Partial decline of cyclone damage claim (retaining wall movement, structural damage) and handling of mould remediation and make-safe works
Text of the determination
Determination
|
Case number
|
12-25-266464
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-266464 17 September 2026
1 Determination overview
1.1 Complaint
The complainants held a home building and contents insurance policy underwritten by the financial firm (insurer). The policy included cover for accidental damage.
The insurer partly accepted a claim for water and mould damage to the building and contents after Cyclone Alfred. However, it said some of the building damage was not covered because it resulted from excluded causes, including:
· long term deterioration,
· structural and design defects, and
· other pre-existing issues.
The complainants want the insurer to accept liability for all damage. They also say the insurer did not handle their claim properly or fairly.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
No. The insurer is required to cover further damage to the garage, entry area and limited deck area. The insurer has not shown this is excluded. However, the insurer is not required to cover:
· the damage to the retaining wall itself, or
· any other further building damage.
I am also satisfied that:
· the insurer has remediated the mould damage to the building and contents, and
· the insurer has properly settled the complainants for the temporary accommodation costs that resulted from the covered damage to date.
Was the insurer entitled to install a make-safe brace to the garage wall?
Yes. I am satisfied this was appropriate and reasonable in all the circumstances. The insurer has also cash-settled the complainants for the works associated with its removal.
Should the insurer pay other compensation to the complainants?
Yes, the insurer should pay $3,000 non-financial loss compensation to each complainant. Indirect financial loss compensation is also warranted in the circumstances.
Why is the outcome fair?
The outcome is fair because the policy covers accidental damage that the insurer has not accepted. However, it would not be fair to require the insurer to pay for damage that is excluded by the policy, or pay more for damage it has already appropriately remediated and settled.
1.3 Determination
This determination is partly in favour of the complainants. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to:
· cash-settle the building claim for the damage I have found is covered, in accordance with the process and timeline set out at section 2.1 of this determination
· if it has not already done so, pay the complainants $1,589.53 for their moving costs, together with interest calculated in line with section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 10 days after the insurer was provided with the receipt for those costs until the date of settlement
· if it has not already done so, pay the complainants $1,333 for the refrigerator replacement cost, together with interest calculated in line with section 57 of Act from 10 days after the insurer was provided with the receipt for that cost until the date of settlement
· if it has not already done so, pay the complainants $3,247.71 for their further moving costs, together with interest calculated in line with section 57 of the Act from 10 days after the insurer was provided with the receipt for those costs until the date of settlement
· pay the complainants $3,000 each ($6,000 total) in non-financial loss compensation.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
No. The insurer is required to cover further damage to the garage, entry area and limited deck area. The insurer has not shown this is excluded. However, the insurer is not required to cover:
· the damage to the retaining wall itself, or
· any other further building damage.
I am also satisfied that:
· the insurer has remediated the mould damage to the building and contents, and
· the insurer has properly settled the complainants for the temporary accommodation costs that resulted from the covered damage to date.
Complainant has onus to establish a valid claim
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The policy provides cover for loss or damage to the insured property, including accidental damage. This is defined in the policy as:
resulting from a sudden mishap or adverse event that you and your family neither expect nor intend
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance (in this case, accidental damage, as defined above). This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Insurer partly accepted the claim
After Cyclone Alfred in March 2025, the complainants lodged a claim for a range of damage, including water ingress, mould contamination, structural movement and cracking, retaining wall damage, damage to contents, and issues affecting the garage door and air conditioning system.
The insurer accepted that some damage was covered, including water ingress and resultant damage to parts of the home caused by water coming through the roof, mould remediation works, certain contents losses, damage to the dividing fence, and later accepted the damage to the air conditioning system and garage door.
However, it did not accept that all the claimed damage was caused by a sudden or accidental event. It said:
· the retaining wall movement was caused by movement over time,
· the resultant damage from the retaining wall movement was not covered because the damage occurred over time, or it was caused by long-standing defects, inadequate drainage, design issues, and other pre-existing conditions, which are all excluded under the policy.
