Home / IAG / Determination 12-25-232100

Determination 12-25-232100

Insurer not required to accept and cash settle claim for sewer pipe leak damage based on complainant's quotes

FirmIAG
Decided2025-10-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$33,392
SourceAFCA PDF

Summary

The complainant, a licensed builder, repaired sewer leak damage before lodging a claim and sought cash settlement based on his quotes. AFCA found in favour of the insurer because the extent of damage and repair costs were not substantiated.

The complainant carries the onus to show the extent of the claimable loss, and his quotes and photographs lacked sufficient detail to require cash settlement.

Issues

Subjects and remedies

home or building damageno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-232100 | Financial firm | Insurance Manufacturers of Australia Pty Ltd Case number: 12-25-232100 31 October 2025 1 Determination overview 1.1 Complaint The complainant holds a home buildings policy with the financial firm (insurer). On 7 February 2025, the complainant lodged a claim for damage to the insured property caused by a leaking sewer pipe. The complainant is a licensed builder and commenced repairs before he lodged the claim. The complainant says the insurer approved of this once he lodged the claim and did not tell him to stop repairs. The complainant wants the insurer to accept the claim and settle it based on the quotes for the repairs he completed. 1.2 Issues and key findings Is the insurer required to accept the claim and settle based on the complainant’s quotes? No. The complainant has not provided sufficient information to show the extent of the: · damage caused by the leaking pipe, or · repairs he completed to the damage caused by the leak. The insurer is not required to accept the claim and settle it based on the complainant’s quotes. Why is the outcome fair? The outcome is fair because the complainant has not substantiated the extent of the damage caused by the leaking sewer pipe, or repairs required to fix the damage. It would be unfair to require the insurer to cash settle the claim based on the complainant’s quotes. It remains open to the complainant to work with the insurer to allow it to assess the damage and determine the extent of its liability for the repairs. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to accept and settle the claim until the complainant provides sufficient information to establish the extent of his claimable loss. 2 Reasons for determination 2.1 Is the insurer required to accept the claim and settle based on the complainant’s quotes? No. The complainant has not provided sufficient information to show the extent of the: · damage caused by the leaking pipe, or · repairs he completed to the damage caused by the leak. The insurer is not required to accept the claim and settle it based on the complainant’s quotes. Complainant must establish a claimable loss It is established insurance law that the complainant carries the initial onus to show a loss of a type covered by their policy (claimable loss). The complainant must show this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is shown, the onus shifts to the insurer to show the loss is not covered, either by way of one of the policy exclusions or on some other basis. The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer provided the policy documents to the complainant. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. In this case, the complainant is seeking cover for damage he says was caused by a leaking sewer pipe in the ceiling at the property. The policy covers various insured events, including ‘water and oil leaks’. This section is set out below in section 3.2 of this determination. Complainant undertook and authorised repairs to the property It is not in dispute the complainant undertook repairs to the property and the insurer could not assess the damage and its cause. The complainant says this was done with the insurer’s approval. The insurer says: · the complainant commenced repairs before he lodged the claim · its consultant confirmed its process was to allocate a panel builder to complete an assessment and to provide a detailed report of the cause of damage, however as the repairs were already commenced, it was unable to assess the damage, and · it advised the complainant he was required to provide documentation showing proof of the loss, proof of the damage and the cause of the damage. The insurer provided a copy of the recording of the claim lodgement telephone call, during which: · the complainant advised the consultant he had commenced repairs himself (as he is a licensed builder) · the consultant told the complainant: > he would have to draw up a scope of works for it to assess > it needed photographs, proof of the loss, proof of the damage, the cause of the damage and the cost of the repairs, and > to send through an assessment report on letterhead with an ABN included, stating what the damage was and what the cause of the damage was. The complainant provided various reports and quotes, which I have considered below. Insurer says complainant has not substantiated loss In relation to the repairs, the complainant provided a quote from: · his company (S) dated 8 February 2025 for $33,391.60 for repairs to, among other things, the upstairs carpet, laundry, bedroom, living area and laundry · C dated 9 April 2025 for $38,400 for repairs to the carpet, ceiling, walls, tiles, skirting, and architraves, and · F dated 28 February 2025 for $4,808.60 for the replacement of carpet. The insurer says: · the complainant’s quote for the repairs is from his own company, which is a conflict of interest · the complainant has not provided photographs of the resultant damage · C’s quote does not provide measurements or a breakdown of costs and would have been prepared after the complainant completed the repairs · it has the right to request the information from the complainant to substantiate the loss at the property and the costs incurred · the complainant’s repairs have prejudiced its ability to assess the damage and determine the cause, and the cost, of repairs · S’s quote does not include a breakdown of costs or all the details of why the areas listed in the quote required repairs or replacement · the complainant holds a building policy, and the damage to the carpet is not covered, and · without a breakdown of costs, it is unable to substantiate the complainant’s costs are fair and reasonable. The complainant says: · he did not monitor the total hours or days the repairs took, but he estimates it took him and his trades approximately one month to complete the repairs · it is impossible to break down the costs room by room, and he has never provided a quote in that manner, and · he cannot provide proof of payment for the repairs, as this has not been done yet. The exchanged information shows on 17 February 2025, the insurer requested: · photographs of the damaged sections where the sewage had ‘got onto’, along with supporting evidence, and · a damage report that outlines the affected areas, the nature of the damage, and the source of the sewage overflow. This appears to be in