Claim declined for cracked concrete carpark slab as not caused by a sudden and accidental event
Summary
A strata corporation claimed for demolition and replacement of a cracked concrete carpark slab caused by dispersive fill soil. AFCA found the insurer entitled to decline because the cause was not sudden and accidental.
The complainant bore the initial onus to show damage from a sudden and accidental cause under the policy definition, and gradual soil movement, faulty workmanship and general rainfall did not meet it.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim; complainant has not established damage from a sudden and accidental cause during the period of insurance.”
- Product terms interpretation secondary · not upheld“Undefined term 'sudden' given ordinary Macquarie Dictionary meaning; faulty workmanship and rainfall not sudden.”
Subjects and remedies
broker or intermediaryhome or building damageno remedy
Related
Text of the determination
Determination
|
Case number
|
12-25-244663
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-244663 21 May 2026
1 Determination overview
1.1 Complaint
The complainant is a Strata Corporation and it holds a commercial strata insurance policy with the financial firm (the insurer).
On 25 January 2022, the complainant first noticed cracking in a concrete slab which is part of a parking lot on the property. On 12 September 2022 the complainant lodged a claim seeking cover for the demolition and replacement of the slab. The complainant says the damage is due to faulty workmanship when the slab was constructed some time in 2012.
The insurer has declined the claim. It says the complainant has not established that the cracked concrete was caused by a sudden and accidental event. Rather, it says, it has arisen from factors such as erosion, earth movement, construction deficiencies, gradual deterioration, and faulty workmanship, all of which are excluded under the terms of the policy.
The complainant disagrees with the insurer and seeks cover for the demolition and replacement of the slab.
The complainant is represented by an insurance broker. In this determination, statements by the complainants’ representative are treated as if they were made by the complainant.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The complainant has not established that the cracked concrete resulted from a sudden and accidental cause occurring during the period of insurance. Therefore, it has not met its onus to establish a valid claim for damage as defined by the policy.
Why is the outcome fair?
The initial onus is on the complainant to show the damage is covered under the policy. I do not consider the complainant has satisfied this onus. It would be unfair to require the insurer to cover damage that is not covered under the policy.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim and no further action is required.
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The complainant has not established that the cracked concrete resulted from a sudden and accidental cause occurring during the period of insurance. Therefore, it has not met its onus to establish a valid claim for damage as defined by the policy.
Initial onus to establish a valid claim
The complainant is required to show, on the balance of probabilities, that it is more likely than not), that the loss or damage was caused by a risk that is covered under the policy. That is known as a valid claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
The panel is satisfied that the Product Disclosure Statement (PDS) and Certificate of Insurance (COI) were provided to the complainant. Therefore, the insurer is entitled to rely on the policy terms. Relevant policy terms are set out in section 3.2 of this determination.
Coverage of the policy
The policy covers damage to the property occurring during the period of insurance. The PDS defines damage as:
any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy
Expert findings
The panel reviewed the expert reports and is satisfied that the damage is primarily due to dispersive, reactive, and uncontrolled fill material beneath the slab. Contributing factors include poor compaction, water ingress, and soil movement. The complainant’s submissions accept that the damage was due to faulty workmanship, rain/storm, dispersive soils, and ongoing water interaction.
Agreement on soil instability due to faulty workmanship
The parties agree that:
· the carpark was constructed around 2012
· cracking and displacement of the concrete slab occurred
· the policy was active when the cracking and displacement was first observed in January 2022.
· expert reports confirm the presence of dispersive, reactive, and low-bearing capacity soils beneath the slab.
Both parties rely on the GES report dated 23 August 2024. GES conducted a geotechnical investigation at the property, including borehole testing. GES’ report includes the following:
· site conditions are generally consistent, comprising predominantly medium plasticity clays with variable overlying fill.
