Denial of escape of liquid claim for ensuite damage on the basis that the cause arose before the policy period
Summary
The complainant's building claim for ensuite water damage was denied because the leaks likely began before the policy started. AFCA upheld the denial but required the insurer to pay $750 for non-financial loss due to claim handling errors.
The general exclusion for incidents outside the policy period applied because the severe rot and corrosion likely resulted from leaks pre-dating the policy, while email errors in claim handling justified $750 compensation.
Issues
- Claim denial primary · not upheld“insurer was entitled to deny the claim on the basis of the exclusion for incidents outside the policy period”
- Poor claim handling secondary · upheld“other errors in claims handling have resulted in avoidable stress and disruption for the complainant”
- Delay secondary · not upheld“lengthy claim process was predominantly due to delays in the complainant providing his plumber report”
- Poor communication secondary · upheld“insurer prefaced the complainant's email address with the digit '1', leading to missed correspondence”
Subjects and remedies
home or building damagepay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-25-240262
|
Financial firm
|
Insurance Manufacturers of Australia Pty Ltd
Case number: 12-25-240262 30 October 2025
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer) which he took out on 28 December 2023.
He says around two and-a-half months later on 11 March 2024, he discovered the ensuite on the second level of his home had suffered building damage caused by an escape of liquid. He lodged a claim seeking cover for this damage.
The insurer denied the claim. It says no claimable loss has been established and the claim is excluded because the damage occurred before the policy was purchased.
The complainant says the insurer accepted the claim but later changed its decision and denied the claim. He wants the insurer to accept the claim. He says the time taken by the insurer to process the claim and the inability to use the ensuite has been stressful and caused inconvenience.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The exchanged information shows it likely the damage was caused by water leaks which started before the complainant took out the policy. As such, the insurer is entitled to rely upon the policy exclusion which excludes claims for damage where the cause arose outside the period of the policy.
Is the complainant entitled to compensation for non-financial loss?
Yes. The claim was in part poorly handled by the insurer. The insurer is required to pay $750 in compensation for non-financial loss.
Why is the outcome fair?
The information shows the causes of the damage to the ensuite likely occurred before the policy was taken out. As such, the insurer does not need to cover the damage. It is fair however the insurer pay compensation for non-financial loss because the claim was in part poorly handled by the insurer.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer was entitled to deny the claim and therefore has no indemnity liability.
If the complainant accepts this determination, the insurer shall pay him $750 as compensation for non-financial loss.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. The exchanged information shows it likely the damage was caused by water leaks which started before the complainant took out the policy. As such, the insurer is entitled to rely upon the policy exclusion which excludes claims for damage where the cause arose outside the period of the policy.
Policy provides cover for accidental damage to the building
The complainant is required to show on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policy. This means he must show the loss was caused by a risk for which he is insured (a ‘claimable loss’).
If he does this, the onus shifts to the insurer to show, on the balance of probabilities, they are entitled to decline the claim because of an exclusion or other policy provision.
The complainant had accidental damage cover. This is defined in the policy to cover ‘damage that is caused unintentionally to your home or contents’.
I consider the complainant has shown a claimable loss for accidental damage. This is because:
· there is no dispute water leaks from the faulty shower tap mixer and shower base caused the damage claimed
· I consider such damage was clearly unintentional, and hence was accidental damage for the purpose of the policy.
The onus now shifts to the insurer to establish whether an exclusion or other policy provision entitles it to deny the claim.
Insurer relies upon an exclusion to deny the claim
The insurer says it is entitled to deny the claim because of the general exclusion applicable to all kinds of cover on page 68 of the policy which excludes:
‘claims arising from incidents that occur outside the policy period.’
‘Incident’ is used in the policy to refer to, for example, bushfires, storms or floods. As such, I consider ‘incident’ means the occurrence of something which causes damage or loss, such as an insured event or something that causes accidental damage.
The insurer says the damage occurred before the policy was taken out. The policy was taken out on 28 December 2023. The complainant says he noticed the damage on around 11 March 2024 when he saw water stains on the ceiling located below the ensuite. His plumber attended on 3 April 2024 to investigate the shower leak.
It is undisputed the plumber discovered a mixer tap leaking inside the shower wall and a leak within the shower base which had caused damage prior to the inspection, and he stopped the leaks. Destructive works were then undertaken which exposed the significant damage to structural framework, which is the subject of the claim. The complainant lodged his insurance claim for the damage on 11 April 2024.
In order to establish the exclusion, I consider the insurer must show it likely the incident or incidents which caused the damage occurred before 28 December 2023 (‘Policy Commencement’), which is about two and-a-half months before the damage was discovered.
Insurer has shown it likely the incidents occurred before policy commencement
It is undisputed the incidents which caused the loss were the tap and the shower base each springing a leak.
On balance, I am satisfied the insurer has established these things likely happened before Policy Commencement.
It is unclear for exactly how long this damage has been occurring. I am not persuaded by the insurer’s engineer report (dated 21 March 2025) which says that damage has been ‘ongoing for years before the damages were first noticed’. This view is based primarily on discussion of a corroded steel brace. The engineer assumes the brace is constructed of a certain rust-resistant material and does not know the usage pattern of the shower.
