replace, rather than repaint, the disputed ceilings.
HVAC ducted air conditioning: further testing required
The parties disagree about whether the event damaged the ducted air conditioning system or whether it still works.
The electrical expert LE could not confirm the ducted unit was electrically damaged: the external unit was operating and passed testing, but the internal ducts were not operating. LE recommended a ducted air conditioning specialist assess it further. The insurer says its trade confirmed the system was working, but it has not provided a report.
This needs further assessment. The complainant is to provide any specialist assessment report and reasonable invoices to the insurer, which is then to consider any claim-related damage.
Insurer to pay its offer, with additions, plus a 15% uplift
For these reasons, I am not satisfied the complainant has discharged his onus to establish the extent of the damage he claims. His evidence is not enough to show the insurer’s accepted scope and offer are inaccurate or unfair. The insurer has correctly assessed the extent of its liability, subject to the minor subfloor repair.
A 15% uplift is fair on the building cash settlement to reflect the transfer of risk to the complainant, who now takes on the repairs.
To the extent it has not already done so, the insurer must cash settle the building claim for $26,993.98, add to this the cost of the minor subfloor repair, plus a 15% uplift on the whole settlement sum. It must also pay statutory interest, as set out at section 1.3.
In due course, the insurer is to consider any reasonable specialist report and invoices the complainant provides for the ducted HVAC system.
2.2 Is the insurer’s contents settlement offer fair?
Yes, mostly. The insurer is to pay its current offer plus 20% uplift. In due course, the insurer is to assess any invoices from the complainant for additional non-salvageable items.
Complainant disputes contents settlement
The parties dispute:
· whether the insurer was entitled to authorise remediation work without first giving the complainant the choice of a cash settlement
· whether the complainant asked for a cash settlement at an earlier time
· whether the insurer’s remediation expenses count toward the sum insured deductions
· how much must be cash settled
· who bears the cost and risk of returning the contents (including uncleaned items and window furnishings).
The relevant policy provisions are at section 3.
Insurer was entitled to authorise work
The complainant’s main argument is that the insurer ran a contents restoration program through AD without first offering him a clear choice of cash settlement, and against his wishes.
The policy sets out how contents claims are settled. It says the insurer aims to use a member of its supplier network to repair or replace damaged contents. If a repair is quoted and the insured does not accept it, the insurer pays the quoted cost. The same applies to replacement. The policy does not require the insurer to proactively explain a cash settlement option before it engages its network. The insurer is not the complainant’s adviser.
The complainant had the policy documents. He could have asked questions, or said clearly at any point at the start of the process that he wanted cash rather than restoration.
The complainant is right to say the insurer could have explained the settlement basis and the potential cash alternative more clearly and earlier than it did. The materials also show an early objection to contents being cleaned or remediated. But the evidence does not establish a clear election, before the contents program had materially progressed, that all of the restorable contents were to be cash settled instead of remediated. By April and May 2025 the insurer had already engaged AD and a substantial part of the contents work had been performed. In those circumstances, the insurer is not required to pay again for work already completed.
I have also considered the complainant’s point that he (through his representative) asked to cash settle earlier than the insurer accepts. The insurer says the request came on 9 July 2025. The complainant points to his first AFCA complaint of 21 May 2025, which sought “cash settlement of all contaminated contents,” and to earlier emails.
I accept the 21 May complaint shows the complainant wanted the contaminated, non-restorable contents cash settled by that date. But it does not assist the complainant’s position because:
· the insurer’s 29 May letter sets out the agreed position that non-restorable items would be cash settled at replacement value and restorable items would be remediated. That is consistent with the 21 May request as to the contaminated items
· the 21 May request did not clearly elect cash for the whole contents program, including the restorable items the insurer was entitled to remediate
· by 21 May, much of the remediation had already been done. The policy entitles the insurer to use its network and to count that cost against the sum insured. It is not required to pay again for work already completed.