· some of the other damage claimed by the complainants was not caused by the retaining wall movement, and was also pre-existing and not caused by any other sudden or accidental event.
It also did not accept liability for the damage to the roof, which it said was caused by pre-existing damage by foot traffic and other pre-existing deterioration.
Complainants say further damage is covered by the policy
The complainants say there is substantially more damage than the insurer accepted that should be covered.
They have provided several photos of water in the garage and surrounding areas. They say the saturation of the surrounding ground and water ingress caused movement of the retaining wall next to the garage, which in turn resulted in cracking, distortion and movement throughout the house. They say this was sudden, and was not intended or expected.
In October 2025, the complainants engaged a structural engineer, PE, to provide a structural engineering statement about the retaining wall. PE said the wall ‘presents a safety concern’ and recommended immediate remedial works, including either stormwater diversion or retaining wall reconstruction. PE’s report also says:
According to information provided by the client, the retaining wall has been observed to lean towards the garage column during heavy rain event[s]
The complainants say the mould assessor engaged by the insurer, MC, supports that this more extensive damage occurred suddenly following the cyclone. This report says, in the ‘Background Information / Initial Observations’ section:
The house was impacted by Cyclone Alfred resulting in high levels of water/water ingress into the area under the house as well as through the ceiling in the Kitchen/Living, this heavy levels of rain caused a landslide which impacted the main brick spine of the home causing visual structural changes/twisting/warping of the main structure
MC’s report also said that there was mould staining and that the complainants considered their health symptoms had worsened because of this. The complainants say the mould remediation works have been inadequate.
Insurer says further damage is not covered under the policy
The insurer says the further damage is not covered under the policy because it did not happen suddenly or accidentally. Rather, it says the damage to the wall and other areas developed over time due to structural and design defects and long-term deterioration.
The insurer engaged an engineering expert, MG, who agreed some of the further damage (including the cracking and movement around the entry area and other structural issues) resulted from movement of the retaining wall. MG said however that the retaining wall movement was not caused by a ‘single, one-off event’ and rather had been ‘ongoing for an extended period’. MG also said that other issues (such as the ceiling gaps and cracking) were not caused by the retaining wall movement but were also not recent or caused by a single one-off event.
MG’s photos and descriptions of the property show it is built on a steep block, with a concrete masonry retaining wall next to the lower level garage and subfloor area retaining the uphill ground behind it.
MG said:
· the retaining wall did not have waterproofing and subsoil drainage behind the wall. MG also says this has been a long-standing construction requirement that would have been in place at the time the property was built (in around the 2000s). MG said that due to this:
no apparent stormwater management system exists on the upslope side of the property to effectively intercept or divert overland flow away from the building. As a result, stormwater is observed to enter the subfloor and garage areas laterally from the adjacent slope. The absence of adequate diversionary infrastructure or subsoil drainage has likely contributed to hydrostatic pressure build-up behind the retaining wall during recent heavy rainfall events
· a large infrastructure water reservoir is also located around 75 metres away up a further steep incline. MG said that:
the contributing catchment area from the hill behind the property appears substantial, further increasing the volume of stormwater directed toward the structure
· there were visible signs of longer-term damage to the wall, such as its outward lean, displacement, and separation from the brick garage wall attached to it. MG said this had occurred over time, due to the water building up behind it and not being able to adequately drain away.
MG also commented on the other damage as follows:
· the cracking and movement damage to the entry area (such as the sticky front door not shutting properly) were likely caused by the retaining wall movement below it
· the internal ceiling cracking, gaps and timber beam cracks throughout the house were caused by long-term drying shrinkage and material movement rather than the retaining wall moving or any other sudden cause. MG said that:
> publicly available real estate photographs taken before the claim showed some of the same ceiling gaps and cracking before the wall failed
> the type and location of the cracking was consistent with gradual contraction of timber and plasterboard over time
> the recently renovated bathrooms showed no signs of damage in the tiles, square-set plasterboard junctions, doors or windows. MG said there would also be damage to these areas if the wall failure caused structural movement throughout the house more generally
> the deck supports were generally stable. To the extent there was minor movement in part of the deck support structure (to the F1 frame of the deck), MG said this was caused by the retaining wall movement. MG however said the movement to the F2 frame was not caused by the retaining wall movement.
