Home / RACQ / Determination 12-25-250920

Determination 12-25-250920

Insurer declined cover for earthworks and removal of trees and debris after Ex-Tropical Cyclone Alfred, and cash settlement for fence repairs was disputed

FirmRACQ
Decided2026-02-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants' home insurer accepted the fence claim after a cyclone but declined earthworks and tree and debris removal. AFCA found these covered, required an updated scope of works and settlement, and awarded $2,000 non-financial loss.

Earthworks necessary to rebuild the covered fence form part of the repair, and storm-felled trees are debris under the demolition and removal of debris benefit.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-250920 | Financial firm | RACQ Insurance Limited Case number: 12-25-250920 27 February 2026 1 Determination overview 1.1 Complaint The complainants (Mr L and Ms B) hold a joint home and contents insurance policy with the financial firm (insurer). On 13 March 2025, the complainants lodged a claim for damage to their property caused by Ex-Tropical Cyclone Alfred (storm). The insurer accepted the claim for the demolition, removal and replacement of the damaged fence but declined cover for the removal of trees and debris, and reinstatement of earth (earthworks). The insurer says the policy does not cover loss of earth and it is not required to remove trees and debris which did not damage the insured home. The complainants say because an event covered under the policy occurred, the insurer is required to provide a cash settlement to allow them to: · reinstate the earth to its pre-loss condition · remove fallen trees and green waste debris, and · replace his fence on a like-for-like basis. The complainants have also raised concerns about how the insurer handled the claim. 1.2 Issues and key findings Is the insurer liable for the earthworks? Yes. Earthworks are required as part of the repairs to the fencing that was damaged by the storm. It is fair for the insurer to cover the necessary earthworks. Is the insurer liable for the removal of the trees and debris? Yes. The policy covers the removal of debris. The trees broken down by the storm are debris. The insurer is liable for the removal of all storm debris, up to the policy limit. Is the insurer’s cash settlement for the fence repairs fair and reasonable? No. The cash settlement does not include the necessary earthworks, or the removal of debris caused by the storm. The insurer must obtain an updated scope of works (SOW) which includes this. Are the complainants entitled to non-financial loss compensation? Yes. The insurer did not engage with Mr L in line with its promise. This caused him unnecessary stress and inconvenience. An award of $2,000 non-financial loss compensation is warranted for this. Why is the outcome fair? The outcome is fair because the complainants have shown most of their claimed loss is covered by the policy. It would be unfair for the insurer to apply the wording of the policy in the way that it has to decline the claim. 1.3 Determination This determination is substantially in favour of the complainants. If the complainants accept this determination, within 14 days of receiving notification of the complainants’ acceptance, the insurer must retain an expert to: · determine the extent of the earthworks required for the fencing repairs to be completed, and · obtain an updated SOW that includes all the work in the current SOW, the earthworks, and the removal of broken trees and other debris. As the policy requires a cash settlement to be made based on reasonable market costs, the insurer must also ensure, if the claim is to be cash settled, its cash settlement offer is actionable, meaning it is not subject to rates only available to it. Within 7 days of receiving the updated SOW, the insurer must: · give the complainants a copy of the updated SOW, and · confirm the complainants’ preferred method of settlement for the claim. Within 7 days of receiving the complainants’ preference, the insurer must: · cash settle the claim in line with the updated SOW (including a 15% uplift), and including the $1,000 payment for the replacement of trees (if not already paid), minus any applicable policy deductions, or · engage its agents to begin repairs. 2 Reasons for determination 2.1 Is the insurer liable for the earthworks? Yes. Earthworks are required as part of the repairs to the fencing that was damaged by the storm. It is fair for the insurer to cover the necessary earthworks. Parties dispute cover for all the claimed damage It is established insurance law that the complainants carry the initial onus to show a loss of a type covered by their policy (claimable loss). The complainants must show this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is shown, the onus shifts to the insurer to show the loss is not covered, either by way of one of the policy exclusions or on some other basis. The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer provided the policy documents to the complainant. