Defective storm damage roof repairs and denial of claim for water damage to units 8 and 14
Text of the determination
Determination
|
Case number
|
12-25-221519
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-221519 27 April 2026
1 Determination overview
1.1 Complaint
The complainant (an owners corporation) has been assisted by a broker. Unless otherwise indicated, the broker and the complainant will be referred to as ‘the complainant’.
The complainant holds a residential strata insurance policy with the financial firm (the insurer) for two residential buildings in the Australian Capital Territory (the property). It lodged a claim for damage to the property following a storm on 20 January 2020. The complainant says the roofs of both buildings were damaged by hail.
The insurer accepted the claim and engaged a builder, IP, to complete the necessary repairs.
The repairs were completed on 18 July 2023 and signed off by the complainant’s superintendent, BA. However, the parties remain in dispute about the quality of the repairs.
Moreover, during repairs, the complainant advised the insurer that leaks and water damage had also occurred in units 8 and 14. The insurer denied the claim in relation to this damage. It attributes the damage to foot traffic on the roofs and unrelated maintenance issues. However, the complainant disagrees and says the leaks are due to poor workmanship by IP. It provided a report from an engineer, CC, in support of this aspect of the overall claim.
The complainant says the insurer should accept its claim in full and:
· ensure all claim-related damage to the roofs of both buildings is properly and satisfactorily repaired or, if this cannot be effectively achieved, replace the roofs
· repair the damage to units 8 and 14
· pay for (or reimburse) its claim preparation costs, including the costs associated with expert reports.
1.2 Issues and key findings
Is the insurer required to remediate the roofs?
Yes. The complainant has shown that problems and workmanship issues with the initial roof repairs completed by the insurer persist. The insurer is required to rectify these problems and issues.
Should the insurer accept the claim for damage to units 8 and 14?
Yes. The complainant has established the leaks to the units, and the resultant damage, are a result of the unsatisfactory repairs completed by the insurer. The insurer must accept the claim for this damage and reimburse the complainant for the cost of the repairs.
Should the insurer contribute to the complainant’s claim preparation costs?
Yes. The work completed by the complainant, and the reports it obtained, were necessary to establish its claim. The reports also assisted in the analysis of the issues involved in this complaint. The insurer must reimburse the complainant up to $5,000 for these reports.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the exchanged material shows the original roof repairs performed by IP were defective and caused further damage to the insured property
· it is reasonable and appropriate that the insurer contribute to the complainant’s claim preparation costs in this instance.
1.3 Determination
The determination is in favour of the complainant.
The complaint should be resolved in accordance with section 2.4, below, as well as the matters set out in this determination.
2 Reasons for determination
2.1 Is the insurer required to remediate the roofs?
Yes. The complainant has shown that problems and workmanship issues with the initial roof repairs completed by the insurer persist. The insurer is required to rectify these problems and issues.
Complainant says roof damage was extensive and severe
The policy provides cover for, amongst other things, damage to the buildings caused during the period of insurance. Page 15 of the Product Disclosure Statement (PDS) states:
Policy 1 - Insured Property
What We insure
If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 – Insured Property in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance.
In this case, the insured property includes a three storey, multi-unit residential development spread over two buildings. Each building has a timber truss roof structure covered in concrete roof tiles. The roofs are pitched to an angle of about 20 degrees.
The exchanged material indicates the buildings, including the roofs, were circa 40 years old when the insured event occurred. They are generally described as, ‘in good condition’.
Shortly after the storm on 20 January 2020, the complainant arranged for SB, roofing specialist, to undertake urgent make safe works that would render the roofs watertight again. SB replaced approximately 300 tiles, as well as roof vents and damaged flashing. SB also provided a preliminary recommendation that major roof works were necessary to return the roofs to a pre-loss condition.
Subsequently, QT, building consultants, inspected the insured property on behalf of the insurer. QT’s report dated 9 March 2020 includes the following relevant observations and conclusions:
· approximately 10% of the concrete roof tiles have been damaged by hail during the insured event
· the roof can be repaired without the need for a total re-roof
· undamaged tiles from the roof areas that are not visible from ground level can be removed and inserted into those areas where damage has occurred and is visible from the ground. New roof tiles can then be used to repair the roof elevations that are not visible.
After several more assessments, and after significant negotiation between the parties regarding the magnitude of the storm-related damage and the extent of the insurer’s liability (such as the number of tiles that required replacement or the ‘percentage’ of each roof that had been damaged), IP commence repairs.
