Insurer declined cover for additional cyclone-related damage (decking, handrails, doors, guttering) relying on gradual deterioration and wear and tear exclusions; complainant also sought non-financial loss compensation for claim handling
Text of the determination
Determination
|
Case number
|
12-25-255570
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-25-255570 10 June 2026
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy issued by the financial firm (insurer). On 18 March 2025, the complainant lodged a claim for damage caused to the insured home as a result of a cyclone on 8 March 2025.
The insurer partially accepted the claim. This complainant disputes the insurer’s decision to decline cover for damage to timber decking, decking handrails, posts, external doors to the laundry and bedroom 3, a screen sliding door and guttering. For convenience, this is collectively referred to as ‘additional damage’ in this determination.
The insurer says the additional damage was caused by long term deterioration and lack of maintenance and therefore exclusion clauses apply. The complainant disagrees and says the damage was caused by the cyclone and related weather conditions.
The complainant wants the insurer to cover the additional damage and also seeks non-financial loss compensation. The complainant has raised issues with the insurer’s handling of the claim and says the insurer’s ex-gratia offer of $2,000 does not reflect the stress and inconvenience the insurer has caused.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
Yes. Taking a balanced view of the exchanged information, I am satisfied the insurer is entitled to decline cover for the additional damage as exclusion clauses apply.
Is the complainant entitled to compensation?
The insurer’s ex-gratia offer of $2,000 in non-financial loss compensation is fair and reasonable in the circumstances. An award above this amount is not warranted.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to decline damage which is more likely due to excluded causes.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is not required to accept the additional damage. However, the insurer is required to settle any other damages already accepted under the claim without delay if settlement is not yet finalised. Further, if the complainant accepts this determination, within 14 days of being notified of that acceptance, the insurer is required to process the $2,000 ex-gratia payment (if it has not already done so).
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
Yes. Taking a balanced view of the exchanged information, I am satisfied the insurer is entitled to decline cover for the additional damage as exclusion clauses apply.
Complainant must establish a valid claim
The complainant has the initial onus of establishing she suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability.
For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
If the complainant can establish she suffered a claimable loss, the onus shifts to the insurer to show, on balance:
· it is entitled to rely on an exclusion under the policy, or
· it is otherwise entitled to decline the claim.
AFCA considers proximate cause of damage
In a claim under a general insurance policy, the term ‘proximate cause’ is used to describe whether an event is the cause of the loss or damage. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the only cause.
It is a question of fact that depends on the circumstances of each case. If there are several causes, each should be examined to determine whether it is a dominant, effective or operative cause of the loss. For example, if one cause would have caused the loss on its own, and the other cause would not have caused the loss without the first, then the first is the proximate cause.
Policy covers storm and cyclone damage subject to exclusions
The terms and conditions of the policy are set out in the product disclosure statement (PDS) and certificate of insurance (COI).
The relevant policy period as shown on the COI is 6 April 2024 to 6 April 2025. The complainant has raised a concern regarding whether the insurer relies on the correct PDS. I am satisfied the PDS numbered RHHB2.0822 effective 15 August 2022 is the applicable policy wording noting it is referred to in the COI at page 15.
In summary, at page 42 of the PDS, the policy covers loss or damage caused to the insured home and contents by a storm including a cyclone.
From page 82, the policy sets out a number of general exclusions applicable to all sections of the policy. Relevantly, the policy does not cover any loss or damage caused by or arising out of or, in connection with:
· rust, corrosion, rot, mould or gradual deterioration. However, the policy covers mould damage to the home that happens within 21 days of loss or damage caused by a storm,
· loss or damage caused by wear and tear through normal use, and
· any indirect loss.
Insurer is entitled to decline cover for additional damage
The insurer accepts the complainant has established a valid claim but says the claimed additional damage is excluded under the policy.
I have carefully considered the exchanged information. I am satisfied the insurer has established the claimed additional damage was more likely caused by long term, gradual deterioration and not the storm. While the storm may have contributed to some of the damage (namely the failure of part of the handrail and the detachment of the gutter) I am satisfied the proximate cause of the damage is long term deterioration. The insurer’s reports are persuasive on this point.
The insurer’s builder, TS, inspected the home on 27 March 2025 approximately 19 days after the storm. Its site report says the damage has occurred over a prolonged period of time (approximately 12 months). It identified wood rot to the handrails and deck boards. It also noted wear and tear to the deck boards. In respect to the deck posts in particular, TS says:
‘the rear deck posts on the deck that is not under cover has badly rotted pine posts, the moisture has entered where the stainless-steel balustrading has been drilled through the posts. There are openings on the internal of the posts where they have rotted from the inside out.’
