Partial decline and cash settlement offer for storm damage to tiled roof and patio; complainant sought full Colorbond roof replacement
Text of the determination
Determination
|
Case number
|
12-25-248880
|
Financial firm
|
Youi Pty Ltd
Case number: 12-25-248880 23 April 2026
1 Determination overview
1.1 Complaint
The complainant held a home building insurance policy for his home in Queensland with the financial firm (insurer). The policy period was from 22 May 2024 to 21 May 2025. The building cover was $761,400.
The complainant made a claim for storm damage to the tiled roof and to the patio.
The claim was highly complex and protracted and numerous experts’ reports were provided.
The insurer partially accepted the claim and made a cash settlement offer for partial repairs to the tiled roof and for the repairs to the patio.
The complainant rejected the insurer’s offer and sought the cost of the replacement of the roof with Colorbond roofing and the cost of the patio repairs. The complainant also sought the cost of his engineer’s report and of make-safe repairs.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
No. The insurer did not dispute that there had been storm damage. The insurer should pay for the roof replacement and the repairs to the patio as estimated by the complainant’s repairer together with an uplift and interest. The insurer should pay for the complainant’s engineer’s report and the make-safe repairs.
Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation.
1.3 Determination
The determination is in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall:
· pay the complainant the amount of $87,589.78 (being OS’s quote plus a 20% uplift)
· pay the complainant interest on the $87,589.78 under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 1 July 2025 to the date the payment is paid by the insurer
· pay for the cost of DI’s Report in the amount of $2,508.00
· if it has not already done so, pay for the cost of the make-safe repairs by DS based on the invoice provided by DS to the insurer
· pay to the complainant $4,000 for non-financial loss.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
No. The insurer did not dispute that there had been storm damage. The insurer should pay for the roof replacement and the repairs to the patio as estimated by the complainant’s repairer together with an uplift and interest. The insurer should pay for the complainant’s engineer’s report and the make-safe repairs.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (together referred to as the policy). I am satisfied that the policy been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Relevant provisions of the policy
The relevant cover under the policy (page 16) was for loss or damage caused by storm.
The policy provided general exclusions (page 30):
2. additional costs resulting from your buildings or any part thereof not being compliant with building codes, regulations or laws, including any required approval by the relevant building authority, which were already in place when the buildings were originally built, subsequently altered or renovated;
3. upgrading undamaged parts of your buildings to comply with current building codes, regulations and laws;
4. repair of any item that has poor or faulty design specification, materials, planning or workmanship, or a defect, unless that item is guaranteed under our Quality Guarantee;
The policy provided provisions regarding how the insurer settles a building claim (page 34):
If we can, we will settle your buildings claim by:
• repairing the damaged parts of your buildings if it is both possible for the parts to be repaired and economical for us to repair those parts because the cost of repair is less than the cost of rebuilding; or
• rebuilding the damaged part of your buildings if it is either not possible for those parts to be repaired or not economical for us to repair those parts because the cost of repair is more than the cost of rebuilding.
The circumstances in which we may be unable to repair or rebuild the buildings include:
• if materials needed for the repair or rebuild are not readily available;
• if the repair or rebuilding cannot commence for a significant amount of time; for example, due to availability of service providers;
• if the pre-incident condition of the buildings prevents us from repairing or rebuilding them; or
• if the insured event makes the land unsafe to build on; for example, after an earthquake.
If we cannot repair or rebuild the damaged part of your buildings, we will pay you an amount equal to the reasonable cost that you would incur to repair or rebuild the buildings up to the limits noted in your policy. We will undertake a search of the market to determine what this cost would be in your area, based on factors including scope of works and comparison quotes from repairers or builders.
We can use a combination of the above settlement methods if we are able to partially repair or rebuild the damaged part of your buildings.
Complainant engaged a builder to conduct a make-safe after storm
The complainant’s home was damaged by a storm on 2 February 2025.
The complainant lodged a claim on 2 February 2025.
The complainant engaged his builder, DS, to conduct a make-safe repair to prevent further damage. The complainant provided a Statutory Declaration dated 21 August 2025 from DS which recorded that ‘an invoice was issued to [SB] for works carried out and forwarded to the [complainant’s] insurer for remittance’. If it has not already done so, the insurer should pay for the cost of the make-safe repairs by DS. The complainant advised that the amount of DS’s invoice was $1,100.
