Insurer declined to contribute to the cost of an ensuite renovation following a leak that damaged the downstairs bathroom ceiling

FirmRAC WA
Decided2026-02-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant sought insurer contribution to a full ensuite renovation after a leak damaged the downstairs bathroom ceiling, saying the insurer's builder wrongly diagnosed the leak. AFCA found the renovation costs were excluded, no incorrect advice or agreement to pay was established, and decided in favour of the insurer.

The policy covers only resultant damage and excludes repairs to the leaking pipe and consequential loss, and the complainant did not establish incorrect advice or any insurer agreement to cover the renovation.

Issues

Subjects and remedies

home or building damageno remedy

Related

All RAC WA determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-253336 | Financial firm | RAC Insurance Pty Limited Case number: 12-25-253336 30 January 2026 1 Determination overview 1.1 Complaint The complainant, SS, holds a building and contents policy of insurance issued by the financial firm (insurer). SS is represented by DH in respect to this complaint. A reference to ‘the complainant’ in this determination is a reference to both SS and DH unless otherwise stated. On 3 February 2025, the complainant lodged a claim in respect to water damage to the ceiling of their downstairs bathroom first observed on or about 28 January 2025. The insurer’s builder, WB, concluded the damage to the ceiling was caused by a leak from the shower breech pipe of the upstairs ensuite located above the bathroom. The insurer agreed to cover the cost of repairing the resultant water damage to the bathroom ceiling. WB made recommendations for works to the upstairs ensuite including repair of the breech pipe. The complainant says that based on WB’s recommendations, she engaged a plumber to undertake works to the ensuite which involved a full renovation. The complainant says that their plumber found no evidence of a leaking shower breech pipe. Instead, their plumber found the leak was due to the failure of an o-ring in the shower waste pipe of the ensuite. The complainant says WB’s finding of a leak at the breech pipe was incorrect and the maintenance repairs recommended were not required. Therefore, the complainant wants the insurer to contribute towards the cost of the renovation of the ensuite. The insurer says it did not agree to cover any of the renovation costs and further, these costs are excluded under the policy. The insurer has agreed to waive the excess as a gesture of goodwill. 1.2 Issues and key findings Is the insurer required to contribute to the costs of the ensuite renovation? No. Costs associated to the ensuite renovation are excluded under the policy. Further, the exchanged information does not indicate the insurer agreed to cover any portion of these costs outside of the terms and conditions of the policy. Why is the outcome fair? The outcome is fair because the costs of the renovation are clearly excluded under the policy. Further, there is no reasonable basis to find the insurer agreed to cover any of the costs or that it should cover any of the costs because it provided incorrect advice. 1.3 Determination This determination is in favour of the insurer. If the complainant accepts this determination, within fourteen (14) days of being notified of that acceptance, the insurer is required to arrange the cash settlement in respect to the downstairs bathroom ceiling damage in accordance with the terms and conditions of the policy. The insurer is also required to waive the excess. 2 Reasons for determination 2.1 Is the insurer required to contribute to the costs of the ensuite renovation? No. Costs associated to the ensuite renovation are excluded under the policy. The policy only covers resultant damage. Further, the exchanged information does not indicate the insurer agreed to cover any portion of these costs outside of the terms and conditions of the policy. Complainant must establish a valid claim​ The complainant is required to show she suffered a loss caused by an event she is insured for under the policy. This is known as a prima facie, or valid, claim. ​Once the complainant establishes a prima facie claim, the insurer is liable for the loss unless it shows an exclusion or condition applies. The insurer has the onus of proof in establishing the application of any exclusion or breach of condition. ​The standard of proof is the balance of probabilities (that is more likely than not). ​The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. Policy covers resultant damage from leak of water The terms and conditions of the policy are set out in the product disclosure statement (PDS) and certificate of insurance (COI). At page 11 of the PDS, the policy covers loss or damage caused by the ‘Bursting, leaking, discharge or overflow of water or liquid from a fixed apparatus’. It is not in dispute that the bathroom ceiling damage is covered under this insured event. At page 11, the PDS also lists a number of specific exclusions under this insured event. Page 11 states there is no cover for: ‘associated repairs to the apparatus, tanks or pipes’. Page 13 of the PDS, lists a number of ‘additional benefits’. It states: When your building has been damaged by an insured event and we have agreed to pay your claim, we will also pay for: Locating the cause of damage We will pay the reasonable costs incurred to locate the cause of damage (if we agree to pay these costs before you arrange to incur them). From page 28, the PDS sets out a number of general exclusions which apply to all cover under the policy. Page 30 states: We also do not cover: » Consequential loss At page 44 of the PDS, ‘consequential loss’ is defined as: any loss or damage following an insured event, that is not directly caused by an insured event. Consequential loss includes but is not limited to: » The cost of your time to help us with your claim, loss of wages or income, medical costs. » Non-financial