Home / IAG / Determination 12-25-225558
Determination 12-25-225558
Insurer denied cover for roof tile damage from a pool solar mat leak, finding it pre-dated the policy, and offered only internal damage repairs
Summary
The complainant claimed for roof tile and internal damage from a leaking pool solar mat; the insurer accepted only internal damage. AFCA found the roof damage pre-dated the policy, upheld the denial of roof cover, and required the insurer to pay reasonable internal repair costs on invoice, or $1,374.45 plus 20% uplift, with interest on invoices.
On the balance of probabilities the roof damage was long-standing and pre-dated policy inception, so it was not a covered loss, while the accepted internal damage must be reimbursed at reasonable cost.
Issues
- Claim denial primary · not upheld
“Not satisfied the roof damage originated during the policy period; insurer not liable for any aspect of the roof damage or pool mat damage.”
- Claim amount dispute secondary · upheld
“Insurer to reimburse reasonable costs of internal repairs on invoice, or pay $1,374.45 plus 20% contingency uplift.”
- Poor claim handling secondary · not upheld
“Some aspects could have been handled better or more quickly, but handling overall was reasonable and no compensation warranted.”
- Repairs or contractors secondary · not upheld
“No persuasive evidence the insurer's contractors damaged the gutter; pre-existing rust and gutters since replaced.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
|
Case number
|
12-25-225558
|
Financial firm
|
Insurance Australia Limited
Case number: 12-25-225558 20 February 2026
1 Determination overview
1.1 Complaint
The complainant held a home building and contents insurance policy underwritten by the financial firm (insurer). He lodged a claim for damage to the roof tiles and inside the home due to an extensive leak from a pool solar mat on the roof.
The insurer agreed to cover the cost of the resultant internal damage it quoted but otherwise denied the claim. It considers the damage to the roof tiles pre-dated the policy inception date. It also says that exclusions apply to this damage.
The complainant disagrees and seeks cover for the full extent of claimed damage. He is also dissatisfied with the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer required to increase its offer for settlement?
The insurer is required to pay the reasonable costs incurred by the complainant to repair the internal damage, subject to receipt of invoices for this work. It is not required to cover the roof damage or the other damage claimed.
Is an award of compensation warranted?
No. Whilst the complainant experienced some inconvenience due to the handling of the claim, the insurer’s approach was correct and fair. There is no need to pay compensation.
Why is the outcome fair?
Based on the exchanged information, there is no persuasive evidence the roof damage and/or the water leak started during the period of insurance. The exchanged material shows the damage to the roof was aged. It would not be fair to require the insurer to cover the roof damage or to pay compensation, noting its handling of the claim was reasonable.
1.3 Determination
This determination is mostly in favour of the insurer.
Outside of covering the reasonable cost to repair the internal damage (subject to receipt of an invoice), the insurer is not required to cover the other aspects of the claim. If no such invoice is provided within four weeks of acceptance of this determination, the insurer may pay the $1,374.45 it previously offered. It must add a contingency uplift of 20%. This is to compensate the complainant for the loss of the lifetime guarantee and the transfer of risk.
The insurer is to pay interest on settlement of the complainant’s invoices, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date of any invoice provided until the date of settlement. However, the insurer is not required to pay interest if settling the claim based on the payment for $1,374.45 as this amount will include a contingency uplift.
2 Reasons for determination
2.1 Is the insurer required to increase its offer for settlement?
The insurer is required to pay the reasonable costs incurred by the complainant to repair the internal damage, subject to receipt of invoices for this work. It is not required to cover the roof damage or the other damage claimed.
Complainant says leaking solar pool mat on roof caused all claimed damage
The complainant has a two-storey home which was constructed in or about 1984. The home has a pool. Heating to the pool is through a roof based plumbed solar mat (pool mat). This permitted water to heat on the roof of the home and filter through to the pool.
The complainant says damage to the pool mat caused water to leak and damage the roof tiles and to ingress into the home. The complainant discovered this damage on or about 26 December 2024.