The complainant says that, ultimately, its concerns were justified, as approximately 7000 tiles were actually replaced during the course of the initial repairs, representing a figure closer to 75% of the entire roof area. The complainant says this is in stark contrast to the earlier limited estimates of the damage made by the insurer’s trades.
No dispute about complainant’s valid claim or terms of the policy
The parties agree:
· the complainant has established a valid claim for the damage to the roofs
· the terms and conditions of the policy are set out in the policy documents, including the PDS and the Schedule of Insurance (SOI)
· the complainant was provided with a copy of the policy documents
· the insurer accepted the claim for the damage to the roofs.
As indicated, the parties disagree about whether further rectification work on the roofs is required and, if so, who should be liable for the costs of that work. There is also disagreement about whether the roofs should ultimately be replaced.
Complainant says roof repairs have not been completed to industry standards and are defective
CC inspected both buildings on 12 December 2023 and provided a report dated 14 May 2024. Upon inspection, CC observed:
The insurance repairs are generally visible on the roof such as evidenced by new metal flashings, new tiles interspersed amongst the existing tiles. New work is evident across the entire roof of the complex. It is reported that approximately 7000 tiles were replaced, representing around 75% of the roof area.
CC noted problems with the repairs completed by IP, including:
· numerous old and new tiles broken at the corners
· new tiles fractured, indicating damage during installation
· insufficient tile fixings and installation in line with Australian Standard AS2050:2018
· ridge cappings have insufficient cover over the tiles and are not scribed to prevent debris and water ingress
· ridge cappings are also held in place only with adhesive which, over time, will degrade and thereby increase the likelihood of water ingress and dislodgement
· thermal expansion and contraction of ridge cappings will also cause the adhesive to shear and fail
· some areas of flashing are held in place with a ‘whaka-flex’ sheet in an attempt to prevent bulging
· there is insufficient protection to wind driven rain in places
· many existing height safety anchors are seen to have their flashings dislodged and are improperly sealed
· there are inadequate flashings around some penetrations, relying on torn adhesive sheets
· the existing flashing is not compliant with Australian Standard AS HB39:2015.
CC’s report also included helpful and illustrative photographs of the roof damage.
CC concluded the way the repairs were completed is not to the same level as the existing roof installation. The new installation/repairs rely on sealant in many places, and the replacement works are not ‘like-for-like’. CC recommended:
A highly trained, experienced and reputable roofing company shall be engaged to upgrade the abovementioned elements in accordance with Australian Standards and best practice to suit the existing conditions.
Following the report of the leaks in units 8 and 14, the complainant arranged for EB, builder, to assess the roofs and undertake further necessary repairs. In its report dated 7 February 2024, EB says:
· unit 8 sustained water ingress due to broken and cracked roof tiles
· the broken tiles were replaced in November 2023
· after replacing the cracked tiles, the water ingress stopped.
Finally, on 23 April 2024, another builder, SR, inspected the roof above Unit 14 at the complainant’s request. SR observed cracked tiles which had been placed by IP.
The complainant relies upon the evidence of these experts to say that further rectification work is essential to restore the roofs to their pre-loss condition and prevent future problems from occurring.
Insurer says remaining damage is due to foot traffic and maintenance issues
As mentioned, the insurer engaged IP to complete the repairs after the storm. In addition, BA, was engaged to manage the scope of works (SOW) and the tendering process for the initial repairs, and to oversee the remediation process.
On 18 July 2023, BA issued a ‘Practical Completion Letter’ to the complainant, saying the repairs had been completed. In this letter, BA stated IP had exercised the standard of skill, care and diligence in the performance of the works that would be expected of a competent professional contractor with experience and expertise in carrying out works similar to the works under contract.
The insurer says BA was appointed by the complainant and acted independently. It relies on this final sign-off by BA as confirmation of the quality of the initial repairs.
Moreover, as mentioned, the insurer says the cracked tiles and water ingress to the units were not due to defective repairs by IP, but are the result of recent foot traffic from other contractors and maintenance issues. The insurer says these causal factors are unrelated to the original claim and should be considered a new ‘incident’.
In summary, the insurer says:
· it does not accept IP’s repairs were non-compliant with Australian Standards
· IP’s repairs were completed to a professional standard and signed off by BA
· there were no cracked tiles present when IP finished the repairs
· any current or persistent damage (including the damage to units 8 and 14) is not related to the original claim or repairs, but is the result of subsequent foot traffic and maintenance.
Complainant has established the roof repairs require rectification
I am satisfied that, on the balance of probabilities, the roof repairs completed by the insurer require rectification. This is because of the following considerations.
