1.1 Complaint
The complainant held a home building insurance policy underwritten by the financial firm (the insurer). The policy covered loss or damage to the insured property caused by defined events, including storm and rain, as well as accidental damage.
The complainant says that on 14-15 January 2025, severe thunderstorms and extreme rainfall caused damage to the underground consumer mains cable supplying electricity to his home. He says there were some initial electrical failures following the storm, followed by a complete loss of power to his home on 22 January 2025. He says that due to his dependency on the electricity supply for his medical needs, he arranged for the repairs to be immediately undertaken the same day, prior to contacting the insurer. He lodged a claim with the insurer later that same day.
The insurer denied the claim. It said it was not given the opportunity to inspect the damage and assess the condition of the cabling before the repairs were made. Notwithstanding this, the insurer says the complainant has not shown the damage was caused by the storm or is accidental damage. It says that the damage was due to gradual deterioration of the cable insulation over time, combined with the conduit design.
The complainant disagrees and says he has shown that the storm was the cause of the damage. He seeks cover for the full amount of the repair costs under the terms of the policy.
1.2 Issues and key findings
Is the insurer required to pay the claim?
Yes. On balance, the complainant has established a claimable loss under the policy. Although he authorised repairs before the insurer could inspect the claimed damage, this was reasonable in the circumstances. The contemporaneous evidence is sufficient to establish the claim, and the insurer has not shown that an exclusion applies.
Should the insurer pay non-financial loss compensation?
No. Whilst I accept that the incorrect claim decision caused stress for the complainant, I am not satisfied that the insurer otherwise mismanaged or delayed the claim.
Why is the outcome fair?
I am satisfied the complainant has established a claimable loss under the policy, and the insurer has not shown that any policy exclusions apply. It is therefore fair in the circumstances that the insurer covers the claim.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of the determination, the insurer is required to settle the claim as set out in section 2.1 of this determination, below.
2 Reasons for determination
2.1 Is the insurer required to pay the claim?
Yes. On balance, the complainant has established a claimable loss under the policy. Although he authorised repairs before the insurer could inspect the claimed damage, this was reasonable in the circumstances. The contemporaneous evidence is sufficient to establish the claim, and the insurer has not shown that any exclusion applies.
Circumstances of the claim
The insured property is the complainant’s residence, which is a house situated on a steep and rocky block, and connected to the electricity network by a consumer mains cable running from the street pillar to the home. The cabling located between the pillar and the property meter box is owned by the complainant as part of the property’s electrical installation, rather than being electricity network infrastructure. There is no dispute that this falls within the scope of the policy as part of the covered home, which includes ‘underground services’ [see page 35 of the Product Disclosure Statement (PDS)].
The complainant says that on the night of 14-15 January 2025, there were severe thunderstorms and extreme rainfall, after which the complainant noticed electrical irregularities in his home, including flickering lights and, later, the loss of power to lighting and the oven circuit. He says that over the following days, these electrical issues worsened and culminated in a complete power failure on 22 January 2025.
When the complete power failure occurred, the complainant immediately sought urgent electrician assistance. He says this was due to his concerns about safety and the risk of fire, and also because he relies on continuous electricity for medical reasons. He engaged an electrician, TW, who he says was the only contractor immediately available to assess the reason for the failure and undertake the repairs. TW identified that the underground consumer mains cable had failed. TW stated that water had entered the underground conduit during the storm, causing the three-phase cable to short and melt within the conduit.
TW stated that, due to the steep and rocky terrain, the damaged cable could not be replaced through the existing underground route. TW instead installed a new private pole, ran overhead cabling to the property, and rewired the fuse box which, it said, was required to meet current electrical standards. The complainant’s power was restored later that day, following TW’s work. The complainant paid $24,022 for this work and contacted the insurer later that day to advise of the issue and lodge the claim.
The insurer denied the claim. It stated that it had not been given the opportunity to inspect the damage prior to repairs being completed and that, based on the information available, the failure was caused by gradual deterioration of the cable insulation, and not by the storm or rain event.
Complainant has onus to establish a claimable loss
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning it is more likely than not. This is sometimes called a claimable loss.
If the complainant is able to establish a claimable loss, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Policy covers loss or damage caused by storm, rain, and accidental damage
The terms and conditions of the policy are set out in the policy documents, including the PDS and the Certificate of Insurance. There is no dispute that the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the contents of the documents.
