Home / Allianz Australia / Determination 12-25-244094

Determination 12-25-244094

Partial denial of cyclone building claim, contents claim declined, and cash settlement amount disputed

FirmAllianz Australia
Decided2026-07-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$97,261
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for cyclone damage to their home and contents; the insurer offered a limited cash settlement and declined contents. AFCA increased the building settlement to $97,260.63 with interest, upheld the contents decline, and awarded $2,000 for non-financial loss.

On balance the cyclone was the proximate cause of the beam, decking access, kitchen cabinet and internal damage, while roof damage fell within exclusions and contents damage was not shown.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-244094 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-244094 10 July 2026 1 Determination overview 1.1 Complaint The complainants held a home and contents insurance policy with the financial firm (the insurer). On 10 March 2025, the complainants claimed for property damage caused by a cyclone on 9 March 2025. The insurer accepted some cyclone-related building damage and offered a cash settlement for the repairs it accepted. It did not accept the complainants’ other building damage claimed, including structural beam works, decking and full cabinetry replacement. It also declined the contents claim. The complainants say the insurer’s part acceptance is too narrow. They seek payment based on their builder’s scope, together with contents and compensation. 1.2 Issues and key findings Is the insurer’s cash settlement for building damage fair and reasonable? No. The cash settlement should be increased to reflect the reasonable cost of repairing the cyclone-related building damage. It should include pool fence balustrade reinstatement, related structural beam and decking access works, kitchen cabinet replacement, accepted internal plaster, painting and skirting repairs, scaffolding, and waste disposal and clean-up costs. Is the insurer entitled to deny the claim for contents damage? Yes. The insurer is entitled to deny the claim. The complainants have not shown the claimed contents were damaged by the cyclone. Are the complainants entitled to non-financial loss compensation? Yes. The insurer is required to pay $2,000 as compensation for the avoidable inconvenience its claim handling caused. Why is the outcome fair? The outcome is fair because it compensates the complainants for the covered loss and handling delay but does not require the insurer to pay for items that have not been shown to be damaged by the cyclone. 1.3 Determination This determination is substantially in favour of the complainants. ​Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to: · cash settle the complainants for $77,808.50 (including GST) for building repairs and include a 25% uplift for contingencies and the loss of a lifetime guarantee on repairs. Therefore, the total amount the insurer is required to pay the complainants for building repairs is $97,260.63. · ​pay interest on the additional cash settlement amount from 11 November 2025, being the date the insurer accepted the claim and made its original cash settlement offer, to the date of payment, in accordance with the rate specified under section 57 of the Insurance Contracts Act 1984 (Cth) · pay $2,000 for non-financial loss. 2 Reasons for determination 2.1 Is the insurer’s cash settlement for building damage fair and reasonable? No. The cash settlement should be increased to reflect the reasonable cost of repairing the cyclone-related building damage. It should include pool fence balustrade reinstatement, related structural beam and decking access works, kitchen cabinet replacement, accepted internal plaster, painting and skirting repairs, scaffolding, and waste disposal and clean-up costs. Complainants have the initial onus to establish a claim The initial onus is on the complainants to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim. Once the complainants have established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. For this claim, the complainants must show that each item claimed was damaged by the cyclone and that the amount claimed is reasonable and necessary to reinstate that damage. Policy covers Storm as an Insured Event, subject to exclusions The policy cover is set out in the product disclosure statement and certificate of insurance. It is an insured events policy. This means it only covers loss or damage caused by a listed event, subject to the policy terms and exclusions. The relevant listed event in this case is storm, cyclone, rainwater or run-off. Storm is defined as: Violent wind (including cyclones and tornadoes) thunderstorms or hail which may be accompanied by rainwater or snow. The policy covers loss or damage that is a direct result of an insured event. When an insurance policy refers to a ‘direct result’ this typically means proximate cause. The proximate cause of a loss is the dominant, efficient or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. It requires a common sense evaluation of the evidence. In the present circumstances, the complainants need to show the proximate cause of the damage being claimed was, on balance, the cyclone. