Determination 12-25-251128
Dispute over settlement method and amount after hail damage: complainant wanted cash settlement based on her builder's quote rather than insurer's repairers
Summary
The insurer accepted a hail damage claim and offered repair via its repairers or a cash settlement; the complainant wanted a cash settlement based on her builder's quote of $47,876.88. AFCA found the insurer's offer fair, requiring only a corrected QBCC premium if cash settled and payment of the $500 already offered.
The insurer may repair or cash settle under the policy, its repairers confirmed they can complete the scoped works with a lifetime guarantee, so the offer was fair.
Issues
- Claim amount dispute primary · not upheld
“The insurer's offer to repair the damage or cash settle the claim (with a 10% uplift) is fair in all the circumstances.”
- Delay secondary · unclear
“Insurer offered $500 towards the delays even though the complainant did not seek compensation.”
- Repairs or contractors secondary · not upheld
“Complainant argued splitting solar works from main repair scope creates warranty and QBCC compliance risk; AFCA found IT and PC willing to complete and guaranteed.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
|
Case number
|
12-25-251128
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-25-251128 22 January 2026
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under a home building insurance policy on 6 December 2024. The property sustained damage from hailstorms in October 2024.
The insurer accepted the claim. It offered to appoint its repairer (IT) to complete the roof repairs and expert PC to arrange replacement of the solar power system.
The complainant is represented by a consumer advocate (CC). For ease of reference, the complainant and the representative will be referred to as ‘the complainant’ in this determination, unless specified otherwise.
The complainant believes the insurer should incorporate all the works into one contract for warranty purposes similar to her builder’s quote (QB). She seeks the insurer to cash settle the claim based on QB’s quote.
1.2 Issue and key findings
Is the insurer’s settlement fair?
Yes, mostly. The insurer accepted liability for the claim. It is entitled to repair or cash settle the complainant for her loss. IT and PC are willing to complete the scoped works for the amounts quoted. The insurer’s offer to repair the damage, also covered by its lifetime guarantee on repairs or cash settle the claim (with a 10% uplift for transfer of risks) is fair in all the circumstances.
However, if the complainant chooses to accept the cash settlement, the insurer should:
· revise its settlement offer to include the correct QBCC insurance premium for the full value of the contract of IT and PC
· as agreed, give due consideration for any fair and reasonable request for variation(s) pursuant to the policy terms and conditions.
Why is the outcome fair?
The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of being notified of the complainant’s acceptance of this determination and the complainant’s choice of claim settlement method, the insurer should pay the $500 compensation offered (if not paid already) and settle the claim as detailed in section 2.1 of this determination.
The insurer is otherwise not required to take any other action in relation to the claim or this complaint.
2 Reasons for determination
2.1 Is the insurer’s settlement fair?
Yes, mostly. The insurer accepted liability for the claim. It is entitled to repair or cash settle the complainant for her loss. IT and PC are willing to complete the scoped works for the amounts quoted. The insurer’s offer to repair the damage, also covered by its lifetime guarantee on repairs or cash settle the claim (with a 10% uplift for transfer of risks) is fair in all the circumstances.
However, if the complainant chooses to accept the cash settlement, the insurer should:
· revise its settlement offer to include the correct QBCC insurance premium for the full value of the contract of IT and PC
· as agreed, give due consideration for any fair and reasonable request for variation(s) pursuant to the policy terms and conditions.
Policy cover is subject to terms and conditions
Your claim will be settled in one or more of the following ways:
1 Repair, rebuild, restore, demolish or arrange services.
2 Replace your items with new ones.
3 Cash settlement.
4 Reimburse costs you have already paid.
We will tell you when we decide that we can only settle your claim in one of these ways. Where you have options to settle your claim, we will give you details about those options so you can make an informed decision about which option you want to take.
1 Repair, rebuild, restore, demolish or arrange services
• Repair or rebuild your home as new – which means to repair, rebuild or restore your home using:
○ the same materials if they are readily available in Australia or
○ equivalent materials in terms of quality, purpose and specifications…
3 Cash settlement
• Home - pay you the cost to repair or replace your home up to:
○ your home sum insured,..
Parties provided different views on policy cover
The complainant says:
· there is contractual and warranty risk in separating PC’s solar works from the main repair scope managed by IP creating ambiguity around liability, compliance, and warranty enforcement
· she risks being caught between contractors in the event of post-repair defects, which is inconsistent with the policyholder’s right to a single, warrantable outcome
· under Queensland Building and Construction Commission (QBCC) regulations, residential construction over $3,300 involving multiple trades must be covered under a single managed contract. For IT to comply, the solar component must be formally subcontracted under their licence. Simply “overseeing” the work does not meet this legal requirement.
