Home / Hollard / Determination 12-25-249581

Determination 12-25-249581

Cash settlement amount for vehicle impact damage and loss of rent benefit

FirmHollard
Decided2026-01-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$35,839
Non-financial loss—
Amount claimed$211,435
SourceAFCA PDF

Summary

The insured's garage conversion was damaged by a tenant's car and the insurer offered a cash settlement and two weeks' rent loss. AFCA found the settlement fair but required the insurer to pay loss of rent from 11 November 2023 to 12 August 2025 plus six weeks.

The complainant did not establish that a full rebuild was needed because of the impact, but the insurer's delay in making a fair offer meant loss of rent was payable under the policy benefit.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay claimpay compensation

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-249581 | Financial firm | Hollard Insurance Partners Limited Case number: 12-25-249581 28 November 2025 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under his investment home insurance policy with the financial firm (the insurer) for impact damage to his garage, which has been converted into a granny flat. The insurer has partially accepted the claim and offered the complainant a cash settlement, including two weeks’ loss of rent. It has denied cover for some of the damage and says for that damage the complainant has not established a loss which is covered by the policy. Alternatively, the insurer says that the cause of the disputed damage is excluded from cover under the terms of the policy. The complainant says the insurer‘s cash settlement does not cover the repair costs, and he seeks payment of the loss of rent benefit for the period in which the property has been empty. 1.2 Issues and key findings Is the insurer’s cash settlement offer fair and reasonable? Yes. Given the exchanged material I am satisfied the insurer's cash settlement offer is fair and reasonable. Is the complainant entitled to the loss of rent benefit? Yes. I am satisfied it is fair for the insurer to pay the complainant the loss of rent benefit from the date his tenant moved out until the date the insurer made a fair and reasonable cash settlement offer, plus six weeks to reflect the time taken for repairs. Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant regarding the claim. Where the insurer delayed providing the complainant with a fair and reasonable offer to settle the claim related damage, it is fair to require it to pay loss of rent for the period of the delay. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination, · within 14 days of being notified of his acceptance the insurer is to pay the complainant $35,839.42 less any applicable policy excess, if it has not already done so · the complainant is to provide the insurer with a copy of his management agreement to verify the fee he was paying regarding the management of the property. Within 14 days of receipt of the management agreement, the insurer is to pay the complainant the following amounts for his loss of rent: · $300 per week, less the management fee, from 11 November 2023 until 12 August 2025 · 6 x ($300 less the management fee) 2 Reasons for determination 2.1 Is the insurer’s cash settlement offer fair and reasonable? Yes. Given the exchanged material I am satisfied the insurer's cash settlement offer is fair and reasonable. Coverage of the policy The complainant’s investment home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. The policy covers sudden impact damage. Page 36 of the PDS details the cover as follows: Sudden impact What is covered Your building and/or contents are covered for loss or damage caused by the sudden impact by: • a rail or road vehicle; • … If the impact was by a vehicle not being driven by you or your family member, you must report it to the police. What is not covered You are not covered under this Insured Event for: … Where a General Exclusion applies (pages 53 to 55). The general exclusions apply to all cover under the policy. The PDS lists the following relevant general exclusions on pages 53 to 55: General exclusions apply to all sections of this policy. Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design. We will only apply this exclusion where you knew or should reasonably have known the issue existed; 2. damage to your building or part of your building that at the time it was built, renovated or installed was not compliant with the relevant local government regulations, or the requirements of any other applicable statutory authority. We will only apply this exclusion where you knew or should have known about the non-compliance; … 10. The vibration, settling, shrinking or expanding of earth or any building, foundation, wall, pavement or path (except under a ‘Lightning’, ‘Earthquake’, ‘Explosion’ or ‘Sudden Impact’ claim); … It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainant lodged his claim with the insurer on 10 November 2023 advising that the property had been damaged by impact from a car on 9 November 2023. The complainant says the tenant from the house maliciously caused damage with their vehicle because they were upset about a rent increase. The tenant drove their car into the garage which is attached to the house. The garage is converted into a granny flat