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. The relevant exclusions are for loss or damage caused by: · wear and tear including depreciation, gradual deterioration or lack of maintenance · inherent defects including faulty design or materials, structural defects or poor workmanship · anything not directly related to one of the insured events. The parties disagree about how much damage the cyclone caused The complainants claimed for water ingress, internal damage and damage to parts of the building they say was caused by the cyclone on 9 March 2025. The insurer accepts the cyclone caused some internal resulting damage. It arranged inspections, make-safe works and remediation, paid $7,778.65 for remediation costs and later offered a cash settlement for the building repairs it accepted were cyclone-related. The insurer initially offered a cash settlement of $15,571.51, based on the repairs it accepted. It later revised its position following further assessment and offered $36,049.90 in March 2026 including a $2,000 allowance for non-financial loss. The insurer has denied some of the building damage. It says some structural and external items, including beam and decking works, were not directly caused by the cyclone because: · some damage was not consistent with a single cyclone event · some damage was not in areas said to have been impacted · some issues were likely due to defects, design or maintenance. The complainants say the insurer’s scope is too narrow. They rely on their builder’s report and scope, which includes structural beam replacement, decking works, cabinetry and broader internal repairs. They also say the insurer’s assessment was incomplete because the original builder did not provide a full report, later inspections were limited and disputed damage was not properly investigated. The key issues in dispute are firstly, how much damage has been directly caused by the cyclone and secondly, what work is reasonable and necessary to reinstate that damage. The parties’ experts disagree about the proximate cause of some damage The parties rely on builder, roofing and restoration material about the cause and scope of damage. The insurer first engaged AG, a building assessor, which inspected the property on 14 April 2025. AG did not provide a completed causation report, photographs or assessment material before it entered administration. Little weight can be given to AG’s assessment. The insurer then engaged TB, another building assessor. TB inspected the property on 17 July 2025 and prepared two reports dated 25 August 2025. TB recorded internal water ingress, minor flooding and movement to the glass balustrade. It did not identify visible structural damage. It attributed the water ingress to roof design, flashing, drainage and workmanship issues, rather than cyclone-related roof damage. The insurer also relies on the roof inspection report dated 2 May 2025 of LP, a plumbing and roofing contractor engaged by the complainant. LP identified issues with roof sheeting, flashings and drainage. It said that the existing sheeting and flashings were not serviceable and must be replaced to eliminate current leaks and restore the building’s waterproof envelope. LP says these defects and poor construction practices, rather than the cyclone, caused the water ingress. LP acknowledges the cyclone did cause some sheeting lift but says the main cause of the water ingress was the pre-existing defects and non-compliance with certain building and plumbing standards (for example, not enough downpipes fitted, no apron flashings and non-compliant roof pitch). TB’s updated scope allowed for internal repairs, partial cabinetry replacement, balustrade reinstatement and certification. It did not include structural beam replacement, decking works or broader replacement works. TB maintained that position in March 2026. It did not support full laundry cabinetry replacement, structural beam works or full replacement of the glass pool fence. However, TB relied mainly on photographs for some disputed items and no engineering assessment was obtained, despite TB indicating specialist input was needed. The complainants rely on material provided by SC, a builder and repair contractor who they engaged. SC provided an early quote dated 17 April 2025 for a broad scope of work totalling $178,926. It included plasterboard, cabinetry, painting, decking, structural beam and pool fencing works, but did not explain the cause of each damaged item. SC provided a more detailed report in March 2026. It attributed various items to water ingress, mould, wind forces and cyclone-related movement. It said movement or bending of the glass pool fence damaged the structural beam and the decking must be removed and reinstated to access it. SC is useful for some disputed structural and access works because it explains how those items are linked to the cyclone. However, it takes a broad approach, includes full replacement in some areas and does not always explain why the claimed work is limited to cyclone-related damage. RR, a restoration company engaged by the complainant, confirmed it carried out water damage restoration works and that contents were present in affected areas. Its material is of limited assistance because it does not assess structural damage, identify the cause of building defects or document contents damage. Overall, I do not accept either party’s supporting information in full. The insurer’s experts focus on roof, drainage and construction issues but did not undertake a structural assessment of some disputed items. The complainants’ builder provides explanations linking those items to the cyclone but proposes more extensive reinstatement works than the material supports in some areas. I have therefore assessed each disputed item separately, having regard to the strengths and limitations of the available expert material. Some, but not all, claimed damage was caused by the cyclone Based on the exchanged information, I am satisfied: · the insurer is required to accept damage to the structural beam, decking access works, kitchen cabinets, plasterboard, skirting, painting, glass balustrade reinstatement and certification, scaffolding and waste disposal and clean-up, because the cyclone was likely the proximate cause of this damage · the insurer is entitled to deny damage to the roof (including the wooden ceiling requiring roof rectification) and laundry cabinets because pre-existing roof design, drainage, workmanship and maintenance issues (which the policy