Home / Allianz Australia / Determination 12-25-243487

Determination 12-25-243487

Insurer accepted storm damage to a garage wall only and denied claimed studio and upper level damage, temporary accommodation and compensation

FirmAllianz Australia
Decided2026-08-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$29,433
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed storm damage to his home including garage wall, studio and upper level, plus accommodation and compensation. AFCA required cash settlement of the garage wall at $29,433.34 and reimbursement of engineer fees up to $5,000 with interest, but upheld the denial of the rest.

The complainant must establish storm as proximate cause; expert evidence supported storm damage to the garage wall only, while upper level movement was more consistent with long term reactive soil movement.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay interest

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-243487 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-243487 11 May 2026 1 Determination overview 1.1 Complaint The complainant held a home building and contents insurance policy with the financial firm (insurer). He seeks cover for building damage he says was caused by a storm in February 2022. He also seeks temporary accommodation, related expert fees and compensation for non-financial loss. The insurer has accepted damage to a garage wall and offered to cash settle this. It disputes the other claimed building damage, including damage to the studio and upper level. 1.2 Issues and key findings Is the insurer’s settlement of the lower level walls reasonable? Yes, in part. The insurer was correct in accepting liability for the storm damage to the garage wall, but not the studio wall. In the circumstances of this case, it is reasonable to cash settle the accepted damage on the SOW produced for the related third party liability claim. Is the insurer entitled to deny the claimed studio damage? Yes. The complainant has not established the storm caused the claimed damage to the studio. Is the insurer entitled to deny the claimed upper level damage? Yes. While there is some damage and movement to the upper level, the exchanged information does not establish it was caused by the storm, nor that it requires relevelling or other rectification under the policy. Is the insurer required to provide temporary accommodation? No. The insurer is not required to provide temporary accommodation because the damage the insurer is required to accept does not make the property uninhabitable. Is the insurer required to pay other compensation? The insurer must reimburse the complainant’s engineer’s fees up to $5,000 but is not required to pay any other compensation. Why is the outcome fair? The outcome is fair because the exchanged information supports that the garage wall damage was caused by the 2022 storm. Basing the cash settlement for this damage on the SOW produced for the related third party liability claim helps bring finality to this aspect of the dispute, avoiding further stress for the complainant and his family, who are experiencing vulnerability. However, the other claimed building damage (including the studio and claimed upper-level misalignment) was not established to fall within the policy terms, so it is fair the insurer is not required to cover those losses or provide temporary accommodation. The insurer should contribute to necessary expert costs (up to $5,000). 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to cash settle the complainant in accordance with the PG SOW. The insurer must include a 10% uplift for contingencies and the loss of a lifetime guarantee on repairs. Therefore, the total amount the insurer is required to pay the complainant for damage to the garage wall is $29,433.34. If the complainant accepts this determination and provides proof of payment for MC’s fees, the insurer must: · reimburse the complainant for MC’s fees up to $5,000 within 14 days of the receiving proof of payment · pay interest on the fees consistent with section 57 of the Insurance Contracts Act 1984 (Cth) from the date each fee was paid by the complainant until the date payment is made. 2 Reasons for determination The complainant is represented by a paid representative. For ease of reference, I generally refer to both the complainant and his representative as ‘the complainant’ in this determination. The parties have provided a lot of information, including about: · the contents part of the claim from the same storm (including related claims handling and expert fee issues), which AFCA has already determined · a separate third-party liability claim the complainant has made against the builder who was doing work at the property when the storm occurred I have considered all information provided but focus this determination on what is necessary to decide the issues in dispute in this claim. 2.1 Is the insurer’s settlement of the lower level walls reasonable? Yes, in part. The insurer was correct in accepting liability for the storm damage to the garage wall, but not the studio wall. In the circumstances of this case, it is reasonable to cash settle the accepted damage on the SOW produced for the related third party liability claim. Complainant has onus to establish valid claim It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. This is known as establishing a valid claim. If the complainant can do this, the onus shifts to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. Information must show the proximate cause of the damage is storm The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Storm is an insured event. When an insurance policy uses the term ‘caused by,’ this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Therefore, to establish a valid claim, the available information must show the cause of each element of claimed damage is the storm. The complainant says: · the storm caused mud and debris to build up against the garage and studio walls · this caused damage to the framing in the lower level of the building, which in turn resulted in damage to the upper level, including misalignment