Insurer declined claim for storm damage to concrete stumps and refused additional temporary accommodation
Text of the determination
Determination
|
Case number
|
12-25-239183
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-25-239183 27 February 2026
1 Determination overview
1.1 Complaint
The complainant held a home building insurance policy underwritten by the financial firm (the insurer) covering loss or damage to the insured property caused by storm impact.
The complainant lodged a claim under the policy after a large tree fell on his home during Cyclone Alfred in March 2025, for damage to the roof, carport, water tank and the concrete foundation stumps supporting the house. The insurer accepted the claim for the damage to the roof, external areas, carport and water tank, and paid a cash settlement for those repairs. The insurer also paid 14 weeks of temporary accommodation relating to those repairs.
However, the insurer denied the claim for the damage to the stumps. It says the damage to the stumps was caused by long term corrosion, concrete manufacturing defects and deterioration, rather than the impact of the storm.
The complainant disagrees and says the stump damage was caused by the storm. He seeks cover under the policy for the stump damage, and also seeks additional temporary accommodation benefits for further periods due to the claimed damage.
1.2 Issues and key findings
Is the insurer required to accept the claim for damage to the stumps?
Yes. I am satisfied that the damage to some of the stumps was caused by the cyclone. I am also satisfied the storm-caused stump damage cannot be rectified unless the stumps are replaced as a complete system. The insurer is therefore required to accept the claim and pay for the full stump replacement.
Is the insurer required to accept the further temporary accommodation claim?
Yes. I am satisfied that the complainant has shown that he has a valid claim arising from being displaced from the property for a longer period due to the stump damage and the insurer is required to pay the claim in the circumstances.
Why is the outcome fair?
An insured event occurred caused damage to the insured property. It is fair the policy responds to this. As the replacement of all the stumps is fundamental to repairing the claim-related damage to the property, it is fair the insurer pays this. It is also fair that the insurer pays the complainant’s claim for temporary accommodation arising from this damage.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to
resolve the complaint for the stump damage and temporary accommodation in accordance with sections 2.1 and 2.2, below.
2 Reasons for determination
2.1 Is the insurer required to accept the claim for damage to the stumps?
Yes. I am satisfied that the damage to some of the stumps was caused by the cyclone. I am also satisfied the storm-caused stump damage cannot be rectified unless the stumps are replaced as a complete system. The insurer is therefore required to accept the claim and pay for the full stump replacement.
Circumstances of the claim
The policy covered the complainant’s residential property in Brisbane, being a high‑set timber home supported on 35 concrete stumps.
On 8 March 2025, during Cyclone Alfred, a large hardwood tree fell onto the home, impacting the roof, carport and rainwater tank. In addition, the complainant says it also caused cracking throughout the stumps.
The complainant lodged a claim with the insurer shortly after the cyclone. The insurer accepted the claim under the policy’s storm cover for the damage to the roof, carport, water tank and associated external areas, and later cash-settled these repairs.
However, as indicated, the insurer denied the claim for damage to the stumps, on the basis that this damage was not caused by the cyclone. The insurer says its independent engineer report indicates the damage to the stumps was caused by long term corrosion and manufacturing defects, rather than by the tree impact during the cyclone.
The complainant appointed his own engineer to inspect and report on the cause of the damage. The complainant’s engineer’s report supports the complainant’s position that more than half the stumps sustained fresh damage from the fallen tree.
Whilst the insurer and complainant’s engineers do not agree on the cause of the damage, they both agree that partial restumping would not be safe and that full system replacement would be required if any stumps are compromised.
Policy covers storms subject to policy terms and exclusions
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainants. It follows the insurer is entitled to rely upon the contents of the documents.
The policy covers loss or damage to the home building and contents caused by an insured event, being the events listed in the PDS. These events include storms. The PDS states at page 38:
You are covered for: Loss or damage to your home or your contents caused by a storm. For example, a cyclone.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Parties do not agree about the cause of the stump damage
Both the complainant and the insurer accept a storm event (Cyclone Alfred) occurred and that during this, a large tree impacted the house. However, the cause of the cracking and spalling throughout the concrete stumps is in dispute.
