Management and delay of storm water ingress claim, mould damage, temporary accommodation entitlement and non-financial loss
Text of the determination
Determination
|
Case number
|
12-25-233655
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-25-233655 25 February 2026
1 Determination overview
1.1 Complaint
The complainant, as a lot owner, is a third party beneficiary under a residential strata insurance policy (policy) held by the Owner Plan with the financial firm (insurer). On 24 April 2024, a claim was lodged for damage to the complainant’s lot (unit) caused by significant stormwater ingress on 6 April 2024.
The insurer has accepted the claim. However, the complainant is dissatisfied with the insurer’s management of the claim. He says unreasonable delays caused by the insurer have resulted in further damage and deterioration to the unit. He says the insurer failed to provide him with adequate temporary accommodation (TA) and wants the insurer to replace the kitchen and kitchen cooktop under the claim. The complainant is also seeking non-financial loss compensation (NFL).
1.2 Issues and key findings
Was the insurer’s management of the claim reasonable?
No. The exchanged information shows the insurer’s assessment and scope of repairs for the internal water ingress damage is mostly fair. However, the insurer’s overall management of the claim was not reasonable.
Is the insurer’s position regarding the TA benefit fair?
No. The insurer’s position regarding the TA policy entitlements is not fair or consistent with the policy wording.
Is the complainant entitled to NFL?
Yes. The insurer is to pay the complainant $4,000 in NFL in line with the AFCA Rules.
Why is the outcome fair?
The outcome is fair because it is based on the exchanged information and policy. The insurer’s assessment of the extent of storm damage to be covered under the policy is fair. However, the insurer’s overall management of the claim and level of communication was not reasonable. Further, the insurer’s assessment of the complainant’s entitlement to TA is not fair. It is fair that the insurer slightly increases the scope of works to be accepted under the claim and pay the complainant NFL.
1.3 Determination
This determination is substantially in favour of the complainant. Within 21 days of receiving notice of the complainant’s acceptance of this determination, the insurer:
· is to arrange an actionable quote to increase the scope of works to be accepted under the claim in line with section 2.1
· pay the complainant $4,000 in NFL.
2 Reasons for determination
2.1 Was the insurer’s management of the claim reasonable?
No. The exchanged information shows the insurer’s assessment and scope of repairs for the internal water ingress damage is mostly fair. However, the insurer’s overall management of the claim was not reasonable.
Policy covers the insured property against accidental loss or damage
The insurer provided the policyholder with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
Onus on complainant to show the loss and damage triggers cover
When making a claim, the complainant has the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on balance, the application of any exclusion it relies on to reduce its liability or deny the claim.
I am satisfied there is no dispute the unit presented with significant water ingress damage from the storm event, and which triggers cover under the policy.
The exchanged information shows that the insurer has in or around February 2025 completed repairs to the storm related internal damage. The insurer also provided TA cover from 3 February 2025 to 10 February 2025, covering the time it took to complete the repairs.
No evidence of delay in claim lodgement prejudicing the insurer
The complainant says the insurer unreasonably delayed arranging removal of saturated building materials. He says this resulted in mould infestation of the unit and further damage. The insurer does not dispute the presence of mould, however, says the delay in being able to complete remediation works arise from:
· a three week delay in claim lodgement
· the complainant turning off drying equipment; and
· the complainant’s delay in arranging recommended maintenance works.
I acknowledge the insurer’s position. However, the insurer has not provided any evidence to show how or to what extent it may have been prejudiced by a delay in claim lodgement. There is no evidence to show the unit presented with pre-existing or long term mould related issues. Further, there is no evidence to show there was any mould damage at the time of claim lodgement.
Insurer caused delays in attempting drying and mould remediation works
The exchanged information shows the complainant raised concerns regarding mould on 17 May 2024. However, there is no persuasive evidence of the insurer taking any steps to assess, remediate or prevent mould spreading until around August 2024. This being around four months after the claim was lodged and three months since being notified by the complainant.
I note the complainant does not dispute turning the drying equipment off when he needed to sleep (is a shift worker). The complainant says he informed the insurer’s contractor of this and was told this would not have a significant impact on the drying process. The insurer has not provided any response to this or information establishing, on balance, the extent to which this may have impacted the drying process.
I am not satisfied the insurer has shown, on balance, it has been prejudiced by the complainant turning off the drying equipment when he needed to sleep.
