Insurer declined loss of rent for mould and water damage to a strata unit, saying the unit was not unfit for its purpose and the late claim caused the mould
Text of the determination
Determination
|
Case number
|
12-25-220451
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-25-220451 10 April 2026
1 Determination overview
1.1 Complaint
The complainant owns a unit within a body corporate scheme insured under a residential strata policy with the financial firm (insurer). He lodged a claim for water and mould damage to the downstairs laundry, caused by a washing machine leak from the adjacent unit.
The insurer accepted the damage but declined loss of rent. It says the laundry damage alone did not render the property unfit, and mould developed because of the complainant’s delay in lodging the claim.
The complainant says the property has been uninhabitable since December 2023. He seeks loss of rent from that date, reimbursement of utilities and body corporate levies, mould report costs, increased renovation costs, and non-financial loss compensation.
1.2 Issues and key findings
Was the property unfit for its intended purpose from 13 December 2023?
Yes. The mould contamination rendered the property unfit to be leased from that date. The mould exclusion does not apply because the mould is resultant damage from a covered event. The late claim lodgement did not cause or worsen the loss.
For what period is loss of rent payable?
From 13 December 2023 until the insurer put the complainant in a position to complete all necessary repairs and re-let the unit. The insurer did not settle the remediation component until 25 September 2025. A reasonable repair period of 9 weeks plus a re-letting period of 3 weeks follows. Loss of rent is payable from 13 December 2023 until 16 December 2025. The insurer has not shown it can reduce its liability because of the late claim lodgement.
Is the insurer liable for increased renovation costs?
No. The delays in repair were not primarily caused by the insurer. The parties agreed to cash settlements. It is not fair to hold the insurer liable for increased costs, or to change the settlement.
Must the insurer reimburse the mould report costs?
Yes. The report addressed a live dispute about the severity of contamination that the insurer had failed to investigate.
Is the insurer liable for utilities and body corporate levies?
Yes, between 13 December 2023 and 27 November 2025 (the time the property was unfit for occupation). Utilities are subject to the $2,000 policy limit.
Is the complainant entitled to non-financial loss compensation?
Yes. $3,000, for claim handling errors is fair.
Why is the outcome fair?
The evidence mostly supports the complainant’s position. On the key issue, the information establishes the insured event rendered the property unfit to be leased from 13 December 2023. The insurer has not shown it is entitled to limit its liability for the mould damage.
In addition, it is fair the loss of rent payment accounts for the time taken to put the complainant in a position to do the repairs. The insurer did not finalise the remediation settlement until late September 2025. The complainant could not do the repairs before this time.
The difficulties in completing repairs after this point are not the insurer’s responsibility.
I note the insurer mishandled the claim, for which compensation is appropriate. However, it is not fair to attribute all delays to the insurer. The unit 3 fire wall issues were not the insurer’s fault. I also accept that, once the insurer cash settled, this transferred some risks to the complainant. That is the nature of a cash settlement, which the body corporate, as the insured, accepted.
1.3 Determination
This determination is mostly in favour of the complainant.
If the complainant accepts the determination, the insurer is to pay the complainant:
· loss of rent at $600 per week from 13 December 2023 to 16 December 2025, less any loss of rent already paid or payable under claim LNG40009409, subject to any relevant policy limits
· utilities (electricity and water) incurred from 13 December 2023 to 27 November 2025, subject to the policy limit, on provision of supporting invoices
· body corporate levies incurred from 13 December 2023 to 27 November 2025, subject to provision of invoices
· $811.20 for the mould report
· $3,000 non-financial loss compensation.
2 Reasons for determination
2.1 Was the property unfit for its intended purpose from 13 December 2023?
Yes. The mould contamination rendered the property unfit to be leased from that date. The mould exclusion does not apply because the mould is resultant damage from a covered event. The late claim lodgement did not cause or worsen the loss.
Background
The complainant made two claims for damage to his unit.
The first claim (LNG40009409) arose from the February 2022 QLD storms. Roof damage caused water ingress to the unit's upstairs areas, resulting in ceiling staining, sagging and mould. The insurer initially declined that claim. The complainant brought a complaint to AFCA, and a preliminary assessment issued in December 2024 found in his favour. Both parties accepted the outcome and that complaint is closed. The insurer paid a cash settlement, including loss of rent for the period needed to complete repairs.
