Home / QBE / Determination 12-25-270602

Determination 12-25-270602

Cash settlement offer inadequate for storm and escape of liquid damage; temporary accommodation, professional costs and non-financial loss

FirmQBE
Decided2026-06-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$150,847
Non-financial loss$10,000
Amount claimed—
SourceAFCA PDF

Summary

Farm insurance policyholders disputed the insurer's cash settlement for storm ceiling/eave damage and kitchen escape of liquid mould damage. AFCA increased the contingency to 30%, ordered contents assessment, extra temporary accommodation, professional costs and $10,000 non-financial loss, but rejected indirect loss and damage to other rooms.

The insurer's cash settlement had to cover all insured damage including contents and temporary accommodation while the property was uninhabitable, and its poor claims handling warranted non-financial loss compensation, though non-claim-related areas and indirect losses were not established.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreassess claimrefund fees or charges

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-270602 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-25-270602 19 June 2026 1 Determination overview 1.1 Complaint The complainants hold a farm insurance policy with the financial firm (the insurer). On 20 August 2024, the complainants lodged multiple claims for damage following a storm which they say caused water ingress and mould that occurred on 25 June 2024. A separate claim was lodged for damage to the kitchen benchtop which was also affected by mould. The insurer has partially accepted the claims. It has offered a cash settlement to the complainants for repairs to the ceilings and eaves. It has offered to cash settle the kitchen damage which includes mould remediation, some contents and temporary accommodation (TA). The complainants dispute the insurer’s offer and say it is insufficient to repair all the claimed related damages. They want the insurer to settle their claim in accordance with a quote obtained from their builder and compensation for contents damaged. They also seek temporary accommodation, reimbursement of their professional costs and compensation for the insurer’s poor claims handling. 1.2 Issues and key findings Is the insurer’s offer of settlement fair and reasonable? No. The insurer should increase the contingency uplift to 30% given the age of the quote and unknown contingencies and assess the complainants’ contents for mould damage. Are the complainants entitled to additional TA? Yes. The insurer is to reimburse the complainants for the cost incurred for TA from June 2025 until the claim is settled. The insurer is also to pay the complainants TA for 21 weeks, being the estimated repair period in the amount of $38,619.84. Is the insurer required to pay the complainants’ professional costs? Yes. The insurer should compensate the complainants $2,618.00 for professional costs. Are the complainants entitled to indirect financial loss compensation? No. The panel is not satisfied that the complainants have established an entitlement to indirect financial loss compensation. Are the complainants entitled to non-financial loss compensation? Yes. The insurer should compensate the complainants $5,000 each for the stress and inconvenience caused by its poor claims handling. Why is the outcome fair? The outcome is fair as the insurer’s settlement offer should include all the damage it is obliged to cover under the policy, including the contents. It is fair for the insurer to pay TA as the property was not habitable because of the insured events. It is fair that the insurer compensates the complainants for its poor claims handling and reimburses the complainants’ expert reports in line with this determination. 1.3 Determination This determination is substantially in favour of the complainants. Should the complainants accept the determination, within 14 days of receiving written notice of their acceptance, the insurer is to: · pay the complainants $109,179.24 for repairs to the kitchen and ceilings · pay the complainants $1,050 for contents damage · appoint a restorer to inspect the complainants’ claimed contents listed for the dining room, lounge room, study, bathroom, ensuite, study and garage to determine if they can be restored, including the carpets and curtains · within 14 days of receiving the report from its restorer, the insurer is to cash settle the complainants for any items that cannot be restored and arrange for the restoration of the contents assessed as being restorable · obtain a quote from the insurer’s preferred supplier for the replacement of the rangehood and cash settle the complainants based on this quote · reimburse the complainants’ costs incurred for TA within 14 days of receiving copies of paid invoices · pay the complainants a further amount of $38,619.84 for TA · pay the complainants $2,618 for professional costs, together with interest in accordance with s 57 of the Insurance Contracts Act from 30 June 2025 until payment to the complainants · pay the complainants $10,000 in non-financial loss compensation. 