Insurer engaged experts to prepare reports
The insurer engaged JL, builder, to prepare a Report dated 17 February 2025 (based on an inspection on 4 February 2025). JL concluded:
· the complainant had engaged DS to complete a make-safe repair which:
> addressed all severely broken tiles
> applied silicone to the roof and gutters at all potential water ingress points
> repositioned all misaligned roof tiles to reduce the risk of further water ingress and prevent tiles from falling off the roof
· in relation to the ’Roof Structure’:
> over 20% of the roof had sustained cracked or damaged tiles due to high winds, leading to compromised structural integrity
> trusses and structure were identified as having 900mm centre spacing, which was uncommon for tiled roofs and may have contributed to structural vulnerabilities during high winds
> limited use of cyclone clips was noted, which may have contributed to the movement and lifting of roof tiles during the high-wind event
> significant damage had occurred to the roof structure:
‒ the complainant reported that high winds had caused roof tiles to lift, leading to an influx of high-pressure air into the roof cavity. This increased air circulation resulted in severe movement within the roof structure, causing sporadic lifting and displacement of roof tiles, ultimately leading to tile breakages
‒ as a consequence of the tile breakages, water ingress was reported in the patio area on 2 February 2025 during the rain event
‒ the high westerly winds lifting the roof tiles further exacerbated the issue, allowing additional water ingress to occur throughout the affected areas
‒ more than 20% of the roof structure had sustained cracked or damaged tiles as a result of the weather event
· evidence of prior repair work conducted by licensed contractors was observed. These repairs, aimed at mitigating previous water ingress issues, were identifiable by the mixed-profile tiles installed throughout the roof. Notably, the recently installed tiles exhibited greater movement or ‘play’ compared to the original tiles. This increased movement likely contributed to their susceptibility to high winds, allowing uplift forces to access the roof cavity more easily
· multiple uncommon building practices were identified during the inspection of the roof structure:
> the 900mm centre truss spacing for the tiled roof. Standard recommendations typically do not exceed 600mm spacing; however, it was noted that the 900mm spacing had been specified in the building plans
> minimal use of cyclone clips, though it was acknowledged that the structure was built prior to the implementation of the new standard requiring their use
· a make-safe repair was completed by a licensed contractor to address the immediate hazards. This included the replacement of all severely broken tiles, the application of roof silicone to all potential water ingress points, and the repositioning of all unaligned roof tiles. These measures were taken to mitigate further water ingress and to prevent additional tile dislodgement
· overall, more than 20% of the roof structure had undergone tile replacement or maintenance, highlighting the significant impact of the recent weather event
· based on JL’s findings, it was evident that the roof structure had sustained significant damage due to high winds, resulting in tile displacement, breakages, and subsequent water ingress. The presence of prior repairs, along with identified construction practices such as the wider truss spacing and minimal cyclone clip usage, has likely contributed to the vulnerability of the roof under extreme weather conditions. While emergency repairs have been conducted to stabilise the structure, further assessment was recommended to determine whether additional reinforcement or maintenance is necessary to enhance the roof’s resilience and prevent future occurrences.
The insurer also engaged MC to prepare a report based on an inspection on 10 February 2025. MC concluded:
· high westerly winds lifted roof tiles causing roof cavity to fill with high pressure air circulation causing severe movement within roof structure allowing roof tiles to lift/move sporadically with the outcome of roof tile breakages
· breakage of tiles has resulted in water ingress during recent rain events
· more than 20% of the structures roof area had seen crack/damaged tiles due to the event
· repair works to the roof had been undertaken by licensed contractors due to previous water ingress to the property
· the repairs could be identified by the mixed matched tile profiles that have been installed throughout the roof
· these tiles which had been recently installed were noted to have more ‘play’ (movement) than the existing original tiles, this more than certainly would have an effect on high winds being able to lift the base of the tiles and access the roof cavity.
· multiple uncommon building practices were identified whilst inspecting the roof structure, such as, 900mm centre truss spacing for tiled roof, recommended spacings usually do not exceed 600mm. However, 900mm spacings have been specified on the plans
· minimal use of cyclone clips to roof tiles identified, however the structure was built prior to the new standard of the use of cyclone clips was put into effect
· a make safe by a licensed contractor had been made to all severely broken tiles, roof and gutter silicone has been added over all potential water ingress points. All unaligned roof tiles have been pushed back into rough positioning to also prevent further water ingress or tiles failing off the roof
· more than 20% of the structures roof area has seen tile replacement/maintenance
· the building plans specified 900mm centres (and included a supporting photograph).