The second claim (LNG40011405) is the subject of this complaint. It is about separate water damage and mould in the downstairs laundry. The damage was caused by a washing machine leak from the adjacent unit 3. It was discovered in December 2023 during an inspection carried out under the first claim. The formal claim was not lodged until June 2024. The insurer accepted the reinstatement damage and paid a cash settlement, but has tried to limit loss of rent to the repair period only. That decision is what the complainant now disputes.
The two claims are legally separate but factually connected. The complainant's position throughout this complaint is that the combined effect of the damage under both claims rendered the unit uninhabitable from December 2023, and that loss of rent should be calculated from that date.
Policy covers loss of rent
The policy covers loss of rent:
Where the Lot is leased out or would have been leased out, the Loss of Rent incurred by the Lot Owner if the Lot or Common Area is made unfit to be occupied for its intended purpose.
We will pay from the time of the physical loss, destruction or damage until the time the Lot is re-let following completion of reinstatement or replacement of Your Insured Property, provided the Lot Owner takes all reasonable action to obtain a new tenant.
To make out a claim, the complainant must show:
· the lot is or would have been leased out
· the lot was made unfit to be occupied for its intended purpose by the insured damage
· he took reasonable action to mitigate loss.
Unit was unfit for its intended purpose from 13 December 2023
The intended purpose of the property was as a rental. The test is not bare liveability. It is whether the property was fit to be let. I am satisfied it was not, from 13 December 2023.
The evidence on this point comes from several independent sources:
· On 13 December 2023, the insurer’s assessor and the complainant’s property manager inspected the unit. They noted extensive black mould in the laundry and took photos.
· In January 2024, a building consultant CR noted “black mould” in the laundry during a separate inspection.
· In October 2024, the insurer’s builder inspected and identified a hazardous environment. Its scope of works included post-remediation verification (PRV) certification, a measure only required where mould contamination poses a health risk.
· The mould report in December 2024 confirmed “high” spore levels throughout the unit, including the lounge and kitchen. The hygienist recommended against occupation.
· The complainant’s property manager confirmed the property failed Queensland’s minimum housing standards. Under those standards, a rental must be free from damp and mould. He stated it would not be possible to let in its condition.
· The photos from December 2023 through to June 2025 show the mould did not worsen over time. Several inspections confirmed this. The insurer’s builder confirmed in November 2024 that repair costs would not have differed if the damage had been notified earlier. This suggests the mould was developed by December 2023.
The insurer has not challenged the above evidence in a persuasive way.
I have reviewed the photos, videos and reports. The mould was clearly serious, and it is common knowledge that spores can spread from one area to another. It is not reasonable to expect a landlord to rent out a property with this kind of mould. Again, I note the policy is directed not at theoretical livability, but at fitness for its purpose, which in this case was a rental.
The mould report shows the mould had spread beyond the laundry to the lounge and kitchen, with spore levels classified as “high” throughout the unit. While it shows mould spread to other areas, I am satisfied the unit was unfit for purpose based on the laundry mould alone.
The insurer says the tenant continued to live in the house for 17-21 months, including during the time when mould was present, which proves the unit was not unfit for purpose.
I do not accept this submission. The fact that a tenant occupied the property until July 2023 does not establish the property was fit for leasing. The mould in the laundry was not discovered until December 2023, after the tenant had vacated. Regardless, what one tenant chooses to do is not determinative of the general fitness of the property.
I am also satisfied the property would have been leased but for the mould. The complainant’s property manager provided a market appraisal of $600 per week. The insurer has not challenged this figure with persuasive information.
Insurer cannot rely on mould exclusion
The insurer relies on an exclusion for loss caused by “mildew, mould, wet or dry rot.”
This exclusion is subject to a proviso:
...but We will pay for resultant loss, destruction or damage under exclusions i) to n) caused by any other Event covered by this Section 1.
The insurer accepted that both underlying events (the February 2022 storm and the adjacent unit’s washing machine leak) are covered events. The mould is resultant damage. The proviso applies. Alternatively, consistent with the AFCA approach to similar exclusions, the exclusion does not apply because the cause of damage was not mould but rather an insured event.
Late lodgement did not cause or worsen the mould damage
The insurer says the complainant’s delay in lodging the claim (about 10 months from the stated date of loss) allowed mould to develop. It also says the policy requires prompt notification and steps to reduce loss.
I am not persuaded by this submission, for the following reasons. First, the complainant did not discover the laundry damage until 13 December 2023. The leak came from the unit 3’s washing machine. The property was vacant. The complainant could not reasonably have detected it earlier. The policy condition requiring prompt notification cannot penalise someone for failing to report damage they did not know about. I also note the insurer’s builder NS’s site report includes a field: "Would the customer have been reasonably aware of the property conditions relating to the event? NO."