· excavation reached clay at depths of approximately 2.5–3.0 m
· at inspection, there were several signs/evidence of dispersive soils being present at the site, tunnels have formed and have been exposed due to soil collapse, some of these were scanned with ground penetrating radar and voids within the soils were found to be up to 2m
· the subgrade beneath the slab is highly variable, with inconsistent or absent compacted granular fill and membrane
· in some areas slabs are founded directly on dispersive clay, creating unfavourable conditions and potential for failure
· the site is underlain by dispersive plastic sub-soils that are inherently adversely affected by water ingress that will result in poor bearing capacities and tunnel erosion. Either one of these properties are likely to cause issues, and if both occur, which is likely what has happened, failure of pavements and structures is likely
· its opinion is that, given the evidence of dispersive soils at the site, and the failure of the concrete slab, it can be surmised that the same or similar conditions are likely to be present beneath the existing concrete slab.
GES clarified its conclusions by email to the complainant dated 30 May 2025. GES says:
It looks as if the contractors that completed the civil works have simply undertaken a 50/50 cut & fill, which is where the material from the higher side of the site is excavated and placed on the lower portion to create a more level platform for construction. As such, as we have discovered, the soil material across the site, both natural (in-situ soils) and fill material (previous natural soil excavated and re-placed) are ‘both’ dispersive, given it’s the same material just some is now disturbed.
Ideally, Geotech investigations would have been completed prior to final design and commencement of the works to identify soil profile, bearing capacities and other geotechnical impediments to design, and in turn these investigations would have included testing for the presence of dispersive qualities within the soils. Had this been completed, dispersive soils management and treatment options would have been provided as part of the report.
Had the civil contractors been provided with documentation on how to approach and mitigate dispersive soils and their management in line with recommendations of the DPIW Technical Reference Manual (attached for reference), the current conditions including cracking of concrete hardstand at the site is unlikely to have occurred.
GES provided further recommendations by letter dated 19 August 2025.
Other expert reports obtained in relation to the claim and considered by the panel include:
· soil consultant, DS, report June 2022. This found that the site is classified as class P due to the presence of deep mixed uncontrolled soft (low bearing capacity) clayey fill to depths of 1 metre to over 2 metres
· engineer, HD, report dated 8 May 2022 which indicated the probable cause of the cracking was faulty workmanship/design during the original construction
· engineer, AM, report dated 15 February 2023. AM’s opinion is that the fill material placed below the slab and subbase layer has likely been moving since the time of construction and led to inadequate support to the driveway slab and subbase, resulting in cracking and damage
· underground detection service, AU’s inspection report on the stormwater and sewer pipes at the property, dated 14 April 2023. AU found no visible signs of holding water or displacement of pipe to believe the grade has been affected by the moving ground.
· reports by loss adjuster, AS.
The parties do not dispute GES’s conclusions. Rather, they dispute whether the policy responds to this.
Dispute between the parties
The complainant says:
· it seeks cover for the cracked concrete slab. It says that rainfall and faulty workmanship (use of dispersive soil as fill and failure to mitigate existing dispersive soil) are the two primary concurrent proximate causes which set in motion a chain of events that ultimately resulted in the cracked concrete
· it does not seek cover for the faulty workmanship. Rather, it seeks damage for the resultant damage, being the concrete slab
· the cracking of the slab constitutes ‘Damage’ as defined in the policy, a physical loss caused by a sudden and accidental event (e.g. water ingress, soil collapse).
· while soil instability may have developed over time, the cracking only became visible on 25 January 2022. Therefore, the cracking should be considered as sudden and accidental
· the contractor’s failure to appropriately identify and manage the existing dispersive soil during site preparation and use of dispersive fill material (faulty workmanship) caused the concrete carpark to crack. A causal link exists between the faulty workmanship and the cracking. Had the dispersive soil been properly managed during site preparation, the cracking would not have occurred
· the insurer cannot rely on the faulty workmanship exclusion because:
> the earth movement was the consequence of the faulty workmanship and part of the chain of events set off by the faulty workmanship
> the policy term excluding cover for faulty workmanship does not apply to resultant damage, which should be covered
· it was not aware of any defect until the cracking became visible in 2022, and therefore an exclusion for a known defect should not apply
The complainant says it will cost approximately $261,818,18 (ex GST) to remove and reinstate the 770m² concrete area, excluding rectification of the soil base.
