Insurer's cash settlement offer and scope of works for building damage and mould, temporary accommodation, non-financial loss and costs
Text of the determination
Determination
|
Case number
|
12-25-265480
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-265480 30 June 2026
1 Determination overview
1.1 Complaint
The complainants held a home building and contents insurance policy with the financial firm (insurer). Between December 2022 and July 2023, the insured property was damaged by three events for which claims were lodged under the policy, the events were:
· escape of liquid in a bathroom
· hail damage to the roof
· water damage to the ensuite subfloor.
The exchanged information confirms the claim for hail damage to the roof has been settled between the parties through a cash settlement payment of $147,904.27 in December 2023. The complainants’ claim for loss and damage to their contents has been the subject of a previous AFCA determination (12-00-1098304) issued on 28 February 2025.
Consideration of this complaint therefore is limited to the complainants’ dissatisfaction with the insurer’s assessment of its liability and final claim settlement offer for the damage to the insured building. This also extends to matters relating to:
· the insurer authorising the repairs or settling the claim by way of a cash settlement
· temporary accommodation cover
· legal fees and out of pocket expenses
· discontinuation of cover; and
· non-financial loss compensation.
1.2 Issues and key findings
Is the insurer’s cash settlement offer fair in the circumstances?
No. The exchanged information shows the insurer is first obliged to complete the repairs, and remediation works to the insured building. The option not to use the insurer’s preferred repairers rests with the complainants which gives rise to the option of a cash settlement.
However, it is fair that the insurer be allowed to cash settle the claim based on its assessed scope of works and repair quote from ‘S’ if the complainants fail to reasonably cooperate in line with their obligations under the policy.
Are the complainants entitled to further temporary accommodation (TA)?
Yes. The complainants are entitled to further TA in line with section 2.2.
Are the complainants entitled to compensation?
Yes. Subject to the complainants’ acceptance of this determination, the insurer is to:
· pay each of the complainants $1,500 in non-financial loss compensation (NFL)
· pay the complainants up to $3,000 towards outstanding professional costs from consultants DP (Building consultant), K (builder) and NS (Mycologist). This includes possible further involvement of these consultants in line with this determination.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· it is fair that the insurer be required to meet its obligations as set out under the policy including accepting to complete the repairs and remediation works if preferred by the complainants
· the insurer is entitled to complete further assessments of the additional damage in question to assess its liability under the policy. The complainants’ refusal to offer the insurer access to the property has prevented it from being able to do so
· it is also fair, if the complainants choose not to reasonably cooperate, that the insurer cash settle the claim based on its assessed scope of works and repair quote from S
· that insurer pays the complainants NFL and contributes to some of the complainants’ expert expenses
· given the brand transition the insurer was not obliged to offer renewal of the policy or new business consistent with its underwriting guidelines.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is to settle the claim for the building damage and TA as set out under sections 2.1 and 2.2 of this determination.
The insurer is to:
· pay the complainants $1,500 each in NFL
· subject to being provided proof of payment our outstanding payment, reimburse the complainants up to $3,000 towards outstanding professional report costs from DP, K and NS. This includes possible further involvement of these consultants in line with this determination
2 Reasons for determination
2.1 Is the insurer’s cash settle offer fair in the circumstances?
No. The exchanged information shows the insurer is first obliged to complete the repairs, and remediation works to the insured building. The option not to use the insurer’s preferred repairers rests with the complainants which gives rise to the option of a cash settlement.
However, it is fair that the insurer be allowed to cash settle the claim based on its assessed scope of works and repair quote from ‘S’ if the complainants fail to reasonably cooperate in line with their obligations under the policy.
The policy covers the insured building against accidental loss or damage
The insurer provided the complainants with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). The panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claims.
The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
This means that not all loss and damage is automatically covered. Rather, only accidental loss or damage caused to the insured building during the period of insurance and not subject to the exclusions, is covered.
When making a claim, the complainants have the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainants must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on balance, the application of any exclusion it relies on to reduce its liability or deny the claim.
There is no dispute the insured building has suffered damage due to events that trigger cover under the policy. Also, that the insurer has accepted the three claims, of which two claims (not including the hail damage to the roof) have since been combined.
However, the complainants are dissatisfied with the insurer’s final claim settlement offer. They say the insurer’s accepted SOW from consultants’ ‘S’ do not include all the additional damage and associated repairs arising from the significant mould infestation.
On 15 December 2023, the insurer cash settled the replacement of the hail-damaged roof and roof cavity insulation for $147,904.27. The complainants subsequently replaced the roof and insulation in January 2024 for $39,600.