of floor level, cracking and gaps in floorboards · the storm caused internal water damage and mould. The insurer accepts there was a storm and that it damaged the garage wall but denies the other claimed damage. It says the complainant has not established a valid claim for this damage. Experts dispute extent and cause of damage The complainant relies on engineer MC’s opinion that storm related soil movement affected a lower level load bearing wall and reduced support to the upper level. MC’s recommendation is the upper level needs to be relevelled. The insurer relies on engineering reports from SA and FM, who accept localised garage wall damage but say damage to the upper level was due to long term foundation movement. Parties dispute extent of damage to garage and studio walls caused by storm The parties agree that eroded materials/mud impacted the lower-level garage wall during and after the storm event. The insurer has accepted the storm damaged the garage wall but says this damage is largely limited to the wall lining and door repairs. The insurer says the complainant has not established storm damage to the studio wall. The complainant says: · the movement of the soil and storm caused structural damage · this damage extended to the right and rear walls of the garage and studio. Reasonable to consider scope of works from separate claim The complainant relies on a scope of works from builder, PG (PG SOW), which was obtained as part of the third party liability claim. He says this SOW supports that there was structural damage to the garage and studio walls. The insurer says the PG SOW appears to be legally privileged and is not relevant to this complaint because it is not an engineering expert opinion. I consider it reasonable to consider the PG SOW when determining the insurer’s liability for lower level wall damage in this complaint because: · on its face, the PG SOW relates to the accepted damage in this claim and helps draw out the facts about the nature of that damage and the repairs proposed · the insurer has not established the PG SOW is subject to legal professional privilege · under rule A.14.3, AFCA is not bound by court rules of evidence. However, I do not consider the PG SOW sufficient on its own to establish the extent or causation of the disputed damage because there is limited contextual information about the document and its purpose. For example: · it is not clear who organised the PG SOW, the basis on which the scope was prepared and how it relates to storm damage as distinct from the builder’s works · it does not contain an expert engineering opinion about causation. Storm likely caused structural damage to garage wall I am satisfied there is likely structural damage to the garage wall because: · as FM acknowledges, the complainant’s photographs show that studs in the garage wall framing moved laterally at the base and appear to be spliced, with the main stud stopping short of the bottom plate (which does not appear to be intact) · this is consistent with the PG SOW, which includes structural repairs such as replacing the wall framing and installing steel supports to the floor. I acknowledge FM says it is not clear when this structural damage occurred and it may not have occurred during the storm. However, I am satisfied it likely did occur due to the storm because: · the insurer accepted other damage to the garage wall was caused by the storm (and implicitly because of the storm related build up and inundation of soil) · the damage to the studs and bottom plate was in the same location as the accepted damage and the large amount of soil piled directly against the wall. The complainant has not established storm damage to the studio wall I am not satisfied the complainant has established the damage extended to the studio wall because: · this is not clear from the photographs the complainant provided (which are not all clearly captioned) · none of the experts (including MC) explicitly make this finding. I acknowledge the complainant says his representative’s analysis of the PG SOW supports that there is damage to the studio wall. However, I do not accept this because: · this finding is not clear from the face of the SOW · the representative’s analysis of the SOW is speculative, based on his subjective reading of the details of the SOW, without sufficient supporting information. Reasonable for insurer to cash settle PG SOW for damage to wall The insurer has offered to cash settle the damage to the garage wall based on a quote by builder UP ($10,738.67). PG’s SOW is higher ($26,757.59) and includes additional works, such as replacing timber wall framing, installing structural steel and electrical works. I acknowledge the insurer says it is not clear who organised the SOW and whether it is to repair damage caused by the storm, as distinct from the builder’s works at the property (which appears to be the subject of the third party liability claim). However, in the circumstances of this case, I consider it reasonable to rely on the PG SOW to cash settle. These circumstances include: · the extreme vulnerability experienced by the complainant’s family · the protracted duration of the claim and complaint · my decision that the storm likely did cause structural damage to the wall (with the PG SOW appearing to detail appropriate repairs to that structural damage). In these circumstances, using the PG SOW is a practical way to bring finality the claim and complaint and avoid further stress from additional engagement and assessment. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to cash settle the complainant in accordance with the PG SOW. The insurer must include a 10% uplift for contingencies and the loss of a lifetime guarantee on repairs. Therefore, the total amount the insurer is required to pay the complainant for damage to the garage wall is $29,433.34. 