Determination 12-25-222740

Dispute over cash settlement amount for hail-damaged solar panels

FirmAuto & General
Decided2026-03-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$6,516
SourceAFCA PDF

Summary

The complainant sought an extra $6,515.63 for solar panel replacement after a hail claim was cash settled, plus electricity costs. AFCA found for the insurer, noting the complainant may instead ask the insurer to do the works on repayment of $6,960.

Where the insurer was able to repair and the complainant requested a cash settlement, the PDS lets the insurer pay what it would have cost its own trades, and the scope was adequate.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-222740 | Financial firm | Auto & General Services Pty Ltd Case number: 12-25-222740 9 February 2026 1 Determination overview 1.1 Complaint The complainant held a home building and contents insurance policy underwritten by the financial firm (insurer). The complainant lodged a claim for damage to his roof as a result of a hail storm. The claim was accepted and the complainant was cash settled for the damage. This complainant is seeking an additional cash settlement for repairs to the solar panels. He says the cash settlement provided by the insurer is too low for him to be able to complete the works and has submitted a variation request. The insurer has declined the request because it says it has met its obligations under the policy. The complainant also seeks compensation for having to purchase electricity from the grid during periods where he had no functioning solar system. 1.2 Issues and key findings Is the complainant entitled to an additional cash settlement? No. The insurer has met its obligations under the policy. Why is the outcome fair? The outcome is fair because the policy says that where the insurer is prepared to undertake the repair works and the complainant requests a cash settlement, the insurer will pay the complainant the amount it would have cost them to do the works. There is no information to support that the insurer was unwilling to do the works. On that basis, the insurer’s cash settlement is fair. 1.3 Determination This determination is in favour of the insurer. However, if the complainant accepts this determination, he may request that the insurer complete the works to the solar panels using its own contractors. The complainant must notify the insurer of this request within 14 days of accepting the determination. If the complainant elects this option, he is required to pay the insurer $6,960, being the amount of the previous cash settlement. 2 Reasons for determination 2.1 Is the complainant entitled to an additional cash settlement? No. The insurer has met its obligations under the policy. Insurer entitled to cash settle claim on basis of insurer’s trade’s quote The complainant held a home building and contents insurance policy. He lodged a claim for hail damage which was accepted by the insurer. There is no dispute between the parties that the insurer provided the complainant with the policy documents, including the Product Disclosure Statement (PDS). On that basis, the insurer is entitled to rely on the provisions of the PDS. Page 28 of the PDS says solar systems are covered as part of the building. Page 19 says if the insurer accepts a building damage claim, the insurer will aim to repair or rebuild the damage to the building. After acceptance of the claim, there is no dispute the parties agreed to settle the claim by cash settlement. I am satisfied the exchanged information, including the claim notes, shows in October 2024 the complainant told the insurer he wanted a cash settlement because he intended to use his trades to do the replacement. There is no information to suggest there was a cash settlement because the insurer said it could not or would not do the works. The complainant says the section of the PDS applies to his cash settlement is on page 20 of the PDS which says: We may not always be able to repair or rebuild the damage to your home…In this is the case, we will pay you the reasonable amount it would cost you to repair or rebuild the accepted loss or damage to your home The insurer says because the complainant requested the cash settlement, the above part of the policy does not apply. Rather, the insurer says page 21 of the PDS applies, which says: If we are able to repair or replace, but we agree to your request to pay you a cash settlement, we will pay you the amount if would have cost us to repair or replace or rebuild I agree with the insurer this part of the PDS applies to the cash settlement. This is because I consider the complainant requested the cash settlement and there is no information to suggest the insurer said it could not or would not do the works. I consider this means the insurer is entitled to cash settle the claim for an amount it would cost the insurer’s trades to do the replacement. Parties disagree about the replacement cost of the solar system ​​​On 4 November 2024, the complainant accepted a cash settlement payment of $76,707.15 from the insurer in relation to a claim for damage to his property on 4 December 2023. This settlement included an actionable scope of works that incorporated a solar system cost of $6,960, which included a 20% markup, goods and service tax (GST), and small-scale technology certificates (STC) rebates. ​The complainant submitted a variation on 2 December 2024 and then lodged a complaint on 10 December 2024, arguing the insurer’s estimate was inadequately low and failed to represent a valid market rate for the actual replacement of the solar system. It is the complainant’s position that the actual replacement cost is $13,475.64, which includes a 20% builder’s margin, GST, and STCs. On the basis of this quote, the complainant seeks a solar panel variation of $6,515.63. The complainant says the scope of works used by the insurer to calculate the cash settlement amount did not reflect the requirements to replace the damaged solar system. Specifically, the complainant says: · the size of the damaged solar system was 6.6kW, the size of the system provided for in the insurer’s builder’s quote was smaller at 5kW · the insurer’s builder’s quote does not include the cost of commissioning the system and administrative costs, and · the quote was not obtained from a qualified solar installer. The insurer says it’s quote provided for all costs associated with the works. Having reviewed the exchanged information, I am satisfied: · the size of the solar panel system is the same, the difference represents panels that were no longer available at the time of replacement but provide the same output · its quote includes supply and install which is the same as commissioning and administrative costs · the quote was obtained by an electrician. I therefore consider the insurer’s scope of works for the replacement was adequate as it reflected the requirements of the damaged system. Cash settlement amount was sufficient The information shows during the AFCA process, the insurer’s builder has stated it can do the replacement to the same brand, model and performance specifications of the damaged system and can provide the builder’s contractual warranty for the works at a cost to the insurer of $6,960. The complainant submits that he is entitled to the difference between this amount and his own quote of $13,475.64, on the basis that $6,960 does not reflect a market rate for replacement. I do not agree with the complainant. This is because I am satisfied the information shows the policy permitted the insurer to cash settle the claim for an amount it would cost the insurer’s trades to do the replacement, because the insurer was able to do the works. The complainant requested a cash settlement. For the reasons explained above, I am satisfied the scope provide by the insurer was adequate to repair the damage. On that basis, the complainant is not entitled to an additional cash settlement. I do not agree with the complainant. I am satisfied the policy permits the insurer to cash settle a claim based on the amount it would cost the insurer’s own trades to complete the replacement, where the insurer is able and willing to carry out the works. In this case, the insurer was able to undertake the replacement and the complainant requested a cash settlement. For the reasons outlined above, I am satisfied the scope provided by the insurer was adequate to reinstate the damage in accordance with the policy. On that basis, the complainant is not entitled to an additional cash settlement. The insurer has indicated it remains prepared to complete the replacement works. Accordingly, I consider it fair and reasonable that, if the complainant accepts this determination, he may request the insurer to engage its trades to complete the replacement, in which case the insurer must do so and provide the policy guarantee on workmanship. If this occurs, the complainant must refund to the insurer the previously paid cash settlement of $6,960, noting that the insurer remains entitled to apply any excess, if this has not already been charged. The complainant is not entitled to electricity costs The complainant seeks compensation for additional electricity costs incurred as a result of not having a solar system since the claimable event. In circumstances where the insurer was prepared to undertake the repairs and I have not found the complainant is entitled to any variation for replacing the solar system, the insurer is not liable for additional electricity costs. Additionally, the complainant’s policy does not cover consequential or indirect losses, as evidenced in the exclusions section of the product disclosure statement. 2.2 Why is the outcome fair? The outcome is fair because I am satisfied the exchanged information shows the insurer appropriately scoped the replacement works and was prepared to do the replacement at the cash settlement amount. It would not be fair to require the insurer to pay more to the complainant when the insurer is willing to do the replacement works and guarantee them. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.