First, in a response dated 5 February 2025, IP said:
In terms of missing nails, well although all care is taken at the time of repair a nail here or there can be missed, we are more than happy to send [a repairer] back to the project to check every replaced tile and ensure that they attend to this.
Second, I am not persuaded by the insurer’s submission that foot traffic from other contractors, and maintenance issues after the initial repairs, caused cracking in the tiles because:
· the complainant has shown only one contractor went onto the roof after IP’s initial repairs, which was to clean gutters in February 2023. The complainant says the contractors were told not to go on the affected areas of the roof
· the report from CC shows the tile fixings are not to AS2050:2018. This is not a maintenance issue and the defective fixings were not caused by foot traffic
· CC reported the repair work relied on sealants and adhesives, not in keeping with the robust installation of the original tiles
· as set out below, it is likely the leak to unit 8 was caused by cracked tiles
· repairs of cracked tiles above units 8 and 14 were not completed to a sufficient standard during the initial repairs
· the insurer has not provided persuasive evidence to show foot traffic or maintenance issues are the cause of the cracked tiles and leaks
· whilst BA signed off on the repairs, it is likely there were ongoing issues with the work, as shown by the leak to unit 8.
Third, I acknowledge the insurer says that neither IP, nor any other contractors it engaged, completed repairs to the flashing. Moreover, IP says the lead flashings were deemed to remain by BA, the ridge capping was not part of the insurance claim, and neither the ‘whaka flex’ nor silicon around the brick pier was installed by IP.
Nevertheless, this does not prove on balance the repairs completed by IP were completed adequately. Nor does this displace the conclusion that some of the repairs require rectification.
Fourth, the insurer relies upon the fact that BA signed off on IP’s roof repairs. The insurer says this is evidence that, on completion of the initial repairs, there was no roof tile damage from the insured event and all works undertaken by IP were completed in full. The insurer says BA’s sign-off also shows the complainant was satisfied with the quality and standard of the repairs and that BA’s sign-off represents the complainant’s position in respect of the damage to the roofs.
The complainant disagrees. It says BA’s sign-off does not represent its position.
In light of the exchanged material (especially the extensive evidence of persistent defects with the initial repairs), I am of the opinion BA’s sign-off becomes moot. For instance, if, hypothetically, BA failed to properly inspect, assess and ‘superintend’ the repairs (which I have not found), it would not be fair to visit that failure upon the complainant. Or, if BA properly inspected, assessed and ‘superintended’ the repairs (again, a matter about which I have made no finding), that endorsement of IP’s repairs should not displace the expert evidence that the initial repairs were defective.
I am of the opinion that, in general, an endorsement or approval of repairs by one trade or specialist, regardless of that specialist’s affiliations, is one item of evidence which should be taken into account and afforded appropriate weight. In this case, in particular, I am persuaded that BA’s sign off should not excuse the insurer from its legal and policy obligations.
In conclusion, I am of the opinion the insurer’s trades have not satisfactorily repaired the claimed roof damage caused by the original storm event. It follows the insurer is liable to rectify the defective repairs in accordance with the terms and conditions of the policy and the matters set out in this determination.
2.2 Should the insurer accept the claim for damage to units 8 and 14?
Yes. The complainant has established the leaks to the units, and the resultant damage, are a result of the unsatisfactory repairs completed by the insurer. The insurer must accept the claim for this damage and reimburse the complainant for the cost of the repairs.
Complainant has established the defective original repairs caused further damage
The complainant says the insurer should cover the costs to repair the damage to units 8 and 14. It says, the damage occurred because IP’s original repairs were defective. It relies upon the evidence of CC, SR, and EB in this regard.
As indicated, the insurer says subsequent foot traffic on the roofs and persistent maintenance issues were the cause of the leaks into the units.
In all the circumstances, I am satisfied the exchanged material shows the leaks to units 8 and 14, and the consequent damage, were likely a result of the defective initial repairs.
This is because, firstly, in its report dated 7 February 2024 (that is, after completion of the initial repairs), EB says:
· unit 8 sustained water ingress due to broken roof tiles
· the broken tiles were replaced
· after replacing the cracked tiles, the water ingress to unit 8 stopped.
Second, the reports of CC, SR and EB also contain the following relevant observations:
· the original repairs were not compliant with Australian Standards
· cracked tiles were installed in the roofs above both units, which caused water ingress
· following EB’s repairs to the roof tiles above unit 8, the water ingress to that unit stopped
· following SR’s repairs to the roof tiles above unit 14, the water ingress to that unit stopped
· when SR inspected the roof above unit 14 at the complainant’s request it observed cracked tiles which had been placed by IP
· repair works by IP are directly attributable to the water ingress events in units 8 and 14 and associated damage to internal plasterboard linings, etc.