2.2 Is the insurer entitled to deny the claimed studio damage? Yes. The complainant has not established the storm caused claimed damage to the studio. Insurer entitled to deny claimed damage to studio The complainant says the storm caused damage to the studio that warrants full demolition and reconstruction including to cabinetry, flooring, air conditioner, full bathroom, insulation, electrical and plumbing works. I am not satisfied the complainant has established the storm caused any damage to the studio because there is insufficient information to establish this. For instance: · the complainant did not include the studio in his initial claim · the complainant’s representative speculates that there would have been liquid and mud throughout the studio due to the storm, but has not provided sufficient photographs or information to support this · the studio has since been demolished, consistent with planned renovations to the property so it is no longer possible to assess any damage. I acknowledge the complainant has provided a photograph he says shows the development of mould in the bathroom attached to the studio. However, there is insufficient information to establish what caused this mould and when it occurred. Therefore, the insurer is entitled to deny the part of the claimed damage to the studio. 2.3 Is the insurer entitled to deny claimed upper level damage? Yes. While there is some damage and movement to the upper level, the exchanged information does not establish it was caused by the storm, nor that it requires relevelling or other rectification under the policy. Exchanged information shows damage likely long term, not caused storm The complainant says: · the upper floor is substantially out of level and requires relevelling, with related physical damage · this damage is caused by storm runoff/soil impact on the lower level walls leading to loss of support and structural movement. The exchanged information supports there is some movement in the first floor (as shown by floor surveys) and some visible signs of movement including: · fine ceiling cracks in the open living area · a gap between the shower door and the adjacent wall · unmeasured gaps between some floorboards and between some door frames and the floor. However, I accept SA and FM’s findings that the visible signs of movement: · are relatively minor, compared to expected patterns of damage from sudden movement · do not establish the first level is structurally unsound · are more consistent with long term foundation movement on reactive clay soils (class M) than sudden displacement of a load bearing wall. I also accept SA and FM’s finding that the magnitude of floor level variation (up to 36mm) is within expected levels for a building of this type and age (at least 28 years) built on reactive clay, and does not warrant relevelling. My reasons for accepting these findings include that: · they are provided by two separate, appropriately qualified experts who make independently reasoned consistent findings about the magnitude of movement, its likely cause and its consistency with expected levels of movement · both experts’ reasoning that the pattern of movement is inconsistent with loss of support from the garage wall is sound and supported by level survey results and exchanged photographs and floor plans. For instance: > the lowest floor levels were recorded in the kitchen, remote from the garage wall, with the level differences above the garage wall inconsistent with a loss of support > the fine ceiling cracks were remote from the garage wall and there was no cracking in the area directly above the failed section of the wall · both experts’ reasoning about the scale of the movement being more consistent with long term movement on reactive soil rather than sudden displacement due to loss of support is sound and consistent with supporting information including: > appropriate standards, which describes 20 to 40mm of vertical movement as expected for Class M sites > the complainant’s Council approved plans that classify the soil as ‘M’ I acknowledge the exchanged photos show: · an unmeasured gap between the shower screen and the adjacent wall in the upper level ensuite near the garage wall · possible gaps between the wall frame and floor towards the eastern side of the upper floor and between some upper level floorboards (exact location unclear). However, I do not consider this sufficient to establish that upper level movement or damage was caused by loss of lower level support. This is because: · the gaps are not measured and appear, from the photos, to be minor · overall, the pattern of visible signs of damage is not consistent with significant loss of lower level support. I also acknowledge MC’s analysis of how the height, weight and force of the soil mass would have induced lateral and rotational movement in the wall frame, resulting in twisting of the residence leading to upper level floor discrepancies. However, I do not find this reasoning compelling because: · it is based on inadequately explained assumptions about the soil mass and its impact on the wall frame · it does not adequately consider the alternative explanation of expected movement due to soil type, consistent with the pattern and scope of damage to the upper level · MC concedes the removal of the soil may have allowed some reversal of the movement (although it also says this may have caused additional damage) · MC did not adequately consider the impact of the complainant’s actions after the event (installing temporary propping and support to provide supplementary support to the first-floor structure) · the exchanged information indicates MC did not physically inspect the property · I do not accept that the low point in the upper floor is above where the lower wall was damaged because this is out of step with the consistent floor level surveys by SA and FM. The complainant has also provided statutory declarations from a builder and engineer (both of whom the complainant knows personally) to support the good pre-event condition of the property and impact of the storm on upper level movement. I give limited weight to these the statutory declarations because the writers were not engaged as independent experts and do not address causation in a sufficiently detailed way to help resolve the disputed issues. Movement does not warrant relevelling Even if I were to accept that the storm damage to the lower