· the General Insurance Code of Practice (GICOP) obligates insurers to manage repairs transparently and competently. Splitting responsibility between contractors without clear safeguards exposes the insured to risk and confusion, falling short of the required standard
· PC’s solar quote excludes builder’s margin and is separated from an already lean base quote. As a result, the proposed settlement does not represent a fair, market-aligned value
· given the delays, repeated failure to address her concerns and loss of confidence in the proposed repair pathway, she would not allow the insurer to arrange repairs. She prefers a cash settlement based on QB’s quote amounting to $47,876.88.
The insurer says:
· PC provided an assessment report and quote for the solar system, inverter and panels. This report was provided separate to the building scope from IT ($29,254.46).
· PC has confirmed the $5,648.50 price quoted is the entire amount to pay in relation to the solar repairs. They are not required to separate the operating margin on quotes provided
· the policy outlines it will pay the amount it would have cost to rebuild or repair the home and PC and IT have confirmed they can complete the repairs and warrant their works
· should additional items be required to be added to the scope, similarly to its trades, the complainant’s trades are able to submit variations for its review
· IT is prepared to conduct the repairs and its licensed builders will supervise the solar repair works. This supervision will be carried out in line with QBCC standards, ensuring compliance with both regulatory and industry expectations
· it acknowledges its obligations under these provisions and confirms it is prepared to accept responsibility for the quality of any works carried out by its appointed trades and the materials used.
Insurer’s settlement is fair
The complainant does not dispute that IT is a QBCC licensed builder. The insurer says it has appropriately engaged IT to manage the entire scope of repairs, including any subcontracted works such as electrical or solar installations (PC).
The complainant does not dispute that the Queensland Building and Construction Commission Act 1991 and the Domestic Building Contracts Act 2000 state a licensed builder must oversee domestic building contracts exceeding $3,300.00 that involve multiple trades.
While the insurer says this requirement is being met by its appointment of IT to oversee PC’s works, the complainant does not agree. She believes a single contractor should be appointed to complete all the repairs.
I accept the insurer’s submission that a subcontractor to a principal contractor is not required to pay a premium. Instead, the principal contractor lodges a single premium covering all work under the contract with the homeowner. This means the principal contractor must include all associated insurable work, including solar installation, when it is part of insurable residential construction work. It is therefore fair the cash settlement offer includes an allowance for the QBCC insurance premium capturing the full value of the contract and not only IT’s contract value.
In the complainant’s recent submissions, she accepts the insurer’s formal subcontracting may meet the technical licensing requirements of the QBCC. However, she believes the underlying issue is that this was not proposed or actioned despite repeated opportunities. The insurer and its vendor panel have consistently failed to provide the complainant a consolidated solution and only now raise subcontracting as a potential fix after protracted delays.
I do not accept this was the case. The insurer has repeatedly assured the complainant her concerns would be covered under the warranty extended by QBCC. It also offered $500 towards the delays even though the complainant did not seek compensation.
In addition to the above, the policy offers lifetime guarantee on repairs. Ultimately the insurer will be responsible for repairs works performed by its appointed trades:
Lifetime guarantee on repairs
You are covered for:
Ø The cost to fix any faulty workmanship resulting from repairs if:
• you made a claim with us,
• if the repairs were completed by a repairer authorised by us and
• you or your family still own your home or your contents.
The complainant raised concerns about PC’s ability to complete the works for the amount quoted as the quote does not display a builder’s margin. The insurer says the margin is built into the quote. I note QB’s quote also does not display the margin allocated for the quote.
I acknowledge the complainant’s various other concerns. However, given
· the insurer has shared the appropriate licence details of the trades who would perform the repair works
· there is no information to show the IT’s and PC’s quotes are incomplete
· the insurer has confirmed IT and PC are willing to complete the repairs for the amounts they had quoted
I am satisfied the insurer’s offer to repair the damage (also covered by its lifetime guarantee on repairs) or to cash settle the claim (with a 10% uplift for transfer of risks) is fair in all the circumstances.
However, if the complainant chooses to accept the cash settlement, the insurer should:
· revise its settlement offer to include the correct QBCC insurance premium for the full value of the contract of IT and PC (as discussed above)
· as agreed, give due consideration for any fair and reasonable request for variation(s) pursuant to the policy terms and conditions.
2.2 Why is the outcome fair?
The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.