Extent of hail damage and whether the insurer must pay for full roof replacement rather than the accepted damage
Text of the determination
Determination
|
Case number
|
12-25-224068
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-25-224068 15 June 2026
1 Determination overview
1.1 Complaint
The complainant is a corporate trustee of a self-managed superannuation fund (SMSF). This complaint is brought by the directors of the corporate trustee, who are represented. The complainant holds a business policy with the financial firm (insurer). Reference to the complainant will include reference to it and its representative.
The complainant lodged a claim for damage to the three roofs of the insured building it says was caused by a hail event in December 2022. Unless otherwise stated, I have referred to the three roofs as ‘the roof’ in this determination.
The insurer accepted the hail event caused some damage to the roof sheeting, whirlybirds and air conditioner. The insurer offered to cash settle the accepted damage for $12,854.30.
The complainant wants the insurer to settle the claim for $94,784.07, based on the cost to replace the roof. The complainant also wants the insurer to pay compensation for non-financial loss and contribute to the professional fees incurred.
1.2 Issues and key findings
Is the complainant entitled to a roof replacement?
No. The complainant has not shown, on balance, the roof needs to be replaced to repair the hail damage. I am satisfied, at this stage, the insurer is liable for the accepted damage. The insurer should obtain an updated quote for the accepted damage.
Is the complainant entitled to further compensation?
The complainant is a trustee company for a SMSF. It is not appropriate to award non-financial loss compensation to a company. The insurer must cover the cost of the engineer’s report once it receives a copy of the relevant invoice.
Why is the outcome fair?
The outcome is fair because the complainant has not shown an entitlement to an entire roof replacement. It would be unfair to require the insurer to cash settle the claim on this basis.
1.3 Determination
This determination is substantially in favour of the insurer. If the complainant accepts this determination, within 14 days of being notified of the complainant’s acceptance, the insurer must request an updated quote based on the scope of works (SOW) it obtained for the accepted damage. Within 14 days of receiving it, the insurer must cash settle the complainant based on the updated quote.
Within 7 days of receiving the invoice for the engineer’s report, the insurer must also cover these costs.
2 Reasons for determination
2.1 Is the complainant entitled to a roof replacement?
No. The complainant has not shown, on balance, the roof needs to be replaced to repair the hail damage. I am satisfied, at this stage, the insurer is liable for the accepted damage. The insurer should obtain an updated quote for the accepted damage.
Not in dispute complainant has shown a claimable loss
It is established insurance law that the complainant carries the initial onus to show a loss of a type covered by their policy (claimable loss). The complainant must show this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is shown, the onus shifts to the insurer to show the loss is not covered, either by way of one of the policy exclusions or on some other basis.
The terms of the policy include the policy schedule and the Product Disclosure Statement (PDS). There is no dispute the insurer provided the policy documents to the complainant. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The policy covers, among other things:
… Damage occurring during the Policy Period and happening at the Insured Location to Property Insured caused by or resulting from a cause not otherwise excluded.
The policy says damage:
means actual (not threat or fear of), sudden and accidental physical damage, destruction or loss.
The policy does not define ‘physical damage’. The online Macquarie Dictionary defines:
· physical as ‘of or relating to material nature’, and
· damage as ‘injury or harm that impairs value or usefulness’.
It is not in dispute there is hail damage to the roof of the insured property. The parties dispute the extent of:
· the hail damage, and
· the insurer’s liability for the damage.
The insurer says the hail damage is limited to 18 of the 62 roof sheets and has offered to cash settle this damage (along with the damage to the whirly birds and air conditioner) in line with its repairer’s SOW. The complainant says the entire roof was damaged by hail and, for various reasons, a roof replacement is warranted.
The complainant is seeking a $94,784.07 cash settlement to cover the roof replacement costs in line with its repairer’s (AB) SOW.
Insurer says its liability is limited to hail damaged roof sheets
The insurer engaged various experts to assess and report on the damage to the roof. I have considered the relevant expert reports below.
