Determination 12-25-264867
Insurer declined a storm damage claim relying on rising damp and drainage-related grounds
Summary
The complainant's storm damage building claim was declined by the insurer on shifting grounds including rising damp and inadequate drainage. AFCA found the claim should have been accepted and ordered a cash settlement with a 20% uplift, interest, temporary accommodation and $4,000 for non-financial loss.
The complainant established a valid storm claim and the insurer failed to prove any exclusion, as the later Building Code standards could not be applied to a 2007 build.
Issues
- Claim denial primary · upheld“The insurer should have accepted the building claim; it has not established that a policy exclusion applied.”
- Poor claim handling secondary · upheld“The insurer has changed its position regarding the basis upon which it seeks to deny the claim which has caused stress and inconvenience.”
- Inadequate claim investigation secondary · upheld“TF's conclusions were more persuasive than CR's Supplementary Report relying on a Building Code not in place at construction.”
- Delay secondary · upheld“complainant experienced an unusual degree of stress and delay due the insurer's claims handling”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-25-264867
|
Financial firm
|
Youi Pty Ltd
Case number: 12-25-264867 28 January 2026
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy for his home in Queensland with the financial firm (insurer) from 19 September 2024 to 18 September 2025. The building was insured for $350,000 with an excess of $2,500. The home was built in 2007.
On 1 April 2025 the complainant lodged a claim for damage caused by storm.
During the course of the claim, the insurer denied the claim based on whether the complainant had established a valid claim and also sought to rely on exclusions under the policy.
The complainant disputed the insurer’s denial of the claim.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
No. The insurer has not correctly assessed the claim. The insurer should have accepted the building claim and should pay for temporary accommodation during the repair period.
Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation.
1.3 Determination
The determination is in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall:
· cash settle the repairs in the amount of $115,765.04
· pay to the complainant interest on the $115,765.04 under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 31 August 2025 to the date the payment is paid by the insurer
· pay the complainant temporary accommodation in accordance with the policy during the repair period upon the provision of written quotes from the complainant to the insurer
· pay to the complainant $4,000 for non-financial loss
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
No. The insurer has not correctly assessed the claim. The insurer should have accepted the building claim and should pay for temporary accommodation during the repair period.
Coverage of the policy
The complainant’s home and contents insurance policy provided cover for loss or damage caused by insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Policy Schedule (Schedule) (together referred to as the policy).
I am satisfied that the policy has been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Policy covered loss or damage to building and contents caused by storm
The policy covered storm as an insured event (page 20) as follows:
6. Storm
What is covered?
Loss or damage to the insured property caused by:
• storm, lightning, wind, hail, snow and storm water overflow from roof gutters and their downpipes or from the area immediately around the premises. This includes instances where the storm causes mechanical, electrical or electronic (including computer software) breakdown or failure;
The policy provided that:
· ‘Incident/s’ meant ‘an unforeseen, unintended, and unexpected event which occurs suddenly and at a specific place and time’
· ‘Insured event/s’ meant ‘an event that is described in the Insured Events section, or added as an Optional Cover and noted as an insured event’
· ‘Storm’ meant a violent atmospheric event which includes a thunderstorm, cyclone or strong wind with or without rain, hail or snow, but not rain showers alone
The cover for storm was subject to the following exclusions (page 20):
What is not covered?
Loss or damage caused by:
• ..
• rising damp or seepage; for example, water from the ground;
• rain, wind, hail or snow entering the buildings through open windows, doors or openings made for alterations, renovations or repairs;
The policy also contained general exclusions (page 36) that the insurer would not pay for loss or damage to property caused by, resulting or arising from:
38. rising damp or seepage; for example, water from the ground;
39. mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which we have accepted a claim;
The policy did not include optional additional cover for accidental damage to the building.
Complainant made a valid claim for storm damage
The insurer’s claim notes for 1 April 2025 recorded that the complainant’s claim was as follows:
What happened? With the rain in [suburb] starting late Jan and early Feb, we've had water flowing under the house and now our floors are starting to get soft and loosen the joins. our subfloor is compressed chip board its getting soft and swelling in a few areas. the vinyl flooring on top is also starting to bubble throughout the house, except in the wet areas which are fibre cement sheeting. with the continuous rain and water it’s not soaking in to the ground as it’s got nowhere to go. ..