The insurer subsequently engaged CR to prepare a report (based on an inspection on 2 April 2025). The insurer provided CR with copies of JL and MC’s reports. CR concluded:
· pre-purchase inspection noted 103 roof tiles to be removed and replaced and grinding of the ridge capping and repointing to be completed
· the complainant advised that this was completed at a cost of $7,101.60
· the complainant advised that the solar system had been upgraded with additional solar panels in approximately August 2023
· the complainant advised that after the solar system upgrades were completed, water ingress event had occurred and an insurance claim made for water damage to the study and bedroom 3 ceilings on the opposite side of the building to the recent water ingress event
· the complainant advised the prior roof leak was due to poor solar installation and after pursuing Queensland building complaint processes all solar panels were removed and total roof restoration was completed by YP, roof restorer bedding and pointing and replacing broken roof tiles
· the complainant advised that significant storm events had occurred after the roof restoration works were completed and no water ingress had occurred onsite
· CR concluded:
> the damage was due to poor installation of roof tiles and age-related wear and tear issues
> pre-existing damage was present prior to the claimed event
> the roof battens installed were under size and should be minimum 75mm x 38mm which was not what was installed
> manufacturer’s specifications stated this brand of tiles Linea should be installed in quarter bond pattern, the tiles onsite have been laid in a straight bond pattern, however this information was provided within Boral manufacturers spec sheet dated 2013. This creates issues with the water course of the tile as it is not supported as required and weakens over time damaging the tile causing breaks and cracks
> it would recommend full roof replacement but not due to the claimed event, but due to the roof tiles being laid incorrectly and the timber battens used to be undersized
> the opinions of JL and MC were incorrect and the damage was ’well under 20% at only 5% max of tiled roof and approximately 3Lm [linear metres] of ridge capping bedding and pointing, and 5Lm of hip ridge capping bedding and pointing’
> CR would not advise conversion of metal roof from tile roof as significant structural upgrades would be required to complete this works
> there was damage evident to the Linea concrete roof tiles and cappings, but not due to the claimed storm event
> the damage was due to several contributing factors, the root cause of the damages onsite to the tile roof was the installation methods used, and the timber roof battens used which were undersized
> rafter spacings referenced within the building plans are not common for this type of build with a concrete tiled Roof in a cyclone rated area of C1, these rafters spacings would typically be 600mm
> rafter spacings listed are 900mm centres, and roof battens to be used are 75mmx38mm hardwood which they are not, softwood battens used under 75mm x 38mm
> tiles installed were reaching their serviceable life span as the manufacturer states 20-year warranty for this product, the existing roof tiles had been installed for 18 years
> the roof tiles had not been installed as per the manufacturer's recommendations which the building plans had noted was required for the roof sheeting as they had not been installed in a quarter bond pattern they are installed in a straight bond pattern. These tiles should also only be installed at a pitch of 20 degrees, the roof pitch onsite was 17 degrees
> Australian Roofing Tile Association of Australia documentation stated that concrete roof tiles can withstand winds in excess of 125 miles per hour that would strip off most other roofing materials. The wind speed data provided from BOM (Bureau of Meteorology) had documented that the highest wind speed recorded during the claimed event was highest reported wind gust for the month of February 2025 being on the 15th of February 2025 which was 61km/h.
JL provided a scope of works for 5% of the tiled roof and for ceiling repairs dated 9 June 2025. JL also provided a scope of works dated 19 June 2025 for repairs to the patio and removal of the roof and installation of Colorbond 381 m2 totalling $46,476.00.
The complainant provided a quotation from OS dated 7 March 2025 for 381m2 Colorbond and patio repairs totalling $72,991.48.
The insurer said on 19 June 2025:
· based on CR’s Report, the damage was a combination of storm damage and building defects
· the storm related damage had been accepted
· the building defects were not as a result of a storm event and the insurer was not liable for those costs
· rafter spacings referred to in the building plans were not common and should be 600mm instead of 900mm
· the reports from JL and MC stated that over 20% of the roof had been damaged due to the storm but CR considered this to be incorrect and that only 5% maximum of the tiled roof and approximately 3Lm of ridge capping, bedding and pointing and 5Lm of hip ridge capping, bedding and pointing was damaged
· the insurer was not required to complete a full roof replacement
· a cash settlement was offered based on quotes (but a figure was not provided) plus a 15% uplift.