The M report dated 11 April 2024 says:
· M observed 22 indentations across three sample areas
· the only indentations likely caused by hail are on the gauge aluminium turbine ventilation extractors on roof three and the air conditioner condenser fins on roof one
· nine indentations were considered barely discernible and of no consequence, and a further nine were considered not caused by hail
· only two indentations were considered possibly caused by hail, but M considered it unlikely due to the absence of hail indentations to the vertical wall sheeting, and minimal roof indentations
· there are no hail indentations on the roof sheet coverings. Any observed indentations are the result of causes unrelated to hail, predominantly foot traffic, and
· the foot traffic indentations affect the visual appearance of the roofs and will decrease their hydraulic performance, leading to ponding water, accelerated corrosion, and a reduced service lifespan.
The P report dated 16 July 2024 says:
· inspection of the roof sheeting revealed approximately 39 visually evident hail indentations, spread across 18 of the total 62 roof sheets (29%)
· the dents are restricted to the crests of the roof sheeting, and the sheet pans are not damaged, and
· the hail indentations have not affected the structural integrity or life expectancy of the cladding product.
The P supplementary report dated 14 October 2025 confirms P observed the above indentations when crouched on the roof. This is generally supported by the photographs which show indentations are evident from far away.
P considered any indentations that were so subtle they required chalking to locate them did not constitute damage under Technical Bulletin 32 (TB 32). I have considered this further below.
The M supplementary report dated 7 October 2025 provides detail on the shape and characteristics of hail damage, as follows:
· indentations caused by hailstone impact are predominantly circular or slightly oval in shape, reflecting the typical geometry of hailstones striking at near-vertical angles
· the diameters of the indentations caused by hailstones are very similar in size when the result of a single hailstorm event where the sheet gauge is consistent
· the edges of hailstone indentations are rounded and shallow, indicative of blunt force trauma rather than sharp or mechanical impact, and
· indentations to ribs are generally the result of foot traffic.
M considered:
· where the above characteristics and uniformity of indentations are observed, it supports that the indentations were caused by a hailstorm event, and
· the elongated and angular indentations of varying sizes evident on the roof to be inconsistent with hail damage.
In relation to damage, the insurer also relies on TB 32. This says a hail dented metal roof will remain structurally sound and hail damage will not affect the life of its coated steel roofs unless the hail causes significant:
· dents in the sheet pans of a low-pitched roof, leading to ponding and dirt accumulation which may promote corrosion, and
· deformations where the sheets overlap, leading to water being drawn into the gap, resulting in corrosion.
The insurer says there is no evidence of this type of damage to the roof. It also appears it is not in dispute there is no hail damage to the roof sheet pans.
The insurer also says the state of the roof (which is heavily corroded and damaged by foot traffic) means any minor hail denting only visible with chalk cannot impact the roofs’ utility or the value of the property.
Complainant has not shown entire roof is hail damaged
The complainant engaged AB to inspect and report on the damage to the roof. The report dated 18 January 2024 says:
· the damage was found to be consistent with a previous hailstorm event
· the roof one and roof two linings and associated capping/flashing sustained hail damage to approximately 100% of the roof, and
· the significant indentations have the potential to accumulate dust, dirt, and water which makes rusting in these areas likely, and because of this, the structural integrity of the roof linings is compromised.
AB recommended a full replacement of the roof linings.
AB also provided commentary on the effect hail damage has on the performance of the roof in its supplementary report. This commentary is general and inconclusive. Therefore, I do not find it persuasive.
M’s commentary on AB’s report is:
…the majority of the photographs provided within the report by [AB] are not characteristic of hailstone impact. Most of the photographs showed indentations which are too angular or elongated to be able to be confirmed as occurring due to hailstone impact. Further, a number of these indentations are no larger than the indentations observed to the much more susceptible condenser fins to the roof mounted AC unit.
M accepted two photographs from the AB report showed indentations similar to those caused by hailstone impact. However, M considered them to be ‘barely discernible’ and unlikely to affect the performance or serviceable lifespan of the roof sheeting.
The engineering report the complainant provided from K includes photographs of what it considers to be hail damage. It does not explain why it considers the indentations to have been caused by hail. This is not persuasive, particularly where:
· some of the indentations identified are elongated, and
· M’s commentary persuasively sets out why such indentations are not consistent with hail damage.
K limited its review of the roof to seven areas, approximately 12.25 metres squared of the total area of the roof. Its conclusion about the extent of the hail damage is ‘because hail indentations were found in all seven areas inspected then it is logical to conclude all areas of the roof were hail impacted’.