Second, the insurer has provided no expert or direct evidence that the delay caused or worsened the mould. The onus is on the insurer to establish its prejudice, and it has not done so.
Third, the evidence shows the mould did not worsen after discovery. The photos from December 2023 onwards are consistent. The insurer’s builder confirmed costs would not differ if the damage had been notified when first discovered. This undermines the suggestion that the delay between August and December 2023 increased the loss.
I also note a March 2023 routine inspection report describes the laundry as "clean and tidy... No visible issues noted. No leak noted." This suggests there was no clearly visible mould at that time, and it developed between March and December 2023.
Fourth, even if the mould grew during that period, the cause is the insured event (the water leak) rather than the complainant’s failure to detect it. An analogous situation is a concealed burst pipe in a wall that causes mould over time before being discovered. It would not be fair to deny cover because the insured did not notice the damage sooner, when there was no reasonable way to have done so.
2.2 For what period is loss of rent payable?
From 13 December 2023 until the insurer put the complainant in a position to complete all necessary repairs and re-let the unit. The insurer did not settle the remediation component until 25 September 2025. A reasonable repair period of 9 weeks plus a re-letting period of 3 weeks follows. Loss of rent is payable from 13 December 2023 until 16 December 2025. The insurer has not shown it can reduce its liability because of the late claim lodgement.
Loss of rent period: 13 December 2023 to 16 December 2025
The policy is clear. Loss of rent runs from the time of the physical loss until the lot is re-let following completion of reinstatement. There are no provisions limiting coverage to the period of repairs alone. To the extent the insurer argues the complainant failed to mitigate his loss, the insurer bears the onus to establish this.
The insurer refers to the previous storm damage complaint, saying the preliminary assessment in that case found loss of rent only payable during the repair period. It implies this case should follow the same approach. However, that case turned on its own facts and, regardless, I am not bound by it.
The insurer first cash settled the reinstatement costs in December 2024, and then issued an updated settlement including remediation on 30 May 2025. But the remediation component was not finally settled until 25 September 2025. Until that date, the complainant could not start repairs because the builder needed the PRV clearance.
I do not consider the insurer discharged its liability on 30 May 2025. The 30 May settlement bundled the remediation costs with unit 3 reinstatement costs in a single offer. It was based on the panel builder's quote for works the builder had just confirmed it could not complete (i.e. it was not actionable). The quote was also dated. The body corporate reasonably disputed the settlement. The insurer's broker described the situation as "unfair" and "unreasonable." The complainant could not act on the 30 May settlement by himself.
Up until this point, the complainant was following the insurer’s processes, as he was entitled to do. He then sourced an alternative remediation quote from M, which the parties agreed on by 25 September 2025. That is the date the remediation was effectively settled.
From 25 September 2025, a reasonable period for remediation (about 2 weeks) and reinstatement (about 7 weeks, based on the builder’s estimate) is 9 weeks. This takes the timeline to about 27 November 2025. I would allow a further 3 weeks for the re-letting process, which takes it to 16 December 2025.
I am satisfied the complainant acted reasonably throughout. The evidence shows he sourced quotes, arranged access with unit 3, commissioned testing, and pursued the insurer’s processes. The delays in reaching this point were not caused by him.
It is fair in the circumstances that the insurer pay loss of rent at $600 per week from 13 December 2023 to 16 December 2025, less any loss of rent already paid or payable under the previous storm claim, subject to any applicable policy limits.
The complainant recently provided further information about developments after September 2025. He says his restorer M completed the unit 2 remediation in February 2026 but could not achieve full PRV certification because the shared wall with unit 3 is still compromised.
In my view, this does not change the end date. The M scope was sourced by the complainant, confirmed by M as sufficient for PRV certification, and accepted by both parties on 25 September 2025. At that point, the insurer had put the complainant in a position to complete the works on the basis both parties agreed was adequate. That the scope later proved insufficient because of the condition of unit 3 is unfortunate. However, it does not extend the insurer's loss of rent liability. In cash settling, the risk of this situation transferred to the complainant.
Insurer cannot limit its liability based on late claim lodgement
To the extent the insurer argues it can reduce its liability for loss of rent based on the complainant’s or the body corporate’s late claim lodgement, the onus is on it to establish its prejudice. This is consistent with the policy wording and section 54 the Insurance Contracts Act 1984 (Cth).
In my view, the insurer’s evidence and submissions are insufficient to do so. Firstly, as noted above, the insurer has not shown the late lodgement caused or exacerbated the damage itself.