Part 1 of the PDS sets out the insured events covered by the policy. It states the policy covers loss or damage to the insured property caused by an insured event listed in the PDS. This includes ’storm‘ and ’rain’. The PDS states at page 16:
We insure you for loss or damage to the home caused by storm (including cyclone), snow or hail. By ‘storm’ we mean a violent wind that may occur with thunder or heavy rain. We do not insure you for loss or damage caused by wind, rain, snow or hail entering the home unless it enters because of structural damage to the home that is directly caused by the storm, snow or hail.
We insure you for loss or damage to the home caused by rain. Rain includes that part of the rainfall that is not absorbed by the soil but runs off as surface water.
The policy also includes cover for accidental damage. The PDS states (at page 24):
In addition to insuring you for loss or damage to the home that is caused by an event (see Part 1), we also insure you for other accidental loss or damage to the home.
We only insure you if the loss or damage to the home:
• happens during the period of insurance, and
• is accidentally and directly caused by a sudden and unexpected event (other than by an event we insure in Part 1), and
• your claim is not excluded by the specific exclusions.
The complainant says the damage was caused by the storm. He says that:
· he noticed electrical irregularities immediately after the storm, including flickering lights and the loss of power to lighting and the oven circuit, which progressively worsened until the home suffered a complete power failure on 22 January 2025. He says the timing of this is consistent with storm‑related damage rather than pre‑existing deterioration
· TW’s contemporaneous findings support that water entered the conduit during the storm, causing the three‑phase cable to short and melt within the underground conduit
· no other homes in the estate experienced similar failures. The complainant says this shows the event affecting his property was unusual, sudden, and linked to the extreme weather, rather than a long‑term defect affecting multiple other properties
· the failure would not have occurred ‘but for’ the storm and extreme rainfall, as the underground system had operated without issue for many years, including during periods of significantly higher rainfall.
The complainant also says the damage is covered under the policy’s accidental damage cover because the failure of the cable was sudden, unexpected, and not something he could reasonably have detected or prevented.
The insurer, however, says the complainant has not shown that the storm caused the damage. It says the failure of the underground cable was the result of gradual deterioration of the cable insulation over time, combined with the original conduit design. It says it was not given the opportunity to inspect the damage before the repairs were completed, and based on the information available, the proximate cause of the damage was a long-term degradation process rather than a sudden, one-off event such as a storm or rain. The insurer also says the complainant has not shown that the cable failure was caused by a sudden, unexpected accidental event.
Satisfied that complainant has established a claimable loss
I am satisfied the complainant has established a claimable loss under the policy.
Damage can have more than one cause. When deciding whether the policy responds, I need to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
If the complainant is able to establish this, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
I acknowledge there are conflicting views about whether the severe storm and heavy rainfall was the direct and proximate cause of the cable failure, and that the insurer was not able to inspect the damaged cable and conduit before repairs were undertaken. The insurer accepts that a storm occurred, but says the complainant has not shown it caused the damage.
After careful consideration of the exchanged material, I am satisfied that the timing of the electrical irregularities makes it more likely than not the storm caused the damage. The issues arose immediately after the storm and progressively worsened until the complete power failure about a week later. Moreover, TW’s contemporaneous observations that water had entered the underground conduit and caused the cable to short further support the conclusion that the storm and resulting water ingress were the proximate cause of the failure.
Not satisfied that policy exclusions apply
As indicated, the insurer says the claimed damage was caused by gradual deterioration, seepage, and long-term degradation of materials, which are causal factors that are excluded from cover under the policy. The PDS at page 33 sets out the relevant policy exclusion as follows:
We do not insure you for loss or damage or legal liability caused by… wear and tear….rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or process.
The insurer engaged an electrical engineer, AL, to report on the claimed damage. Whilst AL was not able to inspect the damaged cabling or conduit, it conducted a desktop assessment of the documentation provided. In addition, AL had a telephone conversation with TW about the repairs undertaken. From this, AL concluded:
· water entering the conduit was foreseeable and would not ordinarily cause damage unless the cable insulation had deteriorated to the point where moisture could reach the copper conductors
· the failure was consistent with gradual deterioration of the cable insulation over time, rather than a sudden storm related cause.
After reviewing the evidence, I am satisfied the insurer has failed to show the policy exclusions for gradual deterioration or seepage apply to defeat the claim. The insurer’s position relies primarily on a telephone conversation between AL and TW, and a desktop assessment by AL, rather than any site inspection (even after the repairs) or any detailed technical examination. Moreover, I am not satisfied the insurer has sufficiently addressed why these exclusions overcome the ’coincidental’ timing of the damage, and clear sequence of worsening electrical issues directly following the storm.
