Home / Allianz Australia / Determination 12-25-219244

Determination 12-25-219244

Insurer declined cash settlement for gutter replacement after hail damage to roof, relying on wear and tear and rust exclusions

FirmAllianz Australia
Decided2025-12-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$9,768
Non-financial loss—
Amount claimed$9,768
SourceAFCA PDF

Summary

The complainant's hail damage roof claim was cash settled, but the insurer declined a further amount to replace gutters incompatible with the new Colorbond roof. AFCA found for the complainant and required payment of $9,768 plus interest.

The policy requires repair to as-new condition, which means compatible roof and gutter materials, and the insurer did not show the gutters had reached the end of their serviceable life before the hail event.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-219244 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-219244 9 December 2025 1 Determination overview 1.1 Complaint The complainant has a home and contents insurance policy underwritten by the financial firm (insurer). The complainant lodged a claim for damage to his roof following a hailstorm (hail event) on 10 November 2019. The insurer accepted the claim for the damaged roof sheeting and provided a cash settlement. The complainant seeks a further settlement amount to cover the gutters on the roof as, he says, the roof material is not compatible with the existing guttering. The insurer has declined the further amount. It says the gutters were not damaged by the hail event but required replacement due to gradual deterioration, wear and tear and rust. It says the gutters were at the end of their serviceable life prior to the hail event. The complainant disagrees. He seeks a cash settlement of $9,768. The complainant initially sought compensation of $500 as it says the insurer has breached its claims handling and regulatory obligations including by unduly delaying the claim decision and its refusal to recognise the necessity of metal compatibility. He has since withdrawn that request. This determination does not consider those issues. The complainant is represented in the complaint. For simplicity, I will refer to the complainant and his representative collectively as ‘the complainant’ unless context requires otherwise. 1.2 Issues and key findings Is the insurer entitled to decline gutter replacement? No. The complainant has established a valid claim for storm damage to the roof sheeting. The insurer has not shown that it is entitled to rely on exclusions to decline the gutter replacement. Rather, its policy obligations require it to replace the gutters. Why is the outcome fair? The complainant has established a valid claim for damage directly related to the roof damage caused by an insured event and the subsequent repairs covered by the policy. The insurer has not established that it is entitled to rely on an exclusion to decline the gutter replacement. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts this determination, within 14 days of being notified of acceptance, the insurer is to settle the variation for guttering for $9,768. The insurer is also required to pay interest according to section 57 of the Insurance Contracts Act from 16 April 2025, being the date of the insurer’s internal dispute resolution decision, to the settlement date. 2 Reasons for determination 2.1 Is the insurer entitled to decline gutter replacement? No. The complainant has established a valid claim for storm damage to the roof sheeting. The insurer has not shown that it is entitled to rely on exclusions to decline the gutter replacement. Rather, its policy obligations require it to replace the gutters. Complainant says gutter replacement is required for warranty and compliance Following a claim for hail damage in 2023, the complainant agreed to the insurer’s cash settlement of the roof repairs in September 2024. On 16 January 2025, the complainant requested a variation for the replacement of gutters. He provided his builder, CD’s, scope of works (SOW) and quote for $13,159 for that work. At around September 2025, the complainant replaced a 5 lineal metre section of guttering at the front gable of the house which was severely rusted. He has provided CB’s revised SOW and quote for $9,768 for the replacement of the remaining guttering. The insurer does not dispute that the complainant established a valid claim under the policy for storm damage to the property. The complainant says the insurer is required to replace the gutters as the replacement Colorbond roofing is incompatible with the existing guttering. He makes numerous points including: · the insurer’s settlement covers the replacement of the roof sheeting with Colorbond. The existing guttering at the property is galvanised. The materials are incompatible and would lead to galvanic corrosion in the guttering if not replaced with a suitable guttering of a suitable material · without replacement, the existing gutters will corrode and will not be compliant with the current Building Code of Australia (BCA) · suitable gutter replacement is required to make the works warrantable · the policy requires the insurer to restore the property to its pre-loss condition and maintain equivalent warranty coverage. This requires the gutters to be replaced with compatible materials. The complainant provided reports, with photos, from builders and roofers, CD. CD says: · it has identified the guttering as galvanised, while the roof replacement material specified in the approved Scope of work is Colourbond · the dissimilarity in metals between the roof sheets and the gutters will cause galvanic corrosion in the gutters if it is not replaced with a compatible material · it is unable to warrant the repairs unless the gutters are also replaced · its roof report says the gutters need to be replaced · the gutters are currently functioning as intended and presence of surface rust does not immediately affect their serviceability · gutter replacement is required to avoid galvanic corrosion between the new Colorbond roof sheeting and existing galvanised gutters, and to ensure the repairs are certifiable and warrantable The complainant has provided CD’s SoW and quote for $12,551 dated 31 December 2024 and CD’s revised SoW and quote for $9,768 dated 15 September 2025. The complainant has provided a letter from building certifier, AB, dated 3 November 2022, providing building code advice for metal compatibility in respect of roof sheeting repairs. AB says: · to prevent corrosion due to adverse chemical reaction of materials used, 3.5.1.2(b) of the BCA requires that the metal roofing and other materials that come in contact with it, such as fasteners, flashings and cappings are compatible with each other · BCA table 3.5.1.2b says zinc coated steel and zinc accessories are compatible with Aluminium/zinc and aluminium/zinc/magnesium coated steel · it attaches two Bluescope steel Corrosion Technical Bulletins (CTB) including CTB 25 ‘Inert Catchment’ which sets out different causations of corrosion, including the use of different materials between the roof and the gutters. It says: > when rain falls on a large catchment