Text of the determination
Determination
|
Case number
|
12-25-214454
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-25-214454 24 April 2026
1 Determination overview
1.1 Complaint
The complainant held a home building and contents policy with the financial firm (insurer) in Queensland. The policy period was from 3 August 2023 to 3 August 2024. The buildings cover was $1,100,000 and there was a policy excess of $3,000.
The complainant lodged a claim on 10 June 2024 for damage due to a water leak.
The insurer made offers to resolve the accepted damage to the laundry but otherwise declined the claim based upon a policy exclusion.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
Yes. The insurer assessed the claim in accordance with the policy. The insurer has made a fair offer to resolve the claim.
Is the complainant entitled to non-financial loss compensation?
No. The complainant is not entitled to compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim.
1.3 Determination
This determination is in favour of the insurer.
Within 28 days of receiving notice of the complainant’s acceptance of the Determination, the insurer shall pay the complainant the amount of $6,436.94 for the accepted repairs.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
Yes. The insurer assessed the claim in accordance with the policy. The insurer has made a fair offer to resolve the claim.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Certificate of Insurance (together referred to as the policy).
I am satisfied that the policy has been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Proximate cause
When establishing the cause of the damage to the property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the damage is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common sense approach is taken to determine proximate cause.
Policy covered insured events subject to exclusions
The policy provided cover for leaks (page 40):
You are covered for:
Loss or damage to your home or your contents caused by liquids that are leaking, bursting, discharging or overflowing from these items or devices:
..
• pipes, gutters and drains which are fixed or connected to your home,
The policy contained exclusions (page 40):
You are not covered for:
X Loss or damage caused by:
• leaks from shower recesses or cubicles
..
X Loss or damage caused by gradual or ongoing leaks
But we do cover you if you can show:
· For your home, that the loss or damage started after you took out Home Insurance with us
· ..
· you did not know or could not have reasonably been expected to know about the leak before it caused loss or damage to your home or your contents.
X Loss or damage to the item or device which leaked
A valid claim subject to whether the exclusion was established by the insurer
The complainant lodged a claim on 10 June 2024 for damage due to a water leak.
The insurer accepted on 4 April 2025 that the complainant had made a valid claim for a leak under the policy.
Accordingly, the issue in dispute was whether, as asserted by the insurer, the cause of the damage was within the policy exclusion. The onus was on the insurer to establish the policy exclusion if it was to be entitled to decline the claim.
Complainant repaired piping and quoted for full bathroom replacement
The complainant engaged a builder to repair damaged copper piping. The builder did not provide any report or documentation regarding the pre-repair state of the bathroom or the cause of the damage to the bathroom or the laundry.
The complainant provided a quote from BC, builder, dated 28 July 2024 for main bathroom replacement based on a ‘complete strip out’ of the main bathroom and replacement as per existing layout in the amount of $73,565.33. The quote did not provide any findings regarding any leak detection test performed by BC. BC’s quote recorded that the ‘copper feeds to the shower combo [combination] have pin hole causing mist of spray’ and that the repairs included ‘existing floor/ beams due to the consistent moisture exposure over the course of 6 months’.
Insurer engaged experts and partially accepted laundry repairs
The insurer engaged AI, builders, to prepare a building assessment report (based on an inspection on 19 November 2024). AI concluded that it was ‘unable without testing [to] provide evidence of the leak’ and recommended a specialist be engaged to determine the cause of the damage.
AI engaged RP, plumber, to conduct a leak detection test. RP concluded in its report (based on an inspection on 20 September 2024):
Repairs had already been attempted by a previous contractor and the shower water supply had been disconnected from the mains water supply.
We reconnected the supply in order to carry out testing, upon testing it has been noted that the spindle bodies have been leaking back into the wall and causing internal water egress, signs point to a failed shower water proofing also however we cannot say definitively until the tap bodies problem is rectified in order to provide a clear indication.
Thermal [images] showed large amounts of water egress and moisture.
The shower base grout and seal [was] in a poor condition.
In its report, RP included a photograph which recorded ‘Tap bodies leaking behind tile and into wall cavity’. RP recommended that the complainant engage a suitably qualified trade to get the tap bodies repaired and perform more testing. RP concluded that ‘Multiple issues [in its professional opinion cause the damages to the affected area and] a second lot of testing will need to be performed once [the complainant] has rectified leaking tap bodies issue’.
On 24 September 2024 the insurer requested that the complainant perform maintenance repairs to the shower breech.
