Home / Chubb / Determination 12-25-256502
Determination 12-25-256502
Denial of storm/water damage claim for building; wear and tear and gradual deterioration exclusion
Summary
The complainant claimed for storm water damage to an insured building, which the insurer declined. AFCA found the insurer entitled to decline because no valid claim was established or, alternatively, the wear and tear exclusion applied.
The insurer's engineering evidence was more persuasive than the complainant's reports, showing long-term deterioration from moisture rather than a storm event, so no valid claim was shown and the wear and tear exclusion applied.
Issues
- Claim denial primary · not upheld“The insurer was entitled to deny the claim because the complainant has not established a valid claim or, alternatively, the damage was caused by wear and tear and gradual deterioration.”
Subjects and remedies
home or building damagenatural disastersmall businessno remedy
Related
Text of the determination
Determination
|
Case number
|
12-25-256502
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-25-256502 8 May 2026
1 Determination overview
1.1 Complaint
The complainant held an industrial special risks policy with the financial firm (insurer) from 31 July 2022 to 31 July 2023. The insured building (together with other buildings) in Queensland was insured for $33,015.00 with a limit of liability of $8,500,000. The deductible for storm damage was $10,000.00.
The complainant initially made a claim for storm damage to the building which it said occurred on 19 June 2023. The complainant authorised a representative regarding the claim. For ease of reference, the complainant and its representative are referred to as the complainant.
The insurer denied the claim on the basis that the complainant had not established a valid claim or, alternatively, based on the policy exclusion for loss or damage caused by wear and tear and gradual deterioration.
The complainant disputed the insurer’s denial of the claim.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The insurer was entitled to deny the claim because the complainant has not established a valid claim or, alternatively, the damage was caused by wear and tear and gradual deterioration and was excluded under the policy.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim.
1.3 Determination
The determination is in favour of the insurer.
The insurer is not required to take any further action.
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The insurer was entitled to deny the claim because the complainant has not established a valid claim or, alternatively, the damage was caused by wear and tear and gradual deterioration and was excluded under the policy.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Policy Schedule (together referred to as the policy).
I am satisfied that the policy been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Policy provided cover subject to exclusions
The policy provided cover in Section 1 for the complainant’s property for material loss or damage:
The Insured Interest in Section 1 – Material Loss or Damage is:
All real and personal property (including money) of every kind and description (except as specifically excluded) belonging to the Insured or for which the Insured is responsible or has assumed responsibility to insure prior to the occurrence of any loss or destruction.
The insuring clause (page 46) for Section 1 ‘Material Loss or Damage’ provided that the ‘Indemnity’ under the policy was:
In the event of any physical loss, destruction or damage (hereinafter in Section 1 referred to as “damage” with “damaged” having a corresponding meaning) not otherwise excluded happening during the period of insurance at the Situation to the Property Insured described in Section 1 the Insurer(s) will, subject to the provisions of this Policy including the limitation on the Insurer(s) liability, indemnify the Insured in accordance with the applicable Basis of Settlement.
The policy included a policy exclusion (page 57) that the insurer shall not be liable under Section 1 in respect of:
(4) Physical loss, destruction or damage occasioned by or happening through:
(a) moths, termites or other insects, vermin, rust or oxidation, mildew, mould, contamination or pollution, wet or dry rot, corrosion, change of colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in flavour texture or finish, smut or smoke from industrial operation (other than sudden and unforeseen damage resulting therefrom)
(b) wear and tear, fading, scratching or marring, gradual deterioration or developing flaws, normal upkeep or making good
Proximate cause
When establishing the cause of the damage to the property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause.
The proximate cause of the damage is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
Complainant made claim for water damage
The complainant made a claim for water damage to the property when it said it ‘suffered significant water damage’, specifically ‘storm water from a neighbouring property overwhelming the boundary wall’ on 19 June 2023 according to the complainant’s complaint to the Australian Financial Complaints Authority (AFCA) dated 19 June 2025.
The complainant said on 21 August 2025 that its previous broker had not correctly lodged the claim and that the damage occurred from a ‘heavy storm in May but the claim was not lodged until June’ 2023.
Complainant initially provided plumber reports describing inconsistent causes
The complainant said on 19 June 2025 in support of its claim:
· that the complainant’s director ‘personally witnessed the water ingress during the storm event’ (and on 20 October 2025 said that he ‘personally witnessed water entering from the neighbouring property’)
· that reports from its plumbers, CE and SP, concluded that water entered from the neighbouring property.