On 25 July 2025 the insurer said that the total settlement offer was $7,619.37 (which was inclusive of a 15% uplift) based on JL’s SOWs. The insurer said that the claim had not been fully declined but that it had accepted damage caused by the storm but not other areas of the property that had compliance issues that were not caused by the storm. The insurer said that:
The exclusions relied upon relate to the source of water ingress into the complainant’s property. The storm has not caused these compliance issues and has purely highlighted its non-compliance. General exclusion 4 relates to the item i.e. the roof in this instance, not being covered under the Complainant’s policy
Based on the above, I accept the insurer was referring to exclusion clause 4 in the PDS to partially decline the claim.
Parties provided further reports after AFCA Preliminary Assessment
AFCA provided a preliminary assessment dated 3 October 2025.
Subsequent to AFCA‘s preliminary assessment:
· the complainant provided a report from DI, civil engineer dated 14 November 2025
· the insurer provided a Supplementary Report from CR dated 5 December 2025 and a further letter dated 15 December 2025.
DI (on behalf of the complainant) concluded:
· the roof pitch was consistent with the plans
· truss spacings were consistent with the plans
· batten sizes when checked against current standards for F5 softwood were slightly undersized but were consistent or similar to those specified for tiled roofs in a C1 region according to AS2050-2002 Installation of Roof Tiles
· while there was some residual damage given the age of the roof (2007), repairs were undertaken as part of the sale of the residence to repair and or replace broken tiles
· the majority of the damage observed was associated with the storm event
· JL and MC reports agreed that in excess of 20% of the roof had been affected
· DI disagreed with CR that damage was limited to 5% maximum
· while DI did not measure the amount of roof affected, by estimation the extent was more in line with those stated by JL and MC.
DI recommended:
Based on [its] inspection, assessment and review of previous reports undertaken [it was] of the opinion that the roof has been damaged or existing damage exacerbated by the storm wind event on 2 February 2025. The extent of damage exceeds 20% and the roof should be replaced in conjunction with relevant guidelines, standards and codes.
It [was DI’s] understanding that the [complainant] would prefer to replace the roof with a metal sheet roof due to the lack of suitable tradesmen that can install and / or repair tiled roofs in the [R – location] area and increasingly more severe climatic conditions. In replacing the tile roof with a suitable metal roof engineering assessment will be required to verify the suitability of the trusses to cater for the increase in wind load. Tie down will also need to be reviewed to cater for the altered loading configuration.
In replacing the roof sheeting battens will need to be upgraded to suit the proposed roof sheeting with our recommendation being for metal battens. Battens will also need to be designed to cater for the additional loading of the solar panels exert on the roof.
On 5 December 2025 the complainant provided a quote from AR, roofer, for a corrugated replacement roof for $95,707.70.
The insurer provided a Supplementary Report from CR dated 10 November 2025: CR concluded:
· CR had conducted a detailed site inspection on 2 April 2025 and took into consideration:
> the significant additional solar panel works completed prior to the storm event
> the complainant’s builder, DS, was the first one onsite after the storm event to complete make safe works which included installation of silicone temporary seals to all storm damaged items to the tiled roof which affected the inspection of damage and subsequent assessments
> silicone has been applied by DS over all identified damaged areas which had prevented a comprehensive inspection of the affected roof tiles:
‒ as a result, it had not been possible to determine whether the underlying damage occurred during the claimed storm event or developed over a longer period. In addition, the silicone application has obstructed the tile watercourses in some areas, inhibiting the designed drainage path and potentially allowing water to be diverted into the roof cavity
· CR maintained that damage was present to the concrete roof tiles and ridge cappings but CR did not consider the damage to be consistent with the claimed storm event:
> the recorded wind gusts were not of sufficient magnitude to have caused the observed damage
> the make-safe included installation of silicone temporary seals to all ‘allegedly storm damaged items to the tiled roof’ which affected the inspections and assessments
· the building had been certified as a tile roof and to change this roof cover to a metal roof cover would require significant structural upgrades due to the additional uplift forces of the metal roof-sheeting
> essentially the tiedowns to the timber frame to the concrete slab would all require additional upgrades which would include removal and replacement of all the internal wall linings and wet areas to allow the additional tie down requirements for engineering of a metal roof cover
> conversion of the existing concrete tiled roof to a Colorbond metal cladding system constituted structural building work under the NCC and Queensland Building Regulation 2021
> the reduced dead load and increased uplift risk require verification by a RPEQ Structural Engineer in accordance with AS/NZS 1170.2 and AS 1684. Tie-downs, battens and framing must be upgraded where necessary to satisfy the revised wind classification. Building approval, Form 15 design certification, and Form 16 inspection certification were required prior to and after completion of works. The replacement roof must comply with AS 1562.1 for sheet cladding installation, AS/NZS 4200 for sarking and condensation management, and NCC Volume 2 energy efficiency provisions
· CR used a holistic approach when completing the site inspection which included taking into consideration all potential contributing factors which may have caused the damages evident onsite
· CR maintained its conclusions in its original report.
