Partial acceptance of cyclone damage claim, limiting liability for pre-existing roof condition and mould, plus claim handling
Text of the determination
Determination
|
Case number
|
12-25-242023
|
Financial firm
|
AAI Limited
Case number: 12-25-242023 29 September 2025
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy underwritten by the financial firm (insurer). She claimed for damage following a cyclone event on 8 March 2025.
The insurer partly accepted the claim. It says most of the claimed damage related to the poor pre-existing condition of the roof, which allowed water ingress into the home. It limited the cover offered under the policy and proposed a cash settlement for this damage.
The complainant says the insurer should accept the claim in full. She also says the insurer mismanaged the claim and seeks compensation for this.
1.2 Issues and key findings
Is the insurer entitled to limit its liability for the claim?
Yes. The overall scope of the repairs allowed for is fair, so long as it addresses all areas of water damage in the home. However, the insurer must first undertake remediation of the mould damage. It must then arrange a new actionable repair quote with a new builder for the balance of the claimed damage. This can then be cash settled, together with a 15% contingency uplift.
Is the complainant entitled to non-financial compensation?
Yes. The insurer must pay the complainant an additional $2,500 compensation.
Why is the outcome fair?
Whilst indemnity is limited due to the demonstrated pre-existing damage to the roof, it is clear water entered and damaged the home. This led to mould and the insurer has not adequately shown it addressed this (or that it should not be liable to). Given this, it is fair that the insurer remediates the mould and arranges a new repair quote for the damage. It must also pay compensation to address the impact its poor handling of the matter had on the complainant.
1.3 Determination
This determination is mostly in favour of the complainant.
Should the complainant accept this determination, the insurer must, within a reasonable time:
· arrange for a mould specialist to attend and decontaminate the home
· provide temporary accommodation, if necessary, for the duration of this period
· get a new builder to prepare an actionable quote to repair the other home damage
· cash settle this amount, with a 15% contingency uplift
· pay the complainant the sum of $2,500 in non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer entitled to limit its liability for the claim?
Yes. The overall scope of the repairs allowed for is fair, so long as it addresses all areas of water damage in the home. However, the insurer must first undertake remediation of the mould damage. It must then arrange a new actionable repair quote with a new builder for the balance of the claimed damage. This can then be cash settled, together with a 15% contingency uplift.
Complainant seeks cover for storm damage caused to home
The insured home is a single storey construction with a relatively flat Zincalume metal roof believed to be about 30-50 years old. She purchased the home in 2024.
The complainant says on 8 March 2025, storms related to ex-Tropical Cyclone Alfred caused substantial damage to the home. She lodged a claim seeking cover for:
· severe roof damage
· damage to the ceilings, laundry, lounge and bedroom areas, including floors
· fence damage (front, side and fence surrounding the swimming pool)
· pool decking.
Whilst the insurer agreed to cover some of the damage, the complainant believes the work conducted and the offer to resolve the balance of the claim was insufficient. She says there is still significant mould present in the home, which has placed her family at significant risk.
Onus on complainant to establish claimable loss
The complainant has the onus of establishing she suffered a loss from an event covered by the policy. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
If the complainant can establish she suffered a claimable loss, the onus shifts to the insurer to show, on balance:
· it is entitled to rely on an exclusion under the policy, or
· it is otherwise entitled to reduce its liability or decline the claim.
Policy covers storms subject to terms, conditions and exclusions
The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for loss or damage caused by a ‘storm’. The PDS defines a ‘storm’ as:
a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust.
There is no dispute a storm occurred or that it caused damage to the complainant’s home. The issues are:
· to what extent the claimed items were caused by this storm
· what has (and has not) been dealt with, and
· whether the insurer has discharged its liability under the terms of the policy.
Any cover provided is subject to the policy terms, conditions and exclusions. To the extent the insurer considers some aspects of the damage involved the storm but are not covered by the policy, it must show why.
Insurer’s experts found some of the damage caused by issues with the home
The insurer arranged for builder CC to attend the home to conduct an initial inspection and any necessary make safe repairs.