The insurer’s appointed builders, AG and AR, both inspected the property and raised doubts that the stump damage was related to the storm, as follows:
· both AG and AR agreed that the roof, water tank, and carport damage appeared consistent with the tree impact, but the cracking to the concrete stumps did not.
· AG stated there was no raking, shifting or structural movement in the dwelling that would normally be expected if the subfloor stumps had failed suddenly due to impact forces.
AG and AR both advised, however, that the cause of stump damage fell outside their professional scope and recommended an engineering assessment be undertaken.
The insurer then engaged an independent structural engineer, ID, to inspect the stumps and determine the cause of the observed cracking. ID concluded the damage was not caused by the tree impact, but instead by long term corrosion of the steel reinforcement and manufacturing defects in the concrete stumps. In its report, ID stated that:
· the cracking and spalling were ‘consistent with the long term corrosion of the internal steel reinforcement’ rather than a sudden impact event‑term corrosion of the internal steel reinforcement
· the widespread nature of the cracking, including on stumps far from the impact zone, indicated progressive deterioration, rather than a single event
· the lack of significant damage to the timber wall and roof framing (aside from one fractured rafter tail) showed that the impact forces would not have been sufficient to also crack concrete stumps if they had been sound prior to the event
· the exposed reinforcement was severely corroded, with evidence of patch repair attempts and discolouration, supporting a long term, ongoing failure mechanism rather than a sudden overload‑repair attempts and discolouration, supporting a long‑term, ongoing failure mechanism rather than a sudden overload
· the irregular and porous concrete mix demonstrated manufacturing flaws, which would have accelerated moisture ingress and corrosion over time.
ID concluded:
The cracking and spalling evident are consistent with long term corrosion and manufacturing deficiencies… The damage is not consistent with a singular impact event.
The complainant engaged an engineer, OI, who reached a different view. OI concluded that the majority of the cracking to the concrete stumps was fresh and was caused by the horizontal forces transferred through the structure when the tree struck the home. OI reported:
· the crack surfaces were ‘pale grey and nondiscoloured’, indicating recent failure rather than long term deterioration‑discoloured‑term deterioration
· the direction of cracking across multiple stumps was consistent with the direction of the tree’s fall, showing a pattern aligned with the impact forces rather than random deterioration
· the forces generated by a falling hardwood tree of the size involved could ‘conceivably exceed the horizontal forces the house was designed to resist’ and produce the type of cracking observed
· more than 20 of the 35 stumps had lost their original design capacity due to the event, leaving the house vulnerable and unsafe to occupy until repaired
· there was no alternative mechanism evident that could have caused such widespread, fresh cracking at the same time other event related damage was observed.
OI concluded:
In our opinion, the evidence indicates that the stump damage is recent and caused by the tree impact.
Both OI and ID also expressed opinions about the structural implications of the damage.
OI considered that the stumps function as a single structural system, meaning partial replacement is unsafe and non-compliant. ID, although not agreeing that the storm was the cause of the stump damage, agreed that partial restumping would not be a viable or engineer-certifiable repair method for the damaged stumps.
Satisfied that complainant has established a valid loss for damage to some of the stumps
In considering whether the damage to the stumps was caused by the falling tree during the storm, I need to identify the proximate cause of the damage, based on the exchanged material. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
After careful consideration of the exchanged material, and particularly the reports of ID and OI, I am satisfied the complainant has shown that some, but not all, of the stump damage was caused by the storm. ID’s report is persuasive in showing why not all the claimed damage was caused by the tree impact. ID concludes that:
The proximate cause of the majority of the cracking and spalling is long-term internal rust, corrosion and manufacturing defects.
ID’s analysis of the widespread deterioration, including aged cracking, discolouration, exposed corroded reinforcement and previous patching, is consistent with this conclusion.
