Determination 12-25-224046

Insurer declined a second variation (V02) to hail damage roof repair scope as an upgrade and for lack of prior approval

FirmAllianz Australia
Decided2026-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$14,555
SourceAFCA PDF

Summary

Complainants sought a second variation of $14,554.69 for veranda roof works after a hail claim cash settlement. AFCA required the insurer to accept the engineering report, delivery, purlins and battens, but not the tie-downs.

Purlins, battens and the engineer's report were reasonably necessary to repair the roof to its as-new condition and meet building requirements, but tie-downs were not shown to be necessary or pre-approved.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterpay claimreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-224046 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-224046 25 March 2026 1 Determination overview 1.1 Complaint The complainants jointly hold a home building insurance policy issued by the financial firm (insurer). The complainants are represented by claims advocate, CC. In this determination, a reference to the complainants includes CC unless otherwise stated. On 24 August 2023, the complainants lodged a claim for hail damage to the roof of his property which occurred on 08 December 2022. The insurer accepted the claim for a full roof replacement and the complainants requested a cash settlement. In October 2023, the insurer settled the claim for $86,133.99 based on a quote from the insurer’s repairer, AG. The insurer accepted an initial variation (V01) to the scope of works. V01 related to additional costs to curve roof sheeting for the bullnose veranda. The complainants want the insurer to accept a second variation for $14,554.69 (V02). The insurer has denied cover for V02 because it says the works are an upgrade and therefore excluded under the policy. Further, it says the complainants did not obtain approval prior to completion of the V02 works. CC has made submissions that the insurer’s handling of the claim has led to unnecessary delays and financial hardship for the complainants. However, CC has confirmed that it’s claim for non-financial loss compensation on behalf of the complainants is withdrawn. 1.2 Issues and key findings Is the insurer required to cover the second variation? Yes. I am satisfied the insurer should cover some of the items in V02 as these were necessary to complete the repairs accepted under the claim. Why is the outcome fair? The outcome is fair in all the circumstances because it is more likely than not that some of the items in V02 (the engineering report, supply and installation of battens and purlins) were necessary to complete repairs to the veranda roof in accordance with engineering advice. Therefore, the insurer should accept these works. However, it would not be fair to require the insurer to cover the tie-downs as it is not clear these were necessary. 1.3 Determination This determination is partially in favour of the complainants. If the complainants accept the determination, within 14 days of being notified of the acceptance: · the insurer is required to partially accept V02 in accordance with paragraph 2.1 below, and · arrange a cash settlement for the V02 items the insurer is required to cover. 2 Reasons for determination 2.1 Is the insurer required to cover the second variation? Yes. I am satisfied the insurer should cover some of the items in V02 as these were necessary to complete the repairs accepted under the claim. Policy covers repairs as a result of a storm The terms and conditions of the policy are set out in the product disclosure statement (PDS) and policy schedule. The policy covers loss and damage as a result of a storm subject to any exclusions and conditions. It is not in dispute that the roof of the insured house sustained storm related damage, triggering a policy response. Cover for building includes some additional benefits set out at page 28 of the PDS. In respect to settling claims, at page 61 the PDS it states that if the claim is accepted, the insurer will: ‘…pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. At our discretion (acting reasonably), we may: • enter into a contract with a builder to repair or rebuild your home, or • pay you the reasonable cost of repairing or rebuilding your home in cash or cash equivalent’ The policy provides additional benefits including: · rebuilding and professional fees including the reasonable and necessary costs of engineers up to $5,000. The policy sets conditions that: > the benefit will be paid if the costs are approved before they are incurred; > the costs must relate directly to the rebuilding of destroyed or damage buildings. · building code compliance costs being the reasonable and necessary costs of meeting the requirements of any statutory authority that relate directly to the destroyed or damaged part of the buildings. The insurer will pay up to $5,000. Page 28 of the PDS says: ‘In order to be sure that you are covered under this policy you should always contact us for approval before you incur expenses you wish to claim. If you do not, we will pay for expenses incurred to the amount we would have authorised had you asked us first.’ From page 54 the PDS, it contains a number of general exclusions applicable to all sections of the policy. The policy excludes: ‘Anything not directly related to one of the insured events’ Insurer has accepted and paid an earlier variation The insurer instructed builder, AG, to assess the claim related damage and prepare a scope of works. The claim was cash settled on the basis of AG’s scope of works in the amount of $86,133.39. AG’s scope of works did not provide an allowance for roof tie-down upgrades and noted that if these were found to be required, a variation would need to be submitted for review. V01 and V02 relate to repairs to the bullnose veranda roof. V01 in the amount of $4,915.15 included: · travel fee with curving equipment, and · an additional allowance to curve 68 roof sheets. V01 was first submitted by CC in March 2024. A revised quote was submitted which the insurer accepted and paid in about May 2024. V01 includes terms and conditions including that: “Any items outside of this that are required to meet Australian Standard and Local Government Legislation shall be raised as a Post Contract Variation and payable as our standard terms and conditions…” The V02 scope of works/quotation dated 19 August 2024 includes: · the costs of an engineering report, · an allowance for the delivery of materials to site, · supply and installation of purlins as required by the engineer for graduated battens to facilitate curved roof sheets, · supply and install of timber battens; · supply and install of structural pine batten, and · the supply and install of standard tie-downs. The complainant says V02 is based on engineering advice from PG. AB, the complainants’ builder, instructed PG to provide a re-roofing report. PG’s report dated 7 March 2024 relates to the veranda of the property. The main house and patio are excluded. The report states: · the wind class is N3, · based on a site assessment, “upgrades” are proposed. · ‘Refer to QBCC – Repair of sheet metal rooves in cyclonic areas for confirmation of all the above details’, · Appendix A states: Bullnose roof- The existing roof framing consists of 100x50 hardwood rafters meeting at 1200 centres. Existing battens are 70x35 hardwood at 1100 centres. In order to adequately support the new sheeting new MGP purlins are to be added. Refer to Appendix B for timber upgrades. Provide tie-down in accordance with Appendix C. The issue in dispute is whether the insurer should accept V02. Having regard to the policy wording, V02 should be accepted if: · the associated costs were reasonable to rebuild the damaged part of the building (the veranda roof) to the same condition as when it was new, and/or · if the work items meet the conditions for cover for the additional benefits in respect to professional fees and building code compliance costs. Insurer says V02 is either an upgrade to the property or rectification works The insurer says the claim was denied because: · the complainants have failed to show that V02 was required to achieve the repairs that were accepted under the claim, · a general exclusion for ‘anything not directly related to one of the insured events’ applies, · the V02 works are an upgrade to the existing roof design (including to purlins, timber battens and tie-downs) which is not covered under the policy, and · prior approval for the V02 woks was not sought. In particular: > the AG scope of works did not provide an allowance for roof tie-down upgrades, > the AG scope said if these were found to be required, a variation would need to be submitted for review, and > the insurer advises any third party builder that variations should be ‘sudden and unforeseen’ to be approved. The insurer says V02 was not necessary and constitutes an upgrade because: · V02 includes the provision of a higher level of tie-down to the veranda roof than was in place prior to the insured event. Specifically: > the tie-downs claimed are required in cyclonic wind areas. The insured home is not in a cyclonic area but is in an N3 wind risk area. Prior to the insured event, the veranda had tie-downs appropriate for an N3 wind risk area, > the claimed tie-downs are therefore unnecessary and are not required to comply with any building code, > their use constitutes an upgrade/improvement which is not covered under the policy. > similarly, if there were no tie-downs present at the time of the insured event, any claim for the provision of tie-downs also constitutes an upgrade. · the battens were not required. The insurer’s builder has advised: curving quality Custom Blue Orb roof sheets are designed to span over 1600mm, the existing 1200mm batten spacing is sufficient. Further, the insurer says a more expensive repair method has been used. According to the claim notes, the insured’s builder is of the view that: · the battens are overpriced and not required. Battens would be pine and paid at $22 not $40, · ‘the engineers reports has requested 5 battens to be used as they believe that is necessary for the curved roof however this is the more expensive option as a thicker grade of metal can span further as the curve is spring curve not a bullnose. Previously only 3 batens for the roof.’ Alternatively, the insurer’s assessor has made submissions to the effect that V02 may be rectification works. The insurer’s assessor says: · The complainants’ builder did not follow its own engineer’s recommendations when repairing the veranda. In particular: > the IE engineering report obtained by the insurer says AB’s work does not comply with the details in the PG report, > the insurer says that V02 relates to works to the veranda that ‘surely fall under rectification’. > the insurer does not warrant the works of third-party builders. CC engaged AB and is responsible for any rectification works under their warranty. I acknowledge the insurer has raised other concerns in relation to AB’s repair works: · AB’s repairs were completed in 2024. CC/AB have not provided a full scope of works for the repairs, · AB/CC have not provided documents which show the cash settlement amounts paid by the insurer have been exhausted. These should be available to support AB/CC’s argument that the claim monies have been insufficient to complete the repairs. · the insurer has already accepted and paid V01 in relation to repair of the veranda roof. No further variation could be required as V01 was paid based on the complainants’ builder’s own quote based on their own work which was completed in 2024. Complainants say V02 works were necessary The complainants say: · the insurer’s builder, AG, referenced the potential for tie-down variations within their scope of works, · the V02 works were based on an engineering report from PG. PG found tie-downs, purlins and battens must be brought up to standard as