On 30 September 2024 the complainant advised the insurer that the maintenance repairs had been completed.
AI engaged TC, plumber, to conduct a further leak detection test. TC concluded in its report dated 22 November 2024 that:
Attendance Findings
Found that it had a previous leak on pipe work which another plumber has fixed.
Found mould and dampness under shower from the leak which has been repaired.
Carried out spray test on external wall to ensure no other leak present.
Repair recommendation
Subfloor to be replaced to remove mould/water damage
On 12 February 2025 the insurer advised the complainant that its repairer would be unable to warrant repairs and obtained a quote from AI for the repairs to the laundry in the amount of $5,364.12 (based on a property claims estimate by AI dated 5 November 2024). The insurer offered a 10% uplift on the cash settlement.
The insurer said on 4 April 2025:
‒ the spindle within the complainant’s shower had held a persistent leak prior to its repair
‒ given the visual indication of leaking water from the spindles included within the imagery provided by RP, it was reasonable to assume that the complainant was aware of the leaking spindle, if not the extent of the damages being caused, prior to the claim
‒ BC, the complainant’s repairer, also recorded that the existing floor damages are resultant of moisture exposure over the course of 6-months and not from a single insured event
‒ the insurer relied on the exclusion to defeat the portion of the subject claim related to the damage to the complainant’s upstairs bathroom and subfloor because the policy cover for the event ‘Leaks’ had a specific exclusion that the policy would not respond to loss or damage that is caused by leaks originating from the shower recess or cubicle.
Complainant obtained expert report after AFCA Preliminary Assessment
On 5 September 2025 the Australian Financial Complaints Authority (AFCA) provided a preliminary assessment to the parties.
Subsequent to the AFCA preliminary assessment, the insurer offered a 20% uplift if the complainant accepted the preliminary assessment, a total of $6,436.94.
The complainant did not accept the AFCA preliminary assessment or the insurer’s revised offer.
The complainant engaged BI, to prepare a report dated 18 February 2026. BI did not provide information regarding its qualifications or experience. BI reported a ‘major defect’ under the bathroom:
Subfloor damaged from pin hole leak
Upon thorough examination, it has been identified that the subfloor area is compromised due to water damage associated with a pinhole leak in the copper piping. The leak has resulted in persistent moisture exposure, leading to potential deterioration of structural components in the affected area. This persistent dampness poses a risk for further complications, including but not limited to, wood rot, mould growth, and a potential compromise in the integrity of the subfloor structure. Remedial action is advised to address the leak at its source and to evaluate the extent of the water damage, ensuring the affected materials are restored or replaced to maintain the safety and durability of the property's infrastructure. Prompt attention to this matter is crucial to prevent exacerbation of the damage and to safeguard the property's structural integrity.
The observation by BI that ‘remedial action’ was necessary to address the leak at its source was a curious one given that both the copper piping had been repaired and the shower breach had been repaired.
The report also recorded:
Bathroom
Finding: Moisture readings
The moisture readings in the shower cubicle were found to be within normal parameters, indicating no excessive moisture presence or water ingress issues. Furthermore, a thorough inspection revealed no visible signs of leakage within the cubicle, ensuring that the waterproofing measures in place are effectively maintaining the integrity of the structure. This indicates a satisfactory condition regarding moisture control and leak prevention within the shower area, supporting the overall functional condition of the space
The observation by BI in February 2026 that moisture readings were normal and there was no visible sign of leakage was not unexpected given that both the copper piping had been repaired and the shower breach had been repaired by September 2024.
BI’s report concluded:
The inspection has highlighted a significant concern within the subfloor area, where a pinhole leak in the copper piping has led to extensive water damage. This persistent exposure to moisture has the potential to degrade structural components, posing risks of wood rot, mould growth, and jeopardizing the integrity of the subfloor. Immediate remedial action is essential to rectify the leak and assess the water damage extent to ensure that the compromised materials are appropriately restored or replaced. This is imperative to maintain the property's safety and structural soundness. In contrast, the inspection found that moisture readings within the shower cubicle were within acceptable limits, with no evidence of leakage. The effective waterproofing measures in place confirm the area is in a satisfactory condition, contributing positively to the shower space's functional integrity and moisture control. Prompt attention to the subfloor issue and ongoing monitoring of the shower area are prudent to ensure continued structural stability and functionality.
