Denial of earthquake claim for garage cracking and mould-damaged contents, plus delays and claim handling

FirmSuncorp Group
Decided2026-08-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed$322,000
SourceAFCA PDF

Summary

The complainant claimed for earthquake damage to his garage and mould-affected contents after the insurer paid only the benchtop. AFCA upheld the insurer's denial but ordered $3,000 for non-financial loss due to delays and communication.

Engineering evidence showed the garage damage was more likely caused by excluded ground movement, the contents were disposed of prejudicing the insurer, and consequential losses were excluded, but delays and poor communication warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-224426 | Financial firm | AAI Limited Case number: 12-25-224426 7 July 2026 1 Determination overview 1.1 Complaint The complainant holds home building and contents insurance with the financial firm (insurer). On 7 October 2021, he lodged a claim for cracking damage to a kitchen benchtop and his garage which he attributed to an earthquake that took place on 22 September 2021. After initially denying the claim, the insurer accepted the benchtop damage was earthquake related. However, it maintains that the other damage is due to excluded ground movement. It also says it is not liable for subsequent mould damage to contents stored in the garage. The complainant says the earthquake caused all the damage claimed. Further, that he had to replace his garage and throw out contents because of the insurer’s delays and poor claim handling. He seeks at least $322,000 from the insurer for the replacement costs he incurred, medical expenses, interest, lost wages, stress and inconvenience. 1.2 Issues and key findings Can the insurer deny the disputed building damage claim? Yes. Based on the exchanged information, the disputed building damage was more likely than not caused by excluded long term ground movement rather than the earthquake. Is the insurer entitled to deny the contents claim? Yes. The insurer is not liable for the mould damage to the contents, and the complainant prejudiced the insurer’s interests by disposing of the contents before it could assess them. Is indirect financial loss compensation payable? No. The policy excludes consequential losses, and I am not satisfied an award of indirect financial loss compensation outside the policy terms is justified. Is non-financial loss compensation payable? Yes. The insurer contributed to the delays experienced and aspects of its claim handling should have been better. It is to pay $3,000 to compensate the complainant for the stress and inconvenience it unreasonably caused him. Why is the outcome fair? The outcome is fair because the insurer has correctly applied the policy but has unreasonably caused the complainant stress and inconvenience. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of the complainant accepting this determination, the insurer is to pay him $3,000 in non-financial loss. The insurer is otherwise not required to take any action. 2 Reasons for determination 2.1 Can the insurer deny the disputed building damage claim? Yes. Based on the exchanged information, the disputed building damage was more likely than not caused by excluded long term ground movement rather than the earthquake. Complainant must show a claimable loss under the policy terms ​​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policy. This means he must show the loss was caused by a risk for which he is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. ​​Subject to the terms and conditions set out in the home building product disclosure statement and the contents product disclosure statement (together, the PDS), the policy covers the complainant for loss or damage to his home and contents caused by a listed insured event. Those events include ‘Earthquake and tsunami’. ​On 7 October 2021, the complainant notified the insurer that following an earthquake on 22 September 2021, he noticed a crack in his stone kitchen benchtop and cracking of the standalone garage’s brick walls. After initially denying the entire claim, on 8 September 2022, the insurer accepted the damage to the kitchen benchtop. On 17 November 2022, it paid the complainant $12,147.24 as a cash settlement for the kitchen benchtop. That aspect of the claim is not in dispute. The insurer maintains that the complainant has not established a claimable loss under the policy terms for any other building damage. It says the disputed damage is not due to the earthquake but is due to excluded long term ground movement. Insurer denied claim for disputed building damage On 25 October 2021, the insurer’s appointed builder J inspected the home. The complainant advised J that the observed cracking only appeared after the earthquake. On a preliminary basis, J considered the damage may have been caused by the earthquake, but recommended an engineer be engaged to report on causation. Engineer K inspected the home on 25 February 2022 and reported to the insurer that: · the cracking to the kitchen benchtop appeared aged noting its staining · the cracks in the garage also appeared aged given their rounded edges and previous patch repairs/painting over them · the cause of the cracking and the front door jamming was ongoing natural ground/footing movement as shown by the existing vertical movement of the floor · normal building movement, the construction method, and deterioration of construction material over time would have contributed to the damage · natural ground movement due to seasonal variations of soil moisture content would also be involved · the floor level survey showed a vertical difference in the floor level of up to 32mm. That was unrelated to the earthquake but would over time have caused cracking to internal and external walls · Geoscience Australia’s website showed the earthquake was 5.9 in magnitude, with its epicentre about 135km from the home · the shaking at the home during the earthquake would on the Modified Mercalli Intensity (MMI) scale have been MMI IV (light) to MMI V (moderate). That is insufficient to cause cracks or damage to a building, which generally requires shaking of VI (strong) or above. As the complainant was dissatisfied with K’s conclusions, the insurer engaged a second engineer, G, to report on causation. G inspected the home on 28 June 2022, G said: · the kitchen benchtop was Caesarstone, which is brittle. A 5.9 magnitude earthquake could cause the stone to yield as it clashes at the joins. The observed hairline cracking demonstrated that movement · the staining to the benchtop crack was due to spillage from the coffee machine nearby · the cracks in the garage brickwork were pre-existing but had been exacerbated by the earthquake. Daylight could now be seen through them and the complainant said that was not the case before · cracks are commonly found in older single-skin brick wall structures like the garage due to their inherently weak design · the hairline crack through the kitchen plaster and cornice was from normal movement and settlement, typical of a building over 60 years old such as the home · foundation movement is often caused by changing soil moisture conditions but can also be due to soil settlement following construction, erosion of sandy soils, or tree roots growing under footings. After the benchtop cash settlement was paid, on 18 November 2022, the claim was closed. In May 2023, the complainant contacted the insurer, advising that he had new information. On 8 June 2023, he provided to the insurer builder T’s quote dated 8 June 2023. T said the earthquake had caused major structural damage to the garage, and that mould was starting to grow due to water ingress through the cracks. T quoted $9,790 for repairs. The insurer’s restorer, R, attended the home on 16 June 2023. The complainant informed R that he had already thrown out contents items and wiped away mould growth. R confirmed there were elevated moisture levels in the garage but did not install dryers as the cracks remained and would still allow water ingress. On 30 June 2023, engineer M attended the home and reported to the insurer that: · the locations and patterns of the wall cracking throughout the garage was typical of damage caused by differential foundation movements in reactive foundation soils · the foundation soils of the site were expected to be highly reactive clay soils, which experience notable volumetric changes with relative changes in moisture content · the cracking pattern and floor level survey showed there had been notable variations in the garage’s floor level with a pattern of relative settlement towards the western side · the differential footing movement was the result of one or more of the following: > long term tree root drying due to several trees in close vicinity to the garage > normal seasonal and climatic effects, amplified by the nearby trees > poor ground surface drainage due to lack of impermeable paving around the garage > abnormal weather periods involving minimal or elevated rainfall · the likely shaking intensity at the site during the earthquake was MMI IV (light), which would be insufficient to cause the observed cracking. ​The insurer submits that the complainant has not established a claimable loss. Rather, the damage is from excluded causes. This is because the PDS says there is no cover for loss or damage caused by, connected with or arising from ground movement, except damage caused by landslide or subsidence that occurs within 72 hours of and directly because of an earthquake. ​Complainant says earthquake caused the disputed building damage The complainant says the earthquake was the most significant seismic event in Victoria’s history. Further, that due to his role in emergency services, he attended many sites where significant damage had been caused by the earthquake. He emphasises the alignment of the timing of the earthquake and the appearance of the damage. The complainant refers to T’s quote dated 8 June 2023, in which T said: · the garage had sustained major structural damage because of the earthquake · the earthquake vibrations had caused large cracks and shifts in load bearing members · the complainant reported that the damage was not apparent before the earthquake · mould was starting to form due to significant water ingress through the cracks · there was extensive efflorescence of the brickwork and surrounding concrete · it estimated the cost to repair the damage was $9,790. According to the complainant, the conclusions of the insurer’s experts are contradictory, vague and speculative. He highlights that J and G accepted there were signs of earthquake damage while K and M said there was no earthquake damage. The complainant submits that the insurer wrongfully closed the claim on 18 November 2022 without his knowledge. In support, he refers to a telephone conversation with the insurer’s representative on 3 October 2023 in which she said, ‘I can see that you are unhappy that we closed the claim without your knowledge, which I do apologise for’. He says as the insurer closed the claim without his knowledge, he thought it was still active and was waiting on the insurer to take further action. He submits that the resultant delay led to the garage deteriorating and the proliferation of mould. The complainant says as the garage had been used for storage, drying clothes and as a home gym, he had no choice but to demolish and rebuild it. He says he incurred $254,117 in doing so and wants the insurer to pay that amount to him, plus interest. Insurer is entitled to deny the disputed building damage claim Based on the exchanged information, I am not satisfied that the complainant has established a claimable loss for the disputed building damage. Rather, it is more likely than not the damage is due to excluded causes. This is because: · builder J expressed a preliminary view that the damage may have been caused by the earthquake, but recommended an engineer be engaged to report on causation · engineers K, G and M all say the disputed damage was not caused by the earthquake. Rather, it was due to long term ground movement due to several contributing factors · the shaking at the home was more likely than not MMI IV to MMI V. Shaking at those levels would be unlikely to cause the disputed damage · G has explained why the earthquake may have damaged the Caesarstone benchtop but not the disputed damage · the earthquake may have exacerbated the cracking in the garage brickwork, but that does not mean it was the dominant or effective cause of the cracking · a temporal connection does not of itself establish a causal connection · I acknowledge that, after examining the home nearly two years after the earthquake, builder T said the earthquake caused the damage to the garage · however, I find the reports of K, G and M more persuasive. As engineers, I consider them better qualified than T to comment on causation. Further, their reports are more thorough and contain detailed analysis supported by scientific data and numerous images · I do not accept that on 18 November 2022, the insurer closed the claim without informing the complainant. The insurer has provided a recording of a telephone conversation on 16 November 2022, during which the complainant was told the claim would be closed upon payment of the benchtop cash settlement, which he acknowledged · I consider the comment made by the insurer’s representative during the telephone conversation with the complainant on 3 October 2023 was an acknowledgement of his concerns rather than confirmation the claim had been closed without his knowledge. Therefore, the insurer is entitled to deny the claim for the disputed building damage. 2.2 Is the insurer entitled to deny the contents claim? Yes. The insurer is not liable for the mould damage to the contents, and the complainant prejudiced the insurer’s interests by disposing of the contents before it could assess them. Complainant says insurer should cover mould affected contents The complainant says due to the insurer’s wrongful denial of the disputed damage claim and closure of the claim in November 2022, ongoing water ingress meant contents in the garage became mould affected. He disposed of them for safety reasons. He wants the insurer to reimburse $1,500 he paid for a replacement safe, and $1,849 for a replacement treadmill. Insurer is entitled to deny the contents claim I have already determined that the insurer was entitled to deny the cracking damage to the garage, and that the insurer did not close the claim in November 2022 without the complainant’s knowledge. I also consider that in disposing of the gun safe and the treadmill without giving the insurer the opportunity to assess them, the complainant materially prejudiced the insurer’s ability to assess the damaged contents. The insurer is therefore entitled to deny the contents claim. 2.3 Is indirect financial loss compensation payable? No. The policy excludes consequential losses, and I am not satisfied an award of indirect financial loss compensation outside the policy terms is justified. AFCA can award compensation for indirect financial loss ​Under paragraph D.3.2 of its Rules, AFCA may require an insurer to compensate a complaint for indirect financial loss (also known as consequential loss). The maximum amount we may award is capped at $6,300. In a general insurance complaint, AFCA cannot require payment of indirect financial loss compensation under a policy if that policy excludes such liability. However, AFCA may make an award outside the policy terms if the insurer’s conduct has unreasonably caused the complainant the loss. Indirect financial loss compensation is not payable The complainant says due to exposure to mould in the garage, his wife developed respiratory difficulties and a major skin condition. He seeks reimbursement of $14,961.16 in resulting medical expenses. He also claims $15,319.20 in lost wages due to having to take time off to manage the claim and the subsequent complaint. I acknowledge the health issues the complainant’s wife has experienced. However, I am not satisfied an award of indirect financial loss compensation is justified because: · the PDS contains an exclusion for consequential losses, including loss of wages and medical expenses · I have determined that the insurer was entitled to deny the damage to the garage, and that it did not close the claim in November 2022 without the complainant’s knowledge · no invoices or other supporting documents have been provided in relation to the financial losses claimed. 2.4 Is non-financial loss compensation payable? Yes. The insurer contributed to the delays experienced and aspects of its claim handling should have been better. It is to pay $3,000 to compensate the complainant for the stress and inconvenience it unreasonably caused him. ​​AFCA can award compensation for non-financial loss ​​​​​​​​​​​​​​Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind. ​​​​​​​AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Non-financial loss compensation is payable The complainant says the insurer incorrectly partially denied the claim, caused excessive delays, communicated poorly, and acted in a manner contrary to its obligations under the General Insurance Code of Practice. He says the insurer’s actions caused profound stress and inconvenience to him and his family. I have determined the insurer’s partial claim denial was justified. I also consider it acted with sufficient timeliness after the complainant asked that the claim be reopened in May 2023 However, the insurer’s initial denial of the damage to the kitchen benchtop was overturned, but not until nearly 12 months after the claim was lodged. There were also delays by the insurer in providing information the complainant requested, and I accept that there were occasions when it should have communicated more clearly and responsively. It is therefore reasonable that the insurer pays $3,000 to compensate the complainant for the stress and inconvenience it unreasonably caused him 2.5 Why is the outcome fair? The outcome is fair because the insurer has correctly applied the policy but has unreasonably caused the complainant stress and inconvenience. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.