Determination 12-25-250891

Denial of building damage claim for vibration from nearby construction; delay in burglary/vandalism claim

FirmHollard
Decided2026-07-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's heritage home was damaged allegedly by vibration from nearby construction and the insurer declined the claim. AFCA found for the insurer on the building claim but required $1,000 non-financial loss for unreasonable delay on the separate burglary/vandalism claim.

Vibration is not a 'sudden impact' or a malicious act on the policy wording and is excluded by general exclusion 10, while the burglary claim delay was unexplained and unreasonable.

Issues

Subjects and remedies

home or building damagetheft or burglarypay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-250891 | Financial firm | Hollard Insurance Partners Limited Case number: 12-25-250891 17 July 2026 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy covering insured events (policy) with the financial firm (insurer). The complainant has made a claim for damage to his property caused by vibration from construction works at a nearby site. The complainant says that the vibration is ‘impact’ or that it is ‘malicious damage’ and should be covered by the policy. The insurer denies the claim and says that the damage is due to long term differential settlement, so the complainant has not established a valid claim under the policy. The complainant says that the property is structurally compromised and must be demolished. If it is re-built, then re-built to heritage standards. This dispute is about whether or not the damage to the property was caused by an insured event under the policy. This determination does not address any issues of liability in respect of the complainant’s potential claim against the construction company or any other party. The claim for burglary/vandalism has been resolved and the only issue to address is whether the complainant is entitled to non-financial loss for that claim. 1.2 Issues and key findings Has the complainant established a valid claim? No. The exchanged information shows that, on the balance of probabilities, the complainant has not established an insured event under the policy. Further, vibration is generally excluded from the policy. Is the insurer estopped from denying the claim? No. As a matter of general principle, an insurer is entitled to investigate a claim and the cause of damage before reaching a decision under a policy. The payment of accommodation costs was not a confirmation of cover and does not give rise to an estoppel under the policy. Is the complainant entitled to non-financial loss? In respect of the claim for damage to the property, non-financial loss is not payable by the insurer. In respect of the burglary/vandalism claim, there is no explanation for the delay in resolving this claim. The delay and lack of a decision was unreasonable. If the complainant accepts this determination then the insurer should pay $1,000 in non-financial loss. Why is the outcome fair? The damage to the complainant’s property is significant. It is deemed structurally unsound and under a demolition order. If the complainant rebuilds the property, it must be done to heritage standards. The cost and inconvenience will have an immeasurable impact and cause hardship to the complainant. I am mindful of all of this. The outcome is, however, fair because based on the information exchanged between the parties, the damage to the property is not covered by the policy. The insurer is entitled to rely on the policy terms and conditions to determine its liability for the claim. It would not be fair to require the insure to compensate the complaint for the loss claimed. 1.3 Determination This determination is in favour of the insurer. Subject to the complainant accepting this determination no further action is required for the building damage claim. In respect of the burglary/vandalism claim, the insurer is required to pay $1,000 in non-financial loss within 14 days of receiving notice the complainant accepts the determination. 2 Reasons for determination 2.1 Has the complainant established a valid claim? No. The exchanged information shows that, on the balance of probabilities, the complainant has not established an insured event under the policy. Further, vibration is generally excluded from the policy. Vibration is established The insurer says that the damage is due to long term differential settlement. The insurer’s engineer’s report says the damage is due to long term differential settlement. It proposes multiple potential causes, but no evidence is adduced in respect of any of those potential causes. Nor does it address why an old property, which may have long term movement, had suddenly deteriorated. The recommendation at 5.8 of the report with respect to monitoring due to the construction work appears inconsistent with a conclusion that the movement was due to ‘natural’ long term movement. However, I make no findings. The reason why I make no findings is because the point is moot: The policy does not cover damage caused by vibration or by long term differential settlement. Notwithstanding, this determination will proceed on an assumption that damage caused by vibration is established and address whether or not that is an insured event under the policy. Further, this determination will not address any issues of liability in respect of the complainant’s potential claim against the construction company or any other party. More information about the background