and is a separate dwelling and tenancy from the main house. Immediately after lodging the claim, on 12 November 2023, the complainant engaged engineering consultant and costs advisor IE to inspect building damages and take pictures of the impact and of the walls and structural members around it that may be affected. IE says they were appointed as insurance claim costs advisor only, not as an engineering consultant, and they did not provide any engineering advice. IE says the following: ... we advise that Main building was intact from the incident. The second building become at risk of failure as front loadbearing wall is damaged significantly. The timber roof frame is supported by load bearing walls on four sides. Front wall (Eastern) is not capable to support the roof frame and the roller door. Crack continued to the side wall at North. ... There are complexities in rebuilding it partially, such as rebuilding the wall will require removal of roof frame and unknown foundation details. Existing and partially rebuilt section will not be integrally connected. To comply with engineering design requirement, it will require building from foundation. Therefore, we believe complete replacement of the building is more practical solution. Gutters and downpipe in between second building and carport also has damage due to the movement. ... Based on IE’s recommendation, the complainant obtained a quote from IE and two other builders to demolish and rebuild the garage as follows: · build cost consultant IE quote, dated 29 November 2023 for $211,434.96 · builder TB quote, dated 28 November 2023 for $216,700 · builder RB quote, dated 30 November 2023 for $195,500.00 The complainant initially wanted the insurer to accept liability for the demolition and rebuilding of the garage. On receipt of the claim the insurer appointed builder RI and engineer SE to report on the cause of damage. SE attended the property on 18 January 2024. The SE report notes the following: · the property suffered impact damage to the front masonry brick wall and inward rotation of the plasterboard wall lining · the lateral displacement and movement of the brickwork have resulted in damage to the plasterboard wall lining and kitchen joinery immediately adjacent to the impacted wall · the damaged masonry brickwork and impact related wall lining and kitchen joinery would require demolition and replacement · no vehicle impact-related damage was observed beyond the front elevation of the garage · the garage conversion does not comply with the Building Code of Australia · missing articulation joints in the brickwork does not allow for movement resulting in vertical hairline cracking around the building perimeter not consistent with vehicle damage · the absence of collar ties compromised the roof’s overall structural integrity of the framing, leading to reduced stability and resistance to external forces · the structural defects in the roof resulted in outward bulging of the roof gutter line and roof spread defect · the inner floor level was at least 300 mm lower than the finished exterior floor level with no tanking system or other approved measures to prevent ground moisture from penetrating through walls · there was no waterproofing membrane present to the external masonry. SE also provided a scope of works (SOW) for the repair of the claim related damage they identified, and builder RI provided a quote based on the SOW. The insurer says because there is significant non claim related damage and the garage conversion does not comply with the Building Code of Australia, RI is unable to warrant the work, and it offered the complainant a cash settlement. After some negotiation over time the insurer offered a cash settlement of $35,839.42, inclusive of a 20% uplift and the following: · replacement of the front brick wall (including acro props to support the roof) · removal and replacement of a downpipe · removal and replacement of the existing roller door · demolition and replacement of plasterboard and skirting boards. The complainant is dissatisfied with the insurer's decision and SOW. The complainant engaged a second engineer, TZ, to report on the cause of damage. TZ inspected the property on 24 June 2024 and also considered the previous reports from IE and SE. The exchanged report, which is marked as draft, includes the following recommendation regarding the repairs: ... Recommendations Due to the observed extent of damage, it seems necessary to partially replace the wall and possibly undertake significant structural work, including deconstruction of the kitchen, removal of the roof, and reinforcement of the foundation if it is inadequate. These measures require careful adherence to safety protocols. Based on the referenced documents, the building dates back to the 1980s. Since then, design standards and building codes have evolved, indicating some discrepancies between current requirements and the existing construction. Therefore, I recommend demolishing and replacing the entire second building to ensure compliance with current construction standards and to maintain safety throughout the reconstruction process. The insurer maintained that it did not accept liability for a complete rebuilding of the garage, and on 16 September 2025 the complainant advised he had undertaken some repairs to the garage, rather