On 15 December 2025 the insurer provided a further letter from CR:
· the recorded wind speeds at the closest weather station (recorded approximately 8.1 km away at R Airport, which is more exposed to the west than the complainant’s property) were less than serviceability design conditions for the site. The recorded wind speeds on 2 February 2025 were not of the strength to cause damage to roof tiles
· CR agreed the truss spacing was adequate
· a review of the photos provided within DI report did not illustrate 1 in 5 (20%) of the tiles to be damaged or to have had recent sealant application
· the extent of damage appeared ’to be less than 1 tile in every 2m2 of the roof. Concrete roof tile coverage is typically 9 - 11 tiles per square meter’
· based on the extent of the damage, the estimation of 5% was ’reasonably accurate’ but ’to categorically determine the percentage of damage a thorough inspection of the roof is required, including counting of the damaged roof tiles to each elevation. When attributing damage to an isolated storm event, damaged tiles that are aged in appearance are to be excluded’
· DI’s report played down the elements of non-compliance of the installation of the roof tiles, which, given the relatively low wind speeds compared to design capacities, was the ’primary cause of the damages to the roof tiles’.
Insurer should pay for replacement roof and patio repairs
The insurer has not correctly assessed the claim and should cash settle the replacement of the roof and the patio repairs without further delay.
The policy provided that the insurer would settle a building claim by:
· rebuilding the damaged part of the buildings if it was either not possible for those parts to be repaired or not economical for the insurer to repair those parts because the cost of repair was more than the cost of rebuilding
· it was not disputed that it was not possible to for the roof to be repaired for one of the reasons stated in the policy - the materials needed for the repair or rebuild were not available
· as the insurer could not repair or rebuild the damaged part of the building, it was obliged to ‘pay [the complainant] an amount equal to the reasonable cost that [the complainant] would incur to repair or rebuild the building’
· the insurer was obliged to ‘undertake a search of the market to determine what this cost would be in [the complainant’s] area, based on factors including scope of works and comparison quotes from repairers or builders’.
The reasonable cost to the complainant to repair or rebuild the roof and patio was OS’s quotations. Whilst JL had provided a quote to the insurer, the complainant did not have the insurer’s bargaining power. Further, the insurer did not challenge the basis upon which OS had quoted, that a full repair and replacement in Colorbond roofing material was appropriate.
The insurer’s offer of 5% of JL’s quote was based on CR’s opinion (which CR maintained) that only 5% maximum of the tiled roof and approximately 3Lm (linear metre) of ridge capping, bedding and pointing and 5Lm of hip ridge capping, bedding and pointing was damaged.
The insurer’s position was, however, inconsistent with detailed reports which it had obtained from JL and MC, its own experts, that over 20% of the roof had sustained cracked or damaged tiles due to high winds, leading to compromised structural integrity. The insurer had not sought supplementary reports from either JL or MC regarding whether they considered that their opinions were wrong or should be revised.
In those circumstances, the insurer’s expert’s conclusions from JL and MC were sought to be challenged by the insurer by the engagement of CR and its report, supplementary report and letter. Those reports from CR were to the effect that there was not any storm related damage. That was a position which was inconsistent with the insurer’s position that storm related damage had been accepted (i.e. that there was storm related damage).