Secondly, the insurer has not shown that, but for the late lodgement, it would have assessed the claim promptly, thereby reducing its overall loss of rent liability. The insurer’s case is not supported by robust submissions on this point.
In addition, the policy contains this general condition:
11. Acts or Failures to Act of Your Body Corporate Manager
We will not deny liability for a claim, or reduce the amount of a claim, if Our right of denial or reduction is solely caused by an act, error or failure to act of Your Body Corporate Manager while acting on Your behalf.
The evidence establishes the late lodgement was not the complainant’s fault. It was due to the body corporate’s actions.
I also note that, to the extent the insurer’s submission rests on policy conditions requiring reasonable steps / reasonable precautions, the AFCA approach to such conditions is well-established: the insurer must show the complainant subjectively knew of the relevant risk, and deliberately or recklessly failed to take steps to avoid it. The evidence here does not support the insurer’s position. The complainant acted reasonably and did not fail to take reasonable steps / precautions.
For these reasons, the insurer has not established it can reduce its liability based on the late lodgement.
2.3 Is the insurer liable for increased renovation costs?
No. The delays in repair were not primarily caused by the insurer. The parties agreed to cash settlements. It is not fair to hold the insurer liable for increased costs, or to change the settlement.
Insurer not liable for increased costs
The complainant says the insurer caused delays, including by twice instructing its builder to close the file (in March and May 2025), and by pursuing a cash settlement the body corporate disputed. He says the insurer’s delays caused increased repair costs. He says the quotes are now dated and the insurer should bear the cost of inflation.
The complainant suggests the insurer should not have cash settled the remediation because he could not, as an individual lot owner, coordinate restoration across both units. He says the insurer was the only party with the standing and practical ability to do this, and by stepping back, it left him in an impossible position.
I have considered this carefully. I accept the insurer’s actions contributed to delays in the remediation process. However, the shared fire-rated wall was a real difficulty that neither party created, and that would have complicated the restoration process regardless. And ultimately, cash settlement transferred risks to the insured.
I note the insurer did not cash settle as a first resort. It authorised its builder NS to proceed with restoration in April 2025. NS then said it could not complete the work because the fire-rated wall needed to be removed, and it would not accept the compliance liability for the wall if a different builder was handling the unit 2 reinstatement on the other side.
It appears that split arose because the unit 2 reinstatement had already been cash settled in December 2024. The complainant / insured accepted this settlement, which allowed the complainant to use his preferred builder. It was a reasonable arrangement at the time and neither party foresaw the difficulty it would create.
When managed restoration failed, the insurer offered to cash settle. The complainant opposed this, but he then found a practical way through: the M quote, which covered unit 2 remediation without requiring access to unit 3 and which M confirmed would achieve PRV certification. The complainant sourced this quote, said he was satisfied with the scope, and accepted the settlement on 25 September 2025. The insurer accepted the quote the complainant put forward. Both parties agreed it was adequate.
The complainant now says the insurer's decision to cash settle was unfair because even the insurer could not complete the restoration. But the fact that managed repairs failed does not mean a cash settlement was unfair. It means the fire-rated wall was a complicating factor, regardless of the repair/settlement pathway. The evidence does not establish the insurer would have overcome that by retaining control of the works. In any case, both parties agreed to the cash settlements which, as I have said, transferred the risk.
I accept the complainant is in a difficult position at present. The shared wall is still compromised, and full PRV certification has not been achieved. However, the ongoing impasse relates to the condition of unit 3. This is a matter between the body corporate, as the insured, and the insurer. It is not something this complaint can or should resolve. The body corporate has standing to negotiate the unit 3 works with the insurer, and it seems that process is ongoing.
Regarding the claim for inflationary costs, I also note:
· the complainant is already compensated for the insurer’s delays to an extent through the extended loss of rent period
· the cash settlement included an uplift to account for the transfer of risk
· the majority of the claimed inflationary costs relate to private renovation works rather than insured repairs.
In these circumstances, I do not consider it fair to hold the insurer liable for increased renovation costs, or to a different quantum or method of settlement.
2.4 Must the insurer reimburse the mould report costs?
Yes. The report addressed a live dispute about the severity of contamination that the insurer had failed to investigate.
Fair insurer pays for report
The insurer says the report was unnecessary because the presence of mould is not in dispute.