Insurer is liable for the significant mould infestation and associated damage
The complainants hold the insurer responsible for the significant mould infestation and associated damage to the insured building.
The panel notes within the exchanged information the insurer appears to continue to try and diminish its role and failures which have led to the said mould infestation. However, the panel is not satisfied this is fair or consistent with the available evidence.
Consistent with the previous AFCA determination, the panel is satisfied it is fair to accept that the insurer’s conduct and failures over the life of the claims is the most likely cause for the significant spread of mould throughout the insured building.
Given the previous AFCA determination, and given the parties have had the opportunity to review and respond to all the exchanged information, the panel does not intend on going into the details of the insurer’s failures.
The panel is satisfied it is fair that the insurer be required to cover the costs to investigate, remediate and repair all claim and mould related damage that is identified at the insured building.
Complainants want insurer to repair their home
The complainants are of the view that the insurer should be required to authorise, manage and complete the remediation and repairs to their home. The insurer appears to accept liability for additional mould damage, but the parties disagree on whether:
· the insurer should authorise repairs or offer a higher cash settlement amount
· the insurer is liable for the complainants’ expanded SOW without its own inspection.
The panel has reviewed the relevant policy wording provided under section ‘How we settle building claims’ on page 57 of the PDS. The panel notes the insurer says it will normally pay its supplier the necessary and reasonable cost to repair, replace or rebuild the damaged parts of the insured building. Further, that where it does this the repairs are covered by the policy’s lifetime repair guarantee.
The PDS then goes on to explain where and how the insurer may settle the claim by way of a cash settlement. However, this is limited to circumstances where the complainants choose not to use the insurer’s appointed consultants/trades/suppliers. The panel is not satisfied the complainants have refused to use the insurer’s preferred consultants/trades/suppliers. Rather, the complainants are requesting that the insurer be required to complete the repairs to the insured building. Relevant policy wording is provided in section 3.2 below.
The panel accepts it is fair to consider any reasonable and persuasive reasoning from the insurer as to why it is unable to or why it would be fair to allow it to cash settle its liability under the policy. However, the panel is not satisfied that the insurer has put forward a persuasive reason as to why it would be fair:
· to allow it to step away from its commitments under the policy; and
· in doing so allow it to deprive the complainants of the policy’s lifetime repair guarantee.
This is of course subject to the complainants reasonably cooperating with the insurer so that it is allowed fair opportunity to assess its liability under the policy. Where the complainants choose not to do so, the panel accepts it is fair for the insurer to cash settle the claim. The basis for such cash settlement will be discussed in more detail later in this determination.
The panel accepts there may have occurred a breakdown in the relationship of the parties. However, it is not unreasonable to accept that on resolution of the issues regarding access to the insured property and a fair SOW that the parties will be able to reasonably cooperate to bring this claim to conclusion.
In saying that, the panel accepts (at the discretion of the complainants) the claim may be settled by way of a cash settlement. If this is the chosen option, it is fair that the cash settlement based on a mutually accepted SOW and repair quote be increased by a further 15% to allow for contingencies and a loss of the lifetime repair guarantee.
It is fair the complainants be allowed a final opportunity to cooperate
The panel has considered the reports, opinions and supporting information from the many consultants, trades and experts the parties have each appointed to support their positions. The panel is satisfied that all this information has been exchanged with the parties and each having had fair opportunity to respond to this information.
Therefore, given the significant number of these reports and information within, the panel does not intend on reiterating the information within this determination. The panel, as noted above, accepts the evidence establishes the insured building presents with claim related damage and significant mould infestation, which the insurer is obliged to cover.
Further, that the insurer relies on the assessments thus far completed by S and its proposed SOW to offer a final cash settlement totalling $1,106,739.53. The panel notes this includes an allowance for an additional 19 weeks of TA (estimated repair timeframe) and a 15% uplift.
The panel notes that the insurer accepts that this SOW from S may not yet include all the damage/remediation works to be accepted under the claim. However, given the complainants refusal to allow it access to the insured building since around July 2024, it has been denied the opportunity to finalise the SOW.
The complainants have provided an alternate SOW and repair quote from consultants’ ‘K’ dated 26 September 2024 in the amount of $1,810,014.93. This was sourced by ‘DP’ on the instructions of the complainants. The panel notes the complainants say they do not rely on this as their preferred SOW but sourced it to assist the insurer with finalising a fair and reasonable SOW.