Whilst the insurer agreed there was an issue and accepted the resultant internal damage, it does not agree the leak caused roof damage. It says this damage was long-standing and predated the inception of the policy on 16 October 2024. Beyond this, it says the roof damage was due to long-term wear, tear and gradual deterioration, which the policy does not cover.
Onus on complainant to establish claimable loss
The complainant has the onus of establishing he suffered a loss from an event covered by the policy. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
If the complainant can establish he suffered a claimable loss, the onus shifts to the insurer to show, on balance:
· it is entitled to rely on an exclusion under the policy, or
· it is otherwise entitled to reduce its liability or decline the claim.
Policy covers listed events subject to terms, conditions and exclusions
The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for loss or damage caused by an escape of water or liquid. This includes water escaping from pipes at the site.
Any cover provided under by the policy is subject to terms, conditions and exclusions.
Insurer’s experts found damage was aged, suggesting it pre-dated the policy
The insurer arranged for several experts to inspect the damage.
Builder FB attended the home on 14 January 2025. It provided a report (based on the findings of roofer TB) which found that water ingress into the home was through the ‘deteriorated terracotta tile laps’ on the roof. It says aged and deteriorated ridge pointing also contributed to this. It recommended the entire roof be replaced.
FB attributed the observed roof damage to age, wear, tear and a lack of maintenance. Whilst the complainant believes water leaking from the pool mat caused damage to the tiles, FB noted much of this damage was above where the leak had occurred.
Forensic engineer CF provided a report dated 23 March 2025. It found:
· whilst situated in the roof void, daylight was ‘clearly visible’ through the roof tiles
· efflorescence was noted on some tiles around where the pool heater pipes were located
· some of these tiles were ‘extremely dilapidated’, with parts having ‘crumpled away’
· degradation (albeit to a lesser extent) was present to roof tiles in other areas as well
· prolonged exposure to chlorinated water can shorten the lifespan of terracotta tiles
· the affected area of tiles is also the area most exposed to the prevailing weather
· ‘wind-blown airborne salts’ from nearby water bodies likely affected the roof too
· noting the damage to other parts of the roof, the most likely cause of damage is exposure to the local elements, however the most affected area was where the heater pipes were
· viewing historical online images of the roof, there was damage visible over several years.
Photos provided by CF show areas where daylight was ‘clearly visible’ through tiles when looked at from within the roof space and instances of efflorescence to the tiles.
Online satellite photos of the home show there was damage in and around the solar mat as far back as February 2021. This is more than two years prior to the inception of the policy. Images from July 2024 and January 2025 confirmed the damage was still there.
Complainant obtained own reports to investigate cause of damage
The complainant says he is only seeking the cost to replace 200+ tiles, which were situated under the pool heater mat. He has since replaced the original roof with a Colorbond roof.
Of the experts the complainant retained to inspect the home:
· plumber DH reported on 10 January 2025 that the solar water system pipework had been ‘leaking for an extended period as roof tiles have signs of damage from the pool water’. It said the coating on the tiles had been ‘washed away leaving the tiles no longer functional’
· roofer DP provided an undated report noting the pool hot water system was leaking, causing water ingress into the home. It recommended the replacement of the roof tiles with Colorbond roofing
· roofer DK provided an undated report noting the roof was ‘starting to show [its] age’. DK wrote that the pool mat was fastened to the roof with silicone and had:
Over a period of time […] leaked extensively onto the terracotta tiles causing severe corrosion.
· DK estimated 250-300 tiles were damaged, noting the ‘chlorinated water [had] eaten away’ these tiles.
The complainant insists the pipes in the pool mat ‘burst after we took out the policy’. He was unable to provide any expert or other independent evidence to support this view.
Not satisfied insurer is liable for claimed roof damage
I accept there was a water leak from the pool mat on the roof, and that this permitted water to enter the home. The insurer agreed to cover this damage.
The key issue is the damage to the roof. The exchanged information does not persuasively show this damage originated during the policy period.