2 Reasons for determination 2.1 Is the insurer’s offer of settlement fair and reasonable? No. The insurer should increase the contingency uplift to 30% given the age of the quote and unknown contingencies and assess the complainants’ contents for mould damage. Onus on complainants to establish a claimable loss The complainants are required to show, on the balance of probabilities (that is more likely than not), that they suffered a claimable loss under the policy. This means that they must show the loss was caused by a risk for which they are insured. Once the complainants, on balance, establish a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on balance, the application of the exclusion or condition. There is no dispute that the complainants were provided with the policy documents including the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). The panel is satisfied that the insurer is entitled to rely on them in determining its liability for the claim. The policy provides cover for loss or damage caused by a series of insured events (including storm and escape of liquid) and cover for accidental damage. The insurer initially declined the complainants’ claim for water ingress damage to the ceiling and eaves. However, on 16 February 2026, it subsequently reversed its claim decision and accepted the resultant water ingress damage to the ceilings and eaves. The insurer accepted the escape of liquid damage to the kitchen benchtop and resultant mould damage in the kitchen. The complainants’ claim for leaking showers of the bathroom and ensuite was declined by the insurer. However, the complainants say that the dispute relates to the ceiling damage in these rooms only. They do not dispute the denial of the leaking showers. The dispute relates to the cash settlement being offered by the insurer. The complainants do not dispute the insurer electing to cash settle the claims. However, they say that the amount offered does not allow them to remediate the property to its pre-loss condition. History of claims and issues in dispute On 20 August 2024, the complainants notified the insurer that their home was damaged. Three claim forms were completed, all with a nominated date of loss being 25 June 2024. The claim for the ceiling damage was described as: Roof leaking, roof has mould, eaves are discoloured (mould) and ceiling mould and discoloured in areas. Rain (heavy rain) overflowed or snuck in. The kitchen benchtop claim was dated the same day, and the damage was described as: Mould on underside of bench near sink and dishwasher Water ingress at back of sink. Water damaged. The complainants say that they lodged these claims after obtaining a mould assessment report from TM dated 26 June 2024 which had identified these areas of damage. The date of loss had therefore been identified as this date. However, they subsequently identified a significant storm in October 2022 and say that the damage to the ceiling and eaves was from this significant storm event. The insurer accepted the complainants’ claim for the escape of liquid damage in the kitchen on 26 September 2024. It obtained quotes and on 26 June 2025, it offered the complainants a cash settlement for the repairs and mould remediation. The insurer advised the complainants that a cash settlement was necessary as it would be unable to obtain a Post Remediation Verification (PRV) because of cross-contamination from unrelated causes to other parts of the property (which the insurer had previously denied). It is not disputed by the parties that the roof had several defects that were allowing water ingress. The report from the complainants’ plumber SM dated 24 September 2024 noted the roof defects as: · no trays for larger roof penetrations · unsealed rivets · roof sheets not weathered · roof sheets not covered by cappings · openings under eave sheets allowing vermin to enter. The insurer obtained a roof report from a plumber NL. NL inspected the roof on 3 September 2024. NL found: · the flue penetrations and seals had deteriorated and in poor condition · the roof sheeting did not continue underneath the ridge/hip capping, causing water to be blown into the eave causing damage · the cause of the water ingress was from the exhaust fans in the bathroom ceiling discharging into the ceiling cavity, causing moisture condensation and mould in the ceilings as there is insufficient air circulation · this has attached an infestation of rats and mice because of this moist and warm environment. JL, a builder, provided a second expert roof report. JL inspected the roof on 9 October 2024 and found: · several areas of blanket insulation were damaged allowing water to drip onto the ceiling in affected areas · sarking under the roof sheets was not lapping into guttering correctly in several areas causing water leaks into eaves · rats and mice infestation is very bad and has started to cause further damage throughout the ceiling space. On 20 November 2024, the insurer declined the claim for roof and ceiling damage. It relied on its exclusion for any damage caused by rodents and vermin, including any damage within the roof cavity caused by the actions of rodents or vermin. It also relied on a policy condition that rules out cover for any claim arising from any failure to: · fix a defect or faulty workmanship · failure to fix damage that existed prior to the incident as soon as is reasonable after becoming aware of the damage, or a reasonable person in the circumstances would have become aware of it · the home not being structurally sound, watertight, secure, well maintained and in a good state of repair. The insurer also relied on its general exclusions for: · wear, tear, depreciation, rust, oxidisation, corrosion and fading · defect, structural fault, design fault or faulty workmanship · rising damp, seepage, mould, mildew, rot · gradual deterioration due to action of light, air, sand, sea salt, water, or atmospheric or climatic conditions. The insurer appointed an engineer, IE who inspected the property on 30 January 2025 and provided a report dated 7 February 2025. IE identified various sources of water ingress and concluded that the damage was unlikely to have been limited to one event. The insurer maintained its claim denial in relation to