How is the water entering your property? The ground floor flowing under the house.
How many rooms have been affected? Throughout the house - about 7 rooms
The complainant’s description in the claim was that he had ‘had water flowing under the house’ which had caused damage to the floors, subfloors and vinyl flooring. This description was ‘loss or damage caused by storm, .. and storm water overflow .. from the area immediately around the premises’ in accordance with the policy wording. This conclusion was confirmed by:
· photos provided by the complainant of significant quantities of water around the premises
· the findings by QA, the insurer’s builder, that in the period between 28 January 2025 and 9 February 2025 there was 1148.4 mm of rainfall recorded at the [suburb] weather station
· a letter from NQ, the complainant’s floorer, which said that vinyl was installed in the home on 5 April 2023 and that the ‘yellow tongue flooring was in good condition when new vinyl was installed’ and the complainant’s statement on 22 May 2025 that he and his family had lived in their home since it was built in 2007/2008 and had ‘never had any previous issues with the flooring until this weather event’.
Accordingly, based on the information the complainant has established a valid claim for storm damage.
Insurer’s initial denial was based on rising damp exclusion
The insurer’s position regarding its denial of the claim changed during the course of the claim and the complainant’s complaint to the Australian Financial Complaints Authority (AFCA).
The initial reports provided by the insurer’s experts were from:
· QA, a builder
· LR, a restorer
· CR, a building consultant.
A summary of the findings of each of the insurer’s experts regarding the cause of the damage are set out in Section 3.2 of this Determination. In brief summary:
· QA’s report concluded that:
> the damage (which totalled $96,470.87 based on a detailed Scope of Works) occurred from a single event in which there had been moisture absorption into the timber flooring causing it to become spongy and experience fixture failure
· LR’s report concluded that:
> due to the continuous rainfall, the ground beneath the property was saturated, and the water was unable to drain properly, exacerbating the moisture issues
> floodwater beneath the property appeared to have compromised the structural integrity of the flooring in six rooms - the lounge, kitchen, dining room, and three bedrooms
· CR’s first report concluded that:
> the damage was caused by ongoing moisture issues from the subfloor area due to inadequate surface water drainage to the sub floor area and also due to the constant drainage of the AC unit’s condensation drainage lines dispersing into the subfloor area since inception
> the clearance of the subfloor between capping and soil measured 600mm which was above the recommended clearance (of 400mm)
> the lack of suitable drainage to the perimeter of the residence was allowing water to enter the subfloor of the property during all heavy rainfall events causing the underside of the particleboard flooring to swell and delaminate over a long period of time, most likely since its inception.
On 21 May 2025 the insurer initially declined the claim. The insurer said that the claim was declined based on an exclusion for ‘loss or damage caused by rising damp or seepage of water from the ground’.
Complainant challenged the insurer’s denial
On 22 May 2025 the complainant challenged the insurer’s denial and said:
· the insurer’s basis of declining the claim by relying on rising damp was impossible because the house was ‘steel post, steel bearer and joist construction off the ground’
· there was, as acknowledged in CR’s report, sufficient ventilation and airflow under the house due to its height
· there had never had any previous issues with the flooring until the weather event in early 2025.
Insurer subsequently declined the claim on a different basis
Between 19 and 26 June 2025 the insurer advised the complainant that it would decline the claim on a different basis. Specifically, it wrote to the complainant on 24 June 2025 and said that it would ‘issue the correct claim decline reason’.
Insurer provided CR’s Supplementary Report dated 15 July 2025
In support of its further decline, the insurer provided a Supplementary Report from CR dated 15 July 2025. In CR’s Supplementary Report, CR concluded:
· it accepted that there was sufficient ventilation and airflow under the house due to the height
· there were minimal surface drainage pits installed around the perimeter of the residence on all elevations and further drainage was required
· not under any circumstance was any water to enter the subfloor area of a residence or structures and surface water drainage must be designed for in accordance with the Building Code of Australia for a Class 1 Building.