The assertion by the complainant that its director witnessed water ingress during the storm event on 19 June 2023 (changed to May 2023) was not supported by a statement from the complainant’s director. Such an assertion was of no assistance to the complainant in the absence of a statement from the complainant’s director. Further, the complainant provided no explanation regarding the circumstances in which the claim was lodged in June 2023 (which was repeated by the complainant in its complaint to AFCA) in which the date of the damage was said to be 19 June 2023 rather than May 2023. The assertions by the complainant were unsubstantiated by the complainant’s director and were unpersuasive.
The report from CE was undated but referred to inspections on 8 July 2023 and 22 July 2023:
· on 8 July 2023
> EC investigated rooms with water and mould damage as well as a sewage smell
> EC initially assumed the smell and water was coming from leaking toilets, showers or piping but on investigation nothing was found to be wrong with the plumbing building
> EC informed the complainant that more extensive investigation needed to be conducted
· on 22 July 2023
> EC conducted further investigations using water location devices and inspection of both the internal and external property
> EC found the owners of the property next door (house to the side of building 3) had an open sewage system running and it appeared faulty as the sewage was making its way on the property and underneath the building causing a build up of liquid (more specifically sewage) underneath the property which had caused not only the bad smell but extensive water/ mould damage to the building due to the dampness and pooling of liquid.
The report from CE was unpersuasive in the absence of information regarding the investigations and inspections it performed or any supporting photographs. The report from CE did record water and mould damage and said that the cause of the damage was from on open sewer from the neighbouring property. The report from CE was inconsistent with the complainant’s claim that the damage was caused by storm water.
The complainant provided an invoice from SP dated 16 December 2024 for ‘stormwater investigation’ which recorded:
Attended site and assessed.
Found when there is a heavy down pour of water, water starts to come in from neighbouring property. Where they have no down pipes or storm water works installed.
The report from SP was unpersuasive in the absence of information regarding the investigations and inspections it performed. By contrast to the cause of damage in CE’s report, the cause of the damage according to SP was from water from heavy rainfall coming onto the complainant’s property due to no down pipes or storm water installed on the neighbour’s property.
Complainant claimed for a component of maintenance repairs
The complainant provided two invoices from SC, construction firm. The first invoice dated 21 June 2023 was in the amount of $87,016 (excluding GST). The second invoice was also dated 21 June 2023 and was in the amount of $72,308 (excluding GST).
The repair works by SC had been commenced after a guest fell through a tiled floor at the property in April 2023 and the invoice from SC at the completion of the works in June 2023 described the repairs performed as follows:
‘For all repair works [at the property]. Damaged property and works [at the property – Beds, Walls, Carpets, Door Handles, Mould treatment, Broken flooring, Broken fans and fittings, Broken lights and sensors.
Gardening, Broken shower screens, Broken glass doors Waterproofing issues, Roof leaks, Full gutters, leaking showers, Broken furniture, Rubbish removal, Cleaning, plumbing, electrical, air-conditioned servicing, lock replacement and repairs, plastering, painting, deck repair, hole in floor repair, stairs repair, water under b3, flooring.’
The complainant said that the second invoice excluded items which were not included in the claim and on 10 October 2023 the complainant said:
[it was only] seeking payment of [a] component, as it was an unforeseen and underlying issue that the [complainant] could not have reasonably been expected to know was causing damage to the property.
[It] appreciated the lack of maintenance from the previous operator will result in no further payment from [the insurer] however, [it confirmed] that all have been rectified by the [complainant] and that regular maintenance will be conducted by [the complainant]. [It confirmed also] that the lease did stipulate that the operator was liable for maintenance and upkeep of the premise, which perhaps did not occur. The operator’s licence has been terminated and [the complainant took] full operations effective immediately of [the property].
On 31 October 2023 the complainant said that it was ‘not disputing the state of disrepair and [it was] withdrawing any matters that relate to the evident lack or non-existent ongoing maintenance of the property’.
The invoices from SC provided no information regarding the cause of the damage. Further, it provided no information in the second invoice regarding the manner in which the ‘component’ it claimed was approximately 80% of the first invoice for extensive repair works.
Insurer engaged engineer and complainant provided report from a builder
The insurer engaged its engineer, FM, to provide a report dated 2 April 2024 (46 pages, including supporting photographs). The report had been prepared by a forensic engineer (based on an inspection on 7 March 2024) and a principal forensic engineer and had been reviewed by a further forensic engineer.
FM recorded that the complainant’s claim was regarding damage to the building, specifically deterioration of floor and subfloor, which may have been caused by discharge from neighbouring property and ineffective spoon drain.