Third, BA signed off on the works in July 2023 before the water ingress into unit 8 had been resolved.
Fourth, I am of the opinion that CC’s evidence about the extensive and wide ranging defective initial repairs presents a more reasonable, logical and rational explanation of the cause of the damage to the units, compared to the submissions proffered by the insurer.
It follows the insurer must accept the claim for the damage to units 8 and 14.
2.3 Should the complainant be reimbursed for their costs?
Yes. The work completed by the complainant, and the reports it obtained, were necessary to establish its claim. The reports also assisted in the analysis of the issues involved in this complaint. The insurer must reimburse the complainant up to $5,000 for these reports.
Insurer must reimburse some of the complainant’s claim preparation costs
The complainant seeks reimbursement for the reports it obtained from CC, EB and SB, along with additional costs relating to several inspections.
Under Rule D.5.2, AFCA may require the insurer to contribute to the professional costs incurred by a complainant. Normally, this would be awarded if the complainant needed to incur the costs to understand or establish their claim, having regard to the complexity of the complaint. AFCA will not require an insurer to contribute more than $5,000 towards these costs unless there are exceptional circumstances.
In all the circumstances, I am satisfied it was reasonable and necessary for the complainant to incur these costs to establish its claim, to identify the defects in the repairs completed and to address the issue of causation. The reports also assisted with the complaint process. However, I am not persuaded there are exceptional circumstances in this particular instance.
Accordingly, I am of the opinion that, after the complainant provides the insurer with evidence of the claim preparation costs it has incurred, the insurer should reimburse to the complainant such costs up to the sum of $5,000.
2.4 Complaint should be resolved in this way
Claim regarding the roof damage
The complainant says it prefers the insurer provide a cash settlement based on SB’s quote dated 13 July 2025 in the total sum of $918,444. It says this quotation effectively reflects the costs to replace the roofs because:
To do anything other than replace the roof will result in repeated instances of tiles cracking, dislodging and/or being more susceptible to water ingress.
As set out above, I am satisfied the initial roof repairs were defective and such defects have caused the damage in units 8 and 14. I also accept the original repairs completed by IP will need to be inspected again, checked and rectified where appropriate. This is the responsibility of the insurer.
However, SB’s quotation involves extensive works on the roofs. It includes the costs associated with, amongst other things, removing the existing concrete roof tiles, timber battens and sarking. As indicated, SB’s quote is, in effect, an estimate of the cost of a full roof replacement.
I acknowledge the complainant’s concerns about the quality of the work completed by IP and the risks of further damage occurring as a result of the defective repairs. However, I am of the opinion those concerns do not justify a full roof replacement in this instance. Indeed, it would not be fair to require the insurer to pay such a cash settlement which would effectively include the costs of repairing maintenance issues unrelated to the insured event and replacing sections of the roof that were not damaged by the storm.
Accordingly, within 28 days’ notice that the complainant accepts this determination, the insurer must engage a qualified builder, roof specialist or other suitably qualified expert (who has not previously inspected the insured property) to attend and inspect the property. This expert must draw up a SOW regarding the necessary repairs and associated works required to remediate the roofs including, but not limited to, rectifying any defective works undertaken by IP and repairing any other claim-related damage that is identified.
After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and Territory building-related, safety-related and health-related laws, regulations and codes.
Within seven days of receipt of the associated quotation(s), the insurer must elect to either:
· agree to commence the necessary repairs and associated works as soon as possible, or
· offer a cash settlement to the complainant based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required.
Claim regarding the damage to units 8 and 14
The complainant has provided two quotes for the internal repairs to both units, completed in December 2024 by JP, builder. The quotations total $2,830.
Within 14 days’ notice that the complainant accepts this determination, the insurer must pay it the sum of $2,830.
The insurer must also pay interest on this sum in accordance with section 57 of the Insurance Contracts Act 1984 (the Act), payable from 1 December 2024 until settlement is paid.
The insurer must also provide to the complainant an explanation, and breakdown, of how this interest has been calculated.
Claim regarding the complainant’s professional costs
Within 14 days’ notice that the complainant accepts this determination and provides evidence of the claim preparation costs it has incurred, the insurer must reimburse to the complainant such costs up to the sum of $5,000.
2.5 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the exchanged material shows the original roof repairs performed by IP were defective and caused further damage to the insured property
· it is reasonable and appropriate that the insurer contribute to the complainant’s claim preparation costs in this instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.