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. It is not in dispute the complainants have shown a claimable loss for the damage to the fencing. The insurer accepts floodwater from the storm caused this damage. The parties dispute: · the cash settlement amount for the fence repairs · the policy cover for: > the removal of trees and debris, and > the earthworks. The complainants have also raised issues about the insurer’s handling of the claim. Insurer is liable for earthworks required to rebuild fencing It is not in dispute work is required to reinstate the earth that has eroded because of the storm and floodwater that flowed through the property. The insurer says this needs to be done before the fencing can be replaced (and this is not in dispute). The insurer has also mentioned the possibility of the complainants needing to build a retaining wall to avoid future loss. However, there is no expert commentary confirming this. The insurer’s site report says: Some of the fencing can not be rebuilt the same way due to the natural water path on the left hand side of the property. This water path has eroded all the ground around the fencing. The insurer says it is not liable for this work because the policy definition of ‘home’ does not include land and earth. There is no specific definition of the term ‘home’. Under ‘what is your home’ the policy says: Your home is made up of the building itself at the insured address shown on your Certificate of Insurance, items that are fitted or fixed to that building as well as certain items that are within the boundary of your property. This section also includes a graphic which highlights what parts of the property are considered ‘your home’. The above wording and the included graphic make it clear ‘your home’ does not include land that is not sealed or paved. However, it is not in dispute: · the earth was in place before the storm · the cause of the earth movement was an insured event, and · the earthworks are required for the fence to be repaired (which is accepted damage). The policy requires the insurer to: · repair or rebuild the home as new, or · pay the amount it would cost to repair, rebuild or restore the home as new, based on the reasonable market cost to do this. It is not the case that earthworks are required because of damage independent to the accepted fence damage and repairs. Rather, the earthworks are required to repair the damaged fence. This is not in dispute. Therefore, while I accept the earth is not included in the definition of home, I am persuaded the earthworks required to rebuild the fence are covered as part of that work. The fence cannot be rebuilt without the earthworks first being completed. The insurer’s liability for the earthworks is in line with its liability under the policy to cover the cost to rebuild the fence (which is part of the home) as new. Therefore, I am satisfied the insurer is liable for the earthworks necessary to rebuild the fence. For completeness, if this requires a retaining wall to be built, as this did not exist before the storm, I do not consider the insurer is liable for this, as this would be betterment. Earthworks independent to fencing repairs is not covered I acknowledge the complainants say the policy provides cover for landslides or subsidence which occurs within the first 72 hours of the loss or damage. It appears the complainants are referring to the flood insured event. However, the policy covers damage caused by landslide or subsidence in those circumstances. The landslide or subsidence itself cannot be considered resultant damage of the landslide or subsidence. To the extent that any earthworks are required to reinstate the land to its pre-loss condition, and such work is not required as part of the fence repairs, the insurer is not liable for this. This is because I accept independent damage to the earth is not covered as part of the home. 2.2 Is the insurer liable for the removal of trees and debris? Yes. The policy covers the removal of debris. The trees broken down by the storm are debris. The insurer is liable for the removal of all storm debris, up to the policy limit. Broken trees and branches are debris It is not in dispute the trees and debris need to be removed before the fence can be demolished and reinstalled. An included benefit under the policy is ‘demolition and removal of debris’. This covers: Demolishing your home and removing any debris that is caused by an insured event, and associated demolition work. The policy does not define ‘debris’. The Macquarie Dictionary definition of the noun is: the remains of anything broken down or destroyed; ruins; fragments; rubbish. The insurer considers this benefit does not apply to the removal of the trees at the property because the trees are not part of the home or contents. However, the question is not whether the trees are part of the home. Rather, it is whether the trees are debris. The policy does not have regard to whether the debris caused damage, only that the insured event caused the debris. It is not in dispute the storm caused the trees to break and fall, and the remnants are left at the property. Considering the photographs of the site show significant broken branches scattered over the fencing and the property, I am persuaded, on balance, this falls within the definition of debris. I accept the limitations of the cover under the ‘impact’ insured events for the removal of the trees that cause damage. However, I consider the removal of the trees to be part of the removal of debris caused by the insured event. For completeness, I do not consider tree stumps in the ground would ordinarily fall within the definition of debris. However, if there are any tree stumps that have been lifted from the ground by the