Whilst OI’s report identifies fresh spalling to several stumps, it does not persuasively explain why some other stumps showed no fresh spalling, or why the claimed storm related damage extended as far as the northeast corner of the dwelling. This unexplained pattern supports ID’s view that some of the stump damage predated the storm. The complainant has not displaced this evidence with persuasive alternative explanations.
ID has also identified clear evidence of pre-existing corrosion related damage in stumps eight, twelve and thirteen, whereas OI did not provide diagnostic evidence demonstrating that all stumps along the western side of the property were free of earlier spalling. This inconsistency further supports ID’s conclusion that a proportion of the cracking is attributable to long term deterioration, rather than the cyclone.
Notwithstanding this evidence, I accept some stump damage was caused by the falling tree during the cyclone. I am satisfied the exchanged material shows that stumps one, two, six, seven and eleven, (those closest to the point of the tree impact) display fresh spalling and recently fractured surfaces. I am also satisfied that, on balance, the evidence shows that this damage is more consistent with a sudden impact than with corrosion driven deterioration. I note that the following evidence is consistent with this finding:
· OI’s evidence is logical in explaining why these stumps in particular were damaged by the tree fall. I note that:
> OI found the direction of cracking across stumps one, two, six, seven and eleven aligned with the direction of the tree’s fall, and was therefore consistent with a sudden horizontal load from the impact.
> OI reported the forces generated by the falling hardwood tree could plausibly exceed the horizontal loads the house was designed to resist, producing the shear type failures observed in this cluster of stumps‑type failures observed in this cluster of stumps
> OI concluded that these stumps had lost their design capacity as a result of the event, and that the cracking pattern displayed the hallmarks of sudden, event driven failure, rather than progressive deterioration‑driven failure.
· ID’s evidence does not directly contradict OI’s specific findings about stumps one, two, six, seven and eleven. Instead, ID offers a broader, systemwide explanation for the majority of stump deterioration.
· Critically, ID also acknowledges that these particular stumps are located in the expected impact-load path and that there is the possibility of limited localised impact effects. As a result, ID’s evidence does not displace OI’s more detailed assessment of this particular cluster of stumps, and does not provide a fully contrary explanation for the fresh spalling, recently fractured surfaces, and the direction of the cracking across these stumps which OI identifies.
· ID also acknowledged that the rainwater tank absorbed part of the vertical load and that the roof lacked cross bracing, meaning some horizontal load could have transferred into the subfloor. Whilst ID considered this insufficient to explain widespread cracking, it noted this limited cluster could plausibly be affected.
Taking these matters into account, I am satisfied the complainant has established a valid claim for the storm related damage to the stumps in the immediate impact zone, as identified and set out above.
Not satisfied that policy exclusions apply to the damage I have accepted
As mentioned, once the complainant has established a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, that it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
The insurer says the policy exclusions for corrosion, gradual deterioration, and defective or faulty manufacture apply to the claimed stump damage. The PDS (at pages 80 and 83) sets out these exclusions as follows:
You are not covered for: Rust, corrosion, rot, mould or gradual deterioration.
You are not covered for: Loss or damage caused by any inherent or built-in or defective or faulty workmanship, design or manufacture.
The insurer relies on ID’s findings that the majority of the cracking and spalling is attributable to long-term internal rust, corrosion and manufacturing deficiencies within the concrete stumps.
However, the insurer has not persuasively shown that these exclusions apply to the specific, localised damage to stumps one, two, six, seven and eleven that I have accepted as damaged by the storm.
I accept the policy excludes damage caused by corrosion, gradual deterioration, or defective workmanship. However, the exchanged material establishes that the cracking in this limited cluster of stumps identified above is different from the damage to the other stumps.
I have already concluded that the proximate cause of the damage to stumps one, two, six, seven and eleven was the impact of the falling tree during the cyclone. For the same reasons, I am also satisfied the policy exclusions for corrosion, gradual deterioration or defective workmanship do not operate to remove cover for this portion of stump damage I have accepted as event related.