Further, TS found the hanging gutter had severe rust in the corner where it had detached. TS also says the laundry door, door to bedroom 3 and sliding security door have damage unrelated to the storm event. TS’ report is supported by a number of photographs.
The insurer engaged engineer, CE, to inspect the property on 20 August 2025. CE provided a report supported by a number of photographs. CE’s findings are generally consistent with TS’ findings. The CE report says:
· the decking, posts and handrail damage existed prior to the claimed event and is due to ongoing decay and deterioration of the timber members. The decay and deterioration is due to exposure to weather and lack of regular maintenance,
· the failed section of the handrail would not have occurred if not for the decay and deterioration,
· the wood rot has not been caused by a single event given the extent of damages,
· there is no possibility the timber decay identified by TS could have occurred over 19 days,
· the guttering may have failed during the storm event however this was a result of the severely corroded fascia snap clips failing,
· the damage to the bedroom and laundry doors is not due to a one-off event. They have minimal protection from the elements (only eave linings).
· the sliding screen door has been damaged by pets. Impact/scratching from animals has led to the screen door dislodging from the lower track.
The TS and CE reports are well reasoned and provide photographs in support of their key assertions. CE in particular identifies specific indications the damage is due to long-term deterioration.
The complainant has provided reports by carpenter, CC. I acknowledge CC’s report dated 18 March 2025 states the existing rear deck has major damage and photographs are provided. The complainant also relies on a second report from CC dated 21 August 2025 which is based on an onsite inspection. In summary, the report says:
> the high force winds and downpour of rain due to the cyclone caused the damage to the sliding security door screen, guttering and handrail,
> exposure to high amounts of water during the cyclone caused the internal doors to swell and warp and will likely result in mould growth,
> the cyclone caused moisture damage and rot to the deck. Decking boards have split and broken in areas and boards have uplifted due to wind, and
> the decking subframe has deteriorated due to moisture caused by the cyclone and high winds. Post supports have been damaged and bowed.
The complainant has supplied quotes from CC for the replacement of the guttering, doors, decking subframe, decking and handrail.
While I acknowledge CC attributes the damage to the cyclone and related weather conditions, I find TS and CE’s explanations for the cause of the damage more plausible. This is since:
· I am satisfied the photographs in the expert reports for each party show wood decay and deterioration to the handrail and decking posts that have more likley occurred over time than as a result of a single storm event.
· similarly, I am satisfied the photographs in the TS report show rot and/or wear and tear to decking boards,
· the damage to the bedroom and laundry door (swelling and warping) is more consistent with long term exposure to water. CE notes the limited protection these doors have from wind-driven rain,
· given the nature of the damage shown in the exchanged photographs, I am satisfied the screen door has been damaged due to causes other than the storm as identified by CE,
· while the gutter and section of the handrail may have failed during the storm, I am persuaded the underlying cause of this failure is long term deterioration based on the condition of these items as shown in the photographs. The TS photos show severe rust in the corner of a hanging gutter and wood rot to the handrail and decking posts,
· even if I were to accept the subframe of the deck is damaged and unstable, I am not persuaded the proximate cause would be the cyclone given the significant deterioration identified to other aspects of the structure.
Given all of this, I accept the insurer is entitled to rely on the exclusion clauses for gradual deterioration and wear and tear. The insurer is entitled to decline cover for the additional damage.
Complainant’s submissions do not assist
The complainant has provided:
· Bureau of Meteorology information relating to March 2025. She says 412.4mm of rain fell and wind gusts exceeded 104 km/h. She says this is consistent with sudden cyclone storm damage,
· statements from family members confirming the complainant has regularly maintained the property including repairing and oiling the timber decking, repairing and replacing screens, and repairing gutters These statements say the claimed damage was caused by the cyclone,
· documents to demonstrate maintenance she carried out including:
> screenshots of banking records showing hardware purchases between September 2024 and September 2025, and
> a maintenance calendar for the property.
Additionally, the complainant has made a number of submissions in support of her position which have been carefully considered. Her main points are that:
· the deck, handrails, doors, and gutters had no issues prior to the storm,
· the timber deck was regularly maintained, cleaned and inspected and had no signs of rot prior to the cyclone,
· the timber deck (which has no covering) was naturally weathered but was structurally sound with no visible damage, sagging or deterioration. The structure has been affected by severe winds during and after the cyclone,
· the TS building inspection was carried out 19 days after the cyclone and in this time, exposure to ongoing rain may have caused further damage including rapid timber rot,
· the insurer’s delay in assessing the damage and failure to carry out repairs has caused further damage including mould growth and further decay,
· the rot and mould are a direct consequence of initial storm damage,
· the decision to decline the decking, railing and guttering is inconsistent with the acceptance of damage to fence palings, and
· the insurer’s engineer inspected the damage 4-5 months after the event.