The insurer also engaged a roof expert, TS. TS found that the stormwater entered the house through areas around foot traffic indentations in the roof. The insurer accepted the resultant internal water damage from this but said the roof damage was not covered because the foot indentations and other damage to the roof were pre-existing.
Some of the further damage was sudden and unexpected
I accept the findings by MG about the condition of the retaining wall. They are persuasive in showing the wall was damaged before it failed, and had been under pressure for some time due to longstanding drainage, waterproofing and design issues. MG’s explanation of water building up over time behind the wall, causing it to lean and become deteriorated, is persuasive and supported by MG’s descriptions of the conditions of the property (including photos).
However, I am also satisfied that while the wall was vulnerable due to these conditions and pre-existing deterioration and damage, it also moved suddenly and unexpectedly. I am therefore satisfied the complainants have shown a valid claim for the movement and the damage caused by it, subject to the policy’s exclusions.
Damage caused by the wall movement
Based on the information in MG’s report, I am satisfied the following damage resulted from the retaining wall movement:
· damage to the wall itself
· cracking and movement around the entry area
· structural damage to the garage, including the movement that required temporary bracing
· the localised displacement of deck Frame F1.
Damage not caused by the wall movement or any other sudden or unexpected event
However, I am not satisfied the following damage resulted from the retaining wall movement or any other sudden and unexpected event:
· the internal ceiling cracking, ceiling gaps and timber beam cracking throughout the house
· the gaps and movement associated with deck Frame F2.
MG’s explanation of this damage is persuasive in showing that the nature of the damage was consistent with long-term material movement and drying shrinkage rather than a sudden event. The photos available to me also support there was similar cracking and gaps in these areas before the claim. I am also persuaded by MG’s explanation that there would be corresponding damage to other areas of the home if significant structural movement had occurred, yet there was not. In relation to Frame F2, MG explained the gaps were inconsistent with the direction of the retaining wall movement, which I also accept. I therefore am not satisfied this damage resulted from the retaining wall movement or any other sudden and unexpected event.
I am also not satisfied the roof damage was caused by a sudden or accidental event (being the retaining wall movement or any other event). TS’s report shows there were widespread tile indentations and other signs of pre-existing deterioration, including rust staining, mildew and cracked silicone. This damage was not limited to areas that may have had foot traffic to inspect the damage that occurred after the cyclone. The complainants have not provided a persuasive alternative explanation about how the roof was damaged suddenly and accidentally. I therefore am not satisfied that the complainants have established a valid claim for the roof damage.
Insurer has not shown policy exclusions apply to all the damage
As outlined above, I have accepted that the complainants have established a valid claim for the retaining wall movement, and the damage I have accepted it caused, because the wall movement was a sudden and unexpected event.
Because the complainants have established a valid claim for this damage, the onus now shifts to the insurer to prove any exclusions apply to limit its liability.
Damage to retaining wall itself is excluded
I am satisfied the insurer can exclude cover for the damage to the retaining wall itself.
The policy provides the following exclusions:
There is no cover under any section of your policy for any:
• defect, structural fault, design fault or faulty workmanship;
• gradual deterioration due to action of light, air, sand, sea salt, water, or atmospheric or climatic conditions. For example, the gradual weathering of brick, mortar or concrete or the breakdown of grouting or tile or ceiling adhesive over time.
I accept the movement of the retaining wall was sudden and unexpected. However, I also accept MG’s findings that the retaining wall itself had gradually deteriorated over time and had longstanding defects and structural faults. This is supported by MG’s expert report and the photographs provided that support the retaining wall had pre-existing damage before the cyclone. I also accept the standards referred to by MG about the retaining wall’s construction being applicable at the time the wall was constructed. I am satisfied that this exchanged material supports that the retaining wall can be excluded from cover under the policy because it was defective and had also deteriorated gradually.