level wall caused movement to the upper level, I am not satisfied it warrants relevelling. In addition to accepting SA and FM’s expert views on this point, I do not consider the complainant’s representative’s reliance on a Queensland Building and Construction Commission guide reliable. This is because, as the insurer says, the guide was introduced after the insured event and applies to new domestic work and materials. Exchanged information does not establish storm caused mould or other upper level damage The complainant says there is mould in the upper level (including in the master bedroom wardrobe) that the storm caused. I am not satisfied the complainant has established the storm caused this damage because there is insufficient information supporting the entry of water or debris to the upper level due to the storm. I am also not satisfied the exchanged information establishes that the storm caused the fine ceiling crack or gaps in the floor and bathroom. For instance: · the ceiling crack is in an area remote from the garage wall · the minor gaps in the floor and bathroom, as well as the ceiling crack, are consistent with the likely long term movement on reactive soil. I acknowledge the statutory declarations the complainant relies on say the property did not have any visible defects before the storm. However, I give this information limited weight because, from the exchanged photographs, it appears the damage to the floor and bathroom is difficult to detect without close inspection. Insurer entitled to deny damage to upper level The complainant has not established that damage to the upper level was caused by the storm, nor that the upper level requires relevelling. Therefore, the insurer is entitled to deny the claimed damage to the upper level. 2.4 Is the insurer liable for temporary accommodation? No. The insurer is not required to provide temporary accommodation because the damage the insurer is required to accept does not make the property uninhabitable. Damage covered by policy does not make property uninhabitable The complainant seeks temporary accommodation, including while repairs are undertaken. The insurer is not required to cover temporary accommodation because: · the insurer is not liable under the policy for damage to the part of the building the complainant lives in · there is insufficient information to support that repairs to the garage wall will make the property uninhabitable. 2.5 Is the insurer required to pay other compensation? The insurer must reimburse MC’s fees up to $5,000, but is not required to pay any other compensation. Insurer is required to cover MC’s fees up to $5,000 The AFCA Rules enable AFCA to require an insurer to contribute to professional costs incurred by the complainant. These costs are usually capped at a total of $5,000 unless special circumstances apply, and I do not consider special circumstances apply here. Given the complexity of the complaint, it was reasonable for the complainant to obtain expert reports from MC to help understand and progress the claim, following the insurer’s initial denial of all damage including the garage wall. While I did not accept MC’s findings, they did prompt the insurer to provide the further expert reports that were useful to determine the claim. If the complainant accepts this determination and provides proof of payment for MC’s fees, the insurer must: · reimburse the complainant for expert fees up to $5,000 within 14 days of receiving proof of payment · pay interest on the fees consistent with section 57 of the Insurance Contracts Act 1984 (Cth) from the date each fee was paid until the date payment is made. Insurer is not required to pay the complainant’s representative’s fees The insurer is not required to reimburse the complainant’s representative’s fees because: · AFCA is a free alternative to the courts, designed to be accessible without paid representation · AFCA does not generally compensate for the cost of representation · the complainant’s representative at times made the claim and complaint more complex than necessary (for instance, with respect to the late claim for damage to the studio). Insurer is not required to pay any further compensation Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. In this case, I have only considered the insurer’s handling the building parts of the complainant’s claim. I accept there were delays in the insurer’s acceptance of the damaged garage wall, and communication was sometimes poor, particularly in the early part of the claim. I also acknowledge this caused significant stress and distress to the complainant and his family, who were experiencing acute health issues and vulnerability. However, as the panel in the related determination regarding the claimed contents found, the insurer made genuine efforts to address the impact of its initial claims handling. This includes: · allocating the claim to a high care team because of vulnerability a family member was experiencing · offering to pay an additional payment of up to $25,000 to bring the dispute to an end. The insurer also obtained a second engineer’s report with respect to the building parts of the claim to provide a third expert’s view that was constructive in determining disputed issues with respect to damage and causation. In these circumstances, I am not persuaded that a further award for non‑financial loss is appropriate. 2.6 Why is the outcome fair? The outcome is fair because the exchanged information supports that the garage wall damage was caused by the 2022 storm. Basing the cash settlement for this damage on the SOW produced for the related third party liability claim helps bring finality, avoiding further stress for the complainant and his family, who are experiencing vulnerability. However, the other claimed building damage (including the studio and claimed upper-level misalignment) was not established to fall within the policy terms, so it is fair the insurer is not required to cover those losses or provide temporary accommodation. The insurer should contribute to necessary expert costs (up to $5,000). 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.