I do not find the complainant’s submissions persuasive because:
· I am not convinced the information provided by the complainant establishes that regular, necessary maintenance works were carried out,
· TS’ photographs show significant timber rot to the handrail and severe corrosion to the gutter among other things. I am not persuaded this could have been caused by exposure to rainwater during the single cyclone event or, in the 19 days after the event,
· it is unlikely the cyclone’s winds caused the wooden deck posts to split, allowing water exposure and subsequent deterioration. There is no expert evidence to support this assertion or sufficient evidence of the condition of the posts prior to the cyclone,
· the nature and extent of the damage as seen in he exchanged reports is more consistent with long term deterioration and wear and tear,
· I do not find the gap in time between the event and CE’s inspection impacts the reliability of CE’s findings. This is particularly since CE’s findings are generally consistent with those of TS,
· the insurer concedes that the damage to the fence was accepted while it should have been declined as the proximate cause of the damage (long term deterioration) is excluded. However, the insurer says it will honour its previous decision to cover the fence,
2.2 Is the complainant entitled to compensation?
The insurer’s ex-gratia offer of $2,000 in non-financial loss compensation is fair and reasonable in the circumstances. An award above this amount is not warranted.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
In assessing whether to award compensation, AFCA expects complainants to:
· be moderately robust,
· bear the normal degree of inconvenience experienced when a problem occurs, and
· take reasonable steps to minimise the inconvenience suffered.
Complainant’s concerns
The complainant has raised a number of concerns in respect to the insurer’s handling of the claim. In particular, she says:
· she was not provided the TS report dated 3 May 2025 until 20 June 2025,
· the insurer failed to regularly communicate with her or acknowledge her complaint,
· the insurer’s delay in cash settling the claim for damaged electrical appliances caused the complainant and her family inconvenience and health issues. She went without essential appliances for over three months and incurred out of pocket expenses,
· the insurer has delayed in setting other accepted aspects of her claim, and
· the insurer’s actions caused her to experience severe anxiety, panic attacks and financial instability. Her mental health and that of her family has suffered.
Insurer’s ex-gratia offer is fair and reasonable
I acknowledge the claim assessment process has been prolonged and the insurer has caused some delay. In particular:
· the claim was lodged on 18 March 2025. The insurer received a report from PL identifying damage to electrical items on 28 April 2025. A further electrical report was obtained on 3 May 2025 and the insurer cash settled the complainant for damaged electrical appliances on 2 June 2025,
· on 2 June and 10 June 2025, the complainant raised concerns regarding delay. The insurer concedes a complaint was not lodged until 10 June 2025. She followed up for a response on 17 June 2025. The outcome of the insurer’s internal review was issued on 10 July 2025. As a gesture of goodwill, the insurer offered a payment of $1,000,
· the insurer received the TS building report on 3 May 2025 and issued a claim decision in respect to building damage on 9 July 2025. Between 3 May and 9 July, other aspects of the claim were settled. The TS report was not provided to the complainant until 4 July 2025, and
· a second complaint was made regarding the partial decline and the insurer issued a letter regarding the outcome of its review on 22 September 2025.
The insurer concedes there have been some delays and non-compliance with timeframes under the General Insurance Code of Practice (GICOP). In light of the delays and lapses in communication, the insurer has increased its ex-gratia offer to $2,000.
I acknowledge the claim documents show the insurer arranged makes safe repairs while the building damage was under assessment. Over the course of the claim, it responded to new information provided by the complainant, including accepting damage to the garage door without insisting on further information.
I empathise with the complainant because she has found the claim assessment process difficult and prolonged. Having regard to AFCA’s approach set out above, I am satisfied the insurer’s ex-gratia offer of $2,000 adequately compensates the complainant for the stress and inconvenience she has experienced.
I acknowledge the complainant has made recent submissions referring to issues with the insurer’s handling of a separate claim and potential cancellation of her insurance policy. As these matters have not been fully addressed in exchanged submissions, this determination makes no findings in relation to them. It is open to the complainant to lodge a sperate complaint with AFCA in respect of these matters for consideration under AFCA’s rules.
2.3 Why is the outcome fair?
The outcome is fair because the insurer is entitled to decline damage which is more likely due to excluded causes.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.