I do not accept this. While the existence of mould was not in dispute, the insurer was actively disputing its severity and whether it rendered the property unfit. On 4 November 2024, the insurer declined loss of rent on the basis the laundry damage would not make the property unfit. The mould report directly addressed that dispute. It confirmed “high” contamination levels and recommended against occupation.
The insurer never assessed the mould itself, despite knowing about it since December 2023. The complainant arranged the report because the insurer had not. The report was central to establishing that the property was unfit for leasing. It was a reasonable expense and it is fair the insurer pays for it.
2.5 Is the insurer liable for utilities and body corporate levies?
Yes, between 13 December 2023 and 27 November 2025 (the time the property was unfit for occupation). Utilities are subject to the $2,000 policy limit.
Utilities and levies covered, subject to limits
These are costs the complainant incurred because of the insured damage. The property was unfit for occupation, but ownership costs continued. The insurer accepted in principle that utilities and levies are payable. The dispute was only about the period. Above I have found that the property would be unfit for occupation between 13 December 2023 and 27 November 2025. The insurer is to pay the relevant costs during this time.
Utilities (electricity and water) are subject to the $2,000 policy limit. Body corporate levies are payable for the full period. The complainant must provide supporting invoices.
2.6 Is the complainant entitled to non-financial loss compensation?
Yes. $3,000, for claim handling errors is fair.
Compensation is warranted
AFCA can award up to $6,300 for non-financial loss per claim. Compensation is only awarded where the complainant suffered unusual stress, inconvenience or delay because of the insurer’s handling. No compensation is awarded for the ordinary inconvenience that comes with making a claim.
I accept the insurer generally communicated within reasonable timeframes. However, in other respects, its claims handling fell short of acceptable standards. The insurer’s key failures include:
· general delays
· no make-safe was provided, despite the insurer being aware of mould from December 2023
· the insurer never sent an assessor to evaluate the mould, despite this being central to the loss of rent dispute
· the insurer declined loss of rent in November 2024 without any habitability assessment
· the insurer twice instructed its panel builder to close the file shortly after access to the adjacent unit had been arranged, setting back progress the complainant and his property manager had made
· the initial cash settlement in December 2024 was based on the wrong quote, requiring the complainant to correct the error.
As a result of the insurer’s conduct, the complainant had to arrange mould testing, source remediation quotes, and coordinate access with the adjacent unit.
The complaint spans December 2023 to October 2025, nearly two years of frequent engagement without resolution. I accept the insurer’s claims handling errors caused an undue degree of stress and inconvenience, although the information is insufficient to establish the insurer caused the complainant’s medical issues.
While the complainant has mentioned other issues, I consider the matters above the most material to the overall picture.
I consider $3,000 compensation is fair in the circumstances.
2.7 Why is the outcome fair?
The evidence mostly supports the complainant’s position. On the key issue, the information establishes the insured event rendered the property unfit to be leased from 13 December 2023. The insurer has not shown it is entitled to limit its liability for the mould damage.
In addition, it is fair the loss of rent payment accounts for the time taken to put the complainant in a position to do the repairs. The insurer did not finalise the remediation settlement until late September 2025. The complainant could not do the repairs before this time.
The difficulties in completing repairs after this point are not the insurer’s responsibility.
I note the insurer mishandled the claim, for which compensation is appropriate. However, it is not fair to attribute all delays to the insurer. The unit 3 fire wall issues were not the insurer’s fault. I also accept that, once the insurer cash settled, this transferred some risks to the complainant. That is the nature of a cash settlement, which the body corporate, as the insured, accepted.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided.
The parties have raised a number of issues and arguments in their submissions. I have considered them all. However, I have restricted this determination to the issues and arguments that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy extracts
Loss of rent provision:
Additional Benefits B
Following physical loss, destruction or damage covered under this Section 1 of the Policy (or in other circumstances described in any of the Additional Benefits B below), We will also pay, in addition to the Sum Insured, the following amounts, costs and expenses incurred in consequence of the physical loss, destruction or damage:
…
5.16 Costs of Losses Incurred by the Lot Owner
We will also pay the following amounts, costs and expenses incurred by a Lot Owner in consequence of physical loss, destruction or damage covered under this Section 1.
…
b) Loss of Rent, and Temporary Accommodation
i) Loss of Rent
Where the Lot is leased out or would have been leased out, the Loss of Rent incurred by the Lot Owner if the Lot or Common Area is made unfit to be occupied for its intended purpose.
We will pay from the time of the physical loss, destruction or damage until the time the Lot is re-let following completion of reinstatement or replacement of Your Insured Property, provided the Lot Owner takes all reasonable action to obtain a new tenant. …