Home / Suncorp Group / Determination 12-25-225149

Determination 12-25-225149

Partial decline of storm/water damage claim and dispute over settlement amount, temporary accommodation and delay

FirmSuncorp Group
Decided2026-01-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowner's storm and water damage claim was partly declined; AFCA found the kitchen/living ceiling damage covered as accidental damage but upheld the decline of garage and stairwell damage, temporary accommodation and delay allegations. The insurer must cash settle on a revised builder's quote with 25% uplift and interest.

The complainant did not show garage and stairwell damage was an insured event and it was excluded as gradual deterioration, but the insurer failed to prove an exclusion for the kitchen ceiling, which fell under accidental damage cover.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-225149 | Financial firm | AAI Limited Case number: 12-25-225149 24 December 2025 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). In February 2025, he made a claim for water damage and cracking to the property which he says was caused by a storm. The insurer partially accepted the claim and agreed to cover water damage to the plaster in the laundry, study, and garage. The insurer declined the water damage to the kitchen ceiling and stairwell wall saying it was caused by a long-term leaks rather than a storm. The insurer offered to engage an engineer to assess the cracking, but the complainant completed repairs himself and sold the property. The insurer has offered to pay $4,655.83 based on repair quotes for the accepted damage. The complainant wants the insurer to reimburse the costs he incurred repairing the property and renting alternative accommodation. He also says the insurer caused delays on the claim. 1.2 Issues and key findings Is the insurer required to cover the disputed damage? Partially. The complainant has not shown the disputed damage to the garage and stairwell was caused by an insured event and this damage is excluded. However, it is fair for the insurer to cover the water damage to the kitchen/living area as accidental damage. What is a fair resolution of the claim? It is fair for the insurer to cash settle the claim based on a revised quote to be obtained from its builder including the kitchen/living area ceiling, plus a 25% uplift and statutory interest. Is the insurer required to pay for temporary accommodation? No. The evidence does not show the home was unfit to live in due to the covered damage. Did the insurer cause unreasonable delays on the claim? No. The insurer complied with industry standards and there were no unreasonable delays. Why is the outcome fair? The terms of the policy and evidence have been applied to determine the insurer’s liability. It is fair for the insurer to cover the damage to the kitchen/living area under accidental damage and cash settle the claim based on a revised quote, plus a 25% uplift and statutory interest. 1.3 Determination This determination in substantially in favour of the insurer. Within 28 days of notification of acceptance of this determination, the insurer is required to: · obtain an updated scope of works and quote from HR to complete all damage covered under the policy including: > the previously accepted damage to the laundry, study and garage > the damage to the ceiling in the kitchen/living area · pay the complainant the revised amount quoted by HR, plus a 25% uplift and interest calculated under section 57 of the Insurance Contracts Act (the Act) from 5 May 2025 (date of IDR letter) to the date of payment. 2 Reasons for determination 2.1 Is the insurer required to cover the disputed damage? Partially. The complainant has not shown the disputed damage to the garage and stairwell was caused by an insured event and this damage is excluded. However, it is fair for the insurer to cover the water damage to the kitchen/living area as accidental damage. Policy coverage The complainant held a home insurance policy for the period 6 March 2024 to 6 March 2025. There is no dispute that the complainant was provided with the policy documents including the Certificate of Insurance (COI) and Product Disclosure Statement (PDS). The policy covers loss or damage to the building caused by an insured event in the period of insurance. The PDS sets out the insured events that are covered including ‘storm’ (page 41) and ‘escape of liquid’ (page 47). The COI states that the policy includes optional cover for ‘Accidental damage at home’ (page 63). The complainant is therefore covered for accidental loss or damage to the building that is not covered under another section of the policy. He is still required to show that the damage occurred due to an incident covered under the policy. ‘Incident’ is defined on page 105 of the policy as ‘a single event, accident or occurrence which you did not intend or expect to happen. A series of incidents attributable to one source of originating cause is deemed to be the one incident.’ The PDS also sets out various terms, conditions and exclusions. Complainant has onus of establishing a claimable loss It is accepted insurance law that an insured has the initial onus to show, on the balance of probabilities (that it is more likely than not), that the loss or damage claimed falls within the terms of the policy. Where this is established, the onus then shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. There is no dispute that the complainant has established a claimable loss for water damage caused by a ‘storm’. However, the extent of the damage and insurer’s liability are in dispute. Insurer says it is entitled to decline the disputed damage The insurer says not all the claimed damage was due to the claimed storm event. The insurer advised the complainant to lodge a separate claim under ‘escape of liquid’ for the water damage to the kitchen ceiling, which it says was caused by a leak from the bathroom. The insurer also says some of the damage relates to ‘wear, tear and gradual deterioration’ and it is excluded under the policy. This exclusion is set out on page 35 of the PDS: Wear, tear and gradual deterioration any part of the building that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: • tiles and their adhesive or grouting breaking down; • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concrete. Expert evidence regarding the cause of the damage The insurer arranged for a builder and plumber to inspect the property. The insurer’s builder, HR, found multiple areas of water damage including the garage ceiling, study ceiling, laundry ceiling, wall in the stairwell and ceiling in the kitchen family room. The HR report makes the following key findings: · the damage to the study, laundry and a small section of the garage were from water entering through the roof · water damage to the stairwell wall is through a window directly above the area · water damage to the ceiling in the kitchen family is from escape of liquid from both bathrooms above the affected area HR identified maintenance issues with the roof, external render and the window frame above the stairwell, together with pre-existing long-term deterioration to the garage ceiling. HR noted that the garage ceiling is in a deteriorated condition from glue and mechanical fixing failure and there is no insulation to the garage ceiling which allows the plaster to become damp from the cold air and causes sagging and ripple effect. HR reported that 95% of the damage to the garage ceiling has been caused from gradual deterioration. The insurer’s plumber, MW, inspected the roof and completed leak detection testing. MW reported that there was no storm damage to the roof of the garage and identified maintenance issues causing water ingress. These included poorly installed flashing along the side of the roof and gaps along the bottom and top floor window frame above the garage. MW further reported that: · maintenance issues were causing water ingress to the study and laundry including a poorly installed apron flashing and gaps in the brickwork · the damage in the stairwell was caused by gaps in the window frame above and spray testing of the window frame failed · following leak detection to the bathroom and ensuite there were no signs of any insurable escape of liquid that would have caused the staining to the ceiling. HR maintains that the damage to the kitchen ceiling is from the bathrooms above and not from a storm event. HR says the staining appears to be long-term and suggested there may be an issue with the pipes despite the fact no escape of liquid was found by MW. Engineer did not inspect the property HR recommended that a structural engineer be engaged to inspect the movement cracking. The insurer offered to engage an engineer to inspect the property in May 2025, but this did not occur. The complainant emailed AFCA on 14 May 2025 stating: Engaging an engineer is a reasonable step forward, but I would urge that we set a clear timeframe for this process. Alternatively, the insurance company should honour the quote I have obtained and proceed with covering the damages. On 2 June 2025, the complainant received a text message from the insurer advising that an engineer had been engaged to inspect the property and would be in touch shortly to arrange an appointment. The complainant emailed AFCA stating: Unfortunately, I am no longer in a position to wait or continue to pursue this matter further. I am also uncertain how much longer the process might take after engaging an engineer. The complainant subsequently completed repairs himself and has provided an invoice for this work in the amount of $18,260. Given repairs have already been completed, and the property has been sold, it is no longer possible for an engineer to inspect the property. The insurer says its previous offer to cash settle the accepted damage for $4,655.83 still stands. Policy condition on page 72 does not assist the insurer Page 72 of the PDS sets out the complainants’ obligations when making a claim. It states that the complainant must allow the insurer to arrange for experts to assess the building and must not carry out repairs without the insurer’s consent. It further states: If you do not comply with ‘What you must do’ and ‘What you must not do’ we can reduce or refuse to pay your claim and/or recover from you any costs and/or any monies we have paid and/or cancel your policy. I acknowledge the complainant completed repairs without allowing an engineer to inspect the property and without the express consent of the insurer. However, Section 54(1) of the Act prevents an insurer from denying claims due to post-contract acts or omissions unless the act caused or contributed to the loss. Where the act prejudiced the insurer, it may reduce its liability to the extent of the prejudice. The insurer had several opportunities to inspect the property and could have engaged an engineer earlier. This was recommended in the HR report dated 25 March 2025 and the repairs were not completed until 26 June 2025. Further, the complainant provided the insurer with a quote and advised that he could not wait any longer before repairing the property. The complainant had an obligation to maintain the property and mitigate his loss, and I do not consider he acted unreasonably. The complainant wants the insurer to reimburse the cost of the repairs completed by him. He has provided an invoice for internal plastering and painting work. The insurer has not shown that the complainant’s actions caused prejudice in relation to this damage and delays obtaining an engineering opinion were contributed to by the insurer. I therefore do not consider the insurer is entitled to reduce the claim based on the policy condition. The complainant does not appear to be seeking the cost of repairing any external cracking. Insurer can decline disputed damage to garage ceiling and stairwell Based on the expert reports by HR and MW, I am satisfied that: · most of the damage to the garage ceiling was due to gradual deterioration and maintenance issues · the