Home / Allianz Australia / Determination 12-25-223037

Determination 12-25-223037

Whether the insurer implemented a previous AFCA determination by obtaining actionable repair quotes and cash settling the storm damage claim

FirmAllianz Australia
Decided2026-09-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$187,000
SourceAFCA PDF

Summary

Complainants said the insurer failed to implement an earlier AFCA determination because its desktop repair quotes were not actionable and understated costs. AFCA found the insurer had complied, and declined further costs or non-financial loss compensation.

The previous Determination required two actionable quotes on the accepted scope and a cash settlement of the higher plus 20%, not site inspections, and the insurer did this.

Issues

Subjects and remedies

health or medicalhome or building damageno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-223037 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-223037 24 June 2026 1 Determination overview 1.1 Complaint The complainants held a home building insurance policy underwritten by the financial firm (insurer). They previously lodged a complaint with AFCA about whether storm damage to their home was covered under the policy. That complaint resulted in a Determination issued on 16 January 2025 in favour of the complainants, requiring the insurer to obtain two actionable repair quotes based on the complainants’ accepted scope of works and to cash settle the claim for the higher of those quotes plus a 20% allowance. The complainants say the insurer has failed to properly implement that Determination. In particular, they say the quotes obtained by the insurer are not actionable because they: · were prepared on a desktop basis without an on-site inspection · do not reflect the full scope of required works, and · significantly understate the reasonable cost of repairs. The insurer says it has complied with the Determination. It says the quotes it obtained are actionable and sufficient to complete the required works. It says it has offered a cash settlement based on the higher of the quotes, together with the 20% contingency allowance. The complainants seek a higher cash settlement amount based on their own builder quotes, as well as legal and expert costs. They also raise concerns about the insurer’s handling of the claim, including the impact of the ongoing damage on their health and living conditions. 1.2 Issues and key findings Has the insurer failed to implement the previous Determination? No. I am not satisfied the insurer has failed to implement the previous Determination. The available information indicates the insurer has taken the steps required under that Determination, including obtaining actionable repair quotes from appropriately qualified consultants and making a cash settlement offer consistent with its terms. Should the insurer pay the complainants other compensation? No. I am not satisfied that this is appropriate in the circumstances. Why is the outcome fair? The outcome is fair because the insurer has complied with its obligations under the previous Determination. 1.3 Determination This determination is in favour of the insurer. In compliance with the previous Determination, and within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to pay the complainants a cash settlement of $53,319.51 for the building repair works (based on AP’s revised quotation of $44,432.92 plus a 20% contingency uplift). 2 Reasons for determination 2.1 Has the insurer failed to implement the previous Determination? No. I am not satisfied the insurer has failed to implement the previous Determination. The available information indicates the insurer has taken the steps required under that Determination, including obtaining actionable repair quotes from appropriately qualified consultants and making a cash settlement offer consistent with its terms. Details of previous Determination On 24 February 2022, the complainants made a claim under their home building insurance policy for storm‑related damage to their home, including water ingress and mould. The insurer did not accept that all the claimed damage was caused by the storm, and only partly accepted the claim. The complainants lodged a complaint with AFCA about this. The AFCA Determination (issued on 16 January 2025) found that: · the insurer was liable for a greater extent of the storm damage than it had accepted · the insurer was not able to rely on policy exclusions to exclude or limit its liability for that damage · the complainants were entitled to temporary accommodation while repairs were carried out · the insurer was required to reimburse certain professional expenses, contribute to the complainants’ legal costs, and pay compensation for non‑financial loss, and · it was appropriate for the claim to be resolved by way of a cash settlement. In relation to the repair works, the previous Determination says as follows: Within 21 days of receiving notice of the complainants’ acceptance of this determination, the insurer is to: • arrange two fresh and actionable repair quotes from appropriately qualified consultants to cover the internal stormwater ingress damage and mould infestation • the quotes are to be based on the scope of works proposed (excluding repairs to the external roof) provided by the complainants’ preferred consultant ‘GA’ in its report dated 7 November 2023 • cash settle the complainants within 7 days of receiving the quotes based on the higher of the two quotes • the cash settlement for the repairs should add 20% to the higher quote to allow for contingencies and loss of lifetime guarantee. The complainants accepted the previous Determination on 28 February 2025. The complainants say the insurer has not complied with the previous Determination The exchanged material shows that after the complainants’ acceptance of the previous Determination, the following has occurred: · the insurer obtained two repair quotes from its panel builders based on the accepted scope of works provided by the complainants’ preferred consultant. These were prepared on a desktop basis without an onsite inspection. These quotes were as follows: > quote by AP dated 11 March 2025 in the amount of $39,879.45 > quote by MM dated 14 March 2025 in the amount of $39,277.52 · in mid-March 2025, the insurer made the complainants a cash settlement offer based on the AP quote with the required contingency allowance. · in early April 2025, the