Considering K confirmed it did not inspect the entire roof, its conclusions that the entire area of each roof sustained hail damage are not supported or persuasive.
On the exchanged information, I am not persuaded the complainant has shown the entire surface of the roof has suffered hail damage.
For completeness, I accept the corrosion evident on the roof is pre-existing and unrelated to the hail dents.
In relation to the minor indentations the insurer’s experts appear to agree exist, I accept these are unlikely to:
· reduce the value of the property (particularly considering the condition of the roof), and
· impact the utility of the roof.
This is because:
· the exchanged information shows, on balance, these minor indentations can only be viewed with the assistance of chalk, and
· there is no persuasive information to show such minor indentations reduce the performance of the roof.
Complainant has not shown roof replacement is required
The representative takes issue with the insurer’s method of repair. It says, for various reasons, individual sheets cannot be replaced. The representative says building codes and regulations mean any re-roofing constitutes new building work and requires approval under the current standards. The representative makes specific reference to the 20% threshold (discussed below).
The causation and roof report from AB provides commentary on why a complete roof replacement is necessary. AB identified issues with:
· the removal of existing fixings from the battens, and
· replacement of the damaged roof sheets and the removal of the ridge, barge and apron flashings (namely in relation to the waterproofing)
While AB expresses concern about the replacement of individual roof sheets, it does not conclude this method of repair is not feasible or warrantable. Rather, it makes general assertions about what often happens, or what might happen, during the repair process. Commentary that is not conclusive is not persuasive.
I also do not consider any issues with aesthetic differences between roof sheets (either now, or in the future) means the insurer is required to replace all roof sheets, where the complainant has not shown they are damaged.
The K report noted ‘the popular misconception that 20% roof replacement triggers the need for an entire roof replacement’. K confirms ‘this is not, in fact, the situation’.
In relation to the building codes and regulations, the K report says:
· the Building Regulations say repair works to less than 20% of a structural element can be undertaken without building approval if it is done in accordance with current codes and regulations
· works to over 20% of a structural element require building approval by a building certifier
· the building certifier is the only person who has the authority to apply retrospective regulations (such as those in force when the building was constructed)
· in K’s experience, items which affect health and amenity such as roof sheeting installation (for water tightness) will be required to be undertaken to current requirements
· due to the age of the building, it may not be fully compliant with current codes and regulations
· it will therefore be necessary for a building certifier to be engaged to certify the works, and
· as part of the building approval process the building certifier will stipulate what they require to be done and what they require from other parties.
The K report also provides commentary on what may be required to achieve certification.
In relation to the building codes, the supplementary AB report says:
Under Queensland Building and Construction regulations, any roof replacement project exceeding 20% of the total roof area is classified as a roof replacement rather than a repair.
In such cases, a licensed building certifier is required to inspect and issue a Form 16 or Form 21 certification to confirm compliance with the Queensland Building and Construction Commission (QBCC) and the Building Code of Australia (BCA). Certifiers are not permitted to approve partial roof replacement when damage affects more than 20% of the roof area, as this would constitute a noncompliant building outcome and fail to meet current code and wind rating standards. Given that the hail damage at the insured property exceeds 20% of the total roof area, and impacts all roof planes, a complete roof replacement is mandatory to achieve compliance and obtain the required certification. A partial replacement would therefore not be eligible for certifier approval and cannot be considered a compliant or insurable repair under Queensland construction norms.
However, the commentary from K (which is inconclusive) and AB (which is unsupported) is not consistent in concluding a roof replacement is required for the repairs to be compliant.
It is unclear whether the roof is compliant with current building standards. The K report leaves room for the possibility that a full roof replacement is not the only option to see repairs to the roof that are over the threshold be compliant. The complainant does not dispute this.
I therefore do not find the complainant has shown, at present, the hail damage can only be repaired in a compliant and appropriate manner if the entire roof is replaced.
Complainant may approach insurer again if certifier requires further work
The policy covers:
Extra Cost of Reinstatement
Cover extends to include the extra cost of reinstatement (including demolition or dismantling) of Property Insured necessarily incurred to comply with the requirements of any Government Authority or other statutory authority imposed after the Damage; subject to the following Provisions and subject also to the terms, Conditions and Limit of Liability or sub limits of liability of this Section.