The insurer says:
· the damage is not sudden, but the result of long-term subsidence and soil movement since construction in 2012
· the damage is the result of progressive deterioration, earth movement, or faulty workmanship, all excluded causes under the policy
· the complainant should reasonably have been aware of the defect in the carpark base
· the slab damage is inseparable from the excluded cause and therefore not covered.
Fair for the insurer to decline the claim
The policy covers damage from any sudden and accidental cause. While the cracking concrete may have occurred suddenly and accidentally, to establish a valid claim, the complainant must show that the cause of the cracking was sudden and accidental.
Having considered the exchanged information, the panel is not satisfied that the complainant has met that onus.
The policy does not provide a definition of ‘sudden’. Where a policy uses a term it does not define, AFCA interprets it in accordance with its ordinary meaning. The online Macquarie Dictionary defines ‘sudden’ as: ‘happening, coming, made, or done quickly, without warning or unexpectedly’.
The complainant says that faulty workmanship (intervening event/concurrent proximate cause) and rainfall/storm (concurrent proximate cause) reacted with dispersive soil (intermediate event) leading to the cracked concrete (resultant damage).
GES says that, during construction, dispersive soil was excavated from the higher side of the site and placed on the lower portion to create a more level platform for construction. No information has been provided about any particular storm event. In these circumstances, the panel is satisfied that the complainant is relying on general storms and rainfall that occurs throughout the seasons.
The panel is not persuaded that either the faulty workmanship during construction, or the rainfall, or the combination of those factors, could be considered sudden using the Macquarie Dictionary definition. Therefore, it is not ‘damage’ as defined by the policy.
The panel has considered whether the earth movement, itself, could be consider ‘sudden and accidental’. The panel is not satisfied that it can. HD notes that the foundation appears to have experienced significant expansion and contraction with varying moisture content changes. On balance, the panel accepts that the earth movement occurred over time and was not ‘sudden’.
The panel has considered the complainant’s position that the policy does not exclude damage due to earth movement, rather, it excludes the cost of rectifying faulty or defective workmanship, design or specification. Therefore, the complainant says, the policy covers the resultant damage, in this case, the cracked concrete. However, the complainant has the initial onus to establish the cracking was caused by a risk covered by the policy. It has not done so. Therefore, the complainant has not established a valid claim for the resultant cracking damage.
As the complainant has not established a valid claim, the panel is not required to consider whether the insurer has established that an exclusion applies entitling it to decline the claim.
Previous AFCA determination and IDR decision do not assist the complainant
The complainant has raised a previous AFCA determination. However, AFCA is not bound by previous determinations and each complaint must be assessed on its own merits.
The panel considers the circumstances of this complaint are distinguished from this other determination because none of the factors in the chain of causation that led to the cracking (faulty workmanship plus rain/storm, and earth movement) were covered by the policy as they were not sudden and accidental.
The complainant also relied on the insurer’s internal dispute resolution response in a different claim. The panel notes that was a decision of the insurer and not relevant to determining this complaint.
2.2 Why is the outcome fair?
The parties are bound by the terms and conditions of the policy. The initial onus is on the complainant to show the damage is covered under the policy. I do not consider the complainant has satisfied this onus. It would be unfair to require the insurer to cover damage that is not covered under the policy.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Relevant policy terms
|
Product Disclosure Statement
|
· Action
|
Policy 1 – Insured Property
What We insure
If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 – Insured Property in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance.
General Definitions
…
Damage, Damaged
means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy.
Exclusions
We will not pay for Damage caused by or arising directly or indirectly from:
1. We will not pay for Damage caused by or arising directly or indirectly from:
…
b. lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time;
…
f. vibration or from the removal or weakening of or interference with the support of land or buildings or any other property, Erosion or Earth Movement
…
i. inherent vice, latent defect, vermin, mice, rats, termites, insects, mildew, or by pecking, biting, chewing or scratching by birds or animals. However we will pay if any of these causes directly result in Damage from any other Event claimable under Policy 1 – Insured Property such as fire or glass breakage
…
l. normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements;
3. We will not pay for:
…
c. the cost of rectifying faulty or defective materials or faulty or defective workmanship, design or specification.
|
Page 15
Page 8