The insurer is not required to pay for the repair or replacement of the wall.
Other damage caused by retaining wall movement is not excluded
However, even accepting that the damage to the retaining wall itself is excluded from cover, this does not, of itself, exclude the other damage caused by its deterioration or defects. In particular, the policy only excludes gradual deterioration itself and not the damage caused by it. It also only excludes damage caused by or arising from defects where there was reasonable awareness of the defect. The policy says:
There is no cover under any section of your policy for any claim, loss, cost, damage, injury, death or legal liability caused by or arising from:
• your failure to fix:
• a defect;
• a structural fault;
• a design fault; or
• faulty workmanship,
as soon as is reasonable after you become aware of it, or a reasonable person in the circumstances would have become aware of it.
I am not satisfied the insurer has established that the complainants knew, or reasonably ought to have known, about the defects and pre-existing issues in the retaining wall before it failed.
The complainants had owned the property for less than two years. The insurer has not shown the complainants were aware, or should reasonably have been aware, that the retaining wall lacked drainage or waterproofing or was otherwise defective. The information before me suggests those issues only became apparent following the engineering investigations carried out after the cyclone.
I therefore do not accept that the insurer can rely on this exclusion to decline cover for the damage I have accepted was caused by the retaining wall movement, apart from the damage to the retaining wall itself (which I have accepted is excluded from cover).
For clarity, the insurer is required to cover:
· the damage to the garage
· the damage to the entry area
· the damage to part of the deck area (Frame F1 localised displacement).
For the reasons already set out above, I am also not satisfied the other upper-level cracking, ceiling gaps and timber beam cracking, the further deck damage (apart from the Frame F1 damage) and the roof damage were caused by any other sudden or accidental event. The insurer is therefore not required to cover this damage.
Satisfied insurer has remediated the building and contents mould damage
The complainants say mould developed throughout the property following the damage and that the insurer's remediation efforts were not sufficient.
The insurer says it accepted the mould damage claim and arranged extensive mould remediation works. Those works included anti-microbial treatment, drying of affected areas, HEPA vacuuming, testing and tagging of affected electrical items, assessment and disposal of non-restorable contents, and post-remediation verification (PRV) testing. The insurer says the remediation process was completed and the final reports say that no further remediation work is required.
On balance, having considered the exchanged material, I am satisfied the insurer has remediated the mould damage to the building and contents.
In reaching that view, I place weight on the reports from the insurer’s mould remediator, JE, which show remediation works were carried out over several months and included treatment of affected areas, drying, cleaning and disposal of damaged contents.
When the complainants continued to raise concerns about mould after JE’s work, the insurer engaged an independent mould assessor, MC, to inspect, test and assess the extent of mould contamination and indoor air quality. I acknowledge that MC found there was further mould contamination, despite JE’s earlier work. However, the insurer then arranged for further remediation works to address this. MC also attended after this and provided PRV signoff, concluding that:
Based on the above inspection, test and associated laboratory microbial sample analysis, the subject dwelling was found to be in a state of Normal Environmental Fungal Ecology (NEFE) at the time of inspection testing and microbial sampling.
However, [two] surfaces need re-remediation:
• Kitchen A/C
• Top of door in office.
JE then reattended the property to remediate these two areas.
The complainant has not provided any persuasive information showing the remediation work was unsuccessful, or the PRV clearance was incorrect. I am therefore not persuaded the insurer is required to undertake further remediation works.
Insurer required to pay further temporary accommodation costs
The complainants say the insurer should continue paying temporary accommodation costs because they do not consider the property safe or suitable to live in. They also say the temporary accommodation payments already made by the insurer were insufficient because they did not cover the full period they say the property was uninhabitable.
The insurer says it has already paid temporary accommodation benefits while the accepted damage was being addressed. It says those payments were made because the damage it accepted made parts of the property temporarily unsuitable to occupy. However, it says the remediation works have now been completed and there is no further damage covered under the policy.
