A retaining wall at the complainant's home collapsed after heavy rain and the insurer declined the building claim. AFCA found the insurer fairly declined the claim and made no order.

With defective design and storm both contributing and both specifically excluded for retaining walls, the insurer was entitled to decline under AFCA's proximate cause approach.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-228502 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-228502 28 November 2025 1 Determination overview 1.1 Complaint The complainant’s property is insured under a home building policy underwritten by the financial firm (insurer). The home is built on a steeply sloping block. There are four retaining walls between the home and the driveway. During heavy rain on 30 April and 1 May 2024, the lower two retaining walls and the side of a hill collapsed onto the driveway. The complainant lodged a claim for damage to the retaining walls. The insurer has denied the claim. It says the complainant has not proved an insured event caused the damage and if a claimable event has been established, the cause of the damage was a defective design which is excluded under the policy. The complainant says that the cause of the failure was a leak in a pipe and that the insurer should cover the claim. 1.2 Issues and key findings Does the policy cover the damage to the retaining wall? No. The insurer has shown that, on balance, the retaining wall failed in part due to defective design, lack of drainage and in part due to a storm. Damage due to defective design is expressly excluded under the terms of the policy as is damage to a retaining wall caused by storm. As the policy excludes the damage to the retaining wall, it is fair that the insurer has declined the claim. Why is the outcome fair? The insurer has appropriately assessed the claim and has correctly applied the terms of the policy. In the circumstances, it is fair that the insurer decline the claim. 1.3 Determination This determination is in favour of the insurer. No further action needs to be taken by the insurer in relation to this complaint or the claim. 2 Reasons for determination 2.1 Does the policy cover the damage to the retaining wall? No. The insurer has shown that, on balance, the retaining wall failed in part due to defective design, lack of drainage and in part due to a storm. Damage due to defective design is expressly excluded under the terms of the policy as is damage to a retaining wall caused by storm. As the policy excludes the damage to the retaining wall, it is fair that the insurer has declined the claim. Policy and terms The terms of the policy are set out in the product disclosure statement and the policy schedule. There is no suggestion that the insurer did not send those documents to the complainant. Accordingly, I accept that the insurer can rely on the terms of the policy set out in those documents. Relevantly, the policy is an accidental damage policy so it covers the building for any accidental damage. The policy defines building to include a retaining wall. The policy defines accidental damage as: damage caused by sudden, unforeseen and unintended events Accidental damage cover includes damage caused by storm. However, the policy specifically excludes damage to retaining walls caused by storm and also excludes damage from: Inherent defects Including faulty design or materials, structural defects or poor workmanship The complainant has the onus of establishing he suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. Damage to the retaining wall The exchanged documents show that on 1 May 2024, after a rain event on 30 April, a Kopper log retaining wall at the property collapsed. The complainant says that the retaining wall collapsed because storm water was leaking from a cracked pipe. The pipe is said to have cracked on 6 April 2024. The complainant also says that a significant rain event occurred on 6 April and the weather in April, along with water leaking from the cracked pipe, supersaturated the area behind the retaining wall, resulting in its collapse on 1 May 2024. The complainant has provided several reports from various experts including an excavator FE, an engineer NB, construction contractor RC and a risk assessment of the site prepared by a geotechnical engineer JC. JC’s risk assessment was dated 17 September 2004 to accompany a building certificate. JC says that the timber retaining wall appears in good condition. However, there is no analysis of how the wall is constructed, and no indication that more than a visual inspection was undertaken. Further, the report was prepared more than 20 years before the retaining wall collapsed. Accordingly, I place only limited weight on the comment in that report. RC says, in a letter dated 10 June 2025, that during remediation of the retaining wall, a broken stormwater pipe was discharging into the collapsed embankment from behind the retaining wall. The pipe continued to discharge large amounts of water and had to be diverted. In another undated letter, RC says that he was told by a contractor who undertook repairs at the property that there was a mixture of collapsed clay soil, concrete and blue metal materials and extensive storm water drainage pipes and ag line drainage removed from the collapsed earth. The excavator, FE, says in a report dated 4 June 2024, that when assessing the property the 1800mm Kopper log retaining wall appears to have failed due to an extensive amount of pressure from fill above due to excessive amounts of water over a few of the extreme weather events. In a report dated 2 June 2025, the complainant’s engineer NB says: · the storm’s intensity on 30 April/1 May was classed by the bureau of meteorology as a violent storm, therefore capable of causing damage · the satellite imagery referred to in IE’s report is unclear and obscured by trees and the straight line created by IE · the Koppers log wall which failed was not 2m high, but two walls of 1.4m · the Koppers log posts are undersized, however, the mode of failure is consistent with saturation of embankment beneath the wall · the cause of the wall’s failure is more likely to be the supersaturation from a broken stormwater pipe. The complainant has provided photographs of the broken pipe. I accept that the photographs show that the pipe is broken. However, the broken pipe ran along the retaining wall that failed and, clearly broke during the collapse. There is insufficient supporting evidence to show that the pipe was broken before the retaining wall collapsed on 1 May 2024, and if the pipe was broken the extent of the leak. The insurer has had a builder (IB) and an engineer (IE) prepare reports on the cause of the collapse. IB, in a report dated 24 May 2024 says that the damages were caused by: “the retaining wall's failure to withstand the weight of the backfill. We believe that during the recent heavy storms, water infiltration into the soil beneath the wall led to a rapid and significant increase in soil weight, resulting in an excessive moment load that the wall was unable to support, ultimately causing the damages.” IE, in a report dated 24 May 2024 says: · it consulted the design guide for Koppers log retaining walls · the wall height of the collapsed retaining wall was 