the ceiling and eave damage. On 12 February 2025 and 20 June 2025. However, on 1 December 2025, in recognition that the complainants had held a policy since March 2013, it offered, to cash settle the complainants for the ceiling damage without admission of liability. In March 2026, the insurer acknowledged that the ceiling and eave damage was accepted. Insurer has offered cash settlement amounts On 9 July 2025, the insurer offered to cash settle the complainants for their kitchen damage based on quotes obtained from FT for restoration and IB for the kitchen repairs. The insurer’s offer was: · restoration- FT- $16,757.00 · building- IB- $34,824.90 · compensation and contingency- 20% - $6,964.98 The complainants rejected the cash settlement offer. The complainants say that they were unable to complete the kitchen repairs without the other areas of the property being also repaired. The insurer’s offer also included TA which is discussed separately below. On 1 December 2025, the insurer increased its offer to include a 20% contingency uplift to both the restoration and building quotes regarding the kitchen. The insurer’s offered $12,807.94 based on a quote from PB which includes a 20% uplift for the ceiling and eaves damage. On 6 March 2026, the insurer asked IE to review the quote provided by the complainants from KB. IE says that several items claimed were not claim related, including repairs to: · wall insulation in dining room, lounge room, study, bathroom and ensuite · hallway · water closet (WC) · bedroom 3 · bedroom 2 · bedroom 1 · walk in robe (WIR) · laundry. The insurer says that based on IE’s advice, it recalculated the cash settlement offer for the resultant water damage to the ceiling and walls using the unit process used by KB. It offered to settle the complainants for the resultant damage to the ceiling and walls in the amount of $39,705.65 which includes a 20% contingency uplift. The insurer says that the offer for the kitchen damage included the cost to replace the dishwasher. It says that the complainants have not provided any expert evidence to support their claim for contents damage being from an insured event. Further, it says that the contents have been contaminated because of the complainants’ inactivity, as well as their failure to address numerous maintenance issues known over the years. The insurer obtained further comments from R, a restorer, dated 4 March 2026. R found that porous items (table, chairs, grinders and first aid kit, if synthetic) likely to be impacted beyond cleaning. R says that items that were plastic or metal, that are not showing extreme mould growth, should be able to be cleaned as mould should not be embedded in the item. The insurer says that based on the comments from R, it has offered $1,050 for possibly damaged contents, on a without admission of liability, which include: · kitchen table · kitchen chairs x 6 · meat grinder · timber salt and pepper grinders · first aid kit. Complainants say cash settlement offer is inadequate The complainants say that they were not aware of any issues with the roof until it was inspected by their plumber in September 2024. They say that they were not aware that the stains on the ceiling were from roof damage. They note that the property was constructed in 2013 and had successfully passed a building inspection at this time. They say that the damage was caused by a significant storm that they experienced in October 2022. The complainants seek: · all insulation be removed and replaced, including the insulation blanket under the roof. This will require all roof sheets and penetration to be removed and reinstalled by the repairer · all roof space to be mould remediated · all damage ceiling and eaves to be safely removed, remediated and replaced and repainted · all plaster walls to be thoroughly investigated and any water damaged/mould affected areas to be removed, remediated, replaced and repainted · all architraves and skirting boards to be removed, remediated, replaced and repainted · the kitchen fittings such as sink, tapware, rangehood, oven and stove to be replaced · all contents (including carpet and curtains) to be replaced · 24 months of TA. The complainants have provided a quote from KB dated 4 December 2025. The quote is in the amount of $250,347.37. They say that this is to repair the water damage from the storm. The complainants have provided a quote for the kitchen from EI dated 15 April 2025 for the joinery and installation in the amount of $22,423.50. They have also provided a quote from ND dated 2 April 2025 in the amount of $16,390.00. However, they say that they are accepting of the offer from the insurer for the kitchen. They seek to have the additional fittings and appliances as noted above included. The insurers liability is limited The panel is satisfied that the insurer can limit its liability to the lounge room, dining room, study, bathroom, ensuite, garage, external eaves and kitchen. The panel is satisfied that the complainants have not shown that the other areas of the property were impacted by the insured event of storm including: · the bedrooms · WIR · WC · laundry · hallway. The panel notes that the complainants’ roof report from AT, the insurer’s roof report from JL and the building report from S identified numerous issues regarding the roof including: · the roof insulation blanket not reaching the fascia which meant that any moisture, condensation or roof leaks run down the insulation foil and disburse into the eave sheets, causing a lot of marking or mould on the eaves · there are a lot of rips in the underside foil where water will drip through if there are leaks · roof sheets do not have enough coverage by ridges