The panel notes the information from the expert quality surveyor ‘MB’ appointed by the insurer to review the two SOWs (from S and K). The panel has also considered the information and explanations from building consultant DP with respect to his concerns regarding S’s SOW and support for the SOW and repair quote from K.
Having carefully considered this information, the panel is not persuaded that either party has presented a strong and persuasive reason to prefer their presented SOW as the more reasonable and fairer. It is clear both parties’ positions are poles apart in terms of the required works and costs of such works. Both parties have made some valid points and which the panel accepts only strengthens the view that further assessments are necessary to finalise a fair and reasonable SOW and therefore the remediation and repair costs.
It is also clear that the insurer accepts and is willing to amend its SOW if allowed access to the insured building to complete these necessary further assessments.
The panel empathises with the complainants in that this has been a long and frustrating period for the family. However, the panel is also satisfied the complainants failure to reasonably cooperate has not been reasonable or assisted the parties in bringing this matter to conclusion.
The panel acknowledges the insurer’s position that without being permitted reasonable access to the insured building since July 2024, it has not had fair opportunity to inspect the additional damage being claimed. Further, that it is left with no other alternative but to cash settle the claim based on the information it has to hand and the policy provisions.
Having regard to what is considered fair in all the circumstances, the best interests of the parties and to bring this matter to conclusion, the panel accepts it is fair the complainants be allowed a final opportunity to reasonably cooperate. This means the complainants, in line with their obligations under the policy, are to permit the insurer reasonable access to the insured building as set out below.
However, if the complainants choose to reject this determination and therefore the insurer reasonable access to the insured building, it is fair that the insurer arranges payment of $1,106,739.53 to the complainants and closes the claim.
The panel is not satisfied it would be fair to require the insurer to pay the complainants based on K’s SOW and repair quote without it first being allowed reasonable opportunity to assess the additional damage being claimed by the complainants.
Parties are to take the following steps towards finalising the claim
On receiving this determination:
· the complainants are to notify AFCA of their acceptance or rejection within 30 days
· where the decision is to reject the determination, the insurer is entitled to arrange the above noted cash settlement and close the claim. The complainants retain their right to continue to dispute the insurer’s position before another forum and for which they can seek their own independent legal advice
· where the complainants choose to accept the determination:
> within 14 days or receiving notice of the complainants’ acceptance of this determination the insurer is to contact the complainants so the parties can discuss steps to permit the insurer access to the insured building
> within 14 days of the parties agreeing to these arrangements the insurer is to contact ‘PM’ (Building Consultant) and ‘Dr WB’ (Microbiologist) and confirm their willingness and availability to attend the insured building to complete their assessments
> on confirming the date(s) for PM and DR WB’s attendance the insurer is to inform the complainants so that they can arrange for DP or K to be present at these assessments
> similarly, the insurer is also permitted to have S or MB present at these assessments
> if PM and/or MB are opposed to these parties being present at their assessments, this is to be respected. However, within 14 days of their assessments PM and Dr WB are to make themselves available (at the cost of the insurer) for a joint meeting with S and DP to discuss their findings with these parties and answer any questions they may have
> PM and Dr WB are to provide the insurer with their reports including their proposed repair and remediation scopes of works
> within 14 days of receiving this information the insurer is to obtain actionable final building repair and remediation quotes consistent with the recommendations by PM and Dr WB
> these are to be shared with the complainants to allow them the opportunity to confirm their preference i.e. whether they prefer the insurer authorise and complete the works or wish to be cash settled for these works. This is to be confirmed within seven days.
· If the complainants choose to be cash settled, the settlement is to be arranged by the insurer within seven days of receiving notification of this preference. The cash settlement is to also be increased by a further 15% to allow for contingencies and loss of the lifetime repair guarantee.
Insurer entitled to reduce liability by outstanding monies from its roof cash settlement
The panel notes the insurer has previously accepted and paid the complainants $147,904.27 for repairing/replacing the main roof and insultation. The exchanged information shows the complainants completed these works at a cost of $39,600 based on a repair invoice from ‘JG’ dated 5 January 2024.