CC found that the roof sheets were ‘severely corroded’ and the damage present was not caused by the claimed event.
Plumber PP agreed the roof was in ‘poor’ condition, with rust and deterioration evident. It found the gutters were blocked and there were rusted screw fittings. It said a lack of regular upkeep ‘accelerated corrosion and allowed minor defects to worsen over time’. PP considered a full replacement of the roof might be more cost-effective than patch repairs.
Photos of the roof show it was in poor condition. Rust is evident, even to the point of significant holes observable in some areas. Mould was present under the eaves. Internally, mould was extensive on the laundry ceiling.
The above experts agreed there was no storm/event-related damage to the roof.
The insurer’s internal assessor BB noted the pool deck damage was due to its pre-existing condition, not the storm event. He said the bearers and joists had failed. A second internal assessor (AE) found that the damage to the laundry (pre-existing), front rumpus room (pre-existing), eaves (defects) and decking (wood rot, wear and tear) were not due to the storm.
Insurer partially accepted liability for the claim
Based on the expert reports, the insurer accepted liability for some (but not all) of the claimed damage. In particular, the insurer says there were pre-existing issues with the roof that it is not liable for.
The insurer also relies on the pre-purchase inspection report obtained by the complainant from RE on 10 July 2024. This report notes:
The roofing sheets are significantly corroded particularly along the north side of the roof… some small areas are rusted all the way through although there does not appear to have been any significant leaking resulting at the time of the inspection the roof should be reviewed for general maintenance and repairs by a suitably qualified roofer.
I accept the provided photos show the roof was in substantially the same condition at the time of RE’s inspection as it was after the claimed loss.
The insurer says this report informed the complainant of issues which required attention at the home. She did not undertake maintenance work recommended by RE.
Given this, the insurer agreed to cover the fence, damage to the second bedroom and the issues created by the initial (and poor) make safe repairs. It otherwise says it is not liable for the balance of claimed damage, including the remaining mould damage.
Cash settlement offer made by insurer in June 2025
On 11 June 2025, building consultant RC provided a report. It visited the home to re-evaluate the success of the work undertaken by the insurer. RC found there was extensive mould through the home which required additional remediation work to address.
RC also noted there was likely ‘concealed water damage and mould growth consistent with the [claimed] event’ within the laundry, first bedroom, living room and master bedroom.
AE acknowledged some of the make safe work was destructive and agreed the insurer should reimburse the complainant for this. AE disagreed with RC about the insurer being liable for the additional mould growth. He allowed a minor additional amount to address some mould damage (detailed in the CC quote), but not all of it.
CC prepared a series of quotes to address the covered damage. The insurer ultimately sought to rely on CC’s quote dated 23 June 2025 for $11,908.66 as a basis for settlement (less the applicable policy excess of $5,000).
AE approved payment of this quote as a cash settlement to the complainant. This was confirmed in an email dated 30 June 2025.
No provision was made for a contingency uplift, the full extent of mould remediation, roof damage much of the laundry damage or the decking damage.
Complainant unhappy with scope of offer
The complainant is dissatisfied with the settlement offer. She raised concerns regarding the insurer’s ‘inadequate and unsafe handling’ of the make safe work. Further, she says:
· the scope of work to repair the home was incomplete and insufficient
· there was no acknowledgement of RC’s independent analysis suggesting additional work was required, and
· there was no acknowledgement of her request to appoint a different panel builder.
The complainant says the settlement offer is not sufficient to address the damage. Based on these failures, the complainant says she has experienced hardship and inconvenience.
She notes there had been no issues with water inundation prior to the claimed event and says RE’s pre-purchase inspection report listed ‘no urgent defects’.
No work has been undertaken and she feels the offer made is inadequate.
Insurer liable to clear the home of mould issues
In my view, the insurer has not adequately addressed the concerns raised by RC.
I acknowledge the roof of the home was compromised prior to the storm event. I further accept the is not liable for all the claimed damage. I agree with the insurer’s assessment of the pool deck damage, the roof and other damage (so long as it covers all water damage in the home from the event). However, I am not satisfied with its assessment of the mould damage.