excludes) likely caused the roof damage, and there is insufficient information to establish that the cyclone caused damage to the laundry cabinets. I have considered each disputed item below. Roof works are not covered because the cyclone did not cause the roof damage I am satisfied the insurer fairly excluded the roof repairs. This is because the exchanged information does not show the roof was damaged by the cyclone. It shows water most likely entered because of the roof’s existing condition, design and drainage. LP identified concealed gutters, inadequate flashing, ineffective drainage integration and corrosion. It said the affected roof elements were not serviceable and required replacement of roof sheeting, redesigned flashing and drainage changes. TB reached a similar view. It attributed the water ingress to roof design, flashing and drainage issues, not a discrete cyclone-related roof failure. The cyclone brought heavy rainfall. However, the exchanged information does not show that it caused a specific roof failure. LP and TB independently reached similar conclusions after inspection. Both identified pre-existing defects in the roof design, flashing and drainage and explained how those issues allowed water ingress during the cyclone. Their opinions are well supported by photographs and specific observations about the condition of the roof. On balance, I find their explanation more persuasive than the complainants’ broader assertion that the cyclone damaged the roof and am satisfied the cyclone exposed existing roof and drainage issues but did not cause the need for roof replacement works. Therefore, the complainants have not established the cyclone was the dominant cause of the damage to the roof. This damage was more likely due to the condition, design and drainage issues that fall within the wear and tear and inherent defect exclusions. Glass pool fence moved during the cyclone, but full replacement is not needed The exchanged information shows the glass pool fence was affected by the cyclone. TB recorded that the balustrade had moved out of alignment. However, I am not satisfied the glass panels were also damaged. This is because the available photographs show movement of the balustrade but do not show damage requiring replacement of the glass panels. No expert has recommended replacement of the glass panels and the information does not identify any damage that could not be addressed by reinstatement and certification. If the panels are reusable, it will not be necessary to fully replace the glass fence. Instead, it is reasonable for the insurer to reinstate the damaged components to their pre-loss condition. TB’s scope allows for realignment of the balustrade and certification. This is consistent with the damage identified. There is no competing expert material showing panel replacement, or a broader scope, is required. The settlement should therefore be limited to reinstatement and certification: Basis of settlement to reinstate glass balustrade $1,350.00 Basis of settlement for certification and associated costs $1,800.00 These amounts are the reasonable cost of returning the pool fence to its pre-loss condition without replacing undamaged components. Structural beam and decking access costs are covered because they are linked to cyclone-related movement SC says the structural beam sits beneath the decking that supports the glass pool balustrade. It says the beam was damaged when the balustrade moved during the cyclone. TB accepted the balustrade moved out of alignment during the event. That supports cyclone-related movement to the pool fencing. TB says the beam damage is not sufficiently close to the glass panels, does not appear consistent with a single event and cannot be determined without engineering input. That material has limits. The beam was not inspected and no engineering assessment was obtained. A photographic review carries limited weight on a structural issue, particularly where TB said specialist input was needed. SC gives a plausible explanation linking the beam damage to movement of the balustrade. This is consistent with the accepted cyclone-related movement to the pool fencing. There is no competing material identifying another cause. For these reasons, I am satisfied that, on balance, the beam damage is more likely than not related to the cyclone. Removing and reinstating the decking is necessary to access and repair the beam. SC’s quote dated July 2025 allows for the following beam and decking works: Decking – remove existing 40 m² $2,800.00 Decking – reinstall new boards 40 m² $8,800.00 Structural beam – supply & replace 1 beam $18,500.00 Laundry cabinets are not covered because cyclone-related damage has not been shown The exchanged information does not show the laundry cabinets were damaged by the cyclone. For instance: · RR identifies water damage to the laundry ceiling and confirms restoration works were done. But it does not identify cabinet damage or describe the cabinets’ post-event condition. · SC includes cabinet replacement in its scope but does not explain how water ingress damaged the cabinets or why replacement is needed. · TB also does not identify cabinet damage and says the photographs do not support replacement. On balance, I am not satisfied the complainants have shown the laundry cabinets were damaged by the cyclone or that replacement is required. The insurer has therefore fairly excluded laundry cabinet replacement from the settlement. Kitchen cabinets are covered because cyclone-related water ingress damaged them The exchanged information supports that the lower kitchen cabinets were affected by cyclone-related water ingress. This is consistent with the accepted internal water damage and the insurer has not provided information disputing replacement of lower cabinets. I am therefore satisfied replacement is reasonable. The remaining issue is the reasonable cost of replacement. The