Good industry practice may have called for the insurer to explain the cash option more clearly and earlier than it did. But it does not make the insurer’s conduct a policy breach, and it does not entitle the complainant to a full cash settlement of the completed works without deduction. Again I note the complainant had the policy documents and could have asked questions at an earlier time, but did not do so. The uplift below, and the open door for non-salvageable items, fairly remedies the situation.
Insurer’s offer is fair, subject to a 20% uplift
On quantum, there is no basis for the complainant’s claim of $160,000. That figure was a rough estimate of the cost to clean, store and remediate all of the contents, not an invoiced amount. The insurer’s offer is fair. This is because:
· AD’s work is supported by detailed reports that have not been challenged with expert evidence
· AD remediated what was restorable. The insurer correctly deducted the cost of that work from the contents sum insured, which is consistent with the policy
· the insurer returned the remediated contents
· the insurer has put forward an actionable quote from AD for $50,056.45 for the remaining works
· the complainant has not provided persuasive information that this figure is unfair overall.
The scope does contain some uncertainty and the potential for additional work. For example, PC sums for delivery, and exclusions for any additional hygienist attendances and laboratory testing. AD’s scope also excludes repairs, conservation specialist services, reframing, the disposal of non-salvageable items, and replacement costs.
A 20% uplift on AD’s quote is fair to account for that uncertainty and the transfer of risk for further work to the complainant.
To the extent it has not already done so, the insurer must cash settle the contents restoration claim based on AD’s quote for $50,056.45, plus a 20% uplift and statutory interest, as set out at section 1.3.
Contents risk passes to complainant upon cash settlement
The complainant raises the cost and risk of returning the contents, including uncleaned items and window furnishings, and the requirement that he collect uncleaned items herself.
Because the complainant is taking over the remediation of the remaining contents under the cash settlement, he will collect and handle those items. Risk for those items passes to him when he takes them over. The insurer remains responsible for any loss or damage its handling caused up to that point.
The cash settlement, with its 20% uplift, fairly accounts for the remaining return and handling for the items the complainant now manages.
As for rehanging and reconnection costs, the complainant has not established that the insurer’s position is inconsistent with the policy entitlements.
Complainant to provide invoices for non-salvageable items
The complainant will engage his own contents remediators. If they identify non-salvageable items, the complainant can submit the disposal and replacement costs to the insurer for consideration. He must support the claim with evidence, such as expert remediation and causation reports. This is so the insurer can fairly verify it.
On the electrical items, LE inspected them and found:
· the range hood failed testing and was not operating; damage consistent with surge or storm damage, though water entry could not be ruled out
· the printer failed testing and was not operating; damage consistent with surge or storm damage, though water entry could not be ruled out
· the coffee maker failed testing and was not operating; damage consistent with surge or storm damage, though water entry could not be ruled out
· the Samsung fridge failed testing and was not operating or cooling correctly; damage consistent with surge or storm damage, though water entry could not be ruled out
· the MacBook Pro could not be tested, because LE had no charger and could not confirm whether it worked
· the Heller fridge and the second fridge could not be confirmed as damaged, because they were not plugged in before LE attended and LE could not reproduce the reported fault
· one Samsung television passed testing and was operating correctly, so it was not damaged
· the second Samsung television and the Sony television failed testing and were not operating; LE found impact damage but could not confirm it was caused by surge or storm.
The policy covers damage from storm, escape of liquid and accidents. For the items that failed and where LE could not rule out water entry, I treat them as covered as part of this claim. There is no independent evidence of a separate storm or surge, so I do not consider a separate excess should be charged for these items.
The two TVs show impact damage of unknown cause. Impact damage of this kind may be covered under the accidental damage cover the complainant holds, rather than as escape of liquid damage. The complainant can claim for them on that basis.
If the complainant provides invoices to replace the failed items above, the insurer is to consider reimbursing them. The same applies to any other contents item, such as the oven, that the complainant says failed because of the event. The item can be assessed and, if claim-related, reimbursed on the same basis.
AD’s remediation scope includes testing and tagging 35 contents electronics. If any further testing identifies non-salvageable items, the complainant is to provide the relevant reports and invoices to the insurer for consideration.