RC noted upon visiting the home that a mould smell was ‘immediately evident’. There is no dispute there is still mould in the home. Whilst the insurer contends it is not liable for this, I disagree.
There was no evidence of mould damage within the home prior to the storm event. I acknowledge, given the issues with the roof, some water ingress likely pre-dated the storm. I also acknowledge the condition of the eaves meant they were likely subject to long-term water damage. However, there is no persuasive evidence of mould being in the home prior to the storm event. I am satisfied mould developed in the home after the storm event.
In my view, properly completed make safe work after the initial event should have meant that no further water entered the home. If the insurer had ensured that mould was contained and treated early, it should not have spread. This has not happened. Therefore, I consider the insurer is liable for it.
Insurer to undertake remediation work and to prepare actionable repair quote
Whilst I acknowledge the complainant is also dissatisfied with CC’s repair quote, she has provided no alternate quote or expert commentary as to why it is not fair.
Even so, it is not clear if this quote is actionable.
An actionable quote is a quote a person can rely on to have the expert undertake the repair work for the quoted price. The insurer did not want to complete the repair work as it remains concerned with the roof issues. I accept it should not have to complete the repair work as the roof issues mean that further damage is likely.
However, I consider the insurer must undertake the remediation work to clear the home of mould. If the existing make safe work is to a suitable level, this should ensure the mould does not return. The insurer is to also have a new builder prepare a quote to address the internal damage the insurer is willing to cover.
This quote must be actionable and attend to all water related damage inside the home. I acknowledge no builder will likely commit to it unless the roof issues are repaired first. Therefore, I am satisfied any actionable quote may be made dependent on the complainant first undertaking the necessary roof and other work to make the home satisfactorily water resistant and fit for purpose.
Once this quote is prepared, the insurer may offer a cash settlement based on the quoted amount. It must also include a contingency uplift of 15%. This will compensate the complainant for the loss of the lifetime guarantee and the transfer of risk.
In my view, the home is not habitable because of the mould contamination present. Until the mould is addressed, the insurer must also cover the costs for temporary accommodation, as per the policy terms and conditions.
2.2 Is the complainant entitled to compensation?
Yes. The insurer must pay the complainant an additional $2,500 compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Complainant unhappy with the insurer’s handling of the matter
The complainant raised several concerns about the matter. These include, but are not limited to, her view that the insurer:
· handled the matter poorly overall
· failed to arrange suitable temporary accommodation, which meant her family was severely inconvenienced, incurred further costs and were forced to move several times
· left her family in a mould affected property for about six weeks after the event.
The complainant says these issues caused significant stress for her, given her family was displaced from its home and their health was compromised. She believes the insurer should ‘be held accountable and compensate [her] for any health issues’ the family experienced due to their mould exposure.
There is no persuasive evidence the complainant’s family suffered health issues arising from the insurer’s negligence. I also acknowledge the complainant and her family were inconvenienced, but this was largely due to the event itself. However, I agree the handling of the matter should have been better.
Insurer to pay further compensation of $2,500
The insurer agreed its handling of the matter fell short of an acceptable standard. It offered an apology and paid compensation of $1,000.
I accept the insurer’s failure to address the mould and the issues regarding temporary accommodation upset the complainant. Some issues were out of the insurer’s control, however it should have better addressed the concerns. I accept this caused an unusual degree or extent of inconvenience, time taken to resolve the matter and interference with the complainant’s peace of mind. To this end, an award of compensation is appropriate.
On balance, I consider the insurer must pay further compensation of $2,500 to the complainant for the inconvenience caused and the impact it had on her.
2.3 Why is the outcome fair?
Whilst indemnity is limited due to the demonstrated pre-existing damage to the roof, it is clear water entered and damaged the home. This led to mould and the insurer has not adequately shown it addressed this (or that it should not be liable to). Given this, it is fair that the insurer remediates the mould and arranges a new repair quote for the damage. It must also pay compensation to address the impact its poor handling of the matter had on the complainant.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.