As discussed above, I am satisfied that some of the further claimed damage is covered under the policy. The complainants have not shown that the home is not currently able to be lived in due to this damage, which is limited to the garage, deck and entry areas. However, I do accept that it is possible that the home may not be able to be lived in for the duration of repairs to these areas. This will depend on the views of the builder, as I have outlined below. If this is the case, the insurer will be required to pay temporary accommodation for this period, subject to the policy terms and conditions (including whether the complainants are still residing at the property).
Insurer to settle the claim
The complainants say that they have already made some repairs to the property, and incurred costs, for the repair of the damage. The complainants acknowledge that some of these costs were also other repairs to prepare the property for sale.
In order to bring a final resolution to these issues, and considering that the property is now for sale, the insurer is required to cash-settle this claim upon the complainants’ acceptance of this determination as follows:
· within 14 days of being provided with the complainants’ receipts and paid invoices for the repair costs they have incurred, pay those costs which I have determined are covered under the policy. For clarity, these costs are:
> the damage to the garage
> the damage to the entry area
> the minor damage to the deck area (limited to the F1 Frame)
These costs include the cost of repairing the impacted doors and doorframes, repainting, crack repairs and associated works to these areas, skirting board and deck repairs, and floor repairs. They do not include costs relating to other areas of the home.
On this amount, the insurer is also required to pay:
· a contingency uplift of 15% to account for the risk and cost burden of these works passing to the complainants, and
· to the extent that the complainants have already provided these invoices to the insurer, interest calculated in line with section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 10 days after the insurer was provided with the receipt for those costs until the date of settlement.
2.2 Was the insurer entitled to install a make-safe brace to the garage wall?
Yes. I am satisfied this was appropriate and reasonable in all the circumstances. The insurer has also cash-settled the complainants for the works associated with its removal.
Insurer’s builder undertook make-safe works
Following the claim, the insurer arranged for its builder, TS, to inspect the property. TS said ‘structural brick wall on side of property which is supporting the upper floor is starting to lean into the garage & at possible risk of more movement or possible collapse’.
TS installed temporary bracing against the garage-side wall as an ‘emergency secure’ to provide support and reduce the risk of further movement while the insurer continued to assess the cause and extent of the damage. The bracing was still in place during the later engineering inspections by MG and PE.
Complainants say these works were inappropriate and caused more damage
The complainants say the insurer's make-safe works were unnecessary and caused further damage to the property. They say the temporary bracing installed against the garage wall altered the condition of the retaining wall and surrounding structures and should not have been installed. They also say the bracing contributed to the cracking and other issues at the property.
The complainants also rely on the opinion of their engineer, PE. They say that PE was critical of the brace support and considered further engineering intervention was required.
Make-safe works were reasonable in the circumstances
I am satisfied the insurer acted reasonably in arranging the make-safe works.
At the time, there were significant concerns about movement of the retaining wall beside the lower-level garage. In those circumstances, it was reasonable for the insurer to take temporary steps to manage any potential safety risk while the cause and extent of the damage were being investigated.
I also note that PE considered the retaining wall presented a safety concern and recommended remedial works, including stormwater diversion or reconstruction of the wall. PE’s report does not say that the make-safe brace was inappropriate, unnecessary, defective, or caused further damage. In my view, the fact that PE also considered the wall required urgent attention supports the reasonableness of the insurer’s make-safe works.
While the complainants say the bracing caused further damage to the house, as I have outlined above, I have found that the broader cracking, movement and structural damage was caused by other issues that are excluded under the policy.
I also acknowledge the installation of the brace resulted in some minor impacts to the wall, including fixing points. However, given the circumstances at the time, I consider those minor impacts were a reasonable consequence of undertaking the make-safe works. I am not persuaded the insurer acted unreasonably by installing the brace. I also note that during the course of this dispute, it paid the complainants a cash settlement of $3,071.48 for rectification works following its removal.
2.3 Should the insurer pay other compensation?
Yes, the insurer should pay $3,000 non-financial loss compensation to each complainant. Indirect financial loss compensation is also warranted in the circumstances.