The available contemporaneous evidence points to a sudden failure following the storm, including the onset of electrical irregularities immediately afterwards, further deterioration over the following days, and TW’s observations that water had entered the conduit and caused the cable to short. This evidence is more consistent with a sudden and one-off storm event, compared to long‑term deterioration.
I have also considered the complainant’s conduct in not contacting the insurer before authorising and incurring the costs for the repairs. I acknowledge this deprived the insurer of the opportunity to inspect the damaged cable and conduit before they were removed and replaced, and therefore limited its ability to fully assess the proximate cause of the damage. I note the PDS (at page 9) states:
As soon as possible after the event that gives rise to a claim, you must: give us reasonable time to inspect the loss or damage before you let anyone fix or interfere with it.
Notwithstanding this, in all the circumstances of this particular claim, I am satisfied the complainant acted reasonably, and it would not be fair for the insurer to rely on this provision to deny liability for the claim. At the time of the complete power failure, the complainant relied on continuous electricity for medical reasons, and was concerned about the safety risks associated with a live but failing electrical installation. He contacted the only available contractor urgently and proceeded with repairs to restore power the same day. The file also records the complainant notified the insurer promptly after engaging the electrician and provided the invoice, report, and photographs as soon as they were available. The insurer has not disputed the existence or severity of the complainant’s particular circumstances. I therefore accept the complainant’s actions were reasonable.
Lastly, I have considered the insurer’s position (based on the report of AL) that if the underground cable could have been replaced on a like-for-like repair basis, upgrading the remainder of the installation would not have been necessary. However, due to the repairer’s decision to install a new overhead service, broader works were required to comply with current standards.
I have already accepted the complainant acted reasonably in the circumstances. He has also explained why the installation of a new overhead service was necessary. TW advised the complainant that the damaged cable had melted inside the conduit and could not be pulled through, and that the steep and rocky terrain meant a compliant underground replacement was not feasible. Given these constraints, the installation of a private pole and overhead service was the only practical method to restore power safely and promptly. The broader works therefore flowed from the repairer’s professional judgment and the physical limitations of the site, not from any unreasonable choice by the complainant. Whilst the insurer says AL’s report shows that a like-for-like underground replacement would have been possible, it has not persuasively rebutted the complainant’s explanation that a like-for-like underground replacement was not feasible in the particular and urgent circumstances.
Therefore, I am satisfied the complainant has shown why the overhead installation and broader associated works were reasonable and necessary in all the circumstances.
Insurer required to settle the claim
I am satisfied the complainant has established a claimable loss under the policy, and the insurer has not shown that it can rely on any of the policy exclusions to deny the claim.
Accordingly, within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is to formally accept the claim and settle it by reimbursing the complainant for the repair works set out in TW’s (fully paid) invoice dated 29 January 2025, subject to the application of any policy excess or monetary limits.
On this calculated amount, the insurer is also required to pay interest calculated in accordance with section 57 of the Insurance Contracts Act 1984 from 28 March 2025, being the date the claim was denied, until the date the claim is settled.
2.2 Should the insurer pay non-financial loss compensation?
No. While I accept that the incorrect claim decision caused stress for the complainant, I am not satisfied that the insurer otherwise mismanaged or delayed the claim.
AFCA can award compensation for non-financial loss
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA does not award non-financial loss in every complaint. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Compensation is not warranted in this particular instance
I accept that the insurer’s decision, which I have found to be incorrect, caused stress to the complainant. However, the insurer’s actions in declining the claim do not amount to undue conduct or delay that would justify an award of non‑financial loss compensation. AFCA does not award compensation for the ordinary experience associated with a claim dispute, or merely because it finds the insurer’s claim decision to have been incorrect.
From my review of the exchanged material, there is no evidence of unreasonable delay, poor communication, or conduct by the insurer that would justify an award of nonfinancial loss compensation. The claim was assessed and responded to within expected timeframes, and when the matter became a dispute, the insurer followed its internal dispute resolution process and provided its reasons to the complainant in a timely manner.
I am therefore of the opinion that an award of compensation for non-financial loss is not warranted in the circumstances.
2.3 Why is the outcome fair?
I am satisfied the complainant has established a claimable loss under the policy, and the insurer has not shown that any policy exclusions reasonably or fairly apply. It is therefore fair in the circumstances that the insurer covers the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.