On balance, I am satisfied there was roof deterioration over several years. This damage preceded the inception of the policy.
Historical online photos show evidence of roof damage where the pool mat lay as far back as 2021. Later photos of the same area showed this damage was still present in mid-2024, just prior to the complainant taking possession of the home.
I am satisfied the photos show long-term deterioration was present.
Whilst I acknowledge the leak may have developed (or worsened) during the period of cover, I consider this unlikely as:
· the damage where the pool mat was located was more severe than other areas of the roof
· this implies leaks from this apparatus only potentially worsened the damage
· evidence of this damage being present prior to the inception of the policy shows this was ongoing for years.
I consider the issue pre-dated the inception of the policy. Given this, I am not satisfied the insurer is liable for it.
The insurer is not liable to cover any aspect of the roof damage or pool mat damage.
Insurer to reimburse reasonable amount paid to repair internal damage
The insurer agreed to cover internal damage to the home, caused by water leaking through the roof. The complainant says this damage was repaired at a cost of $3,000.
No evidence of this repair cost was provided.
Whilst FB quoted $1,374.45 to the insurer to attend to his work, I am not satisfied this should be the basis for settlement. FB noted it would not guarantee repairs in its initial report but said it would in the quote prepared. Given the issues with the roof were not resolved at the time, I am not satisfied FB’s quote was actionable or should be preferred.
Therefore, I accept the insurer should be liable for the reasonable costs the complainant paid to attend to the damage.
However, for the complainant to be reimbursed the amount sought, he must provide evidence of an invoice(s) to show the work was done and what it cost. The insurer is only required to reimburse the complainant for costs directly related to the claim.
If the complainant cannot provide an invoice(s) within four weeks of accepting this determination, I am satisfied it is fair that the insurer settles based on the FB quote. Noting I do not accept this quote was actionable (and as the work has been done), the insurer must include a contingency uplift of 20% with this payment. This will compensate the complainant for the loss of the lifetime guarantee and the transfer of risk.
Not satisfied complainant can show insurer’s contractors caused damage
The complainant also says the insurer’s contractors caused specific damage to the roof through carelessness. He says one of the gutters was damaged by a contractor placing a ladder against it and moving up and down this ladder whilst inspecting the roof.
The complainant could not recall which contractor this was or when it occurred.
The insurer found no evidence to show any of its contractors caused the damage.
Whilst I acknowledge it is possible the damage was caused by one of the insurer’s contractors, it is also possible it was caused by one of the complainant’s contractors. The complainant also acknowledged there was some pre-existing surface rust on the gutter.
The complainant has since replaced all the gutters at the home.
I consider there is no persuasive evidence to show the insurer is responsible for this damage. Even if one of its contractors caused the damage, the pre-existing rust present suggests the damage was likely minimal. As the gutters were uniformly replaced, I cannot be satisfied the complainant can show he suffered a loss (and if so, to what extent) due to the insurer.
I am not persuaded the insurer bears responsibility for this damage.
2.2 Is an award of compensation warranted?
No. Whilst the complainant experienced some inconvenience due to the handling of the claim, the insurer’s approach was correct and fair. There is no need to pay compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
No need for the insurer to pay compensation for non-financial loss
The complainant says the handling of the claim took too long and this frustrated him.
I acknowledge the process was difficult. However, based on the exchanged material, it appears the claimed damage to the roof was likely present prior to the complainant’s ownership of the home.
As previously noted, I am not satisfied the insurer is liable for this.
I acknowledge there were some aspects of the claim the insurer could have handled better or more quickly. However, I accept it made the correct decision on indemnity. I am not satisfied its handling of the claim overall was so poor that its effect on the complainant warrants a compensatory payment.
2.3 Why is the outcome fair?
Based on the exchanged information, there is no persuasive evidence the roof damage and/or the water leak started during the period of insurance. The exchanged material shows the damage to the roof was aged. It would not be fair to require the insurer to cover the roof damage or to pay compensation, noting its handling of the claim was reasonable.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.