than demolishing it and rebuilding it. He provided a revised quote for $89,000 he says he prepared in consultation with his builder. As stated, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy. There is no doubt there is damage, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainant must establish that the damage he is claiming was caused by the sudden impact with the vehicle, as detailed within the terms and conditions of the policy. I am satisfied the insurer’s cash settlement offer is fair and reasonable I am not satisfied the complainant has established that the demolition and rebuilding of the converted garage is required because of the impact damage, or that his revised quote is fair and reasonable. I acknowledge both the reports from the complainant’s engineers, IE and TZ, state that demolishing and rebuilding would be the most efficient way to repair all the issues in the converted garage, however I am not satisfied those reports establish that the impact damage caused all the issues they observed. TZ raised concerns about the foundation of the building but did not suggest the integrity of the foundations had been affected by the impact. In their report, TZ recommends demolishing and replacing the entire garage to ensure compliance with current construction standards and to maintain safety throughout the reconstruction process. However, TZ does not say this is necessary due to the impact damage, nor do they provide any detail about the compliance and safety standards they refer to. Similarly, IE says the state of the foundations and structural works required are unknown, and that a complete replacement of the building is a more practical solution than repair. They do not say this is necessary due to the impact damage. In relation to the complainant’s revised quote, I do not consider he has established that is a fair and reasonable basis for a cash settlement. The quote is not itemised regarding costings. I acknowledge the complainant says it was prepared in consultation with a builder, however there is no information about the builder or the extent of the consultation, and the quote appears to have been prepared by the complainant himself. Further, the quote is not accompanied by any report to show the repairs listed are for damage caused by the impact. The quote is accompanied by photographs of damage, however without a report regarding the cause of damage I cannot be satisfied all the damage is event related. Given the above, I am not persuaded, on balance, that the demolition and rebuild are required due to the impact damage, or that the complainant’s revised quote is a fair and reasonable basis for a cash settlement. Further, I am satisfied that the report from SE is thorough, logical, compelling, and supported by helpful photographs. The claim related damage noted in the SE report and accompanying SOW had been quoted by RI who provided an itemised quote. I consider this quote, plus the 20% uplift offered by the insurer to account for the transfer of risk to the complainant, totalling $35,839.42, is a fair and reasonable basis for a cash settlement. Should the complainant accept this determination, within 14 days of being notified of his acceptance the insurer is to pay the complainant $35,839.42 less any applicable policy excess, if it has not already done so. 2.2 Is the complainant entitled to the loss of rent benefit? Yes. I am satisfied it is fair for the insurer to pay the complainant the loss of rent benefit from the date his tenant moved out until the date the insurer made a fair and reasonable cash settlement offer, plus six weeks to reflect the time taken for repairs. Policy includes benefit for loss of rent Page 42 of the PDS details the loss of rent benefit as follows: What is covered If we pay your claim and the damage at your insured address is so extensive that it can no longer be lived in by your tenant, you are covered for loss of rent you suffer where: your building is insured by this policy; or … We will pay from the time your insured address becomes unliveable until it is liveable again, up to a maximum of 50 weeks. … Once it is liveable, we will also pay up to 2 additional weeks’ rent if a tenant is not immediately available to occupy it. ... If your insured address is rented out under a Residential Tenancy Agreement or equivalent legal agreement, we will pay the lesser of: • the weekly rent nominated on your Certificate of Insurance, and • the weekly amount you were receiving immediately prior to the loss. ... What is not covered You are not covered: • where your insured address has been unoccupied for more than 60 consecutive days immediately prior to the date the damage occurred; • if you do not make reasonable attempts to re-tenant/re-let your insured address; or • for any period of loss of rent where the repair or rebuilding has been delayed by you or anyone who acts with your consent or on your behalf As stated, the insurer maintains only part of the converted garage wall was damaged by the impact, and that damage was localised at the front left masonry brickwork and direct internal plasterboard wall to the garage, It says it is not liable for the structural faults, faulty design, building defects, and the non-compliant renovation/conversion and general building movement over time. It says the property has been confirmed to be habitable by its builder RI and under the terms and conditions of the policy, there is therefore no indemnity to be provided for any loss of rent. The insurer offered the complainant a payment for two weeks’ loss of rent based on the estimated time for repairs according to the quote from its builder RI. The complainant says he has not been able to rent the property since the event because of concerns about the structural integrity of the building. I am satisfied, on balance, the complainant is entitled to the loss of rent benefit The test under the policy for eligibility for the loss of rent benefit is that ’the building cannot be lived in by your tenant.’ Tenant is defined in the policy as being The person/s who have the right to occupy your insured address under a Residential Tenancy Agreement or equivalent legal agreement The information shows the converted garage was rented separately from the main house with different tenants living in each building pursuant to separate tenancy agreements. The insurer has agreed to accept liability for some damage to the garage, and therefore the loss of rent benefit is payable from the time the garage became unliveable until it is liveable again, subject to the conditions of the benefit. I have considered the reports of all three engineers. IE says the garage is at risk of failure as the front loadbearing wall is damaged significantly and TZ says the masonry wall is severely compromised causing immediate collapse risks due to observed movement and structural instability. As stated, the insurer has accepted liability for the damage to the front wall. I consider the fact that two engineers have provided opinions that the building is at risk of collapse due to the claim related damage establishes that the building cannot be lived in by the complainant’s tenant. There is no reasonable basis to expect the complainant should have allowed tenants to live at the property while it remained unrepaired and potentially dangerous. There is no information to support the main house was unliveable due to the event. The complainant has provided the tenancy ledger for both the house and the converted garage. The ledger shows the tenant moved out of the garage on 11 November 2023, the day after the event, and that the tenant was paying $300 per week rent. The COI shows the weekly rent as being $525. Because the amount received for the garage is lower than the amount noted on the COI, the complainant is entitled to the lower amount. The information also shows the property was managed. The complainant would have received $300 less the management fee each week, and therefore he is entitled to the loss of rent benefit at a weekly rate of $300 less the management fee. The updated RI quote, which later formed the basis of the insurer's final cash settlement offer, was provided to the insurer on 26 June 2024. Previous quotes did not include the cost to repair all of the internal damage. It appears that this updated quote was not formally communicated to the complainant or offered to the complainant as the basis for a cash settlement until 12 August 2025, more than a year later. I consider it was reasonable for the complainant not to have accepted the insurer's cash settlement offer until it made the fair and reasonable offer of $35,839.42 in accordance with the updated quote on 12 August 2025. While the policy has a limit payment of the loss of rent benefit for 52 weeks, where the insurer delayed more than a year in communicating its updated quote to the complainant and formalising a fair and reasonable offer to him on that basis, I consider it fair for the insurer to pay the complainant’s loss of rent from the date the property became unliveable to the date of the offer was made to the complainant. I consider the delay in repairs after 12 August 2025 was caused by the complainant, and no loss of rent is payable from that date. The insurer offered the complainant 2 weeks’ loss of rent for the repair period during which it agrees the property will be unliveable. I have reviewed the SOW. It involves extensive external repairs, including rebuilding walls and internal repairs which will require isolating services and coordination of different trades. To bring the issues in dispute between the parties to an end, I consider payment of a further 6 weeks of the temporary accommodation benefit at the rate outlined above, is fair. This amount also allows for the possibility that once the property is liveable, it may take the complainant time to re tenant the property. Should the complainant accept this determination, the complainant is to provide the insurer with a copy of his management agreement to verify the fee he was paying regarding the management of the property. Within 14 days of receipt of the management agreement, the insurer is to pay the complainant the following amount for his loss of rent: · $300 per week, less the management fee, from 11 November 2023 until 12 August 2025 · 6 x ($300 less the management fee) 2.2 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Where the insurer delayed providing the complainant with a fair and reasonable offer to settle the claim related damage, it is fair to require it to pay loss of rent for the period of the delay. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.