On 15 August 2025 (which the insurer repeated on 22 August 2025) the insurer sought to rely on CR’s Supplementary Report and to deny the claim and said that CR had confirmed ‘the lack of suitable drainage to the perimeter of the residence is allowing water to enter the subfloor of the residence during all heavy rainfall events resulting in the underside of the particleboard flooring to swell and delaminate over a long period of time, most likely since its inception’. The insurer did not cite a specific exclusion.
Insurer not entitled to decline the claim and should have accepted it by 31 August 2025
Based on the information, the reference by CR in its Supplementary Report to the Building Code does not assist the insurer and does not support its denial of the claim. This is because the Building Code referred to by CR was the Building Code 2022 (which referred to 2019: 3.1.3.3.). The Australian Financial Complaints Authority (AFCA) approach to the interpretation of such an exclusion in those circumstances has consistently been that:
· it does not accept a policy exclusion (regarding defects or faulty workmanship) can apply based on standards that were not applicable at the time of construction (a Determination by an AFCA Panel (919411)); and
· to establish an exclusion based on defective design or workmanship, the insurer would need to show its construction did not comply with the relevant building code. The insurer has not done so. (914155).
In accordance with the AFCA approach, it was not fair and appropriate for the insurer to deny the claim based on the adequacy of the drainage as the insurer has not established that it was inadequate at the time of the construction of the home in 2007.
Further, on 10 August 2025 the complainant provided a report from TF, plumber dated 10 August 2025 which concluded:
· there was adequate fall across the yard and through underneath the house being roughly 190mm fall across the length of house
· underneath the house there were no catchments and water was able to flow freely
· all of the home’s excess roof water was disbursed into storm water pits and collected in the storm water lines and was then directed to the front storm water drains/culvert.
In the circumstances, the conclusions of TF were more persuasive that CR’s Supplementary Report which had sought to refer to, and rely upon, a Building Code which was not in place at the time of the home’s construction in 2007.
Based on the information, the insurer has not established that a policy exclusion applied to the complainant’s claim and it was not fair or appropriate for the insurer to deny the claim.
Cash settlement with an uplift should be paid on cost of repairs
On 4 August 2025 the complainant advised AFCA that he would be prepared to accept a cash settlement.
In the circumstances it is fair for there to be a cash settlement for the cost of the repairs as the complainant has advised that he would accept one and the insurer’s position has been repeatedly, but inappropriately, that the claim was denied. The insurer, despite its incorrect denial, had provided a detailed scope of works. The complainant has advised that he would accept a cash settlement and has not provided any alternative costings for the cost of the repairs. However, when an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. There may also be additional works identified once repairs begin. When the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
Based on the available information, a reasonable allowance for the transfer of risk was 20%. Accordingly, based on the information it is fair that the insurer should have paid the assessed damage of $96,470.87 (as assessed by QA on 1 May 2025) plus a 20% uplift, namely a total amount of $115,765.04.
Interest is payable under section 57 of the Insurance Contracts Act
Section 57 of the Act says that an insurer has to pay interest on a benefit:
commencing on the day as from which it was unreasonable for the insurer to have withheld payment
AFCA has a published an Approach to Awarding Interest in Insurance, which says:
Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be:
• the date the claim was denied
• if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or
• the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy).
AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm.
In the circumstances, the insurer should have cash settled the claim by not later than 31 August 2025 together with a 20% uplift. It was unreasonable for the insurer to have denied the claim and to have withheld payment from that date. Accordingly, the insurer should pay the complainant interest under section 57 of the Act for the period from 31 August 2025 to the date the payment of $115,765.04 is paid by the insurer.
Temporary accommodation to be paid by the insurer
The policy provided cover for temporary accommodation (page 24) for a period of up to 12 months, while the buildings are being repaired or rebuilt, if the insured cannot live at the premises after an insured event for which a claim is accepted under the buildings policy and the insurer agreed that temporary accommodation is required. The most the insurer will pay for each claim is 12% of the buildings sum insured.