and key events is summarised below at section 3 of this determination. Onus is on the complainant to establish damage is caused by a covered event It is an accepted principle of insurance law that an insured bears the onus of establishing a claim under the policy, on the balance of probabilities (meaning more likely than not). This means that the onus is on the complainant to show the proximate cause of the damage is an insured event under the policy. A proximate cause should be the dominant, effective or operative cause of the damage. It does not need to be the first, last or only cause of damage. Vibration damage is not sudden impact under the policy The complainant seeks cover under two sections of the policy, first sudden impact; secondly, malicious damage. ​The policy was taken out online and renewed on 19 February 2025. The details of the policy are found in the Certificate of Insurance (COI) and Product Disclosure Statement (PDS) which together form the basis of the contract with the complainant. The policy is subject always to the terms and conditions of cover. The policy provides cover for insured events, which are defined in the policy. This means that not all loss and damage is covered by the policy. Rather, only loss and damage caused by one of more of the insured events occurring during the period of insurance, subject to the exclusions, is covered. The complainant has said that vibration is ‘impact’ and should be covered under the ‘Sudden Impact’ cover under the policy. The complainant says that the examples under the policy are illustrative and not exhaustive and damage caused by vibration should be covered. I have considered this argument carefully. The insuring clause for sudden impact is set out at page 36 of the PDS as follows: Sudden impact What is covered Your building and/or contents are covered for loss or damaged caused by the sudden impact by: · A rail or road vehicle; · A bicycle, watercraft, caravan or trailer; · A spacecraft or space debris; · An aircraft or aircraft debris; · An aerial, mast, satellite dish or power pole; or · A falling tree or branch, unless the loss or damage was caused directly or indirectly by tree/branch lopping or felling by: - you or a person who lives at your insured address; or - a person with your consent or the consent of a person who lives at your insured address. If the impact was by a vehicle not being driven by you or your family member, you must report it to the police. The term ‘sudden impact’ is not defined in the policy. This requires further consideration. Here, an ordinary, everyday meaning can be applied. The Macquarie dictionary defines ‘impact’ as: noun: the striking of one body against another; an impinging; forcible contact or impinging, the influence or effect exerted by a new idea, concept, ideology etc. The ordinary meaning of ‘strike’ (or ‘striking’) includes, relevantly: To deal a blow or stroke to (a person or thing), as with the fist, a weapon or a hammer; hit; to deliver a blow; to come into forcible collision with The first part of the definition requires contact or a collision between two things. The second part, that is, an influence on something, is redundant as it clearly does not apply. In the context of understanding the policy, the insured event is not satisfied. This is because there is no contact between the insured property and one of the listed items. I do not accept that list is illustrative. It is meant to be exhaustive given the reference of ‘by’. In addition, the insured events require that the impact be ‘sudden’. This is commonly defined or understood to mean something unexpected or an accident or ‘happening, coming, made or done quickly, without warning or unexpectedly’ (see Visy Packaging Pty Ltd v Siegwerk Australia Pty Ltd [2013] FCA 231). It is not necessary to decide but appears to serve to distinguish the events from something that was expected or could be avoided or occurred gradually over time. Following the above, vibration from the construction works does not fall under an insured event and cannot be considered to be ‘sudden impact’ under the policy. On balance, even if the proximate cause of the damage was considered to be vibration from the construction works, on a proper construction of the policy wording, this does not meet the insured event of ‘sudden impact’. Proximate cause of damage is not malicious (reckless disregard) The second section of the policy under which the complainant seeks cover is ‘malicious act’. The complainant says that the action of the construction company was a malicious act and should be covered by the policy. Page 33 of the PDS provides cover in the following terms: Malicious act including vandalism What is covered Your building and/or contents are covered for loss or damage caused by a malicious act (including vandalism), that has been reported to police, unless it was committed by: [not relevant] What is not covered There is no cover under this Insured Event where a General Exclusion applies (pages 53 to 55). Importantly, the definition of ‘malicious act’ at page 4 of PDS says: Malicious act An act done with the intention of causing loss or damage, or with reckless disregard for the consequences. The case law on malicious acts is well established but the principle can vary, depending on the cause of action in question. Malicious acts are generally understood to mean acts undertaken wrongfully and intentionally designed to cause the harm envisaged. The threshold for proving that an act was undertaken with malice is