storm, and are now strewn across the property, I consider these to be debris. Cover for removal of debris is triggered The ‘demolition’ benefit refers to the demolition of the home. The insurer has sought to rely on findings in a previous determination which says, in part: The Demolition and removal of debris benefit is intended to apply when the home or contents need to be demolished because of an insured event. It is not intended to apply when the home and contents are not damaged, and do not need to be demolished. Notably, where the insurer decides to undertake the repairs, under the policy it may demolish any parts of the home which are considered unsafe or unrepairable. It is not in dispute: · the fence (which is part of the home and damaged by an insured event) is not repairable and needs to be demolished, and · the insurer is willing to undertake the demolition of the fence (subject to the requirements it has placed on the complainant, which I do not consider have been substantiated). In those circumstances, I do not consider the entire house needs to be demolished for cover for removal of debris to be triggered. I consider cover is triggered where part of the home is to be demolished (which is the case here). The complainants’ quote includes the removal of flood and landslide debris. It is unclear exactly what this includes. For the above reasons, I am persuaded the insurer is liable for the removal of all debris caused by the insured event, including the broken-down trees, which I consider to be debris. I also accept the insurer is only liable for the reinstatement of any trees up to the $1,000 policy limit. It appears the complainant does not dispute this, and the insurer confirmed this has been paid. 2.3 Is the insurer’s cash settlement for the fence repairs fair and reasonable? No. The cash settlement does not include the necessary earthworks, or the removal of debris caused by the storm. The insurer must obtain an updated SOW which includes this. Insurer must increase its cash settlement The insurer offered the complainant a cash settlement of $41,414.13 based on the higher of two quotes it obtained, plus a 15% uplift. Alternatively, the insurer offered to have its trades complete the works, subject to the complainant removing the debris, and arranging for the works required for the restoration of the earth. For the above reasons, I accept the insurer is liable for this work (whether it undertakes the work, or cash settles the complainant for it). In relation to the insurer’s SOW, the complainants have asked the insurer to amend it to allow for: · the replacement of timber posts rather than metal (a like for like replacement), and · machinery and support facilities. The complainants say the difference in costs for the timber posts is $7,200. The insurer confirmed the SOW includes an allowance for the machinery to remove the old fencing and reshape the ground to be able to put the new fencing back in the original location. The estimated costs are $5,800, plus GST. I accept the insurer has shown it has accounted for this work. The complainants have not shown, on balance, this is unreasonable. The insurer also confirmed amenities hire is not required. The complainants have not shown otherwise (and their SOW does not include this). The insurer confirmed the assessor made an allowance for timber posts in the SOW. The complainants have not provided a competing quote to show the costs of a like for like replacement. I do not consider the insurer is required to amend its SOW in this regard. However, for the reasons outlined above, I am satisfied the insurer is liable for: · the earthworks, and · the removal of the fallen/broken trees and debris cause by the storm. As the insurer’s SOW and cash settlement offer does not include this work, I am not persuaded the cash settlement is fair and reasonable. For completeness, I note I am also not persuaded the complainants’ quote is fair and reasonable, as it: · includes, among other things, arbour fees, and · is not itemised. It is fair to require the insurer to retain an expert to: · determine the extent of the earthworks required for the fencing repairs to be completed, and · obtain an updated SOW that includes all the work in the current SOW, as well as earthworks, and the removal of broken trees and other debris. The insurer must also liaise with the complainants about their preferred method of settlement. If the complainants prefer to be cash settled, the insurer must add a 15% uplift on the cash settlement amount to account for contingencies and the transfer of risk (minus any applicable policy deductions). As the policy requires a cash settlement to be made based on reasonable market costs, the insurer must also ensure, if the claim is to be cash settled, its cash settlement offer is actionable and is not subject to rates only available to it. 2.4 Are the complainants entitled to non-financial loss compensation? Yes. The insurer did not engage with Mr L in line with its promise. This caused him unnecessary stress and inconvenience. An award of $2,000 non-financial loss compensation is warranted for this. AFCA can award compensation in certain instances ​Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $6,300 per claim) where the insurer's actions have caused an unusual amount of: · ​​​physical inconvenience · ​​​time taken to resolve the situation · ​​​interference with