I accept the exchanged information does include reference to the insurer’s authorised drying process not being as effective as expected. The complainant has provided a water damage/defect report from building consultants ‘M’ dated 18 September 2024. M says the reasons for the ongoing high moisture levels and associated mould are:
· the water ingress event
· the subsequent failure to remove the sodden and water damaged building materials in a timely manner.
The insurer has not provided any qualified or expert evidence in response to M’s opinion.
I acknowledge the complainant was told he needed to arrange some building maintenance works which were considered contributing factors for water entering the unit. I accept the complainant did not arrange these works straight away.
However, I am not satisfied the insurer has provided any persuasive information to show why this prevented it from arranging necessary mould remediation works or removal of the sodden building materials. I have not been provided with any evidence of subsequent instances of water ingress or associated damage relating to the recommended maintenance works not being arranged immediately.
Delay in arranging mould remediation works has caused further damage
The complainant says the insurer’s failure to arrange necessary drying and mould remediation works has resulted in further damage in the kitchen area. The complainant has provided photos of mould present on various surfaces and items. The complainant says, given concerns for his health, he had to repeatedly clean the kitchen surfaces. This, he says, has caused staining damage to kitchen cabinets, damage to cabinet handles and other areas.
The insurer has refused liability for this damage. It says the damage has been caused by the complainant’s actions of cleaning and not the insured event. This being in addition to its positions discussed above regarding the delay in claim lodgement and drying equipment. I am not satisfied the insurer’s position is fair or reasonable.
I am satisfied it is fair to accept the mould issue has been shown to most likely be due to the stormwater ingress event, an event covered under the policy. It is also fair to accept, given the health-related concerns, that it was reasonable for the complaint to continue cleaning the mould off surfaces each time it re-appeared. I am satisfied the dominant cause for this damage is not the act of cleaning, but it is the insured event and associated mould infestation.
It is reasonable to accept the unreasonable delay by the insurer in arranging necessary mould remediation works is a significant factor in the additional damage. This is because if the mould issue had been adequately addressed in a timely manner, repeated attempts of cleaning would not have been necessary.
I am also satisfied that it is fair to accept the level of communication by the insurer and its consultants with the complainant was poor. The exchanged information shows instances of inconsistent advice and information, which only further added to the complainant’s confusion and stress.
Insurer to increase cover to include additional damage in the kitchen
M’s report of 18 September 2024 confirms the persistent moisture present has most likely caused repeated instance of mould contamination. This combined with cleaning attempts has left staining to cabinet surfaces. Further, this also led to deterioration of the cabinet handles compromising the finish of the metal surface.
The insurer, other than seeking to place liability for this additional damage with the complainant, has not provided any persuasive contrary evidence to M’s opinions. I have not been provided with sufficient information to come to an informed decision regarding the extent of this additional damage in the kitchen. I am not satisfied the complainant has shown that it would be fair to require the insurer to cover the cost of a complete kitchen replacement.
Therefore, within 21 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to arrange for a suitably qualified consultant to assess the extent of this additional damage. Within seven days of receiving such report, the insurer is to (at its discretion) either authorise the necessary repairs or cash settle the complainant for the reasonable cost to complete the works based on an actionable repair quote.
2.2 Is the insurer’s position regarding the TA benefit fair?
No. The insurer’s position regarding the TA entitlements available under the policy is not fair or consistent with the policy wording.
Policy includes cover for TA subject to conditions and limitations
Under the property cover section of the policy is reference to additional benefits. This includes cover for TA. The relevant policy wording has been provided in section 3.2 below.
I am satisfied it is reasonable to accept the policy covers the complainant for TA where the unit becomes unfit to be occupied. The policy covers the cost of a similar accommodation located in the vicinity of the unit. This is from the time of physical loss, destruction or damage until the time the complainant re-occupies the unit following completion of repairs.
I accept there is no compelling information to show the unit was immediately unfit for occupation due to the water ingress damage. There is no dispute the complainant would need, and has been covered for, TA whilst repairs were completed in February 2025.
However, the complainant says the insurer failed to arrange TA for him given it was unfit (unsafe) to occupy due to the presence of mould. The insurer disputes the complainant’s opinion and says cover for TA is limited to the period of repairs. That is, it is only required to pay TA for the time it takes to complete repairs. The insurer also says that the TA benefit was not available whilst maintenance works remained outstanding and which were not covered under the policy.