The complainant says he will require temporary accommodation while the works were being completed.
As the repairs have not been performed but are estimated to take two to three months it is fair and appropriate for the insurer to pay the complainant temporary accommodation in accordance with the policy upon the provision of written quotes to the insurer.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Non-financial loss compensation is payable by the insurer
The claim has been under consideration by the insurer since April 2025 and remains unresolved, despite the attendances of specialists engaged on behalf of the insurer. The insurer has changed its position regarding the basis upon which it seeks to deny the claim which has caused stress and inconvenience to the complainant. The complainant, as recorded in the insurer’s claims file records, has repeatedly followed up the insurer regarding the status and consideration of the claim by the insurer.
Based on the exchanged information, I am satisfied the complainant experienced an unusual degree of stress and delay due the insurer’s claims handling which warrants the award of non-financial loss compensation.
In the circumstances it is fair that the insurer pay the complainants $4,000 compensation for non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Summary of the insurer’s experts reports
QA (builder) report
QA’s report (based on an inspection on 7 April 2025) concluded:
· damage appeared to result ‘from moisture absorption into the timber sub-flooring’
· the property did not flood
· the flooring was not affected by inundation
· it appeared ‘that the duration of high humidity and moisture has caused the timber sub-floor to absorb excess moisture, causing it to become spongy and experience fixture failure’
· the damage occurred from a single event
· the estimated repair timeframe was 2-3 months
· based on a detailed scope of works dated 1 May 2025 that the cost of repairs was $96,470.87.
LR (restorer) report
LR’s report (based on an inspection on 15 May 2025) concluded:
· the subfloor was constructed from compressed chipboard, which had started to soften and swell in several areas
· the vinyl flooring laid over the subfloor was also beginning to bubble throughout the house, except in the wet areas, which were constructed from fibre cement sheeting
· due to the continuous rainfall, the ground beneath the property was saturated, and the water was unable to drain properly, exacerbating the moisture issues
· there was no visible microbial growth
· floodwater beneath the property appeared to have compromised the structural integrity of the flooring in six rooms - the lounge, kitchen, dining room, and three bedrooms
· the vinyl flooring in these areas was soft, unstable, swollen, and beginning to split
· the underlying chipboard subfloor was also affected
· slightly elevated moisture levels were detected in the kitchen kickboards
· the wet areas, including the bathroom, toilet, and laundry, were unaffected.
CR (building consultant) Report No.1 dated 20 May 2025
CR’s report was prepared by two building consultants dated 20 May 2025 (based on an inspection on 7 May 2025). CR concluded:
· the home was elevated approximately 600mm left-hand side and 700mm right-hand side off the ground on steel posts supports
· the front timber veranda areas were elevated approximately 250mm on the left-hand side and 400mm on the right-hand side
· ‘soft spots’ to the flooring were located in the dining, kitchen, family room, lounge, entry, bed 1, bed 2 and bed 3 where vinyl flooring was installed but not all areas on the vinyl floors were ‘bubbling up’
· moisture levels taken throughout the above areas showed that there was elevated moisture evident to the vinyl and particleboard flooring products
· the damage was caused by
> ongoing moisture issues from the subfloor area
‒ these issues were due to inadequate surface water drainage to the sub floor area and also due to the constant drainage of the air conditioning unit’s condensation drainage lines dispersing into the subfloor area
> the property would continue to have issues with moisture affecting the particleboard flooring to the residence due to:
‒ inadequate drainage around the perimeter of the residence
‒ air-conditioning unit’s condensation drainage lines continuing to disperse into the sub floor area
‒ non-existing drainage system allowing water ingress into the sub floor area causing an ongoing high moisture content
> the subfloor soil area was currently saturated
‒ the clearance of the subfloor between capping and soil measured 600mm which was above the recommended clearance (of 400mm)
· the lack of suitable drainage to the perimeter of the residence was allowing water to enter the subfloor of the property during all heavy rainfall events resulting in the underside of the particleboard flooring to swell and delaminate over a long period of time, most likely since its inception.