2090mm, (this was adjusted to 1800mm in a subsequent report) · the spacing of the posts for the retaining wall are 1.2m wide · under the design guide, the size of the vertical posts for the retaining wall are 300mm, the current posts are only 120mm and are therefore undersized · the recommended footing embedment depth is 2.3 m deep, the pattern of deflection suggests that the embedment depth of the post’s footings is likely to be less than 2.3m · free drainage (by way of free drainage material and ag lines) is required behind the retaining wall to prevent a buildup of hydrostatic pressure and such material was not observed behind the collapsed retaining wall · a void gap exists under the pool base (which is located up slope of the failed wall) this suggests that the Kopper log wall has failed over time leading to embankment creep and the void · satellite imagery of the property between 2010 and 2023 shows that the retaining wall profile has moved from a relatively straight line in 2010 and is rotated in 2023 · the complainant said that during the rain event a pipe burst behind the retaining wall and the pool overflowed with water flowing into the soil behind the retaining wall · the most likely cause of the wall failure was: > inadequate structural Defective design / workmanship – Inadequate structural capacity; > long-term hydrostatic pressure build-up due to inadequate drainage; > likely long-term tree root growth pressures from nearby trees and vegetation; Relevantly, the photos of the damage to the retaining wall do not show any tree roots and, on balance, I do not accept that tree roots contributed in any meaningful way to the failure of the retaining wall. IE further says, in a report dated 19 September 2025, that: · vertical posts in a retaining wall are the structural members that counteract the lateral earth and hydrostatic pressures acting from behind the wall · the lateral capacity of the post to resist the forces is a function of the post diameter, embedment depth and the height of the retained soil · a defective post diameter can allow the wall to rotate outwards due to inadequate structural capacity · the lack of painting on one of the vertical posts suggests that one part of the retaining wall was not fixed and was effectively cantilevered off a post 1.2m away · there is a lack of observable backfill directly behind the retaining wall, so that even if an ag line was in place, there was insufficient drainage to allow water to enter the ag line · there were several open-ended drainage pipes coincided with the location of the collapsed retaining wall and the greatest extent of the soil · the pattern of the pipes show stormwater being discharged directly at the rear of the retaining walls · the extra water from one burst pipe (assuming the pipe burst when the complainants say it did) would have made only a negligible difference given the amount of water at the retaining wall · if subsoil drainage had been adequate, then it should have been able to handle the increased runoff from a broken pipe. Having carefully reviewed all photographs of the retaining wall before and after collapse: · I do not accept that the photos taken in 2010 and 2023 show the wall is moving. While what appears to be a bow in the wall is visible in the 2023 photo, the 2010 photo of the wall is so obscured that the comparison between the photographs is of little use. · I am persuaded that the drainage of the retaining wall was, on balance, insufficient. The photographs of the damaged retaining wall show no aggregate, just soil. I acknowledge that there may be aggregate closer to the ag line at the base and this may have been what RC was referring to, however, I accept that the lack of apparent aggregate is likely to indicate a lack of sufficient drainage. Experts from the insurer and complainant accepted that the vertical posts were undersize. Accordingly, I accept that there was a failure in the design of the retaining wall. While the design did not collapse by itself, I accept that it was a contributing factor in the failure of the retaining wall. Both parties accepted that a storm occurred on 30 April/ 1 May. The parties disputed the severity. Ultimately, little turns on this. The retaining wall failed shortly after a rain storm that was classified by the BOM as capable of causing damage. The insurer’s engineer says that the storm was not the dominant cause of the failure, however, I accept that it contributed to the failure of the wall. While the complainants say that the wall failed due to the burst pipe, there is insufficient persuasive evidence to show that any water escaping from the pipe was capable of causing the failure, irrespective of the storm. On balance, I accept that a burst pipe may have been a contributing factor to the failure of the retaining wall, but it was not the dominant cause of the failure. The complainants say that the insurer’s engineers did not properly consider the site and did not remove the tarpaulin which was covering much of the failed retaining wall. I accept that the complainants may have concerns with how the engineers have investigated the property however, there is insufficient persuasive evidence to show that the investigation they undertook was insufficient for them to comment on the design of the retaining wall or the drainage. Insurer has established an exclusion under the policy The insurer says that the complainant has not established any ‘event’ under the policy which has caused accidental damage. To establish a claimable loss, the complainant must show that, on balance, the damage to the retaining wall occurred from a sudden, accidental and unforeseen cause. The insurer and the complainant have both put forward possible causes of the failure of the retaining wall. Damage can have more than one cause. When deciding whether the policy responds, I need to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The exchanged documents show that the possible causes of the damage to the retaining wall are a burst pipe, defective design and a rain storm. For the reasons given above, there is insufficient persuasive evidence to show that either the burst pipe, storm or defective design was the dominant cause of damage to the retaining wall. In the circumstances, AFCA’s approach is to consider all causes as contributing to the damage. Consistent with AFCA’s approach document on proximate cause, when one possible cause is covered under the terms of the policy, and another possible cause of damage is excluded by the policy, then the insurer can decline the claim. Here, the insurer has shown that there are two contributing factors to the failure of the retaining wall, defective design and storm. The insurer has also shown that damage to a retaining wall from a storm, or from a defective design, is specifically excluded under the terms of the policy. Therefore, in accordance with AFCA’s approach, and general law, the insurer has established that two relevant exclusion clauses apply and the insurer is entitled to decline the claim. 2.2 Why is the outcome fair? The insurer has appropriately assessed the claim and has correctly applied the terms of the policy. In the circumstances, it is fair that the insurer decline the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.