2.3 Is the complainant entitled to additional compensation?
No. While the insurer’s claims handling was not perfect, it has already waived the $2,000 excess and no further compensation is justified.
AFCA has the power to award compensation
The AFCA Rules allow for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
No compensation is warranted in this case
The complainant alleges the insurer delayed the claim, ignored evidence, acted unfairly in settling the contents claim, and breached its duty of utmost good faith.
The complainant’s daughter says the insurer “took no meaningful steps to protect or remediate” the building and contents between January and early May 2025, and that this led to further damage. She says the insurer knew of her chronic skin condition and her father’s cardiac condition, which makes mould exposure risky.
Having reviewed the file, I am not persuaded by the mitigation argument. The early reports showed the property as within dry standards, with only minimal moisture and no mould. LR recorded the water intrusion as Class 1 (the least damage) on 9 January, with readings within acceptable parameters. So there was no large volume of standing water that earlier drying would have removed. The hygienist identified some mould in March, and that was remediated soon after, with a post-remediation verification passing in June. The complainant has not shown that earlier drying would have prevented any specific item of damage.
More broadly, I do not accept the insurer mishandled the remediation. It appointed multiple contractors, including LR, EH and BB, to assess and restore the building. It appointed AD to inspect, make safe and remediate the contents. Inspections began as soon as the claim was lodged and ran from January to May, with building and contents remediation in around April and May. The evidence does not establish that the insurer or its contractors acted unreasonably.
I am not satisfied the insurer’s conduct breached the duty of utmost good faith or the General Insurance Code of Practice in a way that would warrant compensation. There were some delays and communication issues, and I accept these caused the complainant stress and inconvenience. But this must be weighed against the steps the insurer took, including prompt appointment of contractors, completed remediation, a passed verification, initial temporary accommodation, an apology and the excess waiver. The waiver of the $2,000 excess and the apology fairly compensates for the experience.
I also note that the complainant’s daughter is not the insured. AFCA does not award compensation for stress and inconvenience suffered by a representative.
2.4 Why is the outcome fair?
The complainant bears the onus to establish, on the balance of probabilities, the extent of the damage. Persuasive evidence is needed to show the insurer’s scope of works and repair costs are incorrect or unfair. The available information is not enough to do so. The insurer has fairly assessed its liability, subject to the adjustments explained.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues and arguments in their submissions and I have considered them all, I have restricted this determination to the issues and arguments that are relevant to the outcome.
3.2 Key policy extracts
Product Disclosure Statement – We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
- any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base)
- baths, sinks, toilets and basins (but not showers)
Accidental damage at home
When you have home cover, we cover the home for accidental loss and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance. When you have contents cover, we cover your contents for accidental loss (e.g. accidentally dropping a ring down the drain and you are unable to retrieve it) and accidental damage (e.g. breaking or damaging something) at the insured address during the period of insurance.
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from:
…
Defects, faults, workmanship
Loss or damage caused by, connected with or arising from, or liability caused by, connected with or arising from inherent defects, faulty design, structural defects, structural fault or faulty/poor workmanship (e.g. structural posts, beams or load bearing walls have been removed without taking into account structural engineering requirements), if you knew or should have reasonably known about it (e.g. because the defect or fault was able to be observed by you or because it was identified in a prepurchase building inspection report);
Any loss or damage to the part of the building or landlord contents with an inherent defect, faulty design, structural defect or faulty/poor workmanship, whether or not you knew or should reasonably have known about it.
Matching provision
Matching undamaged parts ($1,000 limit)
When a claim for loss or damage to the home or contents is covered and new materials cannot be matched to undamaged parts, we will pay the extra costs to repair, replace or rebuild certain undamaged parts of the home or contents in order to achieve a uniform appearance where the loss or damage occurred, as set out below.