FM’s report set out detailed site observations regarding the external building, internal building and subfloor. It included photographs which had been taken by ML, the insurer’s assessor, which recorded the northern elevation when the discharge pipe from the neighbouring property was still present (as it was not present on FM’s inspection) and damaged particle board floor sheeting and tile (which had been repaired at the time of FM’s inspection). The report included floor level survey results, moisture meter results and referred to EC’s report.
FM concluded in relation to the cause of damage:
· there was no single discernible event referable to the damage and damage had been happening gradually over time
· the floor level survey did not show significant movement across building footprint. The largest variations noted were in the location of recent floor repairs and would be considered within acceptable tolerances
· the failure of the floor tile and sheeting in Room 25 was a result of long-term deterioration
· the discharge pipe from the northern property which was identified in ML’s photographs and referenced in the report from EC had been considered by FM as a potential contributing factor, however:
> as the pipe was removed prior to FM’s inspection, its location has been estimated based upon the provided photograph. This placed the pipe approximately 800mm from the property border
> no evidence was provided to confirm the type of discharge emanating from the pipe
> the ground in the area sloped downwards from west to east, towards [B] street and the front of the properties
> this would be the expected overland flow path due to the natural topography of the site
> a raised concrete parapet of the retaining wall on boundary served to provide separation between the two properties
· there was no overland flow path present from the northern property onto the property, and therefore any discharge from the northern property would not be expected to impact the building
· the water pooling in the subfloor area indicated that water ingress was occurring. The volume of this water, combined with the pumping equipment in place to remove water which was observed suggested that there was an ongoing source of water ingress
· as the discharge pipe from neighbouring property has been removed, this was not the source of the ongoing water ingress
· the primary drainage system in place along the northern elevation of the building was the concrete spoon drain. The debris present in the spoon drain along with the vegetation seen to be growing through the concrete indicated that the spoon drain was compromised and was therefore not functioning as intended or providing sufficient protection from moisture ingress
· if an effective drainage system were in place for the building, runoff and overland flow regardless of its source would be removed from the immediate area and would not impact the building
· the extent of water present in subfloor ‘may suggest’ a potential plumbing leak. While the report from EC stated no plumbing defects were found, no details regarding the testing undertaken was provided
· the staining to pipework and brickwork observed in the subfloor area indicated that water had been present for an extended period of time. The presence of water and related humidity would increase moisture content in timber members and floor sheeting, resulting in accelerated degradation
· water standing stagnant for an extended period of time can also result in unpleasant odours, regardless of initial source of water. Hence, the reported odours do not necessarily indicate the presence of grey or black water
· moisture content readings taken at a number of locations across site showed significantly elevated levels at all locations
· lower moisture content readings were found in the higher elevations of the walls, suggesting source of moisture was from the subfloor area
· the obstruction of air vents for the subfloor area exacerbated ventilation and humidity issues increasing the potential for degradation of building elements
· if the discharge from neighbouring property had caused damage to the building, it would typically be expected that the following would have occurred:
> discharge would have entered the subject site
> damage to be concentrated in the vicinity of the discharge
> pooled water in subfloor would have dissipated once neighbouring discharge pipe was removed
> this was not consistent with the observations and measurements made on site. In particular:
‒ overland flow path indicated that discharge has not entered the subject site
‒ pooled water was still present a period after discharge pipe was removed
· the damage to the was not consistent with the claimed water ingress due to the discharge from neighbour
· the damage to the subject building was consistent with long term and ongoing water ingress into subfloor resulting in high humidity/moisture content which had degraded building elements
· the damage to the building was the result of long term deterioration due to elevated moisture levels and damp conditions. The cause of these elevated moisture conditions and pooling water under house was inadequate and/or degraded stormwater drainage system and potential plumbing leak
· the damage to the building was not consistent with the claimed discharge from neighbouring (northern) property.
The insurer declined the claim on 17 April 2024 (which denial it maintained on 5 June 2025) and encouraged the complainant to arrange for a contractor to be engaged to minimise the potential further damage to the property.
The complainant engaged a builder, SC, to conduct drainage repairs on 13 July 2024. SC’s invoice recorded it was ‘for waterproofing of spoon drain at right hand side of building’ in the amount of $10,586 and that the description of repair works performed was:
· high pressure clean spoon drain
· patch cracks and broken concrete
· prime spoon drain across spoon drain floor and 250mm up each side
· seal spoon drain floor and side with two part mortar based seal
· clean and clear works area.