line with the claim lodgement telephone call. Complainant’s information does not substantiate extent of damage The insurer confirmed it has not declined the claim. Rather, it says the complainant has not provided sufficient information to substantiate his loss. It is not in dispute the property was damaged. The V plumbing report says: We have repaired a cracked suspended sewer pipe in the ceiling, which had leaked and caused damage to the house. […] Additionally, we replaced the toilet as it broke when it had to be removed in order to replace the pipes. The S quote says: Sewerage Damage to [the property] resulting in the following damages and necessary repairs. The complainant provided photographs of the repairs he undertook to the leaking sewer pipe in the ceiling (including the replastering, repainting and retiling the areas he used to access the pipe). Apart from those photographs, there are no other photographs of the damage the leak caused to the rest of the house, or the repairs the complainant undertook to that damage. I accept the complainant’s quotes likely show what repairs the complainant authorised or undertook to the damage. The insurer says its ability to assess the damage, and the cost of repairs, was prejudiced by the repairs the complainant undertook to the property. However, the claim lodgement telephone call shows: · the complainant told the insurer he had commenced plumbing repairs, and · the insurer agreed to the complainant continuing the repairs when he lodged the claim. I consider the insurer’s own actions contributed to its inability to assess the physical damage to the property before it was repaired. In any event: · the insurer advised the complainant to provide, among other things, photographs and proof of the damage · the C and S quotes do not include measurements or itemised costs for the repairs · the C and S quotes list areas of damage, but contain little detail about what the damage was to those areas, and · the C quote was completed based on the complainant’s description of the required repairs and photographs and was not a final quote. I acknowledge the complainant says he would not have ‘torn apart the building if there was not a problem’. Even if I accept the damage to the property was caused by a leaking sewer pipe, I also accept the complainant’s quotes and reports do not provide sufficient detail of the extent of: · the damage the leak caused · the repairs undertaken/required to address that damage, or · the costs incurred/required to repair that damage. For completeness, I note the insurer says the damage to the carpet is not covered because the complainant does not have contents cover. However, the PDS: · says the insurer does not consider carpets to be part of the home unless the policyholder is a landlord (which is the case here), and · lists other benefits which includes up to 10% of the building’s sum insured to repair or replace, among other things, carpets in the home for tenants' use. I also note, the policy excludes the costs to repair or replace the item the water escaped from. Insurer is not required to cash settle the claim in line with complainant’s quotes The PDS sets out how the insurer calculates the amount when it chooses to cash settle a claim. Relevantly, it says the insurer may ask the complainant to obtain a quote for the repairs (as is the case here). For the reasons outlined above, I am not persuaded: · the complainant has sufficiently shown the extent of the damage caused by the leak, or · the complainant’s quotes persuasively set out the cost of the repairs for the damage that may have been caused by the leaking sewer pipe. Absent any persuasive and detailed information to show: · what damage the leaking pipe caused (for example, water damage to the walls), and · the cost of the repairs to the damage (for example, the length of plaster required to replace water damage to the wall), I am not persuaded the insurer is required to cash settle the claim based on the complainant’s quotes. Complainant may provide further information to the insurer The PDS sets out the complainant’s responsibilities, which includes giving the insurer all the information, documents and help it needs to deal with the claim. The insurer has asked the complainant to provide: …the before photos showing the damages to the upstairs of the property and downstairs damages to the laundry, bedroom 1, bedroom 2, living areas as the only photos provided are after the repairs/plastering had been completed. … a breakdown of the repair costs to show measurements and individual costings to validate the settlement they are seeking in the amount of $33,391.60 along with an explanation as to why items such as the laundry tiles needed to be replaced. I consider it fair and reasonable for the complainant to work with the insurer to allow it to determine the extent of its liability for the cost of the repairs (if any). It remains open to the complainant to provide the requested information for the insurer to determine if the claim is one for acceptance, and the full extent of the cash settlement. If the complainant provides the information the insurer requested about the damage and the repairs, the insurer must assess this information and provide a decision on the claim within 30 days of receiving that information. This includes the claim for damage to the carpet the insurer believes is not covered. If the complainant does not provide the requested information, the insurer is entitled to close the claim until such time that the complainant provides the requested information. I acknowledge the complainant has raised concerns about the insurer’s delay in settling the claim. However, as I am not persuaded the insurer is required to settle the claim on the information it has available to it, an award of compensation for any such delay is not warranted. 2.2 Why is the outcome fair? Outcome is fair in the circumstances The outcome is fair because the complainant has not substantiated the extent of the damage caused by the leaking sewer pipe, or repairs required to fix the damage. It would be unfair to require the insurer to cash settle the claim based on the complainant’s quotes. It remains open to the complainant to work with the insurer to allow it to assess the damage and determine the extent of its liability for the repairs. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Extract of the PDS Water and oil leaks Buildings Insurance Contents Insurance If loss or damage is caused by water or oil leaking or escaping from an item shown here. Covered · water leaking or escaping from: o house gutters, drainpipes or pipes o sanitary fixtures - for example, baths or toilets o appliances - for example, washing machines or dishwashers o waterbeds o aquariums o water tanks o swimming pools · oil leaking from a fixed heating system or sealed portable heater · costs to locate the cause of damage (if we agree to pay these costs before you make any arrangements). Not covered · water leaking or escaping from a shower recess or shower base · costs to repair or replace the item that the water or oil leaked or escaped from.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.