difficult to establish given the seriousness of the allegation. There is no suggestion the construction company acted with malice or engaged in an act intended to cause harm of the kind that was caused to the complainant’s property. The second limb of the definition, that is, an act done with reckless disregard for the consequences requires consideration. The term ‘reckless disregard’ is not defined in the policy. This concept, however, has been considered by the courts. It is appropriate to consider the principles used by the courts, rather than an ordinary definition. To summarise the principle, the threshold for conduct which meets the standard of ‘reckless disregard’ is generally considered high; it is much higher than negligence. It requires subjective knowledge of the risk in question and an intention to disregard the risk or to proceed with wilful blindness to the likely or probable consequences. The complainant says the construction company operating at the site opposite the house acted with reckless disregard for the consequences when it continued with construction activities after issues had been raised by him and neighbours. Based on the information exchanged between the parties, the construction work started in early November 2024. Rock breaking on site appears to have caused vibration to various properties and the complainant says he and his neighbours complained. The information exchanged shows that the construction company was on notice by 11 November 2024 and it was due to monitor the properties and said it would cover internal repairs. There is no information to show that such monitoring was undertaken. There were no internal dilapidations reports or surveys. The risk of damage by vibration and construction activities is a well-known risk in the construction and building industry. The geotechnical report provided by the complainant refers to the soil and ground conditions at the location and the risk of damage to nearby properties. I have not seen sufficient information to determine whether or not the facts of this case would lead to a finding that the works or the continued works met the threshold for reckless disregard. This is because there is no evidence about the subjective knowledge of the key officers or staff to attribute the knowledge to the construction company to satisfy the threshold for such a finding. There is also insufficient basis to make inferences. It is possible, for example, that the construction company believed they were taking reasonable steps to mitigate this. The fact that may not have been the case may be negligent but insufficient to meet the threshold of reckless disregard. Moreover, even if the complainant could show that the threshold for reckless disregard was met, the policy general exclusions still apply to all parts of the policy. Policy excludes vibration The insurer has referred to General exclusion 10, which states that: General Exclusions General exclusions apply to all sections of this policy. Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 10. the vibration, settling, shrinking or expanding of earth or any building foundation, wall, pavement or path (except under a ‘Lightning’, ‘Earthquake’, ‘Explosion’ or ‘Sudden Impact’ claim); If the damage was caused by vibration or settling of the earth, or the building foundation, then the damage is excluded. The exclusion has a ‘write back’ which means that it would not apply to claims coming under the insured events listed (that is, lightning, earthquake, explosion, or sudden impact). However, for reasons explained, I am not satisfied ‘Sudden Impact’ applies. None of the other insured events are applicable. Therefore, this general exclusion would apply even if I was persuaded the damage fell within the insured event of ‘Malicious act including vandalism’. 2.2 Is the insurer estopped from denying the claim? Is the insurer estopped from denying the claim? No. As a matter of general principle, an insurer is entitled to investigate a claim and the cause of damage before reaching a decision under a policy. The complainant says the insurer’s acceptance of the claim on 4 March 2025 and payment of accommodation costs were clear, unequivocal representations that the claim was accepted. It was relied upon by him, to his detriment. For example, he has delayed or prejudiced a potential claim against the construction company and did not take steps to prevent the works during the time the claim was being investigated. Covering temporary accommodation costs, on the recommendation of an engineer because the building was considered unsafe, is not a representation that the insurer agreed to accept the claim. These facts do not give rise to an estoppel under the policy. 