on hips which causes wind driven rain to push past roof sheet coverage and into the ceiling space (AT) · there are a few areas where the roof sheets are lapped insufficiently causing capillary action to allow water into the roof/eave line, over the garage roof specifically (AT). They also noted the rat and mice infestation was very bad and had started to cause further damage throughout the ceiling space. The panel is not satisfied that the insurer is required to replace the wall insulation which has been included in the quote from KB. There is no information to show that this has been damaged by the insured event. The panel is satisfied that the quote from KB includes the replacement of the insulation. However, the panel is not satisfied that the complainants have shown that the roof insulation blanket (or sarking) was damaged by the insured event. The panel considers it more likely than not that the ongoing roof issues and vermin infestation contributed to the damage to the sarking rather than it being caused by a single event. The panel is also satisfied that the insurer is not required to undertake mould remediation of the roof space. The panel is satisfied that the proximate cause of the mould damage is from a lack of extractor fans to the atmosphere. This has caused condensation issues to the roof void as noted by TM and ongoing roof maintenance issues which has resulted in ongoing leaks rather than a single event. The panel is not satisfied that the complainants have established a claimable loss for the bedrooms, WIR, WC, laundry or hallway. There is no evidence of water staining in these rooms. The initial mould report from TM identified high levels of mould in the master, ensuite, bedroom one, two and three, kitchen and bathroom. TM found that bedrooms two and three had high levels of aspergillus/penicillium compared to other rooms. These rooms were noted to be in the middle of the house. TM did not identify the source of the contamination. TM did not identify any signs of water ingress to the bedrooms. TM only noted damage to the ceilings of the bathroom, living and kitchen. In the later report from 2025, TM noted that in bedroom 2, the walls and smooth edges were dry. However, staining was observed on the smooth edges, which TM says likely indicates water ingress from above or from external walls. TM noted that it identified elevated relative humidity and specific humidity in all indoor spaces. It says this is a sign of trapped moisture in the area or lack of ventilation. TM referred to the lack of an extractor fan to the atmosphere has caused condensation issues to the roof void. TM also noted that vermin droppings (which were found in the roof void) attract other pests such as insects and mites, and these can compromise indoor air quality. The panel is not satisfied based on the available information that the complainants have shown that the mould in these rooms is from an insured event of storm. Insurer should increase contingency to 30% The policy allows the insurer to settle a claim by: · repairing the damage; or · rebuilding · paying the complainants, the reasonable cost to repair or reinstate the building to the condition it was in just before the loss or damage occurred (cash settlement). The insurer must exercise this discretion fairly, reasonably and consistent with the principles of utmost good faith. The insurer elected to cash settle the complainants as it says it is unable to warrant the works, due to the pre-existing roof issues at the property. The panel accepts the insurer is entitled to cash settle the complainants in these circumstances. The insurer has offered to cash settle the complainants based on their quote from KB for the affected areas being the dining room, lounge room, study, bathroom, ensuite, garage and external eaves in the amount of $39,705.65 which includes a 20% contingency uplift. The panel accepts the insurer’s assessment of its liability based on KB’s quote. However, as the quote is now more than six months old. Noting that there has been no allowance for mould remediation, strip out and rubbish disposal and tip fees, that the insurer should increase the contingency uplift to 30%. That is, the insurer should pay $45,271.20 for the repairs to the affected ceilings. The complainants do not dispute the cash settlement offer from the insurer regarding the kitchen repairs in the amount of $63,908.04 which includes a 20% contingency uplift. The cash settlement is based on a quote from IB for repairs and mould remediation quote from FT. The insurer should cash settle the complainants $109,179.24 for building repairs and remediation. Insurer should reassess contents The insurer has offered to cash settle the complainants for kitchen contents in the amount of $1,050 which covers the damage to the kitchen table, six dining chairs, meat grinder, timber salt and pepper grinders and first aid kit. It notes that the quote from IB includes the cost to replace the dishwasher. The insurer says that the complainants have not shown that other contents were contaminated. Further, if contents have been contaminated it is a result of the complainants’ inactivity in addressing the numerous maintenance issues. The complainants have provided a list of items that they claim are contaminated. They seek compensation in the amount of $66,693.50 which includes $5,062.50 in disposal fees. The panel does not accept that the make safe repairs in the kitchen resulted in secondary contamination. This is because the previous mould report from TM had clearly identified areas of the property were already previously contaminated with mould. The panel is not satisfied that the sink, tapware, oven and stove were