loss including loss of opportunity or enjoyment, physical or mental stress or inconvenience, injury to feelings or humiliation, delay in claims handling or repairs, interference to peace of mind The issue in dispute is whether the insurer should contribute towards the costs of the ensuite renovation because: · the insurer’s builder provided incorrect advice, and/or · it is required to do so under the terms and conditions of the policy, and/or · because the insurer agreed to cover certain costs. Parties disagree shower breech pipe was leaking Insurer’s experts’ findings WB inspected the site on 7 February 2025 and provided a report. The report states: · the downstairs bathroom ceiling stain is due to a failed breech pipe in the upstairs ensuite. This has released water onto the lower-level bathroom ceiling, · other damage was identified in the ensuite including a cracked floor tile, ‘very visible staining and efflorescence to tiles and grout suggesting a long term leak from shower recess seals’. · corrosion to the ensuite door frame and swelling of the door frame that has caused the crack in the floor tile, and · the damage appears to have been occurring for several weeks before discovery. WB arranged leak detection testing in the ensuite. The leak detection report dated 10 February 2025 is supported by photographs and makes the following findings: · pressure testing of the hot and cold water supply pipework was carried out, · the mains pressure test passed, · the shower breech pressure test and spray test to the shower screen failed. However, the shower screen had not contributed to the clamed damaged, · a visual inspection also failed as there was ‘poor grout and sealant in shower recess and cracked tiles in the bathroom’. The report concluded: In conclusion, the leak detection confirmed that at the time of the inspection there is a leak on the shower breech allowing water to escape down, damaging the downstairs bathroom ceiling. Having regard to the leak detection report, WB’s report made the following recommendation: [WB] recommends that the Insured engages a professional to repair the shower breech &re-grout/re- seal the shower recess to prevent any further water penetration into the adjoining areas as per the BCA requirements and AS3470 for water proofing requirements, and refrains from using the shower until this is completed. · Recommend the insured replaces all the cracked tiles in the bathroom to prevent further water escape. · Recommend the insured re-seal the shower screen to prevent further water escape when the shower is in use. The insurer then arranged for WB to reinspect the property. At this time, the ensuite had been stripped out by the complainant’s plumber. Most relevantly, the WB reinspection report dated 14 April 2025 states: - The stain on the lower level bathroom is under the waste pipe. - [WB] leak detection specialist confirmed a drop in pressure and the failure of the breech pipe. - There is corrosion to metal stud framing above ensuite floor level. Corrosion above floor level cannot be from the waste pipe below floor level. - The member's plumber could not or elected not to attempt to access the breach via the plasterboard hallway wall… - There is potential that more than one leak/water source was in play. These being the failed breech pipe, failed shower screen seals releasing water onto the ensuite bathroom floor and the possible failure of o-ring in the waste pipe. A number of photographs are contained in the WB report. Complainant’s expert’s findings The complainant has provided a letter (undated) from her plumber, PG. The letter states: We have recently completed a report on the above address. It was determined that there were no signs of water damage behind the shower wall where the pipes and taps are located. Once the flooring was partially removed on the second storey of the home, we determined the PVC trap in the ceiling was faulty and caused a leak in the ceiling… The complainant has provided a second letter from PG sent to DH by email dated 18 September 2025. This re-confirms that there were no signs of water damage behind the shower wall. It also says ‘but from where the pvc gully (shower waste) was below in the ceiling we had determined there was a leak in the pvc piping as in the rubbers in the seal have failed…’ The complainant has submitted a number of photos of the ensuite once wall and floor linings were removed. In particular, the complainant says the photos show: · the block of wood on which the breech pipe was attached has no water damage and neither does the surrounding wall. The complainant says none of the wood around the breech pipe has water damage or required replacement, · the shower waste pipe and the location of the leak which PN located. Complainant has not established insurer gave incorrect advice I am not convinced the complainant has established the insurer’s builder provided incorrect advice in relation to a leak at the shower breech pipe. Based on the exchanged information, I am satisfied that it is more likely than not there was a leak in the shower breech pipe which caused or contributed to the damage to the downstairs bathroom. This is since: · WB’s pressure testing of the shower breech failed. While the complainant submits WB’s finding was ‘incorrect’, in the absence of other comparable pressure testing, more weight should be given to WB’s finding which is supported by a photograph of the pressure reading, · it appears the complainant’s plumber did not undertake any leak detection testing as a report has not been submitted for AFCA’s consideration. Therefore, there is no information which contradicts WB’s findings. · the comments in PG’s letters seem to be based on visual observations only. However, they do not include any photographs of the breech pipe which PG suggests was not leaking as they say there was no water damage behind the shower wall. WB were not able to inspect the breech pipe at the re-inspection as it was not available, · the corrosion to metal stud framing above the ensuite