complainants have completed the replacement. TB’s scope did not initially include this item, and the insurer has not provided a competing cost assessment. The only detailed costing is in SC’s material. There is no information showing that amount is unreasonable. It is therefore fair to adopt that amount as the reasonable replacement cost. Basis of settlement for the kitchen cabinets $9,800.00 Only repairs needed for cyclone-related damage should be included The policy covers the reasonable cost of repairing damaged areas to their pre-loss condition. It does not require the insurer to repair or repaint undamaged areas for uniformity. Plaster, painting and skirting are covered only in the damaged internal areas Although the roof rectification works are not covered, the insurer has accepted that cyclone-related rainwater caused resulting internal damage. The policy covers loss or damage that is a ‘direct result’ of an insured event. In these circumstances, I am satisfied the insurer is required to pay the reasonable cost of repairing the internal plasterboard, skirting and painting damage caused by the water ingress. The exchanged information shows water ingress caused internal damage in specific areas. It does not show plaster, paint or skirting were damaged throughout the property. For instance, it shows there is damage to the plasterboard, skirting and painting in the rumpus room and bar kitchenette, family room, lounge and hallway, laundry and stairwell. However, the exchanged information does not show internal damage in other areas of the house. The insurer is only required to reinstate the damaged areas, rather than improving unaffected areas. This is because the policy provides that where the insurer agrees to cover loss or damage to buildings, it will pay the reasonable cost of repairing the damaged part of the buildings. For fixed wall, floor and ceiling coverings, the policy specifically states that repair or replacement is limited to ‘the room, hall or passage in which the loss or damage actually occurred.’ The remaining issue is reasonable cost. The insurer’s scope is based on panel repairer rates, which are not usually available to a retail customer. SC’s July 2025 quote provides the only detailed breakdown of unit rates for plasterboard, painting and skirting in the accepted areas. There is no competing costing for those items and no information showing the rates are excessive for retail building work. Therefore, it is fair to adopt SC’s unit rates for the accepted scope. This allows the complainants to complete repairs at reasonable market rates, rather than discounted panel rates not available to them. See section 3.2 for the calculation of the cost of repairing the established damage. This calculation does not include undamaged areas or works that could improve the property. Basis of settlement for plaster, painting and skirting $16,665.00 Scaffolding is covered because it relates to the accepted repair work The complainants incurred the scaffolding cost. I am satisfied the scaffolding was reasonably required to access and complete the accepted building repairs, including the beam, decking and internal reinstatement works. I have not been provided with any alternative scaffolding costing or other information suggesting the allowance is unreasonable having regard to the accepted repair scope. It is therefore fair to adopt the complainants’ builder’s amount as the reasonable scaffolding cost. Basis of settlement for the scaffolding hire $5,500.00 Waste disposal and clean-up are covered where they relate to accepted repairs SC’s July 2025 quote includes a combined allowance for labour, waste disposal and clean-up. The quote does not separate those costs. Labour is already reflected in the unit rates adopted for the accepted repairs, so allowing the full combined allowance would duplicate part of the settlement. However, waste disposal and clean-up are reasonably associated with the reinstatement works. It is therefore fair to allow the quantified waste disposal and clean-up amount as part of the reinstatement work. Basis of settlement for waste disposal and clean-up $1,770.00 ​Insurer must increase its cash settlement for building repairs For the reasons set out above, the fair basis of settlement for building damage is $77,808.50 including GST. The calculation is set out in section 3.2. This amount reflects the reasonable cost of repairing cyclone-related damage and excludes unrelated or non-covered works. The insurer should add a 25% uplift to that amount. This is fair because the insurer is paying a cash settlement rather than arranging the repairs. The complainants will arrange the repairs themselves and therefore assume the risk associated with the repairs, including any reasonable variations, unidentified damage or cost increases that arise during the works. It is fair to allow an uplift to account for that transfer of risk. The uplift also reflects the age of the cost information. I am also satisfied it is appropriate for the insurer to pay interest on any additional amount resulting from this determination from 11 November 2025 (being the date the insurer made its initial settlement offer) until the date payment is made. I am satisfied it is fair for the interest to be calculated using the rate specified under section 57 of the Insurance Contracts Act 1984 (Cth). 