I acknowledge the complainant says it would be inefficient and unnecessary to revert to the insurer once the certifier has recommended a full roof replacement. I do not accept this, as there is no information to show at this stage a certifier has made, or likely will make, this recommendation.
Therefore, if:
· the complainant goes through the building approval process as part of the insurer’s accepted repairs
· a building certifier requires the complainant to undertake further work (as a result of the hail damage repairs) for the roof to be compliant, and
· the complainant approaches the insurer to cover the cost of the further work,
the insurer must assess its liability for such work in accordance with the terms of the policy.
On the information before me, cover for the replacement of the roof is not warranted as an outcome to this complaint.
Insurer is entitled to limit its liability for the roof damage
The PDS sets out the methods of settlement where there is building damage. In this case, it is not in dispute the preferred method of settlement is a cash settlement.
The PDS also sets out various conditions, which includes:
We will pay the cost of rebuilding, replacing or repairing any Damaged part of Your Property Insured to the same condition when new…
In this case, I am not persuaded the complainant has shown the entire roof is hail damaged. I accept the insurer is entitled to limit its liability to only the parts of the roof that were damaged by hail. The complainant has not shown this outcome is unfair or inappropriate.
I am also not persuaded the complainant has shown:
· the accepted damage caused (or could cause) damage to the other areas of the roof, or compromised the structural integrity of the roof
· replacement of the damaged roofing sheets is not an appropriate method of repair
· the undamaged roof sheets will be damaged in the repair process, or
· the amount of damage to the roofing sheets means an entire roof replacement is necessary to comply with building regulations.
The insurer’s cash settlement for the replacement of the hail damaged roof sheeting, whirlybirds and air conditioners is generally fair and reasonable. The complainant has not taken issue with the specific items in the SOW.
The SOW/quote is not dated, but it appears to be from 2024. It is therefore fair for the insurer to obtain an updated quote based on the existing SOW.
The insurer must then cash settle the repairs based on the updated quote (taking into account the GST component of the quote and any policy deductions).
2.2 Is the complainant entitled to further compensation?
The complainant is a trustee company for a SMSF. It is not appropriate to award non-financial loss compensation to a company. The insurer must cover the cost of the engineer’s report once it receives a copy of the relevant invoice.
Complainant not entitled to non-financial loss compensation
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $6,300 per claim) where the insurer's actions have caused an unusual amount of:
· physical inconvenience
· time taken to resolve the situation
· interference with the complainant's expectation of enjoyment or peace of mind.
In this case, the complainant is a trustee company. I acknowledge the directors have authorised the complaint on behalf of the company. However, even if I accept the insurer did not appropriately handle the claim (which I do not) I do not consider it appropriate to award non-financial loss compensation to a corporate trustee of a SMSF.
The complainant is not entitled to non-financial loss compensation as an outcome to this complaint.
Insurer not required to cover the complainant’s professional costs
The policy covers ‘claim preparation expenses’. The PDS says:
In addition to the amount provided under each Section, We will pay up to $25,000 for necessary and reasonable costs incurred by You or by Your representatives in preparing and negotiating any claim under this Policy for which We have accepted liability…
Further, under Rule D.5 of the AFCA Rules (set out below in section 3.2 of this determination), AFCA may determine an insurer contribute to legal or other professional costs incurred by a complainant during a complaint. Unless exceptional circumstances apply, AFCA will not require an insurer to contribute more than $5,000 to these costs.
When determining whether an insurer should contribute to the payment of professional fees incurred, AFCA will consider the complexity of the complaint, whether the advice was reasonably needed and whether the costs incurred were because the expert advice was genuinely required.
In this case, I accept the engineer’s report was obtained for the purpose of negotiating the outcome of the claim (which the insurer accepted limited liability for).
I also consider the findings in the report were useful in determining the outcome of the complaint (even if the findings did not support the complainants’ position).
I consider it fair for the insurer to cover the cost of the engineer’s report once the complainant provides a copy of the invoice. As it is unclear whether the complainant has paid for the invoice, I do not consider it fair to award interest on these costs.
2.3 Why is the outcome fair?
Outcome is fair in the circumstances
The outcome is fair because the complainant has not shown an entitlement to an entire roof replacement. It would be unfair to require the insurer to cash settle the claim on this basis.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.