Insurer’s approach to TA benefit not fair
I accept the insurer’s position that it is not liable for the cost to complete maintenance works under the policy. However, I am not satisfied there is any reference under the TA benefit to it:
· being limited to the period of repairs only; or
· not being available if maintenance works are identified.
Rather, as noted, I am satisfied cover under the TA benefit becomes available from the time the unit is reasonably considered unfit to occupy, which incudes from the time the physical damage occurs.
Given this, if the unit was unfit to live in due to the presence of mould following physical damage by the storm event, I am satisfied the insurer was obliged to cover the complainant for TA. However, I have not been provided with information from suitably qualified experts to establish as to whether mould levels within the unit meant it was unfit to live in.
Therefore, I cannot determine whether the insurer was obliged (or not) to arrange TA at the time. However, I am satisfied it is fair to accept that the presence of mould is often considered a risk to an occupant’s health. The fact it persisted was also a factor for increased concern and stress for the complainant.
The insurer’s failure to recognise this and unreasonable interpretation of the policy did cause the complainant to experience unreasonable levels of stress, anxiety and delays. I am not satisfied there is any evidence of the complainant suffering any financial prejudice or loss in the form of TA expenses for which the insurer can fairly be held been responsible.
However, I have acknowledged the impact of the insurer’s position on the complainant in awarding NFL under 2.3 below.
2.3 Is the complainant entitled to NFL?
Yes. The insurer is to pay the complainant $4,000 in NFL.
AFCA can award NFL in certain circumstances
AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer.
Insurer is to pay the complainant NFL
I have carefully considered the exchanged information. In line with the matters considered above, I am satisfied the insurer has caused the complainant to experience unreasonable levels of stress, anxiety, delays and inconvenience.
As the more significant failures on the insurer’s part have been identified and discussed above, and in the interest of brevity, I will not repeat them here. It is sufficient to say that I am satisfied the insurer’s overall management of the claim and communication has not been to a level expected of a professional organisation.
I accept there has been a failure by the insurer in fulfilling its policy obligations. This has resulted in avoidable delays, stress, confusion and inconvenience experienced by the complainant over an extended period of time.
I accept the complainant has contributed to the delays by not arranging the recommended maintenance straight away. However, the extent to which, if any, this has caused or contributed to the life of the claim has not been established.
I am satisfied it is fair that the insurer be required to pay the complainant $4,000 for NFL, within 14 days of receiving notice of the complainant’s acceptance of this determination.
2.4 Why is the outcome fair?
The outcome is fair because it is based on the exchanged information and policy. The insurer’s assessment of the extent of storm damage to be covered under the policy is fair. However, the insurer’s overall management of the claim and level of communication was not reasonable. Further, the insurer’s assessment of the complainant’s entitlement to TA is not fair. It is fair that the insurer slightly increases the scope of works to be accepted under the claim and pay the complainant NFL.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Relevant policy provisions
Section 1 Property: Physical Loss, Destruction or Damage
1. Cover
This Section covers:
Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded.
…
2.3 Event
An occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property
…
3. Exclusions Applying To This Section
3.2 We will not cover loss, destruction or damage caused by or arising directly or indirectly from
…
i) wear and tear, fading, scratching or marring;
j) gradual deterioration or developing flaws;
k) rust or oxidisation;
…
m) corrosion, concrete or brick cancer;
…
5. Additional Benefits B
… 5.16 Costs of Losses Incurred by the Lot Owner
ii) Temporary Accommodation
Where the Lot Owner occupies the Lot, the reasonable cost of:
a) immediate emergency accommodation and meals up to $2,500; and
b) Temporary Accommodation, necessarily incurred by the Lot Owner if the Lot is made unfit to be occupied for its intended purpose.
We will pay an amount of money for temporary accommodation calculated on the basis of similar accommodation located in the vicinity of the Location. We will pay from the time of the physical loss, destruction or damage until the time the Lot Owner re-occupies the Lot following completion of reinstatement or replacement of Your Insured Property.
Exclusions
We will not cover loss, destruction or damage caused by or arising directly or indirectly from:
i) wear and tear, fading, scratching or marring;
j) gradual deterioration or developing flaws;
k) rust or oxidisation; …
l) mildew, mould, wet or dry rot;
m) corrosion, concrete or brick cancer;
3.3 Relevant AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or
b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.