indicates that a leak was more likely occurring from the failed breech pipe. I accept that a failure of an o-ring in the shower waste pipe (sitting below the ensuite) is unlikely to have caused corrosion to metal stud flooring above en-suite floor level. · I accept the photos provided by the complainant of the exposed wall where the breech pipe was located do not show obvious signs of water damage. However, given the date these were taken is unclear and extensive renovations were done to the ensuite, I give limited weight to the photographs. Even if I were to accept there was a failure of an o-ring in the shower waste pipe, on balance, the exchange information indicates there was also a leak from the shower breech pipe. WB has recognised the potential that more than one water source contributed to the damage to the downstairs bathroom. Furthermore, even if I were to accept the breech pipe had not been leaking, I am satisfied that repairing the shower breech pipe was not the only reason the complainant removed the wall and floor tiles. The work also related to replacing a cracked floor tile and was necessary due to availability of existing tiles. In a submission to AFCA, the complainant says: ‘On further engaging with relevant tradies, it was brought to my attention that if I needed to replace the cracked tiles on the floor and as I didn’t have any spare floor tiles, it would be difficult to find an exact match. Furthermore, on removing the floor tiles some of the wall tiles at the floor level maybe damaged and I would have the same problem finding matching tiles. So, it would be easier to remove floor and wall tiles fix the leaking shower breech in the wall and replace shower screen’ I acknowledge the complainant says the WB leak detection specialist spent just ten minutes conducting the assessment and left without providing a copy of the report or any of his contact details. However, I am satisfied the insurer informed the complainant of the findings of the leak detection testing. It is unlikely the complainant would have taken any other course of action had the insurer provided a copy of the report at any earlier time. Insurer is not obligated to contribute to costs of ensuite renovation Costs are excluded under the policy I accept the insurer has no obligation under the terms and conditions of the policy to cover any costs related to repairing the source of the leak whether that be the shower breech pipe or the waste pipe. At page 11 of the PDS, there is a specific exclusion for repairs to the leaking pipe. Further, there is no cover for renovations to the ensuite including the removal of tiled walls and flooring because: · this cost falls within the category of a ‘consequential loss’ as defined in the policy, · the complainant did not incur the cost of the renovation directly due to the insured event, being the leaking pipe. In other words, the leak (either from the shower breech pipe or the waste pipe) did not cause water damage to the ensuite that gave rise to the need for the renovation works which were carried out. I acknowledge there is an additional benefit whereby the insurer agrees to ‘pay the reasonable costs incurred to locate the cause of damage’. However, based on the exchanged information, it appears the works were commenced for the purpose of fixing the breech pipe and replacing the cracked floor tile. The works were not for the purpose of locating the cause of the leak/damage. Even if I were to accept some of the works were for the purpose of locating the leak, it is also not clear that the costs incurred were reasonable. PG does not make any comments about whether it was possible to access the breech pipe through the hallway plasterboard as WB suggests. If that were possible, substantial costs could have been avoided. No information to support finding the insurer agreed to cover the costs The complainant says the insurer agreed to cover certain renovation costs being the costs of tiling and labour. In particular, the complainant refers to a telephone conversation he had with the insurer on or around 12 May 2025. However, based on the exchanged information, I am not convinced the insurer agreed to cover any portion of the costs of the renovation. This is since: · on 12 February 2025, the insurer says it advised the complainant that repairing the breech pipe and any excavation costs are not covered under the policy. There is no information to the contrary, · the complainant commenced the renovation in about April 2025 after having been advised of the insurer’s position, · the insurer has provided recordings from telephone conversations with the complainant on 24 April 2025 and 23 May 2025. Relevantly: > the insurer’s representative made comments acknowledging the complainant’s concern that incorrect advice had been given to her which caused her to incur costs. However, the representative also goes on to say the insurer needs a report from the complainant’s plumber, and confirmation of expenses incurred due to the incorrect advice. Based on the conversation, I am satisfied the insurer was clear that no decision had been made on the request for reimbursement of renovation costs. > in the second call, the representative said the insurer would only consider costs of the tiling (including labour) and the waterproofing upon receipt of an itemised quote. I am not persuaded the insurer made any assurance that any of the renovation costs would be covered. 2.2 Why is the outcome fair? The outcome is fair because under the terms and conditions of the policy, the insurer is only required to cover resultant damage caused by a leak of water. Therefore, the insurer is liable for the damage to the bathroom ceiling. It would be unfair to require the insurer to cover any costs of the ensuite renovation given the applicable exclusion clauses. Further, on a balanced view of the exchanged information, the insurer did not give incorrect advice or agree to cover any portion of these costs outside the terms of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.