water damage in the stairwell occurred due to a leaking window frame and was long term in nature The complainant therefore has not shown these items of damage were caused by a ‘storm’. Further, although the damage was accidental in nature, there is no persuasive evidence that it was caused by a single event or ‘incident’ during the period of insurance. The insurer’s experts state that it was long term and have explained how it occurred over time due to various maintenance issues with the property. The complainant has not provided any evidence to refute this. I therefore do not consider the ‘Accidental damage’ cover responds. It follows that the complainant has not established a claimable loss in respect of the disputed damage to the garage ceiling and stairwell. The insurer is therefore entitled to decline this part of the claim. For the sake of completeness, I also consider the policy exclusion for wear, tear and gradual deterioration applies in relation to this damage. The insurer has offered to pay for a small amount of damage to the garage ceiling (deemed to be caused by storm), and I consider this a fair outcome. Fair for insurer to cover damage to ceiling in kitchen and living area The cause of the water damage to the ceiling in the kitchen and living area is unclear. Based on the exchanged material, I am not persuaded it was caused by a storm event or an escape of liquid from the bathrooms above. While HR suggests there might be issues with the pipes, the leak detection test by MW showed no evidence of this. Further, although HR says the damage appears to be long term, he has not explained how he reached this conclusion or provided any supporting information to establish the timing of the damage. In the circumstances, I consider the damage to the kitchen ceiling and living area falls under the cover for ‘accidental damage to the building’. It is an occurrence which the complainant did not intend or expect to happen, and it is not covered under any other section of the policy. The complainant has therefore established a claimable loss in respect of this damage. The insurer bears the onus of showing a policy exclusion applies, and I am not satisfied it has done so. The insurer’s expert reports do not reach any clear conclusion regarding the cause of the damage and there is no persuasive evidence that it was caused by wear, tear or gradual deterioration (or any other excluded peril). For the above reasons, I consider it fair for the insurer to accept this damage under the ‘accidental damage’ cover in the policy. 2.2 What is a fair resolution of the claim? It is fair for the insurer to cash settle the claim based on a revised quote to be obtained from its builder including the kitchen/living area ceiling, plus a 25% uplift and statutory interest. Complainant’s invoice is not fair and reasonable The complainant wants the insurer to reimburse the cost of the repairs completed by him. He has provided the following documents: · Quote from SP dated 10 June 2025 for plastering ($8,000) · Invoice from EH dated 26 June 2025 for plastering and painting ($18,260) · Photograph taken during repairs on 26 June 2025 I have carefully reviewed the complainant’s quote and invoice. I am satisfied that the repair costs included all internal damage to the plaster ceilings and walls at the property (including the disputed damage). The documents are not itemised and include items which are not covered under the claim. It is therefore not possible to determine the costs incurred to repair the accepted items of damage based on these documents. The invoice exceeds the quote by over $10,000. The plastering works appear similar, but it also includes $6,600 for painting and does not specify which areas were painted. Given the amount invoiced for painting, I consider it likely some undamaged areas were painted. In the circumstances, I do not consider the complainant’s invoice fair and reasonable. Fair for insurer to settle accepted damage with an uplift The insurer offered to cash settle the accepted damage for $4,655.83 based on: · Quote by HR for repairs to laundry and study ($2,832.77) · Quote by HR for repairs to the garage ($1,823.06) Pages 74 and 75 of the PDS sets out how the insurer will settle a home claim. In short: · when a member of the insurer’s supplier network can complete the repairs, the insurer will engage a builder to prepare a scope of works and provide a repair quote · when a member of the insurer’s supplier network is unable to complete the repairs, the insurer will ask the insured to engage a builder to provide a scope of works and quote · the insurer will assess the quote and pay the assessed amount or an adjusted amount. The HR report recommends a cash settlement of the damage to the garage due to pre-existing maintenance issues. It can be inferred that HR was unwilling to complete at least some of the works. The complainant provided his own quote to repair the plaster damage for $8,000 and asked the insurer to pay that amount. The complainant’s quote is not itemised and included repairs to areas not covered under the policy. There is no information to suggest the insurer assessed the complainant’s quote or provided an adjusted amount. Instead, the insurer maintained its previous cash settlement offer which was based on the amount quoted by its own builder, HR. The approach adopted by the insurer is not directly in line with page 75 of the policy. It is widely accepted that a cash settlement must be sufficient to enable the complainant to complete repairs. The insurer’s quotes are significantly less than the repair costs incurred by the complainant. Having carefully reviewed the line items, I am satisfied that the HR quotes cover the accepted repairs to the laundry, study, and garage including painting and plastering. However, there is no information to show that these quotes were actionable. The insurer also has not provided a quote to repair the ceiling in the kitchen/living area as this area was initially declined. In the absence of an actionable quote or itemised invoice for all repairs covered under the policy, I consider it fair for the insurer to: · obtain an updated scope of works and quote from HR to complete all damage covered under the policy including the damage to the kitchen/living area ceiling (given HR previously inspected the property this can be done on a desktop basis) · pay the complainant the revised amount quoted by HR, plus a 25% uplift to account for any difference in costs between the insurer’s trades and commercial rates I also consider it fair for the insurer to pay interest on the settlement sum under section 57 of the Act from 5 May 2025 (date of IDR letter) to the date of payment. 