The invoice from SC date 13 July 2024 provided no information regarding the cause of the damage but detailed that repairs were performed to the spoon drain.
Complainant provided an assessment in March 2026
On 27 March 2026 the complainant provided a ‘Water Damage Claim Assessment’ dated 25 March 2026 from EN, (based on an inspection on 6 February 2026). The qualifications of EN’s investigator were not set out in EN’s Report. The assessment stated that it outlined FM's position and ‘details the counterarguments supported by the collected evidence and proposes to contest the claim denial’. EN concluded:
· regarding the permeability of the boundary wall:
> photographic evidence demonstrated that the boundary wall contained holes, allowing water to drain directly through the wall onto the property and that discharge from the northern property could travel over an overland flow path
· regarding the ongoing source of water ingress:
> photographic evidence showed holes in the upstream property's roof gutters. This provided a clear, ongoing source of uncontrolled stormwater discharging onto the aprons below and flowing toward the property during rain events. This alternative explanation accounts for the ongoing presence of water without reliance on an unproven plumbing leak
· regarding the exceedance of drainage design capacity
> the additional, uncontrolled runoff from the neighbouring property's broken gutters, flowing through the permeable boundary wall, exposed the existing drainage system at the property to flow volumes it was never designed to handle. While the spoon drain may have required maintenance, it is believed that the sheer volume of unlawful discharge from the neighbour was the primary proximate cause of the system being overwhelmed and the subsequent subfloor flooding.
The overall finding by EN was the conclusion that ‘based on the deteriorating infrastructure observed on site, there is a strong case that stormwater drainage from the neighbouring property [was] not being discharged only to [B] Street, but that some of it is actually being discharged to the subject site as well’.
The assessment by EN by an investigator was argumentative in nature and did not provide any information regarding the qualifications of the investigator. EN’s assessment also did not provide the level of detail or information provided by FM and provided no detailed site observations regarding the external, internal and subfloor building, no floor level survey results and no moisture meter results. The conclusion by EN that ‘some’ storm water drainage was being discharged onto the complainant’s property did not provide a persuasive conclusion regarding the cause of the damage.
Insurer provided a further report from FM
On 20 April 2026 FM provided a further report in response to EN’s Report. FM concluded:
· all three points were unsubstantiated as inadequate photographs, no flood testing and no design analysis had been provided
· permeability of the boundary wall
> the photographs showed dilapidated paving with no clear photographs of holes through the boundary wall, allowing any substantial water ingress (as referred to in photographs in FM’s Report)
> the EN Report photographic evidence was unsubstantiated
> the widely accepted definition of overland flow path is: “the route surface water (stormwater) takes across land during heavy rainfall when the ground is saturated or underground drainage is overwhelmed. It represents natural or artificial drainage paths - such as channels, dips, or streets - that channel shallow, fast-moving, and short-duration flooding.”
> the overland flow path is the ‘majority’ of water flow during a flooding event and does not preclude ‘any’ rainwater from reaching the subject property. Splashing and minor flow can still occur on the south side of the neighbouring property to the subject property with long-term subsoil flow normal and expected as the neighbouring property is higher to the north; however, this is not the cause of the observed water pooling under the building. During FM’s site inspection, there was minor rainfall with no overland flow observed from the neighbouring building to the north of the subject property, shown in photographs with minor overland flow to the eastern side of the neighbouring property to the street. However, the FM Report showed substantial water under the building and flowing out of the building from a drilled weep hole shown in a photograph during this time.
· ongoing source of water ingress
> FM agreed that the eaves gutter on the neighbouring building was dilapidated but that eaves gutters are designed to overflow during heavy rain events above a 1 in 20 year return interval as per the Australian Standard for stormwater – AS3500.3, or if they are not maintained. Therefore, it was expected that uncontrolled overflow would occur onto the paving on the south side of the neighbouring property and flow to the street on the east side of the property based on the site topography
> in FM Report’s it stated: ‘the ground in this area slopes downwards from west to east, towards [B street] and the front of the properties. This would be the expected overland flow path due to the natural topography of the site.’
> the spoon drain on the property to the north side was also dilapidated and no longer impermeable, which was a potential source of water ingress during rain events as referred to in photographs in the FM Report
· exceedance of drainage design capacity
> as no calculations were provided and no evidence of large volumes of water ingress from the overflow of the neighbouring gutter to the north of the property were provided, the comment by EN was, in FM’s view, unsubstantiated
· FM’s conclusions in the FM Report remained unchanged:
> the damage to the building was the result of long term deterioration due to elevated moisture levels and damp conditions. The cause of these elevated moisture conditions and pooling water under house was inadequate and/ or degraded stormwater drainage system and potential plumbing leak.