When you have home cover, we will pay extra:
— to replace undamaged wall tiles in the same room, stairs, hallway or passageway where the damage occurred so they match or complement new tiles used for repairs;
— to paint, wallpaper or replace undamaged wall coverings (but not tiles) in the same room, stairs, hallway or passageway where the damage occurred;
— so that continuously joined undamaged floor coverings (that are not contents items, such as carpet) of the same material in the same room, stairs, hallway or passageway where the damage occurred will have a uniform appearance. This does not mean that we will always replace the undamaged floor coverings. Sometimes a repair (e.g. sanding or other floor treatment) may be possible to achieve a uniform appearance;
— to replace undamaged parts of the same kitchen cabinet, cupboard, or benchtop so that they match the repaired parts.
When you have contents cover, we will pay extra:
— to replace undamaged blinds and curtains in the same room, stairs, hallway or passageway where the damage occurred;
— so that continuously joined undamaged and matching carpets and other floor coverings (that are covered as a contents item) in the same room, stairs, hallway or passageway where the damage occurred will have a uniform appearance. This does not mean that we will always replace the undamaged carpets or other floor coverings. Sometimes a repair may be possible.
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged in the incident covered by your policy. Apart from the limited circumstances where we will repair undamaged parts (see ‘Matching undamaged parts’ on page 74) this policy does not cover you to replace undamaged parts, such as when:
— one garage door is damaged we will only replace or repair the damaged one, not other doors.
— roof tiles are damaged we will only replace the damaged ones, not the undamaged tiles, even if the undamaged tiles are faded and do not match the new ones used for repairs.
— roof sheeting is damaged we will only replace the damaged roof sheeting, not the undamaged roof sheeting, even if the closest match available to us is a different shade, colour, finish, material or profile to the undamaged roof sheeting. — an external wall is damaged we will replace the damaged parts of the wall, not undamaged areas of the wall or other sides of the home.
How we deal with defects, faults and poor workmanship
There are different ways we manage defects, faults and poor workmanship during the repair or rebuilding process:
— if the home has a defect, fault or poor workmanship (see section 3 `Things we don’t cover’ on page 33), it is not covered and we will not pay to fix it. This is the case whether you knew about the defect or fault or not. For example, we would not fix structural posts, beams or load bearing walls that have been removed without taking into account structural engineering requirements;
— if a defect or fault (or poor workmanship) causes or contributes to loss or damage to the home, that resultant damage is not covered, but only if you knew about the defect or fault or should have reasonably known about it (see `Things we don’t cover’ on page 33). For example, your roof has a fault (and you knew about the fault because you have been told about it by a tradesperson) and this allows rain to enter during a storm, we will not pay to fix the resultant water damage;
— if a member of our supplier network is unable to complete the repairs or rebuild damage covered by your policy (e.g. because a defect or fault or poor workmanship in any building component will not support the repairs) we will pay in accordance with `How we settle home claims’ on page 90 as if the building component did not have the defect or fault. This is the case whether you knew about the defect or fault or not. For example, a defective load bearing wall will not support the repairs needed to the ceiling. We pay you the cost to repair the damage to the ceiling as if the home did not have the defective load bearing wall.
How we settle contents claims
When your claim for loss, theft or damage to your contents (including specified contents and personal valuables) is covered, your contents may be replaced, repaired or we may pay you. We will aim to use a member of our supplier network to repair or replace damaged contents.
How we settle will depend on the circumstances of the claim including the cost of repair or replacement, your sum insured and any lower policy limits.
If the cost of repair or replacement exceeds your contents sum insured, you will be paid your sum insured.
Repairing your contents
We will engage a repairer within our supplier network who is able to complete the repairs to your contents to provide a quote. If the quoted cost to repair the item is less than the cost of replacement, we will authorise the repairs. If you do not accept the offer to repair, we will pay you the quoted cost.
Replacing your contents
If the quoted cost to repair is more than the cost of replacement on a ‘new for old’ basis or if the contents item cannot be repaired, you have the option to accept a replacement on a `new for old’ basis sourced through our supplier network. See page 92 for what ‘new for old’ means.
If you do not accept the offer, you will be paid the value of our replacement item. This may be less than what it would cost you to arrange the replacement in the market. We are able to secure supplier discounts from within our supplier network. We will pay you cash or if available, you can choose to be paid this as a voucher, store credit or stored value card.