2.3 Is the insurer required to pay temporary accommodation? No. The evidence does not show the home was unfit to live in due to the covered damage. Complainant seeks reimbursement of rental costs The complainant says that, due to claim delays, the property sustained further damage and became unsafe for his family to reside in. As a result, his family moved out of the property in April 2025 and rented another property. The complainant has provided a tenant history report which shows that he rented another property commencing 23 April 2025 with monthly rent of $2,477. The complainant advised AFCA that the insured property was sold in August 2025. He wants the insurer to cover the rent paid in the interim. Insurer is not required to pay for temporary accommodation The policy includes cover for temporary accommodation. Page 57 of the PDS states: When you are covered for loss or damage to the building to the extent that the building cannot be lived in, we will pay for your reasonable and necessary temporary accommodation costs for the time it will take to repair or rebuild the building so that it can be lived in again... Page 104 the PDS states: Cannot be lived in means destroyed or made completely or partially unfit to live in. This might include if the utilities are not available or it is not safe to live in. I accept that the complainant moved out of the property in April 2025 and rented another property. However, he has not provided any persuasive evidence that the insured property was unsafe or unfit to live in due to the damage covered under the policy. The reports by HR state that the damage is cosmetic and does not hinder liveability in the property. Further, the temporary accommodation benefit does not apply in respect of the damage to the garage and stairwell which is excluded from cover. I acknowledge the complainant arranged repairs to the property, but the insured repairs were not major and were completed in late June 2025 (2 months after the complainant moved out). He did not move back in following the repairs as the property was advertised for sale. The insurer is not required to pay for temporary accommodation in these circumstances. 2.4 Did the insurer cause unreasonable delays on the claim? No. The insurer complied with industry standards and there were no unreasonable delays. Insurer handled the claim reasonably The complainant has raised concerns about delays by the insurer during the claim. He also says that he tried to contact the insurer multiple times but received no response. I have carefully reviewed the exchange material and note the following timeline: · 16 February 2025 - claim was lodged with insurer · 27 February 2025 - builder HR inspected the property · 14 March 2025 - plumber MW inspected property and completed leak detection testing · 20 March 2025 - insurer advised complainant they were still waiting for BA report · 26 March 2025 - HR report was provided to insurer · 29 March 2025 - insurer communicated its decision to partially settle the claim and made a cash settlement offer to the complainant · 9 April 2025 - complainant lodged this complaint with AFCA before going through the insurer’s internal complaint process · 23 April 2025 - complainant moved out of the property into a rental property · 5 May 2025 - insurer provided its IDR response and offered to engage an engineer · 14 May 2025 - complainant advised AFCA he agreed to proceed with an engineer · 16 May 2025 - insurer’s internal assessor requested an engineer · 2 June 2025 – engineer contacted the complainant to arrange an inspection, at which point the complainant said he could not wait any longer · 26 June 2025 - complainant completed repairs to the property The General Insurance Code of Practice (the Code) sets the standards which insurers must meet when providing services to its customers. The Code states that an insurer will provide a progress update every 20 business days and make a claim decision within 10 business days after receiving all relevant information. Based on the timeline set out above and my review of the claim file notes, I am satisfied the insurer complied with the standard timeframes under the Code. I therefore do not consider the insurer caused any unreasonable delays on the claim. I acknowledge there were some delays engaging an engineer but do not consider these were significant. The insurer complied with industry standards when providing its EDR response and the claim file notes show that they authorised an engineer promptly after the complainant agreed to proceed. I accept that it took approximately 2 weeks for the engineer to contact the complainant. However, engineers are in high demand, and this may have been beyond the insurer’s control. There is no persuasive evidence that the complainant repeatedly contacted the insurer and received no response. Further, it was the complainant‘s decision not to proceed with the engineer. For the above reasons, I am satisfied that the insurer handled the claim reasonably. 2.5 Why is the outcome fair? The terms of the policy and evidence have been applied to determine the insurer’s liability. It is fair for the insurer to cover the damage to the kitchen/living area under accidental damage and cash settle the claim based on a revised quote, plus a 25% uplift and statutory interest. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.