the complainant's expectation of enjoyment or peace of mind. ​​​When considering an award for non-financial loss, AFCA considers the severity and impact of the insurer's conduct on the particular complainant. ​​​​​In assessing whether to award compensation for non-financial loss, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. Insurer is required to pay non-financial loss compensation The exchanged information shows the Mr L was dissatisfied with how the claim was handled by the insurer. Mr L has explained the insurer’s lack of communication and engagement especially given it agreed to provide daily updates. Due to the insurer’s action or inaction, Mr L says he experienced additional stress and inconvenience which ultimately eroded his trust in the insurer. I am persuaded the insurer contributed to additional stress and inconvenience which negatively impacted the Mr L’s peace of mind. It is not disputed the insurer agreed to provide daily updates and did not honour this arrangement. The insurer says despite its best efforts, it was unable to ‘sustain the complainant’s expectation of daily updates’. I note, however, Mr L’s expectations were based on the insurer’s promises. The exchanged information also shows Mr L was left without updates or regular communication when one of the insurer’s representatives was on leave. These actions were reasonably avoidable. While an insurer is generally not obligated to provide daily updates, it should have done so in this case, because that is what it agreed to do. Mr L’s reasonable expectations were not met, and I accept this caused him unnecessary stress and inconvenience. This is particularly as the insurer was aware of Mr L’s personal and financial circumstances. For these reasons, I have awarded the complainants $2,000 non-financial loss compensation. For completeness, I acknowledge Mr L says the insurer should be required to cover the costs associated with a holiday. However, I do not consider the insurer’s actions caused this loss. The insurer is not required to cover these costs. 2.5 Why is this outcome fair? Outcome is fair The outcome is fair because the complainants have shown most of their claimed loss is covered by the policy. It would be unfair for the insurer to apply the wording of the policy in the way that it has to decline the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant PDS wording | Section | | Flood Page 34 | You are covered for: Loss or damage to your home or your contents caused by flood or water runoff […] You are not covered for: […] Loss or damage caused by erosion, landslide, subsidence, vibration, earth shrinkage or expansion or any other earth movement no matter how it is caused. But we do cover damage caused by a landslide or subsidence that: • occurs within 72 hours of the first loss or damage to your home or your contents caused by the flood or water runoff, and • is solely caused by the flood or water runoff (that is, not caused by or contributed to by erosion over time, structural or design fault, or any other factor). | Impact Page 35 | You are covered for: Loss or damage to your home or your contents caused by impact of these items: • a motor vehicle or watercraft, • a tree or tree branch, • an aircraft, space debris, or debris from a rocket or satellite, • a satellite dish, solar hot water tank, or aerial The costs to remove and dispose of a tree or branch that causes the impact. You are not covered for: Loss or damage caused by tree lopping or felling by: • you or anyone who permanently lives with you, • any person who has your consent or the consent of a person who permanently lives with you. Loss or damage to underground services caused by a motor vehicle or watercraft. The cost to remove the tree stump of a tree that causes the impact. | Storm Page 36 | You are covered for: Loss or damage to your home or your contents caused by a storm. For example, a cyclone. […] You are not covered for: […] Loss or damage to: • lawns or grass, • swimming pool and spa covers and liners that are more than 5 years old, • free standing walls, • paintwork or coatings if that is the only building damage caused by the storm. | Demolition and removal of debris Page 52 | You are covered for: Demolishing your home and removing any debris that is caused by an insured event, and associated demolition work Limit • Up to 20% of your home or your contents sum insured shown on your Certificate of Insurance. • We pay this benefit on top of your home sum insured, or your contents sum insured or both sums insured depending on which part of your policy you claim under | Replacing trees, shrubs, plants and hedges Page 59 | You are covered for: The costs to replace your trees, shrubs, plants, and hedges that are lost or damaged by an insured event at the insured address with ones that we consider are reasonably similar Up to $1,000 for each claim You are not covered for: Loss or damage to lawns and grass. | Settling your claim Page 96 | 1. Repair, rebuild, restore, demolish or arrange services • Repair or rebuild your home as new – which means to repair, rebuild or restore your home using: o the same materials if they are readily available in Australia, or o equivalent materials in terms of quality, purpose and specifications. • […] • Demolish your home or any parts of it which are considered to be unsafe or unrepairable

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.