Further, the report from the complainant’s expert, DI, was that the majority of the damage was associated with the storm event. Both JL and MC concluded that the damage was to in excess of 20% of the roof. Both JL and MC’s reports were clear and persuasive and prepared shortly after the claimed event.
The conclusion in CR’s final letter that its estimation of 5% was ’reasonably accurate’ but ’to categorically determine the percentage of damage a thorough inspection of the roof [was] required, including counting of the damaged roof tiles to each elevation. When attributing damage to an isolated storm event, damaged tiles that are aged in appearance are to be excluded’ was a tentative, and unpersuasive, comment.
The insurer in its letter dated 25 July 2025 sought to rely upon the exclusion (numbered 4) for ‘repair of any item that has poor or faulty design specification, materials, planning or workmanship, or a defect’. However, the building had been constructed in accordance with the plans. The insurer was therefore not entitled to rely upon that exclusion.
Based on the information, the insurer should pay the cost of the repairs based on OS’s quote and do so without further delay.
Insurer to pay for professional fees of complainant’s engineer
On 5 December 2025 the complainant sought the cost of the DI’s Report ($2,508.00).
The AFCA Rules provide (clause D.5.1) that an insurer may be required ‘to contribute to the legal or other professional costs or travel costs incurred by the [complainant] in the course of the complaint’ (not exceeding $5,000 unless there are special circumstances). Based on the information, the complainant’s expert’s report was a cost incurred in the course of the complaint and, as referred to above, it has been of assistance in this determination.
In the circumstances, it is fair and appropriate for the insurer to reimburse the complainant the cost of DI’s report in the amount of $2,508.00.
Cash settlement with an uplift should be paid on cost of repairs
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. There may also be additional works identified once repairs begin.
However, when the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
Based on the exchanged information, a reasonable allowance for the transfer of risk was 20%. The insurer offered a 15% uplift in June 2025. However, OS’s quote is now dated. Accordingly, based on the information it is fair that the insurer should pay the assessed damage of $72,991.48 (as quoted by OS) plus a 20% uplift, namely a total amount of $87,589.78.
Interest is payable under section 57 of the Insurance Contracts Act
Section 57 of the Act says that an insurer has to pay interest on a benefit:
commencing on the day as from which it was unreasonable for the insurer to have
withheld payment
AFCA has a published an Approach to Awarding Interest in Insurance, which says:
Interest is payable from the date it was unreasonable for the financial firm to have
withheld payment of the amount it was liable to pay. This will usually be:
• the date the claim was denied
• if there has been an unreasonable delay before the financial firm denied the
claim – an earlier date that is considered reasonable; or
• the date when the benefit was due to be paid under the policy (for example after
the expiry of a waiting period in an income protection policy).
AFCA may also take into account other factors, such as whether a consumer has
unreasonably failed to provide information reasonably requested by the financial
firm.
In the circumstances, the insurer should have cash settled the claim by not later than 1 July 2025 together with a 20% uplift. It was unreasonable for the insurer to have denied the claim and to have withheld payment from that date. Accordingly, the insurer should pay the complainant interest under section 57 of the Act for the period from 1 July 2025 to the date the payment of $87,589.78 is paid by the insurer.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Non-financial loss compensation is payable by the insurer
In the circumstances of the complaint, it is not productive, and not fair to the parties, to traverse each aspect of the protracted claims history and the extensive number of communications. It is fair and appropriate to seek to progress the resolution of the complaint and the claim, including a fair assessment of non-financial loss compensation.
As referred to in Section 3.1 below, all the information the parties have provided has been reviewed and considered.
The claim has been under consideration by the insurer since February 2025 and remains unresolved, despite the attendances of specialists engaged on behalf of both parties. The complainant, as recorded in the insurer’s claims file records, repeatedly followed up the insurer regarding the status and consideration of the claim by the insurer. The repairs have not been performed. The complainant repeatedly expressed his dissatisfaction and frustration regarding the insurer’s position and delays, and the approach taken by the insurer’s expert. The complainant communicated directly to the insurer’s expert which was not appropriate and the insurer requested that all communications be made to it directly. That request by the insurer was appropriate.
Based on the exchanged information, I am satisfied the complainant experienced an unusual degree of stress and delay due the insurer’s claims handling which warrants the award of non-financial loss compensation.
In the circumstances, it is fair that the insurer pays the complainant $4,000 compensation for non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.