Insurer is liable for full restumping costs
I have considered how the complainant can be properly and fairly indemnified for the damage to stumps one, two, six, seven and eleven, which I have accepted was caused by the cyclone.
The engineering evidence consistently demonstrates that the concrete stumps operate as a single, interdependent structural system, meaning it is not feasible or compliant to replace only the damaged stumps. Both OI and ID agree that where any portion of the system has failed, full replacement of all stumps is required.
Notwithstanding my finding that the storm damaged only some of the stumps, I am of the opinion that full restumping is the only method by which the complainant can be properly and fairly indemnified for this damage.
In these circumstances, it is fair that the insurer is liable for the full cost of restumping. I reach this conclusion for the following reasons:
· both OI and ID unequivocally confirm that the stumps form a common structural system, and that partial restumping is not viable under any circumstances. OI states that partial replacement is ‘not feasible or safe’, and ID similarly confirms it would be unsafe, non‑compliant, and not engineer‑certifiable, regardless of the condition of the remaining stumps. Therefore, because the accepted storm damage cannot be repaired in isolation, the entire system must be replaced to rectify the event‑related damage
· even though only some of the stumps were damaged by the cyclone, that damage compromises the stability of the entire structural foundation system. There is no evidence showing that, without the storm damage, full restumping would have been immediately required. Thus, the insured event is the operative cause of the required repair
· under the policy, the insurer is required to indemnify the complainant by restoring the property to a condition consistent with its pre‑loss structural adequacy, subject to policy limits and exclusions. Because the only safe repair method for the storm‑related damage is complete restumping, the insurer must fund the entire work. This is fair and is consistent with AFCA’s long‑standing approach on matters of this nature
· repair of this integrated structural system is functionally indivisible. That is, either the entire restumping is undertaken, or the storm damage remains unrectified. Because the accepted event damage cannot be separated from the required whole‑system repair, the full cost is a single, indivisible loss flowing from the insured event
· while I accept that many of the remaining stumps show long‑term deterioration, this does not change the fact that:
> the insured event damaged part of the system, and
> the system cannot be repaired piecemeal.
For these reasons, I am satisfied the insurer is liable for the full restumping cost.
Insurer required to settle the stump damage claim
Within 14 days of receiving notice that the complainant accepts this determination, and subject to the complainant providing reasonable access to the property, the insurer must:
· engage a structural engineer and licensed building specialist to prepare a comprehensive, up‑to‑date scope of works (SOW) for the full replacement of all concrete stumps. The SOW must fully specify all engineering requirements, building approvals, certification obligations and rectification works necessary to restore the property to pre‑loss structural adequacy, in accordance with Queensland building, safety and construction standards.
Within 14 days of receiving the completed SOW, the insurer must obtain at least one actionable quotation based on the SOW, ensuring that:
· each builder providing a quote attends the site, and
· the quotation is detailed, current and provides a fully actionable costing for restumping and associated works.
Within 7 days of receiving the SOW and quotation(s), the insurer must elect to either:
· commence the full restumping works at the earliest available date, or
· provide a cash settlement based on the total of the preferred actionable quotation, plus a 20% contingency to account for the risk and cost burden passing to the complainant and the reasonable likelihood that additional works may be required during restumping.
Given the up-to-date quotation(s) and contingency uplift, no interest is payable on the restumping component.
As part of the insurer’s settlement of this aspect of the claim, I have also considered whether the insurer should reimburse the complainant for the costs he incurred in obtaining OI’s report.
Under AFCA Rule D.5, AFCA can determine an insurer contribute up to $5,000 in professional costs reasonably incurred by a complainant in the course of a complaint.