insurer made the complainants a revised offer based on an updated AP quote (in the revised amount of $44,432.92), and an increased allowance for temporary accommodation · the complainants say the insurer’s quotes are not actionable, as required by the Determination, because they do not fully reflect the scope of works and materially understate market rates. To support their position, the complainants obtained their own builder quote, which they say was based on a site inspection and the same scope of works. This quote was for around $187,000. The complainants have also referred to some of the other quotes in the reports prepared by the OD, the quantity surveyor engaged by the insurer to review the scope of works and quotes. The complainants say these quotes also support that the insurer’s quotes are significantly lower than market rates · the insurer says the previous Determination did not require that the repair quotes be based on site inspections. It says it obtained actionable quotes from appropriately qualified consultants based on the accepted scope of works. It has since sought to arrange site inspections to further validate those quotes following the concerns raised by the complainants. However, it says it has been unable to do so because the complainants have not provided access to the property. · the insurer says it has also complied with the previous Determination by paying the amounts awarded for non-financial loss, reimbursing the required expenses, and allowing and settling the complainants’ temporary accommodation entitlement. The exchanged material does not indicate any substantive dispute between the parties in relation to these aspects of the previous Determination. The insurer has implemented the previous Determination I am not satisfied the insurer has failed to implement the previous Determination. The core requirement of the previous Determination was that the insurer obtain two fresh and actionable repair quotes, based on the accepted scope of works (which was prepared by the complainants’ preferred consultant), and cash settle the complainants for the higher of those quotes with a 20% allowance. While the Determination required the quotes to be actionable, it did not contain any requirement that they be based on site inspections, nor did it require the insurer to adopt, assess, or even factor in the complainants’ independently obtained quotations. I am satisfied that the exchanged material shows the insurer has complied with these key requirements. In particular: · the insurer obtained two repair quotes from appropriately qualified building contractors (being AP and MM) both of whom hold relevant building licences. I have considered the concerns raised by the complainant about these contractors, including that they are insurer panel builders and have been subject to negative online reviews. However, these matters do not demonstrate that the contractors are not appropriately qualified or that their quotes are not capable of being relied upon for the purposes of the Determination. The Determination also does not prevent the insurer from using builders on its panel to provide the quotes · I have reviewed AP’s and MM’s quotes and I am satisfied that they are based on the accepted scope of works and include sufficiently detailed costings to enable the works to be performed. While the complainants say the quotes do not fully reflect the scope of works, they have not identified any specific items within the accepted scope that have been omitted from those quotes. Instead, their concerns largely relate to the overall cost and their view that the quotes understate market rates · I acknowledge that the quotes were prepared on a desktop basis, without AP or MM attending the property. Even though this is the case, the available information indicates their quotes were based on the agreed scope, photos of the damage, and expert reports. The insurer has also shown that they reflect a recognised estimating methodology for quotes provided without site access. The quotes were also specifically itemised, with both quotes having line items for each distinct item of work and incidentals (including things like site toilets, disposal of materials and labourers to move and put back furniture). · Critically, AP and MM have both confirmed that their quotes are actionable and that the works could be undertaken in accordance with their quotes. AP, on whose quote the insurer has relied, says that: To support the resolution of this matter and assist in responding to the insured and their representative, please note that the quote prepared by [AP] was developed in accordance with our standard desktop estimating procedure. We confirm that, based on the information provided and excluding limitations due to the lack of physical site attendance or unforeseen site-specific conditions, the quote is considered actionable, and AP is confident in its ability to undertake the works as quoted. AP also said that: Yes, the quote provided by [AP] is actionable. However, it is important to note that this quote was prepared on a desktop basis only, without an in-person site inspection. As such, the quote does not include al[l]owances for contingencies or unforeseen conditions and fol[l]ows standard industry practice for desktop estimating…[AP] is prepared to proceed with the works at the quoted cost, subject to insurer approval. We would, however, carry out an in-person inspection prior to commencing works to validate the scope and assumptions used. MM said that its quote was based on the SOW and was ‘valid at the costs presented’. MM also attempted to access the property to further validate its quote during the course of this complaint. It said that: We have contacted the Insured on the number provided to organise the inspection and the Insured advised that all correspondence should be directed to their solicitors and no contact is to be made directly with the Insured…The Insured advised that if [MM] contact him again he will refer the matter to the police. MM did not say it was unable to complete the works. Rather, it indicated only that, due to current workloads, it was not in a position to undertake the works immediately. This does not mean the quote is not actionable. In any event, the insurer relied on AP’s higher quote. · I also note that the insurer relied on these quotes to make a cash settlement offer in accordance with the Determination, selecting the higher quote (AP’s quote) and