The complainants appear to be seeking cover for replacement of the replaced insulation and possibly the roof again as part of the additional works. The complainants say it is reasonable to accept the new roof insulation and roofing will have been damaged by the significant mould infestation within the property. However, without further assessments having taken place, the panel has not been provided with any evidence this is the case. Regardless, if it is found that the replaced roof insulation and/or the roofing is now mould damaged and having regard to what is fair, the panel is satisfied that:
· the intention of insurance cover is not to allow a party to benefit
· it is clear the complainants are left with approximately $108,000 from the settlement they received towards repairing the roof and replacing the insulation
· although, it may have been necessary to arrange the roof replacement to mitigate further damage, it may not have been reasonable to install new insulation in a building known to be presenting with significant mould concerns
· regardless, if it is found that the insulation within the main roof cavity and/or the main roof require remediation or replacement, it is fair:
> that the complainants contribute to these costs up to $108,000 if the insurer is completing the works; or
> for the insurer to be allowed to reduce the final cash settlement equal to the cost quoted for replacement of the roof insulation and roof repairs or $108,000, whichever is the lower.
2.2 Are the complainants entitled to more TA?
Yes. The complainants are entitled to further TA as set out below.
The insurer has continued to provide the complainants with TA
The exchanged information shows that the insurer has continued to provide the complainants with TA whilst this complaint has been considered by AFCA. The insurer has allowed a further 19 weeks TA in its final cash settlement offer which has been estimated to be the time it will take to complete the repairs, and remediation works accepted under the claim.
However, in line with the matters discussed above, the panel is satisfied that it is fair that the insurer provides the complainants with further TA cover as set out below:
If complainants choose the option to have the insurer undertake the works
Where the complainants request the insurer to complete the building repair and remediation works the insurer is to provide further TA cover:
· for the time it takes to arrange the necessary assessments and preparation of the final actionable repair and remediation quotes
· for the time it takes the insurer to complete the repairs and remediation works
· an additional two weeks after completion of the repairs and remediation works to allow the complainants time to arrange their move back home.
If complainants choose the option to be cash settled
Where the complainants choose the option to be cash settled the insurer is to:
· provide TA cover for the time it takes to arrange the necessary assessments and preparation of the final actionable repair and remediation quotes
· to include it its final cash settlement cover for TA in line with the estimated time for completion of the repairs and remediation works provided by PM and Dr WB
· an additional two weeks to allow for the complainants to arrange their return to their home once the works are complete.
If complainants choose the reject this determination
In the interest of completeness, where the complainants choose to reject this determination and the insurer access to the insured building, the insurer is entitled to limit its liability for additional PTA to the 19 weeks allowed in its final claim settlement offer, as well as, the time it takes the insurer to arrange payment to the complainants.
2.3 Are the complainants entitled to compensation?
Yes. Subject to the complainants’ acceptance of this determination, the insurer is to:
· pay each of the complainants $1,500 in NFL
· pay the complainants up to $3,000 towards outstanding professional costs from consultants DP (Building consultant), K (builder) and NS (Mycologist)
AFCA can award NFL in certain circumstances
AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer.
Insurer to pay the complainants $1,500 each in NFL
The panel notes the complainants have already been awarded NFL under the previous AFCA determination dated 28 February 2025 relating to their claim for loss or damage to contents items. The panel is satisfied that in awarding NFL the previous Ombudsman took into consideration the complainants’ experience as well as the insurer’s overall management of the claim.
However, the panel is satisfied it is fair to consider award a further $1,500 each to the complainants in NFL under this complaint. This is because the panel accepts the previous AFCA determination was primarily focused on loss or damage to the complainants’ contents and this complaint relates to the insured building.
In saying that, the panel is satisfied it would not be fair to hold the insurer solely responsible for the delays experienced in bring this matter to conclusion or the stress and inconvenience experienced by the complainants. Rather, that it is fair to accept the complainants have also significantly contributed to the delays and breakdown in the relationship between the parties.
The panel is of the view the complainants’ decision to stop reasonably cooperating with the insurer in terms of refusing it access to the insured building was not reasonable. It may be that this was based on advice from their appointed representatives. Regardless, the panel finds this to have been a poor decision which was inconsistent with their policy obligations and a significant contributing factor in the delays experienced in bringing this claim to conclusion.
That said, the panel accepts the insurer’s failures from very early in the assessment process cannot be ignored. These relate to its failure to identify and recognise the threat posed by mould and associated failures to arrange reasonable make safe and/or steps to mitigate further loss or damage.
As noted, the panel accepts both parties have played their part in bringing the matter to where it is at present. However, that it is fair that the insurer pays each complainant $1,500 in NFL for the unreasonable levels of stress, anxiety and inconvenience it has caused or contribute to. This is to be paid within 14 days of receiving notice of the complainants’ acceptance of this determination.