area, such as the roof, it is collected and directed to the concentrated streams > galvanised steel can be affected in this way. Insurer says its policy obligations do not extend to gutter replacement The insurer says it discharged its obligations to the complainant in respect of the hail event when it cash settled the roof claim in October 2023. It says it has no liability for replacement of the gutters because: · the complainant has not shown that the gutters were damaged by the hail event · the gutters require replacement due to their deteriorated, corroded condition that pre-dated the hail event · damage due to gradual deterioration, wear and tear and rust and poor maintenance is excluded from cover by the policy terms · CD has a financial connection with the complainant’s representative. The complainant’s representative obtains a financial benefit from insurer’s settlements to its clients. Therefore, no weight should be attributed to CD’s reports. The insurer acknowledges that the galvanised gutters may not match the Colorbond roof but says that the complainant is responsible for upkeep and maintenance. The insurer engaged builder, EF, to inspect the property and provide a report. EF’s inspected the property on 25 August 2023 and says: · hail damage has affected the whole roof area. · battens seem to be rotten in some places · all gutters are rusted and need to be replaced, there is a broken downpipe at back left of house The insurer arranged for plumber and roofer, GH, to inspect the roof and provide a report. GH inspected the roof on 25 August 2023 and says: · the roof is zincalume corrugated iron · all gutters are rusted and need to be replaced · there is a broken downpipe at the back left of the house The policy requires insurer to repair to the same condition as when it was new The insurer does not dispute that the complainant established a valid claim under the policy for storm damage to the property. Where a claim is accepted, the policy sets out the extent of the benefit as follows: How we settle your claims Buildings claims If we agree to cover your claim for loss of or damage to your buildings, we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. The insurer says that if the complainant’s builder cannot warrant the repairs, it is the complainant’s responsibility to replace the gutters to ensure a warranty can be provided by his chosen builder. Insurer must cover the guttering in the complainant’s revised SOW Having considered the exchanged information, I am not persuaded that the insurer has shown an entitlement to rely on an exclusion to limit its liability. That is because: · I am not satisfied the insurer has shown that the gutters required replacing prior to the insured event · the insurer’s settlement for roof sheeting replacement was based on its panel builder’s SOW and quote. The SOW and quotes from its panel builders specify Colorbond roof sheeting · I have carefully considered the expert reports and the accompanying photos · on balance, I accept CD’s reports that the gutter replacement is necessary due to the incompatibility between the replacement Colorbond roof sheeting and the existing galvanised guttering and that replacement of the gutters is required to prevent galvanic corrosion · when considering the weight to be given to the expert reports, I have had regard to a number of factors including the evidence presented by the experts to support their conclusions · I acknowledge that EF and GH both say that all gutters are rusted and corroded and need to be replaced for that reason. Photos provided by GH and CD show some rust on the top side of all gutters. However, I am not satisfied that the photos support EF and GH’s conclusion that all gutters are no longer serviceable and required replacement before the hail event. Some photos including those at page 6 of CD’s report and pages 6 and 8 of GH’s report show the gutters to be old but having very little rust. Other photos such as those at pages 3, 4, 5 and 8 of CD’s report and pages 9, 10, 11, 19 and 34 of GH’s report do show rust but also show that also show that the gutters adequately attach to the roof structure and are fit to carry and discharge rainwater as intended. Accordingly, I accept those gutters are still serviceable and, if not for the new roof sheeting, would not require replacement at the present time · I am persuaded that further damage and more progressive corrosion is likely to occur, resulting in total failure, if the materials remain incompatible · I accept that the exchanged information does show that the guttering on the front gable is no longer serviceable and required replacement prior to the insured event. This is evident in the photo at page 7 of CD’s report and pages 17 and 20 of GH’s report. However, the complainant says it has replaced that guttering and provided a revised SOW and quote that does not include the replacement of that guttering. Accordingly, I have carefully considered the exchanged information and am not satisfied that the insurer has met its onus to show that the gutters had reached the end of their serviceable life or required replacement due to gradual deterioration, wear and tear, rust or lack of maintenance. I have considered the insurer’s submission that CD’s reports should be given no weight as, it says, CD has a financial relationship with the complainant’s representative who obtains a financial benefit from the insurer’s settlement. However, I am not satisfied that the CD’s report should be given no weight in circumstances where photos provided by both parties support the conclusions in CD’s report. I have also considered the insurer’s position regarding the additional policy benefit for building code compliance costs. The insurer says the benefit is not payable because the complainant was aware of the BCA requirements and had not complied with those requirements before the loss or damage occurred. However, I do not consider this policy section relevant to the claim. That is because the insurer’s obligation to replace the guttering arises from its obligation to put the property back to its condition when new. In this case, that means having the roof and guttering made of compatible materials. Therefore, there is no need to consider this additional benefit. The insurer is required to pay the cost of gutter replacement as set out in CD’s revised SOW dated 15 September 2025, being $9,768 and interest as set out in section 1 of this determination. The complainant has raised various issues relating to the General Insurance Code of Conduct and ASIC RG 271 which may give rise to compensation for non-financial loss. As the complainant has withdrawn his claim for non-financial loss compensation, I have not addressed these issues as they are no longer relevant to the relief the complainant is seeking. 2.2 Why is the outcome fair? The complainant has established a valid claim for damage directly related to the roof damage caused by an insured event and the subsequent repairs covered by the policy. The insurer has not established that it is entitled to rely on an exclusion to decline the gutter replacement. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.