2.3 Is the complainant entitled to non-financial loss? In respect of the claim for damage to the property, non-financial loss is not payable by the insurer. In respect of the burglary/vandalism claim, there is no explanation for the delay in resolving this claim. The delay and lack of a decision was unreasonable. If the complainant accepts this determination then the insurer should pay $1,000 in non-financial loss within 14 days of the complainant accepting this determination. Insurer not required to pay non-financial loss for property damage In respect of the claim for damage to the property, non-financial loss is not payable by the insurer. The insurer investigated the cause of damage relatively quickly and covered temporary accommodation costs for a fair period of time. The insurer acted fairly and appropriately in investigating a complex claim. The complainant also took issue with the fact that an incorrect engineer was named on the engineer’s report, who had not attended the property to inspect it. This was acknowledged and corrected by the insurer in its IDRS response. It was an unfortunate typographical error but does not give rise to non-financial loss. Insurer should pay non-financial loss for burglary/vandalism claim The delay in resolving the burglary/vandalism claim was unexplained. The break-in occurred in June 2025. The claim was not resolved or dealt with but was eventually accepted and covered in July 2026, with interest. There is no satisfactory explanation for the delay, which was unreasonable and was not progressed by the insurer. The insurer is required to pay $1,000 in non-financial loss within 14 days of receiving notice the complainant accepts the determination. 3 Supporting Information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Background A summary of some of the relevant information appears below. The property is a heritage-status cottage, built in the 1850s. It sits on a small laneway in a city. The complainant purchased the property in 2022. The photos from the date of purchase show a building in good condition, relatively well-maintained, with some minor repairs required although it does not appear to be unusual for a building of that age. In around early November 2024, construction works commenced at a site across the road. The site is directly across a narrow road (single lane). The property is located towards the very front of its site. In early November (around 1-8 November 2024) the complainant noticed cracking appearing which continued, such that plaster and debris was falling inside the house. By around 11 November 2024 the complainant had contacted the construction company and correspondence exchanged between 11 and 29 November, shows that they were due to monitor the property and arrange for internal repairs of cracks. On 27 February 2025, the complainant lodged a claim with his insurers. They sent an assessor to inspect the property the next day, 28 February. The assessor’s report of 3 March 2025 recommended an urgent inspection by an engineer because the property was uninhabitable/unsafe and needed to be reviewed for make safe works. On 4 March 2025, the insurer accepted the claim and temporary accommodation. The insurer’s assessor attended the property on 13 March 2025 and provided a causation report on 24 April 2025. The insurer’s engineer’s report said that the movement was due to differential foundation movement and old age of the structure. It was said to be long term differential movement due to ongoing moisture content variations in the reactive clay soils. Further, the property did not have articulation joints due to its age. No evidence was adduced in respect of the factors which would have affected moisture variation in reactive clay soils for that property. The engineer recommended ongoing monitoring due to the construction works. On 6 June 2025, insurers indicated that, based on the engineer’s report, the claim was not likely to be covered as the damage did not arise from an insured event. A plumber attended on 11 June 2025. The plumber’s pressure testing located a leaking garden tap. This may have contributed to soil moisture variations but the plumber did not consider that it caused damage in question to the property. On 18 June 2025, the property was broken into and vandalised, with personal effects being stolen. This was while the complainant was in temporary accommodation. On 22 June 2025, the insurer declined the claim for damage to the property. The complainant sought a review of the decision. The insurer’s IDRS response was issued on 18 July 2025. Insurer maintained that the damage was due to long term differential movement. It said that the construction company did not intentionally cause malicious damage. On about 28 July 2025, the complainant lodged his complaint with AFCA. The temporary accommodation ceased on about 5 August 2025. The complainant obtained an engineer’s report, dated 2 September 2025. The complainant’s engineer noted the reactive soil which is prone to seasonal movement. The age of the property means that it was not built to modern building standards. For example, the footings were not designed with sufficient stiffness to withstand vibration or soil movement, creating tensile stress. It also does not have articulation joints, making it susceptible to cracking. The engineer concluded that the movement was likely caused by the construction across the road. Further, the property was considered structurally unsafe. Further assessment and monitoring was recommended. On 26 November 2025, the complainant’s engineer stated that the site observations and documents suggest that the cracks in the Eastern wall of the property are likely due to soil movement caused by construction work across the road. The claim in respect of break-in theft was unresolved, with no satisfactory explanation for the delay. It was, however, resolved with a cash settlement in July 2026, with interest applied. The delay in accepting and paying the claim was not reasonable or fair. As at the date of this determination, the property is under a demolition order. The property is considered beyond repair and/or the cost of repair would be prohibitive. The Eastern wall is now a safety hazard. The complainant cannot afford to re-build the property to heritage status.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.