Complainants are seeking compensation for indirect financial loss
The complainants are seeking compensation for a range of financial losses they say resulted from the insurer's handling of the claim and the damage to the property. These include the costs of removing the garage brace, refrigerator and contents-related losses, storage costs, temporary accommodation costs and other out-of-pocket expenses they say were incurred because of the condition of the property.
The complainants say these losses would not have been incurred if the insurer had properly assessed the claim and accepted all the damage.
Compensation for indirect financial loss is partly warranted
The policy excludes cover for consequential or indirect financial loss. However, where appropriate, AFCA may award compensation for indirect financial loss suffered by a complainant due to a financial firm's act or omission, if it is fair in all the circumstances to do so.
I am satisfied it is fair and reasonable for the insurer to compensate the complainants for their moving costs and the damage to their refrigerator which occurred during the move. Those costs arose because the complainants were required to vacate the property while the accepted mould damage was being remediated. The insurer has accepted that the moving costs should be paid and has offered to do so. I consider the refrigerator replacement should also form part of those costs.
Apart from those costs, I am not persuaded the exchanged information shows that the costs claimed by the complainants were caused by any unreasonable act or omission of the insurer.
To the extent the complainants have incurred costs associated with the retaining wall, ongoing accommodation, or removal of the brace, I am not persuaded those costs were caused by any failure by the insurer. Rather, they arise from damage which I have found is not covered under the policy, or from actions the insurer was reasonably entitled to take in managing the claim.
Accordingly, within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to pay the complainants (it if has not already done so):
· $1,589.53 for their initial moving costs, together with interest calculated in line with section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 10 days after the insurer was provided with the receipt for those costs until the date of settlement
· $3,247.71 for their further moving costs, together with interest calculated in line with section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 10 days after the insurer was provided with the receipt for those costs until the date of settlement
· $1,333 for the refrigerator replacement cost, together with interest calculated in line with section 57 of Act from 10 days after the insurer was provided with the receipt for that cost until the date of settlement.
Compensation for non-financial loss
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA does not award non-financial loss in every complaint. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Compensation for non-financial loss is warranted
The insurer has already paid the complainants $3,000 in non-financial loss compensation. I have taken that payment into account when assessing what amount of non-financial loss compensation is fair in the circumstances.
I am satisfied further non-financial loss compensation is warranted. While I have found the insurer was entitled to decline some aspects of the claim, I have also found it incorrectly declined cover for some of the damage caused by the movement of the retaining wall during Cyclone Alfred. As a result, the complainants were required to spend considerable time and effort pursuing their claim and attempting to establish their entitlement to cover.
The complainants also say the insurer declined the retaining wall and structural movement aspects of the claim on 30 April 2025 but did not communicate that decision until 4 July 2025. However, the information presently before me does not clearly establish when the insurer had all information before it to make a claim decision. I accept, however, that the complainants repeatedly sought updates from the insurer during May and June 2025 and the insurer did not give the complainants timely responses to their requests.
The complainants also experienced significant inconvenience and distress because of the way the mould damage was initially handled by the insurer. They continued living at the property for about a month after mould was first identified, despite the health concerns they had raised. They also continued to raise concerns about mould contamination after the insurer's initial remediation works. Those concerns ultimately led to the insurer engaging an independent mould assessor, which found further mould contamination and recommended additional remediation works. The insurer then arranged further remediation. In my view, this supports that the complainants' concerns were not unfounded and that they were required to spend considerable time and effort pursuing this aspect of the claim.
Taking into account the insurer's acknowledged service issues, the need for further remediation, the length of the claim and the impact these matters would reasonably have had on the complainants, I am satisfied an award of $3,000 in non-financial loss compensation for each complainant is appropriate and fair in the circumstances.
2.4 Why is the outcome fair?
The outcome is fair because the policy covers accidental damage that the insurer has not accepted. However, it would not be fair to require the insurer to pay for damage that is excluded by the policy, or pay more for damage it has already appropriately remediated and settled.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.