Whilst the complainant has not submitted any information relating to the cost of OI’s report nor sought reimbursement from the insurer for this, I am satisfied the complainant reasonably needed to obtain independent expert evidence to properly respond to the insurer’s conclusions. OI’s report assisted the complainant in establishing his case and was integral in reaching this determination. In these circumstances, it is fair and appropriate that the complainant not be left out of pocket for these costs necessarily incurred by him.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to reimburse the complainant for OI’s report fee (up to a maximum amount of $5,000), subject to the complainant providing a receipt for his payment of the cost of the report. The insurer must also pay the complainant interest on this amount, calculated pursuant to section 57 of the Insurance Contracts Act 1984 from the date of the complainant’s receipt of payment for the report, until the date of settlement.
2.2 Is the insurer required to pay the further temporary accommodation claim?
Yes. I am satisfied that the complainant has shown that he has a valid claim arising from being displaced from the property due to the damage to the stumps and the insurer is required to pay the claim in the circumstances.
Circumstances of the temporary accommodation claim
The complainant was not living at the property at the time of the insured event. Prior to Cyclone Alfred, he had vacated the home to undertake internal renovations, and he was residing in temporary share accommodation with his family while completing the works.
Following the insurer’s acceptance of the claim for damage to the roof, water tank, carport and associated external areas, it also approved and paid the complainant 14 weeks of temporary accommodation, calculated from the date the cash settlement was issued for the accepted repair items. The insurer assessed this period as the reasonable time required for the storm related repairs to be completed, based on the builder’s estimate of a two-to-three-month repair duration.
The policy provides temporary accommodation cover as follows (page 61 of the PDS):
You are covered for: The costs of temporary accommodation after an insured event happens that makes your home unfit to live in. These costs include: ongoing accommodation costs while your home is being rebuilt or repaired for up to 12 months from when the insured event happened until your home is fit to live in.
You are not covered for: Temporary accommodation if you are not living in your home when the insured event happens. Any costs that you incurred after the completion of the necessary repairs to your home to make it fit for you to live in.
The complainant seeks additional temporary accommodation beyond the 14 week period paid by the insurer. He says he remained displaced because the home could not be safely occupied while the stump system requires replacement (therefore, since the occurrence of the cyclone) and because the delays in progressing the claim left him unable to return to the property. He also says the insurer had previously assured him that accommodation would be covered for the full period he was displaced due to the insured event.
The insurer declined to extend accommodation benefits. It relies on the PDS provision that temporary accommodation is only available when the insured event occurs while the complainant is living in the home, and considered that the complainant’s displacement beyond the 14 week period was attributable to his preexisting renovation plans, not the insured event. The insurer also considered that the complainant had not demonstrated a valid claim for the additional period sought, as required under the policy.
Insurer required to pay additional temporary accommodation claim attributable to stump damage and repair
I have considered whether the complainant is entitled to additional temporary accommodation benefits arising from the damage caused by the insured event. I am satisfied he is, for the following reasons:
· the complainant has demonstrated a valid claim for further temporary accommodation arising directly from the storm‑related stump damage, which has rendered the property unsafe and unfit to live in.
· I am satisfied that the exchanged material demonstrates that the property cannot be safely occupied until the stump system is fully replaced, and this work is now necessary only because of the insured event.
· although the complainant was not living in the home when the cyclone occurred, his absence was only temporary due to internal renovations. The cyclone damage has superseded the need for the renovations and eclipsed their temporary timeline,
· it is therefore fair and consistent with the policy that the insurer meets the complainant’s reasonable temporary accommodation costs for the period during which the property remains uninhabitable due to the stump damage and necessary rectification work.
The insurer is therefore required to pay the complainant’s claim for temporary accommodation, as outlined above, subject to the benefit limit for this cover and the provision of supporting documents by the complainant (such as receipts and evidence of the accommodation and its cost).
2.3 Why is the outcome fair?
An insured event caused damage to the insured property. It is fair the policy responds to this. As the replacement of all the stumps is fundamental to repairing the claim-related damage to the property, it is fair the insurer pays this. It is also fair that the insurer assesses and pays the complainant’s claim for additional temporary accommodation arising from the stump damage.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.