2.2 Is the insurer entitled to deny the claim for contents damage? Yes. The insurer is entitled to deny the claim. The complainants have not shown the claimed contents were damaged by the cyclone or that the claimed amount is payable under the policy. The complainants have not established contents damage To establish this part of the claim, the complainants must show the items were damaged, the cyclone caused the damage, and the claimed cost is reasonable. The complainants claim $49,500 for contents said to have been damaged during the cyclone. They first raised this issue in July 2025. They say water ingress and internal flooding damaged both the building and personal items. The schedule provided by the complainants in support of this claim lists categories such as bicycles, electronics, computers, furniture, curtains or blinds, appliances, sporting equipment, clothing, outdoor furniture, tools and mobile devices, with estimated replacement values. It does not identify the specific items damaged, their condition after the event, the damage sustained or how the cyclone caused it. The insurer declined this part of the claim because it said there was not enough information to assess the alleged loss. It accepts the complainants provided a list but says they did not provide photographs or an itemised damage breakdown. The insurer also says it asked whether the items remained at the property and offered to inspect them but did not receive a response that allowed it to progress the assessment. RR and the restoration material confirm works at the property, but do not identify damaged items or assess their condition. Water entered the property. This does not, by itself, show personal items were damaged or that any damage was caused by the cyclone. There are no photographs, inspection findings, repair assessments, invoices or valuations supporting the amount claimed. Given the size and nature of the claim, further information was reasonably required to assess whether any loss was cyclone-related and what amount, if any, was payable. In these circumstances I am not satisfied that the complainants have shown the claimed loss was caused by the cyclone or that the amount claimed is payable. The insurer fairly declined that part of the claim. 2.3 Are the complainants entitled to non-financial compensation? Yes. The insurer is required to pay $2,000 as compensation for the avoidable inconvenience its claim handling caused. AFCA can award compensation for unusual inconvenience Under the AFCA Rules, AFCA may award compensation, capped at $6,300, for non-financial loss. This applies where a complainant has suffered an unusual degree of physical inconvenience, time taken to resolve the situation, or interference with their enjoyment or peace of mind because of the insurer’s conduct. Compensation is not awarded for the ordinary inconvenience of having an insurance claim. It is also not intended to punish the insurer. Compensation is warranted The insurer’s handling of the claim caused additional inconvenience. The complainants raised concerns about delay, communication and the insurer’s response to their reports and quotes. They say this caused disruption, financial strain and stress. They seek $6,300 for non-financial loss. The information shows shortcomings in the insurer’s assessment. In particular, it finalised its building scope without adequate expert input on some disputed items, despite potential structural issues. There were also delays in progressing the claim. However, the insurer arranged inspections, considered further material, resolved the restoration costs issue, requested more information about contents, including by offering to inspect items. Some parts of the claim could not progress without the complainants providing that information. The insurer has waived the $500 excess and offered $2,000 for non-financial loss. In all the circumstances, $2,000 fairly recognises the additional inconvenience and delay caused by the insurer’s handling of the claim. The complainants should receive that amount. 2.4 Why is the outcome fair? The outcome is fair because it compensates the complainants for the parts of the claim they have established, including cyclone-related building damage and the inconvenience caused by delays. The insurer is not required to pay for items not shown to be cyclone-related, reasonably required or supported by enough information. This includes the contents claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Basis of settlement tables The tables below show how the building repair settlement has been calculated. The first table applies SC’s plaster, painting and skirting rates to the areas where cyclone-related internal damage has been established. The second table adds those amounts to the other accepted building repair items and shows the total settlement amount including GST. Calculation of painting, plaster and skirting costs for damaged areas This table is limited to the damaged internal areas accepted for repair. It does not include undamaged areas or works that would improve the property beyond its pre-loss condition. | Damage area/repair area | Quantity/basis | Unit cost | Cost | Rumpus room/bar kitchenette 10.5m x 7.8m x 2.4m | Painting – ceiling | 82 m² | $70 | $5,740.00 | Skirting-room | Allowance based on measured length | $25 | $655.00 | Skirting kitchenette | 10 lm | $25 | $250.00 | Family room, lounge and hallway | Painting – ceiling | 82 m² | $70 | $5,740.00 | Painting - walls | 9 m² | $70 | $630.00 | Plaster – ceiling | 1 m² | $95 | $95.00 | Laundry 3.3m x 1.4m x 2.4m | Painting – ceiling | 5 m² | $70 | $350.00 | Plaster – ceiling | 5 m² | $95 | $475.00 | Staircase 5.4m x 1.0m x 3.5m | Painting – ceiling | 6 m² | $70 | $420.00 | Painting – walls | 33 m² | $70 | $2,310.00 | Total (excluding GST) | $16,665.00 Basis of settlement for building repairs | Area | Settlement | Kitchen – lower cabinets replacement | $9,800.00 | Stairwell – separate ceiling repair | $3,750.00 | Scaffolding hire | $5,500.00 | Decking – remove existing | $2,800.00 | Decking – reinstall new boards | $8,800.00 | Structural beam – supply & replace | $18,500.00 | Painting, plaster & skirting (as per above table with breakdown) | $16,665.00 | Glass pool balustrade reinstatement and certification | $3,150.00 | Waste disposal | $1,770.00 | Sub total | $70,735.00 | GST (10%) | $7,073.50 | Total (including GST) | $77,808.50

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.