Upon further review of the affected subfloor area and associated plumbing infrastructure, it is my professional opinion that the observed subfloor damage is consistent with water discharge from a pinhole leak in the internal copper supply pipe located within the wall cavity. The pattern and concentration of deterioration beneath the bathroom indicate a localised water source consistent with pressurised pipe leakage rather than minor or intermittent seepage.
Moisture readings taken within the shower cubicle were within normal parameters at the time of inspection, and there was no evidence of abnormal moisture migration, failed waterproofing, or leakage from tap spindles that would reasonably account for the extent of subfloor swelling and deterioration observed.
Based on the available evidence, the damage pattern is not consistent with gradual long-term leakage from shower fixtures or external cladding. In my professional opinion, the dominant cause of the subfloor damage was water discharge from the internal copper pipe leak
The observation by BI that the ‘pattern’ of the damage was consistent with pressurised pipe leakage (i.e. from the damaged copper piping which had been repaired) was not the subject of further explanation, analysis or images.
The insurer provided a response dated 17 April 2026:
since the initial claim was raised on 1 June 2024, a period of over 20-months had elapsed prior to the complainant gaining their independent reporting, with this reporting generated by [BI] which are not specialist in plumbing or leaks but rather in pre-purchase inspections and safety checks.
Given the significance of the period which has elapsed, in addition to the lack of specialist reporting, it is considered that the complainant’s reporting holds considerably less reliability when compared to that of [RP], who conducted their inspection on 20 September 2024; as the conditions which would now be present would greatly differ to that which was present at the time of the initial damage inspections.
Additionally, the BI report contains limited information and imagery on the layout of the damaged areas, providing no commentary on how the burst pipe is connected to the declined damages or the layout which would allow for these damages to occur from a sudden escape of liquids.
Based on the exchanged information, the report from the insurer’s plumber, RP, and prepared in September 2024 three months after the claim was clear and persuasive:
‒ the spindle bodies had been leaking back into the wall and caused internal water egress and a failed shower water proofing
‒ thermal images showed large amounts of water egress and moisture and a thermal imaging photograph recorded tap bodies leaking behind tile and into wall cavity.
By contrast, the observations by BI were not persuasive:
‒ that ‘remedial action’ was necessary to address the leak at its source
‒ particularly, in circumstances where both the copper piping and shower breech had been repaired by September 2024
‒ that moisture readings were normal and there was no visible sign of leakage
‒ particularly, in circumstances where both the copper piping and shower breech had been repaired by September 2024
‒ that the ‘pattern’ of the damage was consistent with pressurised pipe leakage (i.e. from the damaged copper piping which had been repaired)
‒ particularly, where this conclusion was not the subject of further explanation, analysis or images.
Further, the complainant’s quote from BC, the complainant’s builder, did not provide any findings regarding any leak detection test performed by BC or the cause of the damage other than the broad, generalised conclusion that the damage was consistent with moisture exposure over the course of six months. BC’s conclusion was not the subject of further explanation, analysis or images.
In those circumstances, RP’s conclusions were more persuasive that the proximate cause of the damage was that the spindle bodies which were located in the shower. According to the policy, loss or damage was excluded when it was caused by leaks from shower recesses or cubicles. The insurer has, based on the information, discharged the onus which it bore of establishing the policy exclusion. Accordingly, the insurer was entitled to decline the claim in relation to the complainant’s claimed damage for the full bathroom replacement.
The insurer, appropriately, accepted the claimed damage caused by the leaking copper pipe and made an offer (together with an uplift) based on the estimated cost of repairs to the laundry.
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. Further, if additional works are identified, the insurer will include those.
Therefore, when the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for this transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
The insurer initially offered an uplift of 10%. The AFCA preliminary assessment recommended an uplift of 20%. The insurer, in line with the AFCA preliminary assessment, increased its uplift to 20%. In the circumstances, an uplift of 20% was fair and appropriate.
The determination is in favour of the insurer. The insurer should pay the complainant the amount of $6,436.94 for the accepted repairs (being AI’s quote for the laundry repairs in the amount of $5,364.12 plus an uplift of 20%).
2.2 Is the complainant entitled to non-financial loss compensation?
No. The complainant is not entitled to compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, it can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer is not required to pay non-financial loss compensation
Based on the information, the insurer correctly assessed the claim, engaged experts, accepted partial damage and declined further claimed damage in accordance with the policy.
There is no basis for an award of non-financial loss compensation.
2.3 Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
‒ the legal principles
‒ applicable industry codes or guidance
‒ good industry practice
‒ previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
‒ available documents
‒ the recollections of the parties
‒ all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.