part of reinstating the damaged roof to a compliant and functional condition, · VO2 was essential to ensure the reinstated works complied with current building codes. New MGP purlins and tie-downs were essential for compliance with Australian Standards and warranty provisions, and · an attending engineer approved any deviation from the specifications in V02 in accordance with PG’s revised engineering report. The complainants have submitted a letter from building certifier, PA, dated 3 July 2025 confirms: > PA issued a building development approval to AB for the re-roof works. A discretionary decision was required from the building certifier, > PA found the roof framing did not comply with the current assessment benchmarks in the Building Act 1975. These benchmarks are the National Construction Code 2022, AS1684 and AS1720, > PA requested AB to engage an engineer to provide an opinion and scope of works to make the roof framing safe and structurally adequate, and > the engineer’s recommended works had to be complied with to ensure the roof complied with the building development approval conditions and the requirements of discretionary decision by the building certifier. The complainants have also submitted a ‘Supplementary Technical Assessment Report’ prepared by CC Loss Adjusting dated 17 June 2025 (technical assessment report). This report states (among other things): · ‘Repairs required are not an upgrade to the property to make it better than it was before the loss, but instead to restore the warranty of the repair method suggested’, · CC says the insurer’s builder is stating the required items are overpriced and PG’s recommendations are not required. CC says typically, an engineering report would hold more credibility than a builder’s view due to differences in qualifications and experience. I acknowledge the insurer says the technical assessment report lacks credibility. The insurer says there is a conflict of interest between AB and CC due to the common owner of each and this is one reason CC’s report should be given limited weight. The insurer also says the details and credentials of the report’s author are not provided. Insurer must cover some V02 items Taking a balanced view of the exchanged information, it is fair in all the circumstances that the insurer should cover the following items in V02: · the costs of the engineering report, · an allowance for the delivery of materials to site, · supply and installation of purlins, · supply and installation of timber battens, and · supply and install of structural pine batten, It is reasonable and fair that the insurer cover these items because: · while the PG report uses the term ‘upgrades’ to describe the works, I am not convinced these were upgrades and unnecessary to achieve the repairs accepted under the claim, · the insurer accepted V01 based on PG’s report. PG says, the battens and purlins were necessary to facilitate the curved roof sheeting already approved by the insurer, · The letter from the building certifier, PA, confirms these costs were necessarily incurred > it was recommended that AB obtain an engineer’s opinion and scope of works, and > the engineer’s recommended works were necessary to ensure the roof complied with the building development approval conditions. · I acknowledge AG says the battens were a ‘more expensive option’ as compared with using a thicker grade of metal. However, no information has been provided which shows: > the difference in cost between these two options, and > V01 was accepted subject to any conditions set by the insurer on the particular repair method to be used. · I am satisfied that the supply and installation of battens and purlins was necessary to repair the roof ‘to the same condition as when it was new’ (in accordance with the policy wording). This is on the basis that when the roof was new, it would have met the building codes applicable at that time, be fit for purpose and functional. However, it would not be fair in all the circumstances to require the insurer to cover the supply and install of tie-downs. This is because: · PG’s engineering report clearly states the area is an N3 rated wind zone. The insurer’s builder agrees. · However, PG’s report refers to the QBCC requirement for the “Repair of sheet metal rooves in cyclonic areas…”. The complainant has not established it is more likely than not: > the insured property is in a cyclonic area and not a N3 wind class area; > when the roof was new, the veranda had tie-downs of a class capable of withstanding cyclonic winds; and > the tie-downs included in V02 were necessary to repair the veranda roof to the same condition as when it was new. Further, while the AG scope of works acknowledges the potential need for tie-downs, it clearly says that if these were found to be required, a variation would need to be submitted for review. AB/CC did not seek prior approval and the exchanged information does not show any reasonable basis for this. There is insufficient information to reach a finding that V02 relates to rectification works. I acknowledge the IE engineering report dated 29 November 2024 found the veranda’s framing had not been done in accordance with all the specifications in the PG report. Among the issues identified is the use of inadequate tie-downs and fixings and undersized timber members. However, the complainants say any variations to the PG requirements were approved. I am not convinced V02 constitutes works to rectify AB’s repair works based on the exchanged information. 2.2 Why is the outcome fair? The outcome is fair in all the circumstances because it is more likely than not that some of the works in V02 (the engineering report, supply and installation of battens and purlins) were necessary to complete repairs to the veranda roof. Therefore, the insurer should accept these works. However, it would not be fair to require the insurer to cover the tie-downs as it is not clear these were necessary. 2.3 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.