contaminated by the insured event. The complainants have not provided any information in support that they have been. FT did not identify any requirement to dispose of the items claimed by the complainant. The SOW from FT provides for their reinstatement. The panel is satisfied based on the comments from the restorer from JL that the porous items would be considered contaminated beyond cleaning. The panel accepts the assessment from CL of these additional items for the kitchen in the amount of $1,050. However, the panel is satisfied that the rangehood should also be included as it is likely to be contaminated through the mechanism of its usage of extracting air from the kitchen. The insurer is to obtain a quote for the replacement of the rangehood and cash settle the complainants based on this quote. The complainants’ list includes items for many rooms that have not been affected by the insured event. The panel is satisfied that the insured event and/or the insurer’s actions have not resulted in their contamination, and it is not required to compensate the complainants for these items. The panel is not satisfied the insurer has demonstrated that it is not liable for any contents damaged in the rooms where liability has been accepted for the ceiling damage. The quote from KB includes the replacement of carpets and curtains. The complainants spread sheet includes an estimate of 550 books at a cost of $15,950 and many other items claimed to be damaged. The panel is satisfied that it is fair in the circumstances that the insurer should be given the opportunity of assessing the complainants’ contents. Should items in the rooms where liability is accepted be contaminated, the insurer should either remediate them or compensate the complainants for their replacement in accordance with its policy terms. 2.2 Are the complainants entitled to additional TA? Yes. The insurer is to reimburse the complainants for the cost incurred for TA from June 2025 until the claim is settled. The insurer is also to pay the complainants TA for 21 weeks, being the estimated repair period in the amount of $38,619.84. Insurer has offered TA for a closed period The insurer says that it provided TA for the complainants from 12 June 2025 while the claim was being further assessed and after it had received a report from TM dated 23 May 2025. It says that after it determined that the initially offered repair option could no longer be offered, it made a cash settlement offer to the complainants which included TA. The insurer says that it initially offered TA based on a period of 12 weeks, with an additional eight-day buffer. It says that this was a sufficient period for the complainants to make their own arrangements for longer term accommodation. It says that it is not required to provide further TA or extend support to cover restoration, or rectification works unrelated to the accepted claim. On 9 July 2025, the insurer offered TA of 12 weeks (84 nights @ $262.72 per night) in the amount of $22,068.48. On 16 February 2026, the insurer increased its offer to include 16 weeks of TA, being $29,424.64. The insurer says that the TA allowance included in the cash settlement offer is higher than the complainants claimed TA expenses. It says that if the complainants had started the repair process at the time of the cash settlement offer, the repairs would have been completed in late 2025. Further, it says that the complainants would have required additional TA because of the extensive maintenance repairs not covered by the policy. Insurer is to increase TA settlement The panel is satisfied that it is appropriate for the insurer to reimburse the complainants for their costs of TA incurred from 12 June 2025 to date. This is because the panel is satisfied that the property was uninhabitable because of the insured events for both storm damage and EOL which the insurer has accepted liability for. The panel accepts the insurer’s estimate of 16 weeks for the kitchen repairs. However, the panel considers it appropriate to allow an additional 5 weeks for the ceiling repairs. The insurer is required to cash settle the complainants for 21 weeks of TA in the amount of $38,619.84. 2.3 Are the complainants entitled to professional costs? Yes. The insurer should compensate the complainants $2,618.00 for professional costs. Complainants seek reimbursement of professional reports The complainants seek reimbursement for the costs of the reports from: · TM dated 3 July 2024 $1,766.50 · FT dated 26 February 2025 $1,314.50 · AP dated 11 March 2025 $142.00 · TM dated 30 May 2025 $2,508.00 · TM dated 11 June 2025 $110.00. Insurer has offered to cover some reports The insurer has offered to reimburse the complainants for TM’s report in the amount of $2,508.00 and $110.00. However, it has declined to cover TM’s report dated 3 July 2024 which was obtained prior to the lodgement of the claim. Further, it says that it repeatedly asked the complainants to provide a full unredacted copy of this report. However, it was not provided until late 2025 which it says ultimately delayed its assessment of the claim. The insurer also says that the report from FT has not been provided to them. The insurer says that it does not cover the pest inspection (AP) costs. Insurer should reimburse the complainants $2,618.00 Under its Rules, AFCA may require an insurer to contribute to a complainant’s professional costs incurred (usually capped at $5,000) in bringing their complaint. This may include legal costs or expert reports. AFCA will consider the complexity of the complaint, whether the costs are reasonable and whether they helped to resolve the complaint. The panel is satisfied that the insurer’s offer of reimbursement in the amount of $2,618 is fair and reasonable. The insurer is not required to reimburse the complainants for the cost of TM’s report obtained prior to claim lodgement. The complainants have not provided a copy of FT’s report and therefore it is reasonable that the insurer is not required to reimburse the complainants for this report. Further, the insurer is not required to reimburse the complainants for the cost of AP’s report as this did not assist the complainants in establishing that the damage was from an insured event. 