Determination 12-25-248529
Claim for cracking attributed to a water leak declined by insurer
Summary
The complainant claimed for cracking in his home which he attributed to a water leak, and the insurer declined the claim. AFCA found in favour of the insurer, as the damage was caused by soil movement and pre-dated the policy.
The engineer's well-supported reports showed the cracking was caused by soil movement and pre-existing settlement, which the policy excludes, rather than by an insured leak.
Issues
- Claim denial primary · not upheld“The insurer was entitled to decline the claim because the cracking was not caused by a leak, or anything else the policy provides cover for.”
- Delay secondary · not upheld“The insurer's engineer's second report was provided on 17 December 2024 which was a reasonable time in the circumstances.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
|
Case number
|
12-25-248529
|
Financial firm
|
Youi Pty Ltd
Case number: 12-25-248529 20 January 2026
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm (insurer) in South Australia from 7 August 2021 to 6 August 2022. The building was insured for $383,010 with an excess of $745.
The complainant was represented during this complaint by an authorised representative. The complainant and his representative are referred to in this Determination as the complainant.
The complainant made a claim for cracking caused by a leak.
The insurer declined the claim.
The complainant disputed the insurer’s denial of the claim.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
Yes. The cracking was not caused by a leak, or anything else the policy provides cover for.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim.
1.3 Determination
This Determination is in favour of the insurer.
The insurer is not required to take any further action.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
Yes. The cracking was not caused by a leak, or anything else the policy provides cover for.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Schedule of Insurance (Schedule) (together referred to as the policy).
I am satisfied that the PDS and Schedule have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Policy provided cover for escaping water subject to exclusions
The policy provided cover (page 15) for loss or damage to the insured property caused by escaping water that occurred:
· suddenly and without warning; or
· slowly over a period of time and you could not reasonably have been aware of it.
The policy contained general exclusions (page 28). The insurer would not pay for:
· repair of any damage that existed prior to the start date of the policy
· loss or damage caused directly or indirectly by hydrostatic pressure, rising water table, expansion or contraction of the earth, ground or soil.
Complainant made a claim for damage from water leak
On 11 May 2022 the complainant made a claim having ’noticed water in between cracks in pavement. Suspect there is a leak in piping. Noticed cracking in walls of the house and in tiles of laundry single storey’.
Insurer engaged engineer to provide reports
An assessment report was obtained from BB, builder, dated 23 May 2022 which concluded that there was damage due to water escape from a burst water line underneath the paving next to the kitchen foundations but provided no further findings in support of that conclusion.
The insurer engaged an engineer, FM, to prepare a report. FM’s report dated 15 June 2022 (based on an inspection on 1 June 2022) concluded that:
the damage was caused by a combination of long term settlement and expected differential footing construction between the affected area (bathroom, kitchen and laundry) and the original section of the house. [FM] is of the opinion that the damage first occurred prior to the [complainant]’s purchase of the property [in 2020]
FM provided detailed support in its report for its conclusions that the long-term settlement of the foundation soil had been caused by a combination of:
· long term surface water penetration due to surface drainage around the perimeter of the house resulting in gradual collapsing of the expected calcareous soil stratum
· tree root drying of foundation soils which caused reactive clay soil (i.e. non-calcareous soil stratums) to shrink and can result in settlement of nearby buildings
> the floor level survey indicated patterns of relative settlement towards the north-west corner of the building towards a tree in that corner, as well a historic tree that was present in this area before its removal by the current owner circa late 2020-early 2021.
· the measured slab settlement from the original section of the house is due to the footing system of the extension (understood to be comprised of bath, kitchen and laundry area) behaving independently from that of the original house section.
FM recommended that to determine whether the leak has exacerbated the damage:
· a comprehensive leak investigation should be undertaken to ensure there are no additional leaks
· after an initial monitoring period of 12 months (after confirmation of no further leaks), then an additional floor level survey should be undertaken together with a comparison of the results to the current survey to determine if there has been any exacerbation of the damage.
On 9 August 2022 FM provided a review of a leak investigation report by PP (dated 1 August 2022) and concluded that a second leak was present in the main pumped rainwater system which had allowed water ingress adjacent to the previously reported affected area to the west side of the house after the initial leak was repaired. FM recommended that this leak should be repaired and a floor level survey should be undertaken to update floor level. FM concluded that:
· all the other identified stormwater leaks at the reported leak locations within PP‘s Report had not contributed to the cracking to the house
· based on the extent of damage FM observed during its site attendance on 1 June 2022, the scope of works for repairs would be the same even if there has been some exacerbation of damage and that the additional leak to the main pumped rainwater system should be addressed to eliminate the potential of further damage exacerbation.
On 15 November 2024 the complainant provided a copy of a Building Inspection Report dated 3 August 2020 from JB. JB concluded that a defect in 2020 in all areas of the building was that ’Brickwork - Cracking noticeable’:
There were several cracks and or crack repairs evident to external and internal brickwork ranging from 1 - 5mm wide. There is also some drummy render evident adjacent to internal cracks.
Noticeable cracks are a common occurrence in external brickwork and are a likely result of age expected building movement, general expansion, and/or contraction of building materials in different weather conditions. Noticeable cracks in brickwork may develop if left unattended, with potential for necessitating remedial works or replacement of the brickwork. Other defects often arise with this level of movement including the jamming of windows and doors which may require easing or adjustments from time to time.
It is advised that a qualified bricklayer be appointed to provide works to cracked brickwork to prevent any further damage. Such works should be conducted at the discretion of the client with other trades such as carpenters, painters and plasterers required if other secondary defects are present also. Always monitor these cracks and contact a building inspector should cracks widen, lengthen, or become more numerous
FM prepared an ’Engineering Investigation Report 2’ dated 17 December 2024 (based on an inspection on 10 December 2024). In its second report FM concluded (based, again, on detailed findings) that the damage had been caused by on-going, long-term variations in the moisture content of the reactive foundation soils at due to a combination of the following factors:
· seasonal changes in soil moisture contents
· tree root drying of foundation soils
· variations of the perimeter paving.
Based on the information, the insurer’s expert engineer, FM, provided reports which were persuasive and well supported by detailed findings. FM concluded that the damage was caused directly or indirectly by soil expansion and would have occurred in any event. These findings were supported by the complainant’s own building inspection report in 2020 that there were noticeable cracks evident in 2020 prior to the claim in May 2022 which ‘may develop if left unattended, with potential for necessitating remedial works or replacement of the brickwork‘.
Accordingly, the insurer was entitled, as it did, to decline the claim because the cracking was not caused by a leak, or anything else the policy provides cover for.
Complainant expressed concern with insurer’s claims handling
The complainant expressed concern that the insurer delayed in the preparation of the second engineer’s report. The complainant provided its 2020 building inspection report on 15 November 2024 and the insurer’s engineer’s second report was provided on 17 December 2024 which was a reasonable time in the circumstances.
The insurer was entitled to decline the claim and is not required to take any further action.
2.2 Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.