> the damage to the subject building was not consistent with the claimed discharge from neighbouring northern property.
Based on the exchanged information, the conclusions in the insurer’s report from FM were detailed and comprehensive and were more persuasive regarding the cause of the damage. FM’s Report set out detailed site observations to external, internal and the subfloor and photographs and included floor level survey results, moisture meter results. FM conclusions in relation to the cause of damage were maintained by FM in its response to EN’s assessment:
· there was no single discernible event referable to the damage and damage had been happening gradually over time
· the discharge pipe from the northern property had been considered by FM as a potential contributing factor but the ground in the area sloped downwards from west to east, towards [B] street and the front of the properties which would be the expected overland flow path due to the natural topography of the site and a raised concrete parapet of the retaining wall on boundary served to provide separation between the two properties
· there was no overland flow path present from the northern property onto the property, and therefore any discharge from the northern property would not be expected to impact the building
· as the discharge pipe from neighbouring property has been removed, this was not the source of the ongoing water ingress
· the primary drainage system in place along the northern elevation of the building was the concrete spoon drain. The debris present in the spoon drain along with the vegetation seen to be growing through the concrete indicated that the spoon drain was compromised and was therefore not functioning as intended or providing sufficient protection from moisture ingress
· the staining to pipework and brickwork observed in the subfloor area indicated that water had been present for an extended period of time. The presence of water and related humidity would increase moisture content in timber members and floor sheeting, resulting in accelerated degradation
· water standing stagnant for an extended period of time can also result in unpleasant odours, regardless of initial source of water
· if the discharge from neighbouring property had caused damage to the building, it would typically be expected that the following would have occurred:
> discharge would have entered the subject site
> damage to be concentrated in the vicinity of the discharge
> pooled water in subfloor would have dissipated once neighbouring discharge pipe was removed
> this was not consistent with the observations and measurements made on site. In particular:
‒ overland flow path indicated that discharge has not entered the subject site
‒ pooled water was still present a period after discharge pipe was removed
· the damage to the was not consistent with the claimed water ingress due to the discharge from neighbour
· the damage to the building was consistent with long term and ongoing water ingress into subfloor resulting in high humidity/moisture content which had degraded building elements
· the damage to the building was the result of long term deterioration due to elevated moisture levels and damp conditions. The cause of these elevated moisture conditions and pooling water under house was inadequate and/or degraded stormwater drainage system and potential plumbing leak
· the damage to the building was not consistent with the claimed discharge from neighbouring (northern) property.
Based on the exchanged information, the complainant’s assertion of its director witnessing damage, and the complainant’s reports, including the ‘assessment’ from EN, were unpersuasive:
· the assertion by the complainant that its director witnessed water ingress during the storm event on 19 June 2023 (subsequently changed by the complainant to May 2023) was not supported by a statement from the complainant’s director and was unsubstantiated and unpersuasive
· the report from CE was unpersuasive in the absence of information regarding the investigations and inspections it performed or any supporting photographs. The report from CE did record water and mould damage and said that the cause of the damage was from on open sewer from the neighbouring property. The report from CE was, however, inconsistent with the complainant’s claim that the damage was caused by storm water
· the report from SP was unpersuasive in the absence of information regarding the investigations and inspections it performed. By contrast to the cause of damage in CE’s report, the cause of the damage according to SP was from water from heavy rainfall coming onto the complainant’s property due to no down pipes or storm water installed on the neighbour’s property
· the invoices from SC dated 21 June 2023 provided no information regarding the cause of the damage. Further, SC provided no information in the second invoice regarding the manner in which the ‘component’ it claimed was approximately 80% of the first invoice for extensive repair works
· the invoice from SC dated 13 July 2024 provided no information regarding the cause of the damage but detailed that repairs were performed to the prime spoon drain
· EN’s assessment:
> was argumentative in nature and did not provide any information regarding the qualifications of the investigator
> did not provide the level of detail or information provided by FM and provided no detailed site observations regarding the external, internal and subfloor building, no floor level survey results and no moisture meter results
> that ‘some’ storm water drainage was being discharged onto the complainant’s property, did not provide a persuasive conclusion regarding the cause of the damage to the complainant’s property.
Based on the exchanged information, insurer was entitled to decline the claim because the complainant has not established a valid claim or, alternatively, the damage was caused by wear and tear and gradual deterioration and was excluded under the policy.
The insurer is not required to take any further action.
2.2 Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.