2.4 Are the complainants entitled to indirect financial loss compensation? No. The panel is not satisfied that the complainants have established an entitlement to indirect financial loss compensation. AFCA can award indirect financial loss compensation Under paragraph D.3.2 of the AFCA Rules, we may require an insurer to compensate a complainant for indirect financial loss (also known as consequential loss). For complainants made after 1 January 2024, this is capped at $6,300. Many insurance policies exclude cover for indirect loss. If this is the case, we will not award this type of compensation for loss caused by the event giving rise to the claim. However, if the complainants suffered an additional loss because the insurer mishandled the claim, we may require the insurer to compensate the complainants for the additional loss. The complainants claim for the following losses: · electricity costs $579.55 · water usage $147.32 · gas usage $367.54 · travel costs from rental accommodation to property $26,152.90 · moving costs of $1,500. Insurer is not required to compensate the complainants for these losses The panel is not satisfied that the insurer is required to compensate the complainants for the losses claimed. Many of these items such as utility costs, water and gas usage are costs that would normally be incurred by the complainants, despite an insured event. The panel is not satisfied that the insurer’s actions have caused the complainant to incur the travel costs and moving costs. The complainants chose to reside in a town further away. While the panel acknowledges that this is likely due to availability of rental properties, the complainants have not shown why it was necessary for them to return to the property. The panel is satisfied that the insurer is not required to reimburse the complainants for these costs. 2.5 Are the complainants entitled to compensation? Yes. The insurer should compensate the complainants each $5,000 for the stress and inconvenience caused by its poor claims handling. Complainants say the insurer caused undue stress and delay The complainants seek maximum non-financial loss compensation for each of the claims lodged. They say: · the insurer’s poor and unfair handling of their claims and lack of understanding of the issues (by the insurer and its contractors) has caused undue stress on their family and directly affected them due to the delays which has resulted in health issues · they have incurred costs of health care in treating mould related illnesses which they say have been directly caused by the insurer’s mishandling of the claims · they had to take significant time off work due to moving four times in less than eight weeks and putting together supporting information for their claim · they were not offered TA until mid June 2025 despite the insurer being aware of the mould issues in the kitchen · the insurer’s communication was poor · the insurer failed to provide all information when requested. The complainants seek the maximum compensation. Insurer should compensate the complainants The insurer made an ex-gratia offer of compensation in the amount of $6,300. The panel is satisfied that the insurer’s poor claims handling has caused the complainants a significant amount of undue stress and inconvenience. The complainants have outlined the significant impact that the insurer’s claims handling has had on them. This includes the stress of health concerns while living in the property, and significant time and inconvenience in establishing their claims. The panel does not accept the complainants are entitled to non-financial loss compensation for each of the claims they have lodged as they have been considered together in this determination. However, the panel is satisfied that each complainant is entitled to non-financial compensation as they each have been individually affected, noting the medical information that has been provided by the female complainant. The panel accepts the insurer’s communication and conduct led to an unusual interference with the complainants’ expectations of enjoyment or peace of mind. This included cancelling the complainants’ TA after it made a cash settlement offer to the complainants. The panel is satisfied it is fair for the insurer to pay the complainants $5,000 each in non-financial loss compensation. The complainants have also provided medical information in relation to their children. The panel accepts the complainants’ family were also impacted by the insurer’s errors on the claim. However, in line with the AFCA Rules, consideration of an award of compensation is limited to the complainants and does not extend to their family members. 2.6 Why is the outcome fair? The outcome is fair as the insurer’s settlement offer should include all the damage it is obliged to cover under the policy, including the contents. It is fair for the insurer to pay TA as the property was not habitable because of the insured events. It is fair that the insurer compensates the complainants for its poor claims handling and reimburses the complainants’ expert reports in line with this determination. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.