applying the required 20% contingency allowance. The insurer also later revised that offer following an update to AP’s quote · in the course of this dispute, the insurer has sought to arrange site inspections to further validate AP’s quote, but was unable to progress this due to limitations on access to the property. However, as I have already outlined above, a site inspection was not required for the insurer to comply with the previous Determination. The material shows that these later attempts for an inspection were instead made in response to the concerns raised by the complainants and as a means of potentially resolving the dispute, rather than as a requirement of the Determination. I note that the insurer also engaged OD to conduct an independent quantity surveying review of the approved scope of works and the various repair quotations obtained. OD reviewed the available documentation, including the scope of works and multiple builder quotes, and provided an independent cost assessment. It concluded that the works were relatively minor in nature and estimated the cost of those works to be approximately $42,524 with a margin of tolerance. It also found that the quotes obtained from the insurer’s builders were detailed, based on the accepted scope, and broadly aligned with market expectations, while identifying a number of the higher quotes relied upon by the complainants as excessive or insufficiently supported. It stated that those quotes: are considered excessive and not reflective of the work required… we recommend declining these quotations and inviting resubmission with detailed breakdowns in accordance with the scope of works It also said that no breakdown had been provided on costs on either of the complainants’ quotes (which I have also reviewed and can confirm that there are no costs next to any of the line items in the quotes). For these reasons I have outlined above, I am satisfied that the insurer has implemented the previous Determination. Lastly, to the extent the complainants consider that the outcome set out in the previous Determination is inadequate or results in a settlement amount they regard as too low, this is not a matter I can revisit in this complaint. The previous Determination was accepted by the complainants and is binding on the parties. The purpose of this determination is limited to assessing whether the insurer has complied with the terms of the previous Determination, not to reconsider or vary the approach, methodology, or entitlements established by the previous Determination. Insurer required to pay the cash settlement If the insurer has not already paid the complainants the cash settlement for the building repair works, then in compliance with the previous Determination and within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to pay the complainants a cash settlement of $53,319.51 for the building repair works (based on AP’s revised quotation of $44,432.92 plus a 20% contingency uplift). 2.2 Should the insurer pay the complainants other compensation? No. I am not satisfied that this is appropriate in the circumstances. Complainants are seeking reimbursement of professional costs Under AFCA Rule D.5, AFCA can determine an insurer contribute up to $5,000 in professional costs reasonably incurred by a complainant(s) in the course of a complaint. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant(s) needed to incur costs to understand or establish their claim. The complainants say they have incurred additional legal and expert costs in connection with this current dispute about the insurer’s compliance with the previous Determination, and seek reimbursement of those costs from the insurer. The insurer says that a further contribution to professional costs is not warranted. It notes that the issue of professional costs was already considered in the previous Determination, which awarded a contribution in accordance with the AFCA Rules, and says there are no circumstances to justify any additional payment. Compensation is not warranted I have reviewed the exchanged material and, on balance, I am not persuaded that a further contribution to the complainants’ professional costs is appropriate in this case because: · the previous Determination has already considered the issue of professional costs and awarded a contribution in accordance with AFCA Rule D.5 · the present complaint is limited to whether the insurer has complied with that Determination, rather than raising new or complex issues requiring additional legal or expert assistance · this did not materially assist the complainants in this dispute about the insurer’s compliance with the previous Determination · AFCA’s process is designed to be accessible without the need for legal representation, and the complainants have not demonstrated that further professional assistance was necessary to understand or pursue this complaint. For these reasons, I consider that a further contribution towards professional costs is not warranted. AFCA can award compensation for non-financial loss I have also considered the complainants’ submissions about the impact that the unresolved repairs and living conditions have had on their health and wellbeing, and whether this warrants a further award of non-financial loss compensation. Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Compensation for non-financial loss is not awarded by AFCA when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. Compensation is not warranted in the circumstances I am not satisfied that a further award of compensation for non-financial loss should be paid by the insurer in the circumstances. I note that non-financial loss was considered in the previous Determination, which awarded compensation for the inconvenience and delay caused by the insurer’s handling of the original claim. This present complaint, however, is limited to whether the insurer has complied with the previous Determination. I have found that it has. While I acknowledge the complainants remain dissatisfied with the settlement amount and the desktop-based quotations, I am not persuaded that the insurer’s implementation of the previous Determination has caused an unusual degree of inconvenience or other circumstances warranting a further award of non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair because the insurer has complied with its obligations under the previous Determination. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.