Compensation for indirect financial loss not warranted
Under paragraph D.3.2 of the AFCA Rules, we may require an insurer to compensate the complainants for indirect financial loss (also known as consequential loss), capped at $6,300.
The complainants claim various amounts including $2,436 for filtered water and compensation for contents in temporary accommodation lost due to mould. These matters have previously been considered under the AFCA determination dated 28 February 2025 and therefore will not be considered again here.
Further, the panel is not satisfied the complainants have shown the insurer has mishandled the claim since the previous AFCA determination was issued to the parties. The insurer is not liable for:
· contents in the temporary accommodation
· items purchased to prevent mould in temporary accommodation
· filtered water costs.
The insurer is not required to pay compensation for indirect financial loss.
Reimbursement of some professional fees warranted
Under paragraph D.5 of the AFCA Rules, AFCA may require an insurer to contribute up to $5,000 towards legal or other professional costs incurred during a complaint.
The panel is satisfied that it is fair that the insurer contributes up to $3,000 towards any outstanding fees with respect to DP, K or NS. The panel is satisfied that the information from these consultants has been of assistance in coming to an informed decision on this complaint as well as forwarding the complainants’ position.
This can include any additional costs that may arise from additional services received in line with this determination. Payment is subject to the complainants providing the insurer with reasonable evidence of the outstanding costs and/or proof of payment.
The panel is not satisfied the complainants’ appointed claim management consultant or legal representatives have assisted in forwarding the complainants’ position. Rather, it would not be unreasonable to conclude that their involvement appears to have only contributed to the unnecessary and avoidable delays arising from the complainants’ election not to allow the insurer access to the insured building.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· it is fair that the insurer be required to meet its obligations as set out under the policy including accepting to complete the repairs and remediation works if preferred by the complainants
· the insurer is entitled to complete further assessments of the additional damage in question to assess its liability under the policy. The complainants’ refusal to offer the insurer access to the property has prevented it from being able to do so
· it is also fair, if the complainants choose not to reasonably cooperate, that the insurer cash settle the claim based on its assessed scope of works and repair quote from S
· that insurer pays the complainants NFL and contributes to some of the complainants’ expert expenses
· given the brand transition the insurer was not obliged to offer renewal of the policy or new business consistent with its underwriting guidelines.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Relevant policy provisions
HOW WE SETTLE CLAIMS
We only pay once for loss or damage caused by the same event covered by this Policy even if that loss or damage is covered under more than one section of the Policy.
HOW WE SETTLE BUILDINGS CLAIMS
We'll normally pay our supplier the necessary and reasonable cost to repair, replace or rebuild the damaged parts of the buildings to a condition substantially the same as, but not better than, when new. Where this happens, you'll receive our Lifetime guarantee on buildings repairs.
If your buildings are a total loss and your claim is accepted, full building replacement cover will apply unless the buildings are in a dilapidated condition at the time of a claim. In this case we may settle your claim for a reduced amount in accordance with our legal rights.
If you don't use our supplier
We will pay you the reasonable cost to repair, replace or rebuild the damaged parts of your buildings to a condition substantially the same as but not better than when new if, for example:
· you decide to:
- rebuild to a better standard; or
- sell the land at the site; and/or
- rebuild elsewhere;
· if it's not practical for us to repair, replace or rebuild your buildings due to the age, construction or condition of your buildings or if materials needed for repairs are not readily available;
· if you choose to go with a supplier (which includes a repairer or builder) of your choice. …
…
3.3 AFCA Rules
D.3.2 In addition, or instead, an AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for indirect financial loss. This is not the case if the complaint arises as a result of a claim:
a) on a General Insurance Policy that expressly excludes such liability; or
b) by the Complainant under another person’s Motor Vehicle Insurance Product.
Rule D.4 sets out the maximum amount that an AFCA Decision Maker can award for indirect financial loss.
…
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or
b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.
Other matters
The complainants have raised concerns regarding the insurer not offering renewal of the policy or cover under a new policy. They say this left them in an uninsurable position exposed to risks for further damage to their home.
The insurer has provided some limited information regarding the policy being part of transition of business from one financial firm to another. Further, that the decision to not offer renewal of the policy or new business was unrelated to the damaged condition of the property or the claims. Rather, that given the land size of the property, it does not meet the new and post transition underwriting guidelines.
The panel accepts the insurer’s position that this is a new issue, and which was raised late in the complainant. Therefore, it is fair that if the complainants wish to pursue this matter, they will need to raise this as a complaint with the insurer and if need be, as a new complaint for AFCA’s consideration.