The engineer was provided with limited information about the shower recess. Its assessment was based on photographs, rather than a physical attendance, and its report notes it was challenging to provide a correct assessment. It says reasonable assumptions were made about the extent of damage, but does not describe what these assumptions are. Overall, the report is of limited use in estimating timeframes.
That said, the report contains photographs on pages ten to 12 which show extensive and severe water damage to the timber studs, noggins, baseplates, particleboard substrate and the steel angle brace in the shower area. In particular, the baseplates are badly rotted and deteriorated. The steel angle brace is severely corroded along most of its length.
The insurer’s assessor did attend the property and estimated the damage had been occurring for 3 to 6 months. The reasoning behind this estimate is not outlined in the report, yet I accept an assessor (as with an engineer) is qualified to comment on property damage.
While I am not persuaded the damage has been ongoing for years, I accept that the rot, degradation and corrosion are so severe and widespread they are unlikely to have arisen for the first time within the two and-a-half months since Policy Commencement. Rot and corrosion are gradual processes, and the extent of this damage is considerable. It follows the leaks which caused this damage likely arose before Policy Commencement.
The complainant has not persuasively argued or provided a report to suggest the causes of the damage arose after Policy Commencement. The report from his plumber does not say when the leaks likely arose. Rather, it notes damage had occurred prior to the inspection and that timber was already swollen, and tiles loose.
The photographs show the steel angle brace corrosion extends up the brace to a height around a foot above the level of the tap. It seems unlikely to me that water leaking from the shower base, which is much lower, would rise up to that level. This suggests the cause of the steel corrosion at that level in the room was likely the tap leak, given its closer proximity to the corrosion. As I accept this corrosion damage has occurred over an extended period, it follows the tap leak itself also likely arose before the Policy Commencement.
I note the engineer’s inspection took place about one year after the damage was discovered. However, the nature and severity of the damage visible in the photographs appears to be the same as that visible in the photographs contained in the insurer’s builder’s report with attendance date of 19 April 2024. As such, I do not consider the passage of time between the discovery of the damage and the engineer’s inspection detracts from the findings of the engineer.
Damage arising during policy period does not stop the exclusion applying
I accept it likely some of the damage caused by the leaks likely occurred after Policy Commencement, such as the damage to the ceiling below identified by the complainant.
However, as mentioned above, the policy excludes claims arising from an incident that occurred outside the period of the policy. Some additional damage occurring after Policy Commencement does not mean the exclusion does not apply.
As such, I find the insurer was entitled to deny the claim on the basis of the exclusion.
2.2 Is the complainant entitled to compensation for non-financial loss?
Yes. The claim was in part poorly handled by the insurer. The insurer is required to pay $750 in compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer is required to pay compensation
The complainant says the insurer managed the claim poorly and caused avoidable delays. He says poor communication, including an assurance the claim would be paid which was later retracted, contributed to a stressful claim experience.
The insurer says delays were caused by the complainant. Claim notes show the insurer requested a copy of the complainant’s plumber report on 4 June 2024. This was followed up on two occasions via email, before the insurer successfully reached the complainant via phone on 8 August 2024, reopening the complaint and again requesting the plumber report.
The complainant then provided photographs of the bathroom, but no report. The insurer explained via phone on 23 August 2024 that a report was required. The insurer says it called the complainant to made this request again on 19 September 2024, but claim notes make no reference of the call, and the recording supplied was of an unrelated conversation.
The submissions include an email sent to the complainant on 19 September 2024 referencing this call – however, the complainant’s email address was prefaced with the digit “1”, and the complainant denies receiving the email. It is unclear whether the insurer did contact the complainant on 19 September 2024. However, I accept the complainant was asked to provide his plumbers report via telephone on 4 June, 8 August and 23 August 2025.
The insurer received the complainant’s plumber report on 25 February 2025. The following day, based on concerns outlined in this report, it engaged its engineer to attend. Following receipt of the engineer report in mid-March, it declined the claim in April 2025.
It was reasonable to request the complainant’s plumber report, and the insurer was generally proactive in doing so. In my view, the complainant’s delay in providing the report is the primary reason the insurer’s decision to decline the claim was not made until April 2025.
With regard to an assurance the claim would be paid, the complainant this happened during a telephone call. However, the insurer made clear on multiple occasions that it required a copy of the complainant’s plumber report, with the implication being a copy was necessary for the insurer to decide whether claim would be covered.
Overall, I accept there were some issues with claims handling. On at least one occasion, the insurer has prefaced the complainant’s email address with the digit “1”, leading to missed correspondence. This means the only updates the complainant received were via phone, creating an inconsistent line of communication. While the submissions indicate these emails were directed to an invalid email address, and there was likely no privacy breach in relation to the complainant, I accept this compounded frustration for the complainant.
On review of the exchanged information, I consider the lengthy claim process was predominantly due to delays in the complainant providing his plumber report. Once this was provided, the insurer had made a claim decision in approximately two months.
I accept however that other errors in claims handling have resulted in avoidable stress and disruption for the complainant. Feasibly, if emails had been sent to the complainant’s correct email address, the matter would have been resolved sooner. In these circumstances, it is appropriate the insurer pay him $750 in compensation for non-financial loss.
2.3 Why is the outcome fair?
The information shows the causes of the damage to the ensuite likely occurred before the policy was taken out. As such, the insurer does not need to cover the damage. It is fair however the insurer pay compensation for non-financial loss because the claim was in part poorly handled by the insurer.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.