Home / RACQ / Determination 12-25-237885

Determination 12-25-237885

Insurer declined cover for external cladding staining after Cyclone Alfred and cash settlement amount disputed

FirmRACQ
Decided2026-08-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined cover for cladding staining after Cyclone Alfred as gradual deterioration and offered a cash settlement of $24,477.22. AFCA found the insurer liable for the cladding damage and required an updated scope, new quote and 20% contingency.

The cyclone more likely than not caused at least some of the damage and the insurer did not show the gradual deterioration or other exclusions applied; cash settlement must reflect current prices and a higher contingency for risk transfer.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-237885 | Financial firm | RACQ Insurance Limited Case number: 12-25-237885 20 August 2026 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). She lodged a claim under the policy for damage to her house following Cyclone Alfred in March 2025. The insurer partially accepted the claim but declined cover for staining to the external cladding of the house. The insurer considers this damage occurred gradually over time and says it is therefore excluded from cover under the policy. The complainant disagrees with this decision and says the cladding staining did not exist prior to Cyclone Alfred. She says Cyclone Alfred caused the damage to the cladding. To resolve the complaint, the complainant wants the insurer to accept liability for the cladding damage. She also wants the insurer to increase the overall cash settlement amount for repairs, pointing to inflation she says has occurred in the period since the insurer obtained its quote. 1.2 Issues and key findings Is the insurer liable for the external cladding damage? Yes. The insurer is liable for the cladding damage. Is the insurer required to increase the cash settlement? Yes. The insurer is required to increase the cash settlement amount. Why is the outcome fair? I accept the intense wind-driven rainfall that accompanied the cyclone had the capacity to cause water damage to the paintwork and cladding of the complainant’s house. Given this, I accept the cyclone caused at least some damage to this area of the house, as it did to various other parts of the house. While the insurer pointed to some potential shortcomings in the renovation and paintwork carried out to the complainant’s house, I am not persuaded it sufficiently demonstrated these issues, rather than the cyclone, caused the paintwork and cladding damage. Accordingly, I consider it fair the insurer allows for repairs to the cladding in its scope of works. 1.3 Determination This determination is in favour of the complainant. Within 14 days of the insurer being notified of the complainant’s acceptance of this determination, the insurer is required to add allowances for the works outlined by the complainant’s painter to repair the damage to the paintwork and cladding. It is then required to obtain a new quote based on the updated scope of works. The insurer is then required to add a 20% contingency amount on top of the updated quote to allow for the transfer of risk. 2 Reasons for determination 2.1 Is the insurer liable for the external cladding damage? Yes. The insurer is liable for the cladding damage. Complainant must show claimable loss The complainant is required to show, on the balance of probabilities, she suffered a loss caused by a risk insured against under the policy. This is known as showing a claimable loss. The complainant must show this on the balance of probabilities, in other words, that it is more likely than not. Once the complainant shows a claimable loss, the insurer is liable for the loss unless it shows an exclusion applies or it is otherwise entitled to deny the claim. The insurer has the onus of proof in establishing this. The policy provides cover for loss or damage caused by a series of insured events, including storm, as follows: You are covered for: · Loss or damage to your home or your contents caused by a storm. For example, a cyclone. The policy defines storm as: Strong winds that may also involve heavy rain, hail or snow. For example, a cyclone. I acknowledge the certificate of insurance shows the complainant selected the optional ‘advanced cover’ and the product disclosure statement (PDS) confirms advanced cover includes cover for accidental damage. However, the PDS goes on to say the following: · Under Home Insurance, we cover accidental damage to a fully enclosed and lockable part of your home. The external cladding which is in dispute is not in a fully enclosed, lockable part of the home, and as such, I accept the external cladding is not covered under the optional accidental damage cover. Accordingly, to show a claimable loss, the complainant must show the staining and damage to the external cladding was, more likely than not, caused by Cyclone Alfred in March 2025. Complainant has shown claimable loss, onus on insurer to show exclusion There is no dispute the complainant’s house suffered damage as a result of Cyclone Alfred in March 2025. The insurer accepts this and accepted the claim for damage to various parts of the house as a result of the cyclone. The complainant says she had not observed any damage, either staining or otherwise, before the cyclone in March 2025. I have no reason to question the complainant’s credibility regarding her reporting of this. The complainant also confirmed the house underwent extensive renovations in 2022 with the addition of a third level with all new cladding, and full external painting of the house approximately two years prior to the cyclone. Additionally, the complainant provided photos of the house from January 2025, approximately two months before the cyclone, which she says show the house had no staining visible at this time. While the insurer speculated these photos might have been retouched as they were taken for the purposes of selling a neighbouring property, the complainant says they were not retouched and provided correspondence from the photographer saying the photos were not retouched. In my view, while some of the photos are taken from too far away to determine whether staining was present at this time, a handful of them have a reasonable view of one of the walls that was later affected by staining, and do not appear to show any staining in January 2025. The complainant provided some other photos from after the cyclone, taken by the same photographer and taken from a similar distance away, in which I observe some staining to the same wall. There is no dispute the cyclone brought with it significant amounts of wind-driven rainfall. I accept this type of intense wind-driven rainfall, significantly greater in terms of rain volume and wind speed than what is typically experienced in a storm or weather event, had the capacity to cause water damage to the paintwork and cladding of the complainant’s house. Given all the above, I accept, on balance, the cyclone caused at least some damage to this area of the house, as it did to various other parts of the house. As such, the onus shifts to the insurer to show that policy exclusions apply or that it is otherwise entitled to decline the claim. In this case, the insurer relies on the exclusion for loss or damage caused by ‘rust, corrosion, rot, mould or gradual deterioration’, along with exclusions for loss or damage caused by the complainant not taking action to limit or prevent further damage. The insurer relies upon the following exclusions for: · Loss or damage if you don’t do everything you reasonably can do to limit and prevent further loss or damage to your home or contents. · Loss or damage to your home or your contents which cannot be linked to any identifiable insured event unless otherwise stated within the benefit. · Rust, corrosion, rot, mould or gradual deterioration. · Loss or damage caused by you not maintaining your home and contents in good condition or not keeping your home and your contents safe and secure. Insurer has not shown exclusions apply I have reviewed the submissions from both parties, and I am not persuaded the insurer has sufficiently shown policy exclusions apply to the complainant’s claim for the staining and damage to the exterior paintwork and cladding. I set out my reasons below. As discussed above, the complainant reported no damage was evident to her the external paintwork or cladding prior to the cyclone occurring, and I have no reason to question this is true from her perspective. Accordingly, I am not persuaded the insurer has shown the first or last exclusions listed above, regarding the complainant’s obligations to limit and prevent further damage and to maintain the home in good condition, apply. This is because I do not consider the insurer has demonstrated the complainant was aware of any such damage prior to the cyclone that would have prompted her to take action to prevent further damage or take additional steps to maintain the home. Similarly, as set out above, I am satisfied that on the balance of probabilities, the cyclone likely caused at least some of the damage to the paintwork and cladding. Accordingly, I am not persuaded the exclusion for loss or damage that cannot be linked to an insured event applies. I consider there is enough information to link at least some of the damage to the cyclone. This leaves the exclusion (of those raised by the insurer) for loss or damage caused by ‘rust, corrosion, rot, mould or gradual deterioration’. No mention has been made by either party in their submissions about rust, corrosion, rot or mould being present to the paintwork or cladding, so I consider the relevant part of this exclusion for the purposes of this claim is gradual deterioration. The onus is on the insurer to show the paintwork and cladding was subject to gradual deterioration. The complainant provided correspondence from the painter (KP) who painted her house externally following the 2022 renovations. KP advised the materials and processes used carried a 10-year warranty, and the appearance of splitting and staining damage of this extent within the space of less than three years points to a significant event such as the cyclone being the cause, rather than gradual deterioration. When the insurer’s building expert (C) provided its original report, it said the rear elevation and right-hand side cladding showed signs of water staining and deterioration and attributed this to the age of the property. C did not provide any further explanation in this initial report as to why it considered the staining and cladding damage to be age-related as opposed to being resultant damage from the cyclone. Given the complainant’s advice the property was renovated and painted externally approximately two years before the cyclone, I do not find this particularly persuasive. At the insurer’s request, C then provided further commentary regarding its view on the cause of the staining and cladding damage following its reattendance of the property on 8 May 2025. In this report, C said the deterioration of the cladding around the level three balcony seems to be due to inadequate surface preparation, resulting in paint flaking. To this end, I note there is a photo showing a small amount of paint flaking off one of the corner trim pieces on the corner of the house, but I do not see a lot of evidence of paint flaking off the horizontal cladding boards themselves in the photos provided. As for the cladding to the rear elevation, C said this appears to have been poorly installed as part of the 2022 renovation works, with a patchwork approach of joining shorter cladding boards together, instead of full-length cladding boards being installed in these areas. C further said the ends of the boards do not appear to have been properly sealed, allowing for ongoing deterioration of the cladding. While I acknowledge some of the photos show a couple of areas where external cladding boards were joined, the report does not provide any additional commentary or photos to explain or show exactly how the ends of the cladding boards were not properly sealed, as reported by C. I also note much of the staining the complainant is claiming for does not appear to be directly adjacent to the joined cladding boards. Given the above, I do not find C’s findings to be particularly persuasive in showing the claimed staining and damage to the paintwork and cladding was caused gradually over an extended period of time. I acknowledge the insurer says that if the paintwork damage was caused by the cyclone, it would be expected that this damage would be more widespread, rather than contained within the limited property sections. The insurer says that as the majority of the paintwork to the house remained undamaged, it accepts KP completed a ‘passable job’, but that deficiencies with the painting to the level three balcony have gradually become apparent. I am not persuaded by this. Much of the staining in the balcony area does not appear to be in areas where the boards were joined. Further, I consider it possible the cyclone was driving wind and rain in a particular direction, perhaps when the rain was at its most intense. If this was the case, then I accept the staining damage might be more localised to the sides of the house which were most exposed to this. Fair for insurer to add paintwork and cladding repairs to scope of works I consider it entirely plausible the significant volume of wind-driven rain during the cyclone caused at least some damage to the paintwork and cladding. Given the insurer has not convincingly shown the application of a policy exclusion, I consider it fair in the circumstances the insurer covers the cost of repairing this damage. The complainant has not indicated she is seeking full replacement of the cladding, but rather resealing and repainting of it. Her painter, KP, provided a scope of works to attend to these repairs in an email dated 21 July 2025, as follows: · wash down all affected weatherboards · use an orbital sander over all substrates affected to remove flaking and defected paints · fill all splits in timber with exterior timber fillers and sand back to a flush surface · undercoat all affected areas to ensure adequate adhesion · apply two coats of all-weather low sheen paint to colour match existing paint. While KP quoted an overall cost of $13,890 for these works, it did not provide a cost breakdown to explain how this figure was arrived at. I consider it fair in the circumstances that the insurer adds the above works to its existing scope of works. I discuss the cash settlement of the claim further in section 2.2 of this determination below. 2.2 Is the insurer required to increase the cash settlement? Yes. The insurer is required to increase the cash settlement amount. Complainant says costs have increased since quote due to inflation The insurer has chosen to offer cash settlement for the repairs to the complainant’s house as there are a number of maintenance issues which need to be addressed before repairs can be completed. It offered cash settlement of the claim based on a quote it obtained from C, dated 27 March 2025, which totals $24,477.22. The complainant has raised concerns that since the insurer obtained its quote from C, which is dated 27 March 2025, there has been significant inflation. Accordingly, she does not believe the amount quoted by C is sufficient to complete the repairs at today’s prices. Insurer required to obtain new quote and increase contingency amount The quote from C is now close to 18 months old and I accept there has been inflation during this time. Per my findings in section 2.1 of this determination, the insurer is required to add allowances for the works to repair the paintwork and cladding to the existing scope of works. I consider it fair in the circumstances the insurer obtains a new quote at today’s prices based on the update scope of works. The insurer has previously offered to add a 10% contingency amount to the cash settlement in the interests of resolving the claim. Where an insurer is cash settling a claim as opposed to arranging the works, the AFCA typically considers it appropriate for the insurer to add a contingency amount to the settlement to compensate for the transfer of risk to the complainant. I consider a 10% contingency amount is quite conservative for building works that tend to have a reasonable likelihood of cost increases or further damage being discovered upon commencement of the repair works. As such, I consider it fair in the circumstances that the insurer adds a 20% contingency amount on top of the final quote it obtains based on the updated scope of works. Finally, I acknowledge the complainant raised concerns about the way her claim was handled. While I acknowledge the insurer’s claims handling might not have been perfect, AFCA’s approach to compensation is conservative. AFCA expects complainants to bear a normal amount of inconvenience during a claim or when a problem arises. Based on the exchanged information, I do not consider compensation is warranted in the circumstances. 2.3 Why is the outcome fair? I accept the intense wind-driven rainfall that accompanied the cyclone had the capacity to cause water damage to the paintwork and cladding of the complainant’s house. I accept the cyclone caused at least some damage to this area of the house, as it did to various other parts of the house. While the insurer pointed to some potential shortcomings in the renovation and paintwork carried out to the complainant’s house, I am not persuaded it sufficiently demonstrated these issues, rather than the cyclone